Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sultan Minerals Inc

Publié le 18 juillet 2007

Confirms High-Grade Moly & Discovers New Lead & Zinc Zone At Jersey-Emerald

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Jersey | Zinc |

Home

Corporate

Info

News

Releases

Stock

Info

Projects

News

Articles

Contact

Us

 

Sultan Minerals Confirms High-Grade Molybdenum and

Discovers New Lead & Zinc Zone at Jersey-Emerald Property, B.C.

Vancouver, B.C. ? July 18, 2007 ? Sultan Minerals Inc. (SUL-TSX-V) ("Sultan") is pleased to report that assays have been received for an additional 13 underground diamond drill holes, relating to the spring drilling program of 20,000 feet, from the ongoing exploration program at its 100% owned Jersey-Emerald Molybdenum-Tungsten Property located near Salmo, BC.? The drill results confirm the high-grade molybdenum intersection reported in the news release of June 6, 2007, and show an important new discovery of lead and zinc mineralization in the footwall of the historic mine.

Three of the 13 new widespread holes, JM07-16, JM07-17 and JM07-18 were drilled to investigate the vertical thickness and lateral continuity of the molybdenum zone intersected in drill-Hole JM07-04, which assayed 0.10% molybdenum sulfide (MoS2) over a core length of 548.0 feet.? All three holes successfully intersected the molybdenum zone confirming exceptional grade, excellent thickness and good lateral continuity.? Drill-Hole JM07-17 was the highlight of the three holes giving an impressive intersection of 0.21% molybdenum sulphide (MoS2) over a core length of 160.0 feet.? The intersection included a 60.00 foot section that assayed 0.41% MoS2, including a very high-grade section that carried 0.85% MoS2 over 10.0 feet.

Mr. Arthur G. Troup, President and CEO commented, ?We are extremely pleased with the high-grade intersections obtained from this drill program and particularly the east-west continuity of these zones.? With each successive drill program that Sultan has completed on the Jersey-Emerald Property, we have continued to expand and confirm the large size potential of this deposit.?

Drilling has now been completed in 19 holes out of a planned program of 50 holes for 2007.? Sultan?s summer drill program, for an additional 20,000 feet of drilling will focus on expanding the known molybdenum deposit as well as the tungsten and lead-zinc.? The Company will commence drilling by the end of July.

Significant intersections from the three molybdenum drill holes are given in the following table:

 

DRILL-HOLE

NUMBER

FROM

(feet)

TO

(feet)

WIDTH

(feet)

MOS2

(%)

 

 

JM07-16

308.00

704.00

396.00

0.07

 

 

Including

379.00

384.00

5.00

0.13

 

 

and

454.00

464.00

10.00

0.17

 

 

and

594.00

684.00

90.00

0.18

 

 

Including

624.00

634.00

10.00

0.34

 

 

JM07-17

463.00

623.00

160.00

0.21

 

 

Including

553.00

613.00

60.00

0.41

 

 

Including

603.00

613.00

10.00

0.85

 

 

JM07-18

413.00

724.00

311.00

0.12

 

 

Including

484.00

504.00

20.00

0.71

 

 

and

574.00

584.00

10.00

0.66

 

Note:? All dimensions and core lengths are recorded in feet in order that results are compatible with the historic mine grid and the existing 5,600 drill hole database.

The three holes were vertical holes drilled from the overlying Jersey Lead-Zinc Mine workings to intersect the molybdenum zone at approximately 150-foot east-west intervals.? The holes demonstrate excellent grade and lateral continuity to a zone that remains open in all directions.

The East Dodger molybdenum zone has now been tested with 30 drill holes over an area measuring 3,400 feet north south by 900 feet east west.? Molybdenum mineralization has been intersected in 28 of these holes showing a number of high-grade molybdenum veins and stockwork zones that comprise broad zones of bulk-tonnage-grade mineralization.? The bulk tonnage-intersections obtained to date are summarized below.

DODGER MOLYBDENUM ZONE BULK-TONNAGE INTERSECTIONS

 

DRILL-HOLE

NUMBER

FROM

(feet)

TO

(feet)

WIDTH

(feet)

MOS2

(%)

 

 

JM05-01*

398.00

461.00

63.00

0.07

 

 

JM05-02*

4.00

196.00

192.00

0.21

 

 

JM05-03*

0.00

495.00

495.00

0.11

 

 

JM05-05*

29.00

166.00

137.00

0.13

 

 

JM05-13*

0.00

217.00

217.00

0.12

 

 

JM05-14*

0.00

234.00

234.00

0.12

 

 

JM05-15*

0.00

248.00

248.00

0.07

 

 

JM05-16*

0.00

215.00

215.00

0.10

 

 

DS05-01*

350.00

455.00

105.00

0.10

 

 

JM07-04*

789.10

1,338.00

548.90

0.10

 

 

JM07-16

308.00

704.00

396.00

0.07

 

 

JM07-17

463.00

623.00

160.00

0.21

 

 

JM07 -18

413.00

724.00

311.00

0.12

 

* Previously reported assay.

Several important new zones of lead and zinc mineralization were also intersected in six of the recent drill holes.? Significant lead-zinc intersections obtained from these holes are given in the following table:

NEW LEAD ZINC DISCOVERY

 

DRILL-HOLE

NUMBER

FROM

(feet)

TO

(feet)

WIDTH

(feet)

Pb

(%)

Zn

(%)

 

 

JM07-11

200.50

207.67

7.17

5.88

3.13

 

 

Including

200.50

204.83

4.33

9.33

4.63

 

 

and

349.00

352.17

3.17

2.00

2.43

 

 

JM07-12

190.00

195.00

5.00

0.90

1.14

 

 

JM07-13

145.00

148.75

3.75

0.24

0.87

 

 

JM07-16

0.00

109.67

109.67

0.27

0.71

 

 

Including

0.00

6.00

6.00

0.03

3.15

 

 

and

86.25

107.17

20.92

1.36

2.59

 

 

Including

86.25

90.25

4.00

6.34

11.65

 

 

JM07-17

0.00

26.00

26.00

0.01

1.45

 

 

Including

0.00

4.00

4.00

0.01

8.16

 

 

JM07-19

0.00

9.33

9.33

1.31

1.53

 

 

Including

0.00

0.67

0.67

17.18

20.16

 

Note:? Drill hole intersection angles vary from 45? to 65? suggesting that the true width of these intersections may range from 60% to 80% of the drill core intersection length.

Drill holes JM07-16 and JM07-17 intersected a zone of previously unknown lead and zinc mineralization situated in the footwall of the historic Jersey Zinc Mine workings.? Hole JM07-16 carried low-grade mineralization over a core length of 109.67 feet including a four-foot zone of high-grade mineralization that assayed 11.65% zinc and 6.34% lead.? Hole JM07-17 intersected a four-foot zone that assayed 8.16% zinc within a 26-foot wide zone of low-grade mineralization.? These lead and zinc assays compare very favourably with historic mine grades of 3.80% zinc and 2.00% lead and confirm that important deposits of these metals exist beyond the limits of the former mine workings.

Tungsten mineralization was intersected in nine drill holes. Several intersections were below a cut off grade of 0.15% WO3 in the areas drilled.? Higher grade tungsten deposits normally occur as ore shoots along favourable host horizons and consequently are more difficult to identify with this early stage drilling.? Even low-grade intersections are important in that they show the location of the tungsten bearing horizons.? This information will help future exploration programs to locate ore zones along these tungsten bearing horizons.

Significant tungsten intersections are given in the following table:

 

DRILL-HOLE

NUMBER

FROM

(feet)

TO

(feet)

WIDTH

(feet)

WO3

(%)

 

 

JM07-01

15.00

17.00

2.00

0.18

 

 

JM07-04

75.35

84.60

9.25

0.10

 

 

JM07-05

0.00

15.83

15.83

0.06

 

 

JM07-07

15.75

17.25

1.50

0.19

 

 

JM07-08

4.00

9.75

5.75

0.07

 

 

JM07-11

170.00

175.58

5.58

0.07

 

 

JM07-15

334.00

369.00

35.00

0.04

 

 

JM07-16

50.42

52.67

2.25

0.07

 

 

and

107.17

109.67

2.50

0.07

 

 

JM07-17

463.00

473.00

10.00

0.03

 

Note:? Drill hole intersection angles vary from 45? to 65? suggesting that the true width of these intersections may range from 60% to 80% of the drill core intersection length.

Drilling has now been completed in 19 holes out of a planned program of 50 holes for 2007.? Mr. Ed Lawrence, P.Eng., former Manager of the Jersey and Emerald Mines, is managing the ongoing diamond drilling programs. Mr. Perry Grunenberg, P.Geo., of PBG Geoscience from Kamloops, BC, is Sultan's project supervisor and "Qualified Person" for the purpose of NI 43-101, "Standards of Disclosure for Mineral Projects."? Standard sampling procedures were used whereby the core was split with a core splitter and half of the core sent by trucking company directly to Acme Labs Ltd in Vancouver for assay by standard analytical procedures.? The remaining half of the core is stored in the Company's core storage facility in Salmo, BC.? All sample preparation was done at the laboratory by Acme staff.? Checks are being run on 5% of the samples at Becqueral Laboratories in Mississauga, Ontario for tungsten and Assayers Canada in Vancouver, BC, for other elements.

- 30 -

For further information on the Company's projects, visit www.sultanminerals.com

Arthur G. Troup, P.Eng., Geological

President and CEO

 

For further information, please contact:

Marc Lee, Investor & Corporate Communications

Tel: (604) 687-4622 Fax: (604) 687-4212 Toll Free: 1-888-267-1400

Email: mlee@sultanminerals.com or info@sultanminerals.com

or

Linda Armstrong, Vice President

CHF Investor Relations

Phone: (416) 868-1079, Ext. 229

Email: Linda@chfir.com

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents of this News Release. This release was prepared by Sultan management and no regulatory authority has approved or disapproved the information contained herein.

This news release includes certain statements that may be deemed "forward-looking statements.? All statements in this release, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and those actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's filings that are available at www.sedar.com? or the Company?s website at www.sultanminerals.com.

 

SUL : TSX Venture????????????????????? RZN : Frankfurt???????????????????? SEC 12g3-2(b): 82-4741

 



This Email is powered by SendWord

Données et statistiques pour les pays mentionnés : Canada | Jersey | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Jersey | Tous

Sultan Minerals Inc

EXPLORATEUR
CODE : SUL.V
ISIN : CA86556L1004
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sultan Min. est une société d’exploration minière de zinc et de plomb basée au Canada.

Sultan Min. détient divers projets d'exploration en USA et au Canada.

Ses principaux projets en exploration sont KENA et JERSEY-EMERALD au Canada et GARNET en USA.

Sultan Min. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 673 860 CA$ (520 287 US$, 468 206 €).

La valeur de son action a atteint son plus haut niveau récent le 31 mai 1996 à 3,65 CA$, et son plus bas niveau récent le 15 juillet 2016 à 0,01 CA$.

Sultan Min. possède 134 771 918 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Sultan Minerals Inc
2007 Annual Report
Financements de Sultan Minerals Inc
10/01/2012Announces Non-Brokered Private Placement
03/07/2009Completes Brokered Private Placement
14/05/2007Completes First Tranche Of Private Placement Financing
03/05/2007Announces Private Placement Financing
Nominations de Sultan Minerals Inc
16/11/2009Appoints Robin Merrifield CA (S.A.) to its Board of Director...
Projets de Sultan Minerals Inc
11/11/2013Announces Disposition of the Jersey Emerald Property, B.C.
05/11/2013Commences Sampling Program on the Daylight Gold Property, B....
30/04/20132013 Exploration Update
10/09/2012(Kena)Reports Successful Drill Expansion of Gold Mineralization at...
19/07/2012(Kena)Announces Commencement of Drill Program at the Kena Gold-Cop...
13/09/2011(Kena)Applies for Drill Permit for Kena Gold Property, BC.
05/07/2011$6,500,000 Drill Program Recommended for Sultan Minerals Cop...
25/01/2011(Kena)Intersects 1.55 Metres of 7.94g/t Gold at its Kena Property,...
19/10/2010(Kena)Confirms High Grade Gold Corridor at Kena Property, BC
05/05/2010(Garnet)to Drill Zinc Targets at the HB & Garnet Zinc Mines, Jersey-...
01/03/2010(Jersey-emerald)Reports Substantial Ni 43-101 Lead-Zinc Resource Estimate
15/01/2010(Garnet)Discovers Potential for large Extensions to the HB & Garnet ...
01/10/2009(Garnet)Acquires Garnet Lead-Zinc Mine
28/09/2009Intersects 0.76% Tungsten (WO3) on its Jersey Emerald Proper...
20/08/2009(Jersey-emerald)Intercepts 28 Feet of 0.18% WO3 and Resumes Drilling on Its ...
23/06/2009(Jersey-emerald)Resumes Drilling on Its Tungsten-Molybdenum Property
21/05/2009(Kena)Commences Exploration At Its Kena Gold Property, BC
17/02/2009(Jersey-emerald)Identifies Potential New Tungsten And Zinc Deposits At Jerse...
21/01/2009(Jersey-emerald)Tungsten Resource
16/12/2008(Jersey-emerald)Receives Environmental Baseline Report for the Jersey-Emeral...
18/11/2008(Jersey-emerald)Expands East Emerald Tungsten Zone at Jersey-Emerald Propert...
03/11/2008(Kena)Trenches 0.26% Copper Over 56 Metres On Its Kena Property, B...
26/08/2008(Kena)Trench Porphyry Copper-Gold Zone On Its Kena Property, BC
18/08/2008(Jersey-emerald)Drills Impressive 85 Foot Zone of 0.16% MoS at its Jersey-Em...
22/07/2008(Jersey-emerald)Expanding Tungsten and Molybdenum Resource at Its Jersey-Eme...
23/06/2008(Jersey-emerald)Intersects High Grade Molybdenum Veins at its Jersey-Emerald...
02/06/2008Intersects 28.50 Feet of 3.98% Lead and 0.71% Zinc at its Se...
07/05/2008(Kena)Metallics Gold Assay Increase Grade On Sultan Minerals' Kena...
27/03/2008(Jersey-emerald)Expands Tungsten and Zinc Mineralization at its Jersey-Emera...
13/03/2008(Jersey-emerald)Intersects Lead-Zinc and Gold at its
Jersey-Emerald Mol...
27/02/2008(Kena)Drills 430.0 Metres (1,428 Ft) Of Gold Mineralization On Its...
11/02/2008(Jersey-emerald)Intersects Stratiform Lead-Zinc-Silver at its Jersey-Emerald...
29/01/2008(Kena)Confirms Copper Zone At Kena Gold Property, BC
07/11/2007Commences 800 Metre Drill Hole to Expand Kena Gold Resource ...
29/10/2007(Jersey-emerald)Project Update, Jersey-Emerald Property, British Columbia, C...
24/09/2007Discovers High-Grade Extension to its Jersey-Emerald Lead-Zi...
08/08/2007(Jersey-emerald) Acquires Additional Surface Rights at Jersey-Emerald Tungst...
18/07/2007(Jersey-emerald)Confirms High-Grade Moly & Discovers New Lead & Zinc Zone At...
06/06/2007(Jersey-emerald)Intersects Spectacular Zone of Molybdenum At Jersey-Emerald ...
23/05/2007(Jersey-emerald)NI 43-101 Scoping Study For Tungsten Operation
Communiqués de Presse de Sultan Minerals Inc
28/07/2016Apex Resources Inc. Applies for Multi-Year Permit to Test Hi...
15/07/2016Name Change and Consolidation
22/06/2016Sultan Minerals Inc. Announces 10:1 Share Consolidation and ...
12/05/2016Sultan Minerals Engages PBG Geoscience Ltd for its High Grad...
09/05/2016Sultan Minerals Inc. Plans Sampling and Metallurgical Testin...
31/03/2016Sultan Minerals and Margaux Resources Amend Option Agreement...
31/12/2015Sultan Minerals and Margaux Resources Amend Option Agreement...
27/06/2012(Kena)Provides Resource Update on the Kena Project
03/04/2012Altair Agreement Approved By TSX-Venture Exchange
29/11/2011Signs Letter of Intent with Tunxsten Resources to Develop th...
23/06/2011Provides Shareholder Update
08/03/2011(Jersey-emerald)to Assess Rich Silver Mineralization on its Jersey-Emerald T...
10/08/2010Adopts Shareholder Rights Plan
03/02/2010Anticipates Significant Lead Zinc Resource Estimate for its ...
11/01/2010Identifies Two Priority Geophysical Targets on its HB Zinc P...
26/11/2009Correction: Sultan Minerals Acquires Aspen Lead-Zinc-Silver ...
10/09/2009Identifies Strong New Exploration Targets on the Kena Gold-C...
08/01/2009Focussing On Metals Unaffected By The Commodities Crunch
17/09/2008Presents New Corporate Video and Publication of "Jewel of Th...
10/09/2008Project Validated by $542,000 Geoscience BC Survey
20/06/20082008 Annual General Meeting
11/06/2008Retains Renmark Financial Communications Inc.
29/04/2008Expands Tungsten Zone at its Jersey-Emerald Property, BC
15/04/2008Drills Bulk Tonnage Tungsten Mineralization at its Jersey-Em...
20/12/2007Drills First Hole To 1,800 Ft On Kena Gold Property, British...
23/08/2007Featured on CEO Clips on The Biography Channel
15/08/2007National Post Article Featuring Sultan Minerals
03/07/2007 Engages Wardrop Engineering To Conduct Environmental Study ...
20/06/2007Acquires Surface Rights To Additional 150 Acres At Jersey-Em...
29/05/2007Completes Final Tranche of $3.6 Million Financing
17/05/2007Commences Underground Mine Survey At Jersey-Emerald Zinc Min...
01/05/2007Reports On Annual & Special General Meeting Results
08/02/2007Cabo to drill underground for Sultan Minerals Inc.
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SUL.V)Other OTC (SLMLF)
0,005-50.00%0,048-20.00%
TSX-V
CA$ 0,005
15/07 14:33 -0,010
-50%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,005 0,010
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,005 -50,00%
Volume var. 1 mois
297 000 -50,00%
24hGold TrendPower© : -37
Produit
Développe
Recherche Gold - Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :