Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Adriana Resources Inc.

Publié le 04 juin 2008

Commences 2008 Diamond Drill Program on the Company's 100% Owned Lac Otelnuk Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter


 

Adriana Commences 2008 Diamond Drill Program on the Company's 100% Owned Lac Otelnuk Project

View News Release in PDF Format


Adriana Resources Inc. ("Adriana" or the "Company") - (TSX-V: ADI, WKN: A0F7EL) is pleased to announce that diamond drilling has resumed on the Company's 100% owned Lac Otelnuk Iron Project in the Labrador Trough, Qu�bec. All of the drill results, assays and technical data from the 2007 drill campaign are compiled and will form the basis for drilling in 2008.

In 2007, the Company completed 27 diamond drill holes totaling 2,191 meters on the South Zone of the Lac Otelnuk Iron Deposit. Results from the drilling indicate good lateral continuity of the iron formation and a significant increase in stratigraphic thickness as compared with drilling in the 1970's. The 2008 diamond drill program will focus on completing the remaining 40 holes (approximately 4,000 meters) required to test the 9,000-meter strike length of the South Zone; as recommended by Watts Griffis and McOuat Limited ("WGM"), a Toronto-based firm of independent consulting geologists and engineers contracted by Adriana to act as technical consultants to the project.

The diamond drill program is designed to define a National Instrument ("NI") 43-101 compliant inferred mineral resource estimate on the South Zone of the Lac Otelnuk iron deposit. Upon completion of drilling the South Zone, drilling will focus on extending the strike length of the deposit towards the North Zone, probing the limits of the deposit to the southeast, and testing other related magnetic anomalies. The Company recently staked 123 new claims totaling 5933.82 hectares in and around the Lac Otelnuk Project, bringing the total land position to 36,678.63 hectares.

"The Lac Otelnuk Iron Project is proving to be a significant iron formation. Recent drilling indicates that the mineralized zone is considerably thicker than indicated in the 1970s," commented Michael Beley, President of Adriana, "We look forward to the continued development of the Lac Otelnuk Iron Deposit as we seek to outline a NI 43-101 compliant resource. Lac Otelnuk could become a long term strategic asset for the world steel mills as a high quality magnetic concentrate for pellet feed."

The attached Table, "Lac Otelnuk Project - 2007 Drill Summary" contains the weighted average grades of the stratigraphic sub-units of the formation on the basis of an 18% Davis Tube Weight Recovery (DTWR) cut-off grade. Iron (% Fe) and silica (%SiO2) values for both head sample and magnetite concentrate are provided. Assaying was carried out by SGS Minerals and Midland Research Laboratories under Quality Control / Quality Assurance procedures prepared and audited by WGM. For further information and a copy of the "Drill Hole Location Base Map" and "Lac Otelnuk Drill Hole Program" drawings please refer to Adrian's website at:

http://www.adrianaresources.com/s/LacOtelnuk.asp

Mr. Frank Condon, Professional Engineer, and Adriana Director, is the Qualified Person as defined in NI 43-101, for the Lac Otelnuk Project. Mr. Condon has reviewed the technical data disclosed in this press release.

About Lac Otelnuk Iron Project

The Lac Otelnuk Iron deposit is a Lake Superior type iron formation or taconite identified over a strike length of approximately 25 kilometers based on exploration drilling (36 holes) in the 1970s and geological and geophysical mapping. The deposit is similar to the taconite deposits of the Mesabi Iron Range in northern Minnesota, where iron mining occurred for over 100 years and continues to expand into the future.

The Lake Superior type iron formations are banded sedimentary rocks composed of iron oxides, magnetite and hematite within chert. The Lac Otelnuk deposit is exposed at surface and dips gently to the northeast at 4 to 5 degrees eventually plunging under a cherty carbonate cap rock. The southwest flank of the deposit outcrops over the entire strike length. The South Zone is open along strike in both directions and down dip, constrained only by the increasing depth of the cap rock and overburden to the northeast.

Pilot plant test work done in 1977, at Lakefield Research, on a 21-ton bulk sample collected from the upper units of the North Zone of the deposit, indicated that the iron formation is amenable to conventional magnetic separation technology, yielding a good concentrate of 68.5% iron with a silica content of 3.5%, suitable for pelletizing.

The Company has retained the services of WGM to provide ongoing technical assistance through its drill program to ensure that the drilling and sampling is conducted in compliance with NI 43-101 guidelines and to industry standards. WGM has assisted the Company in setting up and monitoring its logging, sampling and assaying protocols.

WGM prepared the initial NI 43-101 technical report on the property and consequently is very familiar with the mineralization on the property. This report titled, "A Technical Review of the Lac Otelnuk Iron Property, Labrador Trough Northeastern Quebec for Adriana Resources Inc.", can be viewed at www.sedar.com (file date December 1, 2005). In the report, WGM quoted a "resource" of 623 million tonnes with 33.92% soluble iron and 25.08% magnetic iron within the North Zone and 1.145 billion tonnes of 33.06% soluble iron and 25.76% magnetic iron in the South Zone. The reader should be aware that these historic "mineral resource" estimates were prepared prior to the implementation of NI 43-101 and WGM has neither audited these estimates nor made any attempt to classify them according to NI 43-101 standards or the Council of the Canadian Institute of Mining, Metallurgy and Petroleum definitions ("CIM Standards"). They are presented because the Company and WGM consider them to be relevant and of historic significance. These estimates should not be relied upon and are provided as contextual information only.

About Adriana Resources Inc.

Adriana's goal is to become a fully integrated iron ore producer through continued development of its iron ore port facility in Brazil, through acquisition of iron ore mineral resources in Brazil, and the advancement of the Lac Otelnuk Iron Project in Quebec, Canada.

For more information, contact Robert Ferguson or Ali Sinawi at (604) 629-0250 or toll free at (877) 629-0150 or visit the Company's website at www.adrianaresources.com.

ON BEHALF OF ADRIANA RESOURCES INC.,

"Michael J. Beley"
President

Certain information regarding the Company including management's assessment of future plans and operations, may constitute forward-looking statements under applicable securities laws and necessarily involve risks associated with mining exploration and development, volatility of prices, currency fluctuations, imprecision of resource estimates, environmental risks, access to labour and services, competition from other companies and ability to access sufficient capital. As a consequence, actual results may differ materially from those anticipated in the forward-looking statements. The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release.

Lac Otelnuk Project - 2007 Drill Summary

Drill Hole
Coordinates

Rock
Unit

From
meters

To
meters

Length
meters

Head
% Fe

Head
% SiO2

DTWR
%

CONC
% Fe

CONC
% SiO2

 

 

 

 

 

 

 

 

 

 

Some of the #�s below have been automatically rounded due to decimal point calculation.

 

LO-S-1001

2a

38.7

46.5

7.8

29.9

46.4

30.2

69.9

2.3

L210/1000E

2b

46.5

53.6

7.1

33.1

40.8

34.6

70.1

2.2

 

2c

53.6

94.6

41.0

26.9

45.6

24.6

68.9

3.2

 

 

Average

38.7

94.6

55.9

28.1

45.1

26.6

69.2

2.9

 

 

 

 

 

 

 

 

 

 

LO-S-1002

2c

23.0

41.2

18.2

28.2

43.7

24.4

70.6

1.6

L270S/500W

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LO-S-1003

2b

3.0

8.7

5.7

33.4

37.5

25.7

69.1

2.7

L290/500w

2c

8.7

39.4

30.7

27.1

47.6

26.7

69.3

2.8

 

3a

39.4

50.2

10.8

25.1

48.0

10.0

70.3

2.1

 

3b

50.2

68.1

18.0

28.3

48.6

28.8

70.1

2.2

 

 

Average

3.0

68.1

65.1

27.7

47.0

24.4

69.7

2.5

 

 

 

 

 

 

 

 

 

 

LO-S-1004

2a

80.5

83.9

3.4

27.1

46.9

27.0

70.1

2.0

L210S/1500E

Hole Lost at 83.9 meters

 

 

 

 

 

 

 

 

 

 

LO-S-1005

2a

1.2

19.9

18.7

37.8

37.7

42.7

70.3

2.1

L210S/500E

2b

19.9

29.7

9.8

31.7

40.1

28.0

69.7

2.3

 

2c

29.7

57.9

28.2

27.5

46.1

26.5

69.9

2.3

 

 

Average

1.2

57.9

56.7

31.6

42.3

32.1

70.0

2.2

 

 

 

 

 

 

 

 

 

 

LO-S-1006

2b

3.6

4.7

1.1

27.6

47.3

30.7

69.3

2.6

L330S/00

2c

4.7

27.0

22.3

25.7

49.2

29.1

69.2

3.0

 

3a

27.0

41.5

14.5

25.7

49.7

24.9

68.5

4.5

 

 

Average

3.6

41.5

37.9

25.8

49.4

27.6

69.0

3.6

 

 

 

 

 

 

 

 

 

 

LO-S-1007

2a

1.7

5.9

4.2

36.4

34.8

41.3

68.6

2.8

L330S/500E

2b

5.9

17.7

11.8

32.1

44.2

36.9

69.8

2.5

 

2c

17.7

41.4

23.7

25.4

47.7

26.8

69.3

3.1

 

3a

41.4

47.5

6.1

26.1

48.1

25.1

68.0

5.8

 

 

Average

1.7

47.5

45.8

28.2

45.6

30.5

69.2

3.3

 

 

 

 

 

 

 

 

 

 

LO-S-1008

2a

2.4

22.4

20.0

35.0

38.4

40.9

69.5

2.8

L310S/500E

2b

22.4

32.1

9.7

25.4

57.2

30.9

69.5

3.0

 

2c

32.1

53.7

21.6

27.0

47.4

28.0

69.3

3.6

 

 

Average

2.4

53.7

51.3

29.8

45.8

33.6

69.5

3.2

 

 

 

 

 

 

 

 

 

 

LO-S-1009

2c

6.6

33.0

26.4

26.4

46.7

26.5

66.7

5.4

L310S/00

3a

33.0

43.0

10.0

25.6

47.1

25.6

67.6

5.0

 

 

Average

6.6

43.0

36.4

26.2

46.8

26.3

67.0

5.3

 

 

 

 

 

 

 

 

 

 

 

LO-S-1010

2c

32.4

53.0

20.6

28.0

43.4

22.8

70.7

1.7

L210S/00

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LO-S-1011

2a

3.2

10.8

7.7

37.6

34.0

43.1

68.1

3.5

L290S/00

2b

10.8

25.9

15.0

27.0

46.6

28.9

67.6

4.3

 

2c

25.9

43.8

17.9

27.0

47.0

27.2

68.7

3.0

 

3a

43.8

54.0

10.2

25.2

49.7

25.3

67.4

4.9

 

3b

54.0

72.5

18.5

27.9

48.9

30.5

68.8

2.8

 

 

Average

3.2

72.5

69.3

28.2

46.4

29.9

68.3

3.6

 

 

 

 

 

 

 

 

 

 

LO-S-1012

2a

7.5

19.5

11.9

32.1

41.8

31.0

69.1

2.5

L290S/500E

2b

19.5

47.7

28.3

33.9

40.2

39.0

68.6

3.0

 

2c

47.7

72.5

24.7

26.2

47.1

25.4

67.2

4.4

 

 

Average

7.5

72.5

65.0

30.6

43.1

32.3

68.1

3.4

 

 

 

 

 

 

 

 

 

 

LO-S-1013

2c

9.5

30.4

20.9

27.7

42.3

24.0

69.3

1.8

L230S/500W

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LO-S-1014

2c

10.5

38.1

27.6

27.6

43.9

25.9

70.1

2.1

L50S/00

3b

38.1

59.3

21.2

28.9

48.6

28.5

69.2

3.0

 

 

Average

10.5

59.3

48.8

28.1

45.9

27.0

69.7

2.5

 

 

 

 

 

 

 

 

 

 

LO-S-1015

2b

3.2

24.1

21.0

32.8

40.3

21.7

69.9

2.1

L50S/500E

2c

24.1

49.1

25.0

28.0

41.9

24.9

69.2

2.2

 

 

Average

3.2

49.1

45.9

30.2

41.2

23.5

69.6

2.2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LO-S 1016

2c

14.6

45.5

30.9

27.4

43.3

22.5

70.2

1.9

L70S/01

3a

45.5

56.0

10.5

28.1

48.7

24.2

70.0

2.7

 

 

Average

14.6

56.0

41.4

27.6

44.7

23.0

70.1

2.1

 

 

 

 

 

 

 

 

 

 

LO-S-1017

2a

8.0

24.0

16.0

32.3

43.0

34.4

69.5

3.0

L50S/1000E

2b

24.0

42.7

18.7

35.3

37.6

23.9

69.5

2.1

 

2c

42.7

73.0

30.3

28.8

44.1

25.1

69.7

2.3

 

3a

73.0

81.5

8.5

27.1

46.5

16.3

70.3

2.2

 

3b

81.5

100.0

18.5

28.4

48.2

31.0

70.3

2.4

 

 

Average

8.0

100.0

92.0

30.5

43.6

26.8

69.8

2.4

 

 

 

 

 

 

 

 

 

 

LO-S-1018

2b

2.8

26.3

23.5

34.2

40.4

19.3

69.9

2.9

L70S/500E

2c

26.3

58.0

31.7

28.2

42.9

28.4

69.9

2.2

 

3a

58.0

76.4

18.4

27.0

48.7

21.7

69.0

2.0

 

 

Average

2.8

76.4

73.6

29.8

43.6

23.8

69.7

2.4

 

 

 

 

 

 

 

 

 

 

LO-S-1019

2c

19.0

49.8

30.8

27.0

43.6

25.2

69.1

1.9

L90S/02

3a

49.8

53.8

4.0

26.8

49.3

24.6

69.5

1.9

 

3b

53.8

78.0

24.3

26.8

49.6

28.1

69.7

2.3

 

 

Average

19.0

78.0

59.0

26.9

46.5

26.4

69.4

2.1

 

 

 

 

 

 

 

 

 

 

LO-S-1020

2a

15.3

34.8

19.5

32.4

41.6

33.0

69.0

2.9

L70S/1000E

2b

34.8

53.5

18.7

32.7

42.0

25.1

68.7

3.0

 

2c

53.5

83.0

29.5

28.8

42.3

28.5

68.3

3.7

 

3a

83.0

90.0

7.0

27.3

48.1

18.4

68.7

4.4

 

3b

90.0

101.8

11.8

29.2

47.8

30.9

67.3

5.5

 

 

Average

15.3

101.8

86.5

30.4

43.3

28.3

68.4

3.7

 

 

 

 

 

 

 

 

 

 

LO-S-1021

2a

25.0

43.3

18.3

33.9

40.5

37.5

68.4

4.3

L90S/1000E

2b

43.3

56.8

13.5

35.5

37.4

33.3

66.6

3.8

 

2c

56.8

89.0

32.3

28.0

43.4

24.8

67.2

4.5

 

3a

89.0

95.2

6.2

26.6

48.9

13.1

68.6

4.5

 

3b

95.2

101.5

6.3

28.0

49.3

28.2

66.8

6.2

 

 

Average

25.0

101.5

76.5

30.6

42.6

28.7

67.5

4.4

 

 

 

 

 

 

 

 

 

 

LO-S-1022

2b

2.3

27.2

24.9

34.3

39.4

24.0

69.9

2.6

L110S/00

2c

27.2

55.3

28.2

28.0

42.3

26.5

68.8

3.4

 

3a

55.3

63.0

7.6

26.7

49.7

15.9

69.1

3.5

 

3b

63.0

83.2

20.2

28.9

48.3

33.0

68.8

3.9

 

3c

83.2

86.4

3.2

29.1

38.5

28.1

68.8

3.1

 

 

Average

2.3

86.4

84.1

30.0

43.4

26.4

69.2

3.3

 

 

 

 

 

 

 

 

 

 

LO-S-1023

2b

0.8

31.5

30.7

33.9

40.0

23.9

70.0

2.5

L90S/500E

2c

31.5

58.2

26.7

29.1

43.1

26.3

68.8

3.3

 

3a

58.2

60.8

2.5

27.3

47.9

20.6

68.0

4.6

 

3b

60.8

85.4

24.6

29.8

54.0

28.1

75.4

4.6

 

 

Average

0.8

85.4

84.6

31.0

45.3

25.8

71.1

3.4

 

 

 

 

 

 

 

 

 

 

LO-S-1024

2a

11.7

27.4

15.8

32.5

41.1

34.6

66.9

5.7

L110S/1000E

2b

27.4

43.1

15.7

35.7

35.8

40.0

66.7

5.7

 

2b,2c

43.1

52.3

9.1

26.3

47.1

27.6

67.3

4.9

 

2c

52.3

76.8

24.5

29.2

41.6

25.7

66.3

5.7

 

3a

76.8

88.8

12.0

28.2

48.2

17.9

67.8

4.8

 

3b

88.8

107.5

18.8

29.1

47.3

27.9

66.5

6.7

 

 

Average

11.7

107.5

95.8

30.4

43.1

29.2

66.8

5.7

 

 

 

 

 

 

 

 

 

 

LO-S-1025

2a

3.0

31.1

28.1

34.0

39.7

38.3

68.7

3.6

L270S/500E

2b

31.1

37.6

6.6

36.4

36.6

40.7

68.0

3.9

 

2b,2c

37.6

48.2

10.6

31.2

43.0

34.5

67.2

4.4

 

2c

48.2

66.0

17.7

26.4

45.7

22.7

66.7

4.8

 

3a

66.0

77.2

11.2

26.7

48.9

22.9

65.1

7.2

 

3b

77.2

80.9

3.7

21.1

47.6

25.2

65.4

5.8

 

 

Average

3.0

80.9

77.9

30.4

43.0

31.6

67.3

4.7

 

 

 

 

 

 

 

 

 

 

LO-S-1026

2a

1.1

2.4

1.2

36.9

42.1

46.4

68.3

4.4

L230S/500E

2b

2.4

31.7

29.3

35.2

39.8

36.0

68.4

3.0

 

2b,2c

31.7

38.0

6.3

26.6

46.4

29.5

66.4

4.8

 

2c

38.0

56.6

18.6

27.1

45.1

28.2

64.8

6.3

 

3a

56.6

66.3

9.7

26.3

45.8

18.7

65.6

6.4

 

3b

66.3

71.8

5.5

26.2

50.5

24.2

66.0

5.7

 

 

Average

1.1

71.8

70.7

30.4

43.4

30.2

66.6

4.7

 

 

 

 

 

 

 

 

 

 

LO-S-1027

2a

1.3

14.5

13.2

31.2

42.4

31.9

67.6

3.8

L250S/500E

2b

14.5

42.9

28.4

34.0

40.4

33.7

68.4

3.2

 

2b,2c

42.9

46.0

3.2

22.9

46.4

22.1

67.3

5.6

 

2c

46.0

64.1

18.1

27.0

44.7

22.0

67.5

4.1

 

3a

64.1

67.0

2.9

28.2

50.6

20.7

65.7

7.3

 

 

Average

1.3

67.0

65.7

30.7

42.8

29.0

67.9

3.8

 

 

 

 

 

 

 

 

 

 

 

Old drill hole re-assayed

 

 

 

 

 

 

 

 

 

 

76-130S-2

2a

18.3

46.4

28.1

33.1

38.7

37.5

65.1

5.9

L130S/1000E

2b

46.4

61.6

15.3

23.6

51.2

26.8

62.6

5.8

 

 

Average

18.3

61.6

43.3

29.7

43.1

33.7

64.2

5.8

 


Suite 1818 - 701 West Georgia St
Vancouver, BC
Canada V7Y 1C6

Telephone: 604.629.0250
Fax: 604.629.0923
Toll Free: 877.629.0150
Email:
info@adrianaresources.com


(TSX-V: ADI)


Jun 04, 2008: News Releases: Adriana Commences 2008 Diamond Drill Program on th... (more...)

May 29, 2008: News Releases: Adriana Reaches Milestone in Brazil Port Permittin... (more...)

May 16, 2008: News Releases: Adriana Appoints Michael Petrina Vice President Op... (more...)

May 08, 2008: News Releases: Adriana Announces Dr. Anthony Patriarco Joins Boar... (more...)


 
 

Adriana Resources Inc.

EXPLORATEUR
CODE : ADI.V
ISIN : CA00735P1062
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Adriana Res. est une société développant des projet miniers de fer basée au Canada.

Adriana Res. détient divers projets d'exploration au Bresil, au Canada et en Finlande.

Ses principaux projets en exploration sont MUSTAVAARA en Finlande, BRAZORE LTDA et MACKENZIE IGNEOUS EVENT au Bresil et UNAD JV au Canada.

Adriana Res. est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,6 millions CA$ (1,2 millions US$, 1,1 millions €).

La valeur de son action a atteint son plus haut niveau récent le 05 mai 2006 à 2,03 CA$, et son plus bas niveau récent le 29 avril 2024 à 0,01 CA$.

Adriana Res. possède 157 554 238 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Adriana Resources Inc.
2008 Annual Report
Annual Report 2007
Financements de Adriana Resources Inc.
22/05/2011Continues Negotiations
15/02/2011Announces Signing $28 Million Private Placement With WISCO
31/12/2009Announces Flow-Through Private Placement Closing
17/12/2009Announces C$4 Million Flow-Through Financing and New Chairma...
15/11/2007Announces $30 Million Private Placement
Attributions d'options de Adriana Resources Inc.
18/09/2009Engages Investor Relations Specialists & Grants Incentive St...
19/08/2009Grants Incentive Stock Options
16/06/2009Grants Incentive Stock Options
26/06/2008Grants Incentive Stock Options
Nominations de Adriana Resources Inc.
09/04/2013The Company Appoints a Director, Metallurgical
11/03/2013Announces Resignation of a Director of the Company
04/02/2013The Company Appoints a Director, Environment and Sustainabil...
20/07/2009Appoints Allen J. Palmiere to Board of Directors
20/11/2008Appoints Director of Port Development for Brazil Operations
25/06/2008Appoints Joseph Fodor as Executive Vice President
16/05/2008Appoints Michael Petrina Vice President Operations
02/04/2008Appoints Paul Yeou to the Board of Directors
Projets de Adriana Resources Inc.
23/10/2013(Lac Otelnuk)The Company Awards Feasibility Study Contract for Lac Otelnu...
15/08/2013(Lac Otelnuk)on Corporate Position And Progress on Lac Otelnuk Project
22/10/2012(Lac Otelnuk)Provides Project Update for Lac Otelnuk
20/03/2011(Lac Otelnuk)Announces Assay Results
17/01/2011(Lac Otelnuk) Adriana Announces Strategic Partnership with WISCO
12/02/2009(Lac Otelnuk)Confirms Lac Otelnuk Iron Deposit Over 22.5 Square Kilometre...
29/01/2009(Lac Otelnuk)Commences Resource Estimate at Lac Otelnuk Iron Project
25/11/2008(Lac Otelnuk)Completes 2008 Exploration Program At Lac Otelnuk Iron Proje...
09/07/2008(Lac Otelnuk)Drills 1,730 Meters at Lac Otelnuk; Completes Geophysics on ...
04/06/2008(Lac Otelnuk)Commences 2008 Diamond Drill Program on the Company's 100% O...
29/05/2008Reaches Milestone in Brazil Port Permitting
03/04/2008(Lac Otelnuk)Reports Results at Lac Otelnuk - Drills 95.8m of 30.4% Fe
19/02/2008(Lac Otelnuk)Announces Update on Lac Otelnuk Drill Program
10/01/2008(Brazore Ltda) Completes Purchase of Brazilian Port Land; Achieves First P...
Communiqués de Presse de Adriana Resources Inc.
30/05/2016Adriana Files Financial Statements for the Quarter Ended Mar...
09/05/2016Adriana Provides Shareholder Update
01/04/2016Adriana Announces Change Of Director And Change Of CFO
31/03/2016Adriana Announces Change of Director and Change of CFO
26/02/2016Adriana Files Annual Financial Statements Ended December 31,...
04/01/2016Adriana Funds the Lac Otelnuk Joint Venture beyond 2020
06/11/2015Adriana Files Third Quarter Financial Statements Ended Septe...
06/08/2015Adriana Files Second Quarter Financial Statements ended June...
23/04/2015Adriana announces that it has filed a NI 43-101 Technical Re...
23/04/2015Adriana announces completion of the Feasibility Study on the...
22/04/2015Adriana Announces Completion of the Feasibility Study on the...
06/03/2015Vista Partners Publishes March 2015 Macroeconomic & Investme...
26/02/2015Adriana Files Financial Statements for the Year Ended Decemb...
06/02/2015Vista Partners Publishes February 2015 Macroeconomic & Inves...
06/11/2014Adriana Files Third Quarter ended September 30, 2014
21/10/2014Adriana Announces its Participation in Feasibility Study for...
18/09/2014Adriana Grants Incentive Stock Options
08/08/2014Adriana Files Second Quarter Ended June 30, 2014
03/07/2014Vista Partners Publishes July 2014 Macroeconomic & Investmen...
17/06/2014Adriana Grants Incentive Stock Options
08/05/2014Adriana Announces Results of the Financial Quarter ended Mar...
04/04/2014Vista Partners Publishes April 2014 Macroeconomic & Investme...
30/10/2013Announces Completion of Mineral Resource Estimate
13/04/2011(Lac Otelnuk)Announces Positive Preliminary Economic Assessment on Lac Ot...
25/01/2011Adriana Res. announces grant of 947.500 incentive options at...
01/12/2009BNN - Chinese Demand For Iron Ore - Interview with Adriana C...
25/11/2009Announces Management and Board Changes
17/08/2009Announces Approval Of Amended Arcelormittal Convertible Debe...
24/07/2009Enters into Memorandums of Understanding with a Major Chines...
01/06/2009ArcelorMittal Extends Port Agreement with Adriana
09/03/2009& Stock Research Portal
06/01/2009Arcelormittal Extends Port Agreement with Adriana
12/11/2008Goldbard Cancels Agreement to Acquire MIE Metals Corp.
05/11/2008Iron sector hit by global slowdown
12/09/2008Closes $10 Million Financing
10/09/2008Goldbard Enters Agreement to Acquire MIE Metals Corp.
25/08/2008featured in the Globe and Mail
20/08/2008Partners With ArcelorMittal
11/08/2008Announces $2 Million Financing
02/07/2008We're Moving!
20/06/2008featured in Global Mining Finance
09/05/2008 Shareholders Approve Shareholder Rights Plan
09/05/2008Announces Dr. Anthony Patriarco Joins Board of Directors
08/04/2008 Adopts Shareholder Rights Plan
25/03/2008 Acquires Labrador Trough Iron Prospect
20/02/2008 Signs Letter of Intent with Makivik Corporation
14/02/2008Announces Brazilian Iron Ore Focus and Project Spin-Out
15/01/2008 Announces Conversion of Convertible Debentures
22/11/2007 Closes First Tranche of $30 Million Financing; Exercises Po...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (ADI.V)OTHER OTC (ANARF)
0,010+0.00%0,143+0.13%
TSX-V
CA$ 0,010
29/04 10:30 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,010
Année b/h Var. YTD
0,010 -  0,020 -%
52 sem. b/h var. 52 sem.
0,010 -  0,035 -66,67%
Volume var. 1 mois
191 100 -%
24hGold TrendPower© : 27
Produit
Développe
Recherche Iron - Vanadium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-50,00%
2023-20,00%0,040,02
2022-85,29%0,240,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$+0,52%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,46 US$-6,22%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX+2,68%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,72 CA$-4,61%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$-4,35%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,74 CA$-8,42%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,18 US$-3,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :