Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Les systèmes malthusiens donnent à leurs auteurs toutes les apparences de l'action généreuse, alors qu'ils organisent la misère et la ruine
Jacques Rueff  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1386,20-1,40
Silver 22,36-0,14
Platinum 1447,50-10,00
Palladium 724,00-11,00
MARCHES MONDIAUX
DOWJONES 1530312
NASDAQ 34590
NIKKEI 14612128
ASX 4964-77
CAC 40 3957-10
DAX 8305-47
HUI 255-3
XAU 97-3
MONNAIES (€)
AUS $ 1,3402
CAN $ 1,3332
US $ 1,2933
GBP (£) 0,8548
Sw Fr 1,2430
YEN 130,7400
RATIOS & INDEXES
Gold / Silver61,99
Gold / Oil14,77
Dowjones / Gold11,04
MATIERES PREMIERES
Copper 3,27-0,03
WTI Oil 93,87-0,38
Nat. Gas 4,22-0,04
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet
======================================================================
Re: News Releases - Thursday, April 24, 2008
Scorpio Commences Production Mining at the Nuestra Senora
Project, Mexico
======================================================================

Vancouver, April 24, 2008 - Scorpio Mining Corporation (TSX:SPM) is
pleased to announce the commencement of production mining from the
first stope in the Hoag Zone at its 100% owned Nuestra Senora project,
Sinaloa State, Mexico. The Hoag Zone has been developed on three levels
and stope preparation is virtually complete for long-hole mining.

The first long-hole production blast in Block 10-15 of the Hoag zone
was completed on Friday April 18, 2008, and since then long-hole
drilling has been completed for the entire block. With this first
production blast, block 10-15 is now open on its full width of 20
metres. It is located between levels 10 and 10.5 and contains a total
of 21,298 metric tonnes (MT). The first blast of this stope provides an
extra 3,866 MT to the stockpiles, which currently contain 79,000 MT. A
second stope from the Hoag zone, Block 10-13, is ready and will
eventually provide to the operation another 30,804 MT.

Peter J. Hawley, Chairman, CEO comments, "The first long-hole
production blast in Block 10-15 represents one more important benchmark
the Company has achieved according to schedule and within budget. The
development in ore has confirmed the continuity and homogeneity of the
mineralization within the Hoag Zone and supports our planned mining
method. The production ore will be transported to the current Stockpile
#2 at the mill site, which will be processed following mill
commissioning from development ore in Stockpile #1. In addition to the
Hoag Zone, development and stope preparation is ongoing in the Main NW
and Santa Teresa Extension zones, where long-hole and room-and-pillar
mining methods will be used. Along with other areas currently being
prepared for higher grade selective mining, we are confident that we
will achieve full production according to schedule."

President, Mr. D. Roger Scammell, PGeo, is the Company's Qualified
Person for the Nuestra Se�ora project. Mr. Scammell is responsible for
the current exploration and development program and has reviewed the
content of this release.

ON BEHALF OF SCORPIO MINING CORPORATION

Peter J. Hawley
Chairman & CEO

For further information contact:
Glenn Little, Jackson Little Holdings Ltd: 604-930-4375; 1-888-930-4375
Email: jlconsulting@telus.net
Rich Kaiser, YES International: 1-800-631-8127; 001-757-306-6090
(outside North America)
Email: yes@yesinternational.com

This news release includes certain statements that may be deemed
"forward-looking statements" within the meaning of the United States
Private Securities Litigation Reform Act of 1995 and applicable
Canadian securities legislation. Forward-looking statements include,
but are not limited to, statements with respect to the future price of
silver, zinc, copper, lead and gold, the timing of construction and
production activities, the mine life of the Nuestra Se�ora Project, the
economic viability and estimated internal rate of return of the Nuestra
Se�ora Project, the estimation of mineral reserves and mineral
resources, the results of drilling, estimated future capital and
operating costs, projected mineral recovery rates, requirements for
additional financing and Scorpio Mining Corporation's commitment to,
and plans for developing the Nuestra Se�ora Project. Generally, these
forward-looking statements can be identified by the forward-looking
terminology such as "plans", "expects"' or "does not expect", "is
expected", "budget", "scheduled", "estimates", "projects", "intends",
"anticipates", or "does not anticipate", or "believes", or "variations
of such words and phrases or state that certain actions, events or
results "may", "can", "could", "would", "might", or "will" be taken",
"occur" or "be achieved". Forward-looking statements are subject to
known and unknown risks, uncertainties and other factors that may cause
the actual results, level of activity, performance or achievements of
Scorpio Mining Corporation to be materially different from those
expressed or implied by such forward-looking statements, including but
not limited to: risks related to the exploration and potential
development and construction of the Nuestra Se�ora Project, risks
related to international operations, construction delays and cost
overruns, the actual results of current exploration, development and
construction activities, conclusions of economic evaluations, changes
in project parameters as plans continue to be refined, future prices of
silver, zinc, copper, lead and gold, as well as those factors discussed
in the sections relating to risk factors of our business filed in
Scorpio Mining Corporation's required securities filings on SEDAR,
including its Annual Information Form dated March 26, 2008. Although
Scorpio Mining Corporation has attempted to identify important factors
that could cause results to differ materially from those contained in
forward-looking statements, there may be other factors that cause
results to be materially different from those anticipated, described,
estimated, assessed or intended.

There can be no assurance that any forward-looking statements will
prove accurate, as actual results and future events could differ
materially from those anticipated in such statements. Accordingly,
readers should not place undue reliance on forward-looking statements.
Scorpio Mining Corporation does not undertake to update any
forward-looking statements that are incorporated by reference herein,
except in accordance with applicable securities laws.

======================================================================
Copyright (c) 2008 SCORPIO MINING CORPORATION (SPM) All rights
reserved. For more information visit our website at
http://www.scorpiomining.com/ or send mailto:scorpio@scorpiomining.com
Message sent on Wed Apr 23, 2008 at 2:56:18 PM Pacific Time
======================================================================
.
Tweet

Scorpio Mining Corporation

PRODUCTEUR
CODE : SPM.TO
CUSIP : 80917V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Scorpio Mining Corporation
2007 Annual Report
Financements de Scorpio Mining Corporation
05/05/2011Debt Free with Repayment of Debentures
06/05/2008Closes Bought Deal Financing
Attributions d'options de Scorpio Mining Corporation
06/03/2007Announces Grant of Incentive Stock Options
Nominations de Scorpio Mining Corporation
18/04/2011Appoints New CFO
22/01/2011Scorpio Mining Announces Appointment of Jonathan Berg Resig...
22/07/2010Appoints New Chairman
02/03/2010Appoints Pierre Lacombe, Eng., to the Board
17/02/2010Appoints Mexico Country Manager
05/01/2010Appoints New Director to the Board
30/01/2008Appoints New Director To The Board
Rapports Financiers de Scorpio Mining Corporation
18/03/2013Reports Fourth Quarter and Year-End Financial Results for 20...
08/11/2012Reports Third Quarter Results - Cost reduction programs are ...
04/11/2011Announces Third Quarter Financial Results
29/07/2011Announces Second Quarter Financial Results
19/05/2011Reports Record Silver Production in Q1 2011 and Increases Mi...
01/04/2011Announces Fourth Quarter and Year-End Financial Results for ...
16/11/2010Announces Third Quarter 2010 Financial Results
17/08/2010Second Quarter 2010 Financial Results
01/04/20102009 Year-end and Fourth Quarter Financial Results
15/08/2009Announces Second Quarter 2009 Results
14/05/2009Announces First Quarter 2009 Results
Projets de Scorpio Mining Corporation
30/01/2012(Nuestra Senora)Advances Expansion Planning to Increase Production Capacity ...
07/11/2011(San Rafael - 120 Zone)Announces High-Grade Results from San Rafael Drilling; Six R...
27/06/2011(Nuestra Senora)to Advance Feasibility Study of an Additional Plant and Plan...
17/03/2011(Cosala District)Acquires Additional Mineral Concessions inCosal=E1 District ...
13/03/2011(Nuestra Senora)Reports Nuestra Senora Mineral Reserve of 2.764 Mt @287 AgEq...
14/01/2011(Nuestra Senora)Reports Record 2010 and Fourth Quarter Production Results an...
03/12/2010(La Verde Sinaloa)Reports Drill Results Targeting Titan 24 DCIP Anomalies at t...
06/05/2010(Nuestra Senora)Drilling Reports 42.4 metres grading 198.03 g/t Silver, 1.37...
05/11/2009(San Rafael - Main & Upper Zone)Reports Drill Highlights of Platte River Gold=E2??s La Verde...
26/02/2009(Nuestra Senora)Reports on Drilling of the Main Zone from the 9th Level
06/11/2008 Drilling of the North West Main Zone from the 10th Level Co...
04/11/2008(Nuestra Senora)Provides October Operations Update on Nuestra Senora Mine, M...
06/10/2008(Nuestra Senora)Continues to Increase Lead-Zinc Concentrate Production at Nu...
06/09/2008(Nuestra Senora)?s Drilling of the North West Main Zone Intersects 13,671 g/...
03/09/2008(Nuestra Senora)Provides Operations Update on Nuestra Senora Project, Mexico
03/07/2008(Nuestra Senora)Drilling on 9th Level of the Main Zone Reports 5.80 metres g...
16/06/2008(Nuestra Senora)Mexican Subsidiary Enters Into Agency Agreement for Marketin...
09/06/2008(Nuestra Senora)Hosted its Mine / Mill Inauguration at the Nuestra Senora Pr...
13/05/2008(Nuestra Senora)Receives New Resource Estimate
05/05/2008(Nuestra Senora)Drilling of the Main Zone from the 8th Level of the Nuestra ...
24/04/2008(Nuestra Senora) Commences Production Mining at the Nuestra Senora Project, ...
11/04/2008(Nuestra Senora)Discovers Another New Zone Reporting 11.50 metres grading 16...
31/03/2008(Nuestra Senora)Receives Mill Facility Construction Completion Certificate A...
18/03/2008(Nuestra Senora)Santa Teresa Extension Continues to Produce High-Grade Resul...
12/03/2008(Nuestra Senora)Nuestra Senora Main Zone Increases In Size With Underground ...
28/02/2008(Nuestra Senora)Santa Teresa Deposit Continues to Deliver with Underground D...
26/02/2008(Nuestra Senora) Reports on Mineralized Stockpile for Initial Mill Throughpu...
16/01/2008(Nuestra Senora)Underground Drilling of Santa Teresa Deposit Reports 32.8 me...
02/11/2007(Nuestra Senora)Deep Drilling of Nuestra Senora Deposit From 11th level Hits...
02/10/2007Reports High-Grade Intercept of 1,158 g/t Ag, 29.95% Zn, 4.2...
25/09/2007(Nuestra Senora)Scorpio's Underground Drilling of Sept 9 Zone Hits 1,483 g/t...
19/09/2007(Nuestra Senora)Underground Drilling of Nuestra Señora Deposit Hits 21 metr...
30/08/2007(Nuestra Senora)Mexico Team Fully Staffed and Ready for Production
20/08/2007(Nuestra Senora)Scorpio's Underground Drilling from the 9th Level of Nuestra...
13/08/2007(Nuestra Senora)Scorpio's Underground Drilling of Nuestra Senora Deposit Hi...
08/08/2007(Nuestra Senora) Provides Nuestra Senora Project Update, Sinaloa State, Mexi...
30/07/2007(Nuestra Senora)First Ever Surface Drilling of Santo Domingo Satellite Depos...
10/07/2007(Nuestra Senora)8 Level Underground Drilling of Nuestra Señora Deposit Repor...
14/06/2007AMENDED: Scorpio Receives Positive Results from the Pre-Feas...
13/06/2007(Nuestra Senora)Receives Positive Results from the Pre-Feasibility Study on ...
08/06/2007(Nuestra Senora)2007 Technical report
23/04/2007(Nuestra Senora)Drilling of Nuestra Señora Main Zone Reports 4.4 metres grad...
26/03/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 11 Mineralized Intercep...
19/03/2007(Nuestra Senora)Drilling of Nuestra Senora Zone Hits 8 Mineralized Intercept...
21/02/2007(Nuestra Senora)Receives Metallurgical Test Work and Moves Forward
Communiqués de Presse de Scorpio Mining Corporation
22/05/2013Reports New Mineral Reserve Estimate for Nuestra Señora and ...
09/10/2012Deepens Hole EC-109 at New El Cajón La Emma Zone and Int...
17/09/2012Announces 2012 Corporate Update, Action Plan
18/07/2011Provides Exploration Update on its Projects in Mexico
13/07/2011Maintains Strong Production Levels in Second Quarter 2011
15/12/2010Announces Further Corporate Update
10/12/2010Provides Corporate Update
11/11/2010Names Parviz Farsangi CEO as Peter Hawley Retires
30/08/2010Completion of Titan-24 Geophysical Survey - Plans Exploratio...
26/05/2009Provides April 2009 Update
04/05/2009Provides Update Following Mexican Government Directive
22/04/2009Provides March 2009 Update
19/03/2009Provides February 2009 Update
22/12/2008Provides November-December Update and January 2009 Forecast
05/08/2008Begins Shipments Of Concentrates From Its 100% Owned Nuestra...
06/08/2008GOLD CORPORATION SIGNS LETTER OF INTENT WITH CINCORO CAPITAL...
07/07/2008Drilling of Santa Teresa Zone reports 1.60 metres grading 1,...
18/04/2008Granted Increase on Mill Processing Permit and Connects Nues...
25/03/2008Defines the "Jewel Box" Trend within the Northwest Sector of...
19/03/2008Announces Termination of Merger Between Scorpio Gold and Bac...
06/12/2007and BacTech Mining Corporation Seek Shareholder Approval to ...
19/11/2007NEWS OUT(GOLD): RSM.TSXV-ROYAL STANDARD MINERIALS-PRODUCTION
08/11/2007Additional Deep Drilling of Sept 9 Zone from 11th level of t...
30/10/2007 Signs Definitive Agreement for Merger with BacTech and Move...
07/09/2007Sign Letter of Intent with Bactech Mining Corporation for Sa...
27/06/2007Surface Drilling of Satellite Santa Teresa Deposit Reports 1...
25/06/2007Makes Production Decision on its 100% Owned Nuestra Senora P...
28/05/2007Pre-Feasibility Update
16/05/2007Creates Gold Subsidiary
30/04/2007Announces Change of Officer
10/04/2007Construction of a 33-Kv Line to Connect the Comederos Hydro ...
04/04/2007Infill Drilling of the Hoag Zone Continues to Demonstrate Co...
13/03/2007Receives Positive Metallurgical Test Work on the Hoag Zone, ...
26/02/2007Hits 5.2 metres of 171.96 g/t Ag, 11.36% Zn, 2.27% Cu, 4.81%...
23/02/2006(Nuestra Senora)adds tonnage to Nuestra Senora estimate
29/11/2005(Nuestra Senora)drills 14 holes in Nuestra Senora
15/08/2005(San Rafael - Main & Upper Zone)adds more land to Cosala
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SPM.TO)FRANKFURT (SZ7.F)
0,470-2.08%0,351+0.57%
TORONTO
CA$ 0,470
24/05 15:42 -0,010
-2,08%
Cours préc. Ouverture
0,480 0,470
Bas haut
0,460 0,470
Année b/h Var. YTD
0,450 -  1,19 -56,48%
52 sem. b/h var. 52 sem.
0,450 -  1,25 -48,91%
Volume var. 1 mois
155 022 -2,08%
24hGold TrendPower© : -44
Produit Copper - Gold - Lead - Silver - Zinc
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-53,92%
2012-48,74%2,200,48
2011103,06%2,430,85
201053,13%1,250,61
2009204,76%0,750,25
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois