Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Pele Mountain Resources Inc

Publié le 05 mars 2010

Completes VTEM Survey at Pigeon River, Identifies Several Priority Ni-Cu-PGE Exploration Targets

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Nickel | Uranium |

Pele Mountain Completes VTEM Survey at Pigeon River, Identifies Several Priority Ni-Cu-PGE Exploration Targets

<!--[if gte mso 10]-->

Symbol: GEM
Listing:  TSX Venture Exchange
Common Shares Outstanding: 101,843,608
 
 

FOR IMMEDIATE RELEASE


March 5, 2010 -
Toronto - Pele Mountain Resources Inc. (TSX Venture: GEM) ("Pele" or the "Company") today announced the completion of a 1,015 line-kilometre Versatile Time-Domain ElectroMagnetic ("VTEM") airborne survey over its Pigeon River property in the Thunder Bay area of Northern Ontario.  Pele has staked more than 500 additional mining claim units since introducing the project in January and its total land package now exceeds 24,000 hectares (240 km2).  The property covers large unexplored magnetic targets with the potential to host nickel ("Ni"), copper ("Cu"), and platinum group elements ("PGE") mineralization.

 

Pele President and CEO Al Shefsky stated, "Our property is ideally situated in the Mid Continent Rift, near the basal contact of the Duluth Complex.  The survey shows magnetic and conductive trends with similarities to known Ni/Cu/PGE deposits in similar geological settings.  We are particularly encouraged by the correlation of conductivity with a known, anomalous, Geological Survey of Canada (GSC) Ni/Cu lake sediment sample.  These results have increased our confidence in the potential of the Pigeon River property and we will prioritize exploration in this area in the months ahead."

 

The Pigeon River property lies in the Proterozoic, Superior Mid Continent Rift, a geological setting with proven potential to host mafic/ultramafic igneous systems associated with the rifting of the Archean cratons.  Recent discoveries in this setting include Kennecott`s Ni/Cu/PGE deposits at Eagle (in Michigan) and Tamarac (in Minnesota) and Magma Metals' PGE deposits to the northeast of Thunder Bay.   Pele's exploration targets at Pigeon River are: a massive sulphide deposit similar to the Eagle, Tamarac, and Magma deposits, magmatic sulphide deposits hosted in an ultramafic body or conduit; and disseminated sulphides similar to the vast, but lower grade, Ni/Cu deposits of the Duluth Complex, located immediately to the south of the project.

 

The VTEM survey was flown over the Pigeon River East Block by Geotech Ltd. of Aurora, Ontario.  The survey has defined linear magnetic features with the potential for mafic/ultramafic conduit systems and feeder dykes into larger mafic/ultramafic intrusions.   Preliminary analysis by the geophysical contractor indicates the presence of a number of, possible sulphide-related conductors, coincident with conduit-type magnetic features and other, larger, conductive anomalies with similarities to known mineralized layered mafic/ultramafic complexes.   Conductive zones, possibly sulphide-related, are also found in the vicinity of a GSC lake sediment anomaly which gave anomalous values of 234 parts per million (ppm) Ni and 298 ppm Cu1.


Geotech has identified several high-priority, drill-ready, targets from the survey.  Other priority targets require further definition through prospecting and follow-up geophysical surveys, which are planned after spring break-up.   The targets are generally till or swamp covered and no previous prospecting, mapping, or geophysical surveys, other than an airborne magnetic survey flown by the GSC in 1964, are known. 

 

Maps showing the Pigeon River project area are available on the Pele website at http://www.pelemountain.com/pdfs/PigeonRiver_Map_PR.pdf.

 

This news release has been reviewed and approved by Peter Dimmell, P.Geo. (NL, Temp ON), a Pele Director and a Qualified Person under National Instrument 43-101.

 

About Pele

Pele Mountain Resources has generated and advanced high-quality mineral projects for more than a decade, discovering and developing the mineral wealth of Northern Ontario. At its vast Eco Ridge Mine uranium project, Pele is focused on the sustainable development of a safe, secure, and reliable operation near Elliot Lake.

At its high-grade Highland gold properties, Pele's goal is to identify mineable, near-surface gold resources. At its over 100 square mile Pigeon River project, Pele has completed a VTEM survey over large unexplored magnetic targets in search of Ni/Cu/PGE deposits. The Company also holds the Ardeen Gold and Sudbury Nickel projects, which are actively explored under option agreements with Coventry Resources Ltd. and Wallbridge Mining Company, respectively. Pele's shares are listed on the TSX Venture Exchange under the symbol "GEM".

 

For further information please contact Al Shefsky, President, at (800) 315-7353, or visit the Pele website at www.pelemountain.com.

 

1   Note: Lake Sediment sample values when regressed against LOI gave 156 ppm Ni (mean 22.6 ppm) and 136 ppm Cu (mean 37.5 ppm) - GSC OFR 2179.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.  Some of the statements contained in this release are forward-looking statements, such as estimates and statements that describe Pele's future plans, objectives or goals, including words to the effect that Pele or management expects a stated condition or result to occur. Since forward-looking statements address future events and conditions, by their very nature, they involve inherent risks and uncertainties. Actual results in each case could differ materially from those currently anticipated in such statements. The economic viability of the 43-101 mineral resource at Pele's Elliot Lake Project has not yet been demonstrated by a preliminary feasibility study.


 
Sent By:
Pele Mountain Resources
2200 Yonge Street
Suite 905
Toronto Ontario M4S 2C6
To view as a web page.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Pele Mountain Resources Inc

EN DÉVELOPPEMENT
CODE : GEM.V
ISIN : CA7059071034
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Pele Mountain Res. est une société d’exploration minière et d'uranium basée au Canada.

Pele Mountain Res. est en développement de projets de rare earth au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est ECO RIDGE au Canada et ses principaux projets en exploration sont HIGHLAND (EAST / WEST), ARDEEN, ALLIANCE, SUDBURY et FESTIVAL au Canada.

Pele Mountain Res. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 6,3 millions CA$ (4,6 millions US$, 4,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,62 CA$, et son plus bas niveau récent le 02 juin 2017 à 0,01 CA$.

Pele Mountain Res. possède 210 000 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Pele Mountain Resources Inc
24/10/2007 Advances Baseline Environmental Studies at Elliot Lake Uran...
Financements de Pele Mountain Resources Inc
23/09/2016Pele Mountain Enters Into Funding Agreement
13/04/2015Announces Closing of Private Placement
03/10/2013Announces Closing of Private Placement Offering
26/07/2013Announces Closing of Private Placement Offering
04/07/2013Announces Closing of Second Tranche of a Private Placement O...
Nominations de Pele Mountain Resources Inc
11/02/2014Nominates Janis Peleshok to its Board of Directors
27/11/2013John Wilkinson Former Ontario Cabinet Minister Joins Pele Mo...
07/11/2007 Appoints Fergus Kerr Vice-President of Uranium Operations t...
09/05/2007Appoints James Andersen as Chief Financial Officer and Renew...
Projets de Pele Mountain Resources Inc
09/10/2013Interview with Roger Payne P. Eng. Executive Vice President ...
12/09/2013(Eco Ridge)Reviews Economics at Its Eco Ridge Mine Rare Earth and Urani...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
10/06/2013(Eco Ridge)Announces Major Increase in Uranium and Rare Earth Resources...
28/05/2013(Festival)Announces Reactivation of Festival Project Joint Venture Nea...
03/04/2013(Eco Ridge)to Update Eco Ridge Resource Estimate
29/01/2013Hits Higher Grade Uranium & Rare Earths at Elliot Lake
17/01/2013(Eco Ridge)Drilling Expands Eco Ridge Deposit
16/10/2012(Eco Ridge)Begins 6,500-Metre Drill Program at Its Eco Ridge Mine Rare ...
27/09/2012Samples High Grade Rare Earths at Mountain Pass
26/09/2012Closes Acquisition of Mining Claims 1800 Metres from Molycor...
15/05/2012(Eco Ridge)Closes Highland Project Sale Agreement; Will Focus on Eco Ri...
17/04/2012(Eco Ridge)Enters Agreement to Sell Highland Gold Projects; Will Focus ...
16/04/2012(Eco Ridge)Announces Robust Updated PEA for Eco Ridge Mine Rare Earths ...
06/03/2012Enters Agreement to Acquire Rare Earth Mining Claims Surroun...
13/10/2011(Eco Ridge)Announces Discovery of Continuous Rare Earths Mineralization...
07/09/2011(Eco Ridge)Files Preliminary Economic Assessment for Eco Ridge, Providi...
05/07/2011(Eco Ridge)Announces Preliminary Economic Assessment for Eco Ridge Mine...
26/05/2011(Eco Ridge)Launches 7,000 Metre Drill Program at Its Eco Ridge Mine Rar...
17/05/2011(Eco Ridge)Receives Mining Leases at Its Eco Ridge Mine Rare Earths and...
07/03/2011(Ardeen)Provides Gold Projects Update
24/02/2011(Eco Ridge)Announces Total Rare Earth Oxide Resources of 52-Million Pou...
24/01/2011(Eco Ridge)Announces Major Increase in Indicated Resources at its Eco R...
25/06/2010(Highland (east / West))Initiates Permitting Process to Mine Gold Bulk Sample
04/03/2010(Highland (east / West))Hits High Grade Gold at Highland’s A-Zone
18/01/2010(Highland (east / West))Begins Drilling at East Highland Gold Project
23/12/2009(Highland (east / West))Samples 14.76 g/t Gold Over 3.6 Metres at Its East Highland ...
11/12/2009(Highland (east / West))Samples 50 g/t Gold, 161 g/t Silver 4.3% Zinc, and 1.2% Lead...
10/11/2009(Highland (east / West))Discovers New Mineralized Zones, Expands Others, at East Hig...
17/09/2009Finds More High-Grade Gold at East Highland
01/09/2009(Ardeen)Coventry Resources Commences Diamond Drilling at Pele Mounta...
11/08/2009(Highland (east / West))High-Grade Gold Discovery at Its Highland Project
27/07/2009(Eco Ridge)Signs Agreement With the City of Elliot Lake for Surface Rig...
09/01/2009(Eco Ridge)Advances Eco Ridge Mine Project - Extensive Drill Program Re...
08/01/2009(Sudbury)Wallbridge Mining Company to Continue Exploration at Pele Mo...
09/09/2008(Eco Ridge)Initiates Permitting Process at Eco Ridge
26/08/2008(Eco Ridge)assembles team of uranium industry leaders to develop Eco Ri...
12/05/2008(Timmins - Whitney Township)Enters Into Option Agreement to Sell Its Timmins Nickel Proj...
02/05/2008(Eco Ridge)Launch Pre-Feasibility Study for Elliot Lake Uranium Mine Pr...
06/03/2008(Eco Ridge) Reports Additional Positive Drill Results from Its Elliot L...
13/02/2008(Eco Ridge)Identifies High Priority Geophysical Targets at its Elliot L...
25/01/2008(Eco Ridge)New Drill Results Expand Higher-Grade Zone at Pele Mountain'...
17/01/2008(Eco Ridge)Expands Exploration for Higher Grade Remobilized Uranium at ...
28/11/2007(Eco Ridge)Targets Remobilized Uranium at Elliot Lake
12/10/2007(Eco Ridge)Publishes Positive Scoping Study for Uranium Mine Project at...
04/10/2007Achieves Major Milestone with Positive Scoping Study for Ura...
02/10/2007Announces Scoping Study for Its Elliot Lake Uranium Project ...
19/09/2007(Eco Ridge)Achieves Positive Results from 5,600-Metre Drill Program at ...
09/07/2007(Eco Ridge)Advances Mine Planning and Scoping Studies on 33-Million Pou...
30/05/2007(Eco Ridge)Expands Drilling at Elliot Lake Uranium Project
07/05/2007(Eco Ridge)Intersects High-Grade Uranium In Basal Conglomerate Bed at E...
02/05/2007(Eco Ridge)Expands Elliot Lake Uranium Project
01/05/2007(Eco Ridge)Drilling Confirms Near-Surface, Higher-Grade Uranium at Pele...
26/01/2006hits more high grade gold at Talisker
Communiqués de Presse de Pele Mountain Resources Inc
05/07/2016Pele Mountain to Sell Its Ardeen Gold Project
04/05/2016Pele Mountain Provides Update on Development Plans and Progr...
15/01/2016Pele Mountain Resources Appoints Wayne Richardson as Chairma...
07/10/2015Pele Mountain Announces Option Grants
01/10/2015Pele Mountain Provides an Update on its Eco Ridge Monazite P...
28/07/2015Pele Mountain Advances Cogent Solution to Rare Earth Industr...
13/04/2015Pele Mountain Announces Closing of Private Placement
30/03/2015Pele Mountain Executes MOU with Major Chinese Rare Earth Pla...
30/03/2015IIROC Trading Resumption - GEM
30/03/2015Executes MOU with Major Chinese Rare Earth Player to Pursue ...
30/03/2015IIROC Trading Halt - GEM
05/03/2015Pele Mountain Shareholders Approve All Matters Presented at ...
05/03/2015Shareholders Approve All Matters Presented at the Annual and...
17/02/2015Pele Mountain Advances Monazite Recycling Strategy to Kick-S...
12/02/2015Pele Mountain Announces Option Grants
24/12/2014Pele Mountain Announces Closing of Private Placement
02/12/2014The Council of the City of Elliot Lake Supports Pele Mountai...
07/11/2014Pele Mountain Announces Proposed Shares for Debt Settlement
07/10/2014Pele Mountain Expands its Business Model to Include Recyclin...
25/09/2014Pele Mountain Appoints Martin S. Cooper As Vice President of...
11/09/2014Pele Mountain Acquires Key Mining Lease in Elliot Lake
02/09/2014Pele Mountain Announces Collaboration with Canmet to Advance...
08/07/2014Pele Mountain Participates in Regional Roundtable Discussion...
25/06/2014Parliamentary Committee on Natural Resources Publishes "The ...
24/06/2014Pele Mountain Announces Closing of Private Placement
09/05/2014Pele Mountain Announces Closing of Private Placement Offerin...
02/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
01/05/2014Pele Mountain Announces Closing of First Tranche of Private ...
05/06/2013Shareholders Approve All Matters Presented at the Annual and...
29/01/2013Intersects Higher-Grade Uranium & Rare Earths; Discovers Wid...
17/01/2013CEO Interviewed by Jeb Handwerger
24/10/2012(Eco Ridge)Achieves Processing Milestone: Mixed Rare Earth Concentrate ...
04/07/2012(Eco Ridge)Files Updated Preliminary Economic Assessment for Eco Ridge ...
31/01/2012Updated PEA on Schedule for Q1 2012
12/09/2011(Eco Ridge)Drilling Expands Eco Ridge Deposit Northward, Demonstrates S...
27/07/2011Roger Payne Named Executive Vice-President at Pele Mountain
21/07/2011(Eco Ridge)to Separate Gold Assets from Eco Ridge
03/05/2011Commences Trading in the United States on OTCQX Internationa...
05/08/2010Dr. William Bird Joins Rare Metals Advisory Board
17/05/2010Begins Drilling Ni-Cu-PGE Targets at Pigeon River
29/04/2010to Drill Ni-Cu-PGE Targets at Pigeon River
03/05/2010Coventry Resources Reports Winter Drill Results from Pele Mo...
05/03/2010Completes VTEM Survey at Pigeon River, Identifies Several Pr...
07/01/2010Acquires Property in Thunder Bay Area with High Potential fo...
07/10/2009Confirms Significant Rare Earth Mineralization at Its Eco Ri...
05/08/2009Initiates Long-Term Research Study to Minimize Environmental...
05/02/2009Letter to Shareholders
05/02/2008Completes Acquisition of the Westward Extension of the Histo...
29/10/2007 Resumes Drilling at Its Elliot Lake Uranium Mine Project
26/07/2007Retains O&M Partners for Investor Relations
03/05/2007Announces Plan to Optimize Corporate Structure
27/04/2007Featured in Northern Miner Article
17/04/2007Expands Elliot Lake Uranium Project
29/03/2007Advances Mine Planning Studies on 33-Million Pound Uranium O...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GEM.V)Other OTC (PMNHF)
0,030+20.00%0,040+0.00%
TSX-V
CA$ 0,030
26/04 12:16 0,010
20%
Cours préc. Ouverture
0,025 0,030
Bas haut
0,030 0,030
Année b/h Var. YTD
0,025 -  0,060 -50,00%
52 sem. b/h var. 52 sem.
0,025 -  0,080 -57,14%
Volume var. 1 mois
35 750 -%
24hGold TrendPower© : 22
Produit
Développe Rare earth
Recherche Diamonds - Gold - Platinum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 13/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-45,45%
202337,50%0,100,04
2022-70,37%0,180,04
202117,39%0,720,09
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :