Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Atna Resources Ltd

Publié le 27 février 2009

Confirms New Gold Zone at Briggs Mine

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Re:        News Releases - Friday, February 27, 2009
Title:     Atna Confirms New Gold Zone at Briggs Mine

Golden, CO - Atna Resources Ltd. ("Atna") - (TSX:ATN) is pleased to announce that the 2008/2009 exploration program at its Briggs Mine, which focused on targets with potential to extend the mine life has confirmed a deeper zone of gold mineralization beneath the current minable reserves in the Briggs Main pit. Atna has intersected this new Briggs Main Deep ("BMD") zone with 14 holes. The BMD drill holes have intercepted a gently dipping tabular zone over an area 800 feet long (north-south) by 700 feet wide. Apparent thickness of the zone ranges from 30 to 90 feet. The mineralization comes within 40 to 50 feet of the $750 ounce per gold design pit bottom. The BMD remains open for expansion to the north, south and east of the current intercepts.

The apparent thickness, grades, and broad distribution of the mineralization warrant a follow-up drill program to further define the BMD mineralization. The follow-up drilling at BMD will begin immediately following the drilling currently underway at the Cecil R satellite deposit to the Briggs Mine, located approximately four miles north of the Briggs Mine.

Atna's President and CEO, James Hesketh states, "These exploration results at Briggs Main Deep are very positive for the mine operation. If the next phase of drilling is successful, it may very well set the stage for adding significantly to the project's mine-life and profitability."

BRIGGS MINE DRILL HOLE RESULTS

Drill Hole No. From (ft) To (ft) Length*(ft) oz/ton Au
BMD08-016 75 80 5 0.021
  530 535 5 0.022
  545 550 5 0.024
  605 615 10 0.015
  640 650 10 0.011
  710 720 10 0.011
  730 745 15 0.011
  800 850 50 0.017
BMD09-017 80 90 10 0.024
  350 360 10 0.024
  435 535 100 0.023
including 470 500 30 0.046
  575 635 60 0.014
  645 655 10 0.012
BMD09-018 HOLE LOST    
BMD09-019 505 520 15 0.017
  555 570 15 0.013
  590 650 60 0.022
  665 705 40 0.017
  730 750 20 0.013
  760 850 90 0.029
including 775 805 30 0.050
  Hole terminated in mineralization 845-850 (5') 0.048
BMD09-020 185 195 10 0.011
  350 360 10 0.015
  380 385 5 0.015
  535 540 5 0.015
  575 610 30 0.041
  635 660 25 0.038
  680 705 25 0.025
  Hole lost in mineralization    
* Intercept lengths do not represent true widths of the mineralized zones.

The Briggs Mine is located in Inyo County, California. The mine has open pit proven and probable reserves containing 267,000 ounces of gold with an average grade of 0.021ounce per ton (see press release dated February 18, 2009). An additional 650,367 tons of inferred resource containing 9,510 ounces of gold are contained within the pit shell limits, but are not included in the reserves. An updated NI 43-101 technical report is nearing completion and will be filed shortly. Open pit mining is underway and construction of the leach pad expansion has been completed. Crushing of stockpiled ore is expected to commence in March, with first gold production expected in April 2009.

The latest mine plan, excluding results for this drill program, projects a mine life of six years. The plan produces approximately 213,000 ounces of gold with an annual average full year production rate that ranges from 40,000 to 50,000 ounces per year during the years 2010 to 2013 with residual gold recovery in 2014. Gold production and sales for 2009 is expected to be over 20,000 ounces. Life-of-mine cash cost and full cost is projected to be $468 and $587 per ounce of gold, respectively. Life-of-mine pre-tax cash flow at a gold price of $750 is approximately $36 million net of capital recapture including sustaining capital and project closure costs. Total project pre-tax cash flow increases by over $20 million for every $100 increase in gold price.

Analytical results contained within this press release were completed by standard fire assay methods with an atomic absorption or gravimetric finish by Inspectorate America Corporation, an ISO certified, commercial analytical laboratory, located in Sparks, Nevada. Atna maintains a rigorous Quality Assurance - Quality Control program utilizing both certified gold standards and blanks to augment Inspectorate's internal QA/QC program. This press release was prepared under the supervision and review of William Stanley, V.P. Exploration of Atna, a Licensed Geologist, and Qualified Person with the ability and authority to verify the authenticity and validity of information contained within this news release.

For additional information on Atna Resources and the Briggs Project, please visit our website at www.atna.com.

This press release contains certain "forward-looking statements," as defined in the United States Private Securities Litigation Reform Act of 1995, and within the meaning of Canadian securities legislation, relating to possible mineralized material located at the Briggs Main Deep zone, and the Company's possible economic results from mining operations at the Briggs Mine based on technical reports compliant with Canadian NI 43-101. Forward-looking statements are statements that are not historical fact. They are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made and they involve a number of risks and uncertainties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause future results to differ materially from those anticipated in these forward-looking statements include: the Company might encounter problems such as the significant depreciation of metals prices; accidents and other risks associated with mining exploration and development operations; the risk that the Company will encounter unanticipated geological factors; the Company's need for and ability to obtain additional financing; the possibility that the Company may not be able to secure permitting and other governmental clearances necessary to carry out the Company's mine development plans that will prevent it from restarting mining operations at the Briggs Mine; and the other risk factors discussed in greater detail in the Company's various filings on SEDAR (www.sedar.com) with Canadian securities regulators and its filings with the U.S. Securities and Exchange Commission, including the Company's Form 20-F dated March 25, 2008.

Cautionary Note to U.S. Investors - The United States Securities and Exchange Commission permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We use certain terms in this report, such as "measured," "indicated," "inferred," and "resources," that the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC.

FOR FURTHER INFORMATION, CONTACT:

James Hesketh, President and CEO - (303) 278-8464
Valerie Kimball, Investor Relations - toll free (877) 692-8182

www.atna.com

Copyright � 2009 ATNA RESOURCES LTD. (TSE:ATN) All rights reserved. For more information visit our website at http://www.atna.com/ or send email to info@atna.com ..
Message sent on Fri Feb 27, 2009 at 7:20:34 AM Pacific Time
<

Atna Resources Ltd

PRODUCTEUR
CODE : ATN.TO
ISIN : CA04957F1018
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Atna Resources est une société développant des projet miniers de zinc et d'or basée au Canada.

Atna Resources est en développement de projets de zinc, d'or, d'argent, de cuivre et de plomb au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en production est BRIGGS en USA, son principal projet en développement est WOLVERINE au Canada et ses principaux projets en exploration sont KENDALL GOLD MINE, CONVERSE, ATLANTA (NEVADA), MOUNT EDNA, CLOVER, WOLF PROPERTY, TRAM PROSPECT, SAND CREEK JV, TREE PROPERTY, WHITE BULL, BEOWAWE, TY, UDUK, JARBRIDGE, ECSTALL PROPERTY, CONVERSE & SAND CREEK URANIUM, TRIPLE JUNCTION, GOLDTOOTH - BRIGGS, SEVEN-UP PETE GOLD, COLUMBIA PROPERTY, REWARD PROPERTY, PINSON, MT. EDNA et MCDONALD au Canada et CACHINAL et CELESTE au Chili.

Atna Resources est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 10,6 millions CA$ (7,7 millions US$, 7,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 29 décembre 2006 à 2,56 CA$, et son plus bas niveau récent le 29 décembre 2015 à 0,05 CA$.

Atna Resources possède 212 090 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Atna Resources Ltd
2008 Annual report
Annual Report 2007
Nominations de Atna Resources Ltd
08/01/2013Mr. Daniel Saint Don Joins Atna as Vice President and Chief ...
16/08/2011Douglas Stewart Joins Atna As Chief Operating Officer
05/04/2011Paul H. Zink Joins Atna's Board of Directors
Rapports Financiers de Atna Resources Ltd
17/03/2015. Reports Fourth Quarter and 2014 Fiscal Year Results
12/11/2014Reports Third Quarter 2014 Earnings and Operations Results
05/08/2014Reports Second Quarter 2014 Results
05/05/2014Reports First Quarter 2014 Earnings and Operations Results
11/11/2013Reports Third Quarter 2013 Earnings and Operations Results
31/07/2013Reports Second Quarter 2013 Earnings and Operations Results
13/05/2013Reports First Quarter 2013 Earnings and Operations Results
22/03/2013Reports Fourth Quarter and 2012 Fiscal Year Results and High...
13/11/2012Announces Third Quarter 2012 Earnings and Operations
15/10/2012(Pinson)Reports Third Quarter Development Progress at Pinson
16/08/2011Reports Second Quarter Earnings of $1.1 Million
24/05/2011Reports First Quarter 2011 Results
25/03/2011Reports Fourth Quarter and 2010 Fiscal Year End Results
12/08/2010Reports Second Quarter 2010 Results
26/03/2010Reports Fourth Quarter and Year End 2009 Results
14/08/2009Reports Second Quarter 2009 Results
14/11/2008Reports Third Quarter 2008 Results
14/08/2008Reports Second Quarter 2008 Results
29/05/2008REPORTS FIRST QUARTER 2008 RESULTS
14/11/2007 Reports Third Quarter Results
15/05/2007Reports First Quarter Results
Projets de Atna Resources Ltd
09/03/2015(Pinson)Provides Update on Pinson Mine
17/11/2014(Clover)Announces Sale of Reward and Clover Properties for US$10.0 M...
02/07/2013(Briggs)Briggs Mine Reports Near Record Gold Ounces Mined
03/06/2013(Pinson)Provides Additional Information on its Pinson Mine
29/05/2013(Pinson)Modifies Operations at its Pinson Mine
27/03/2013Veris Gold Enters Into A Toll Milling Agreement with Atna Re...
25/03/2013Cuts 120 feet Grading 0.057 oz/ton Gold at Reward Gold Proje...
18/03/2013(Ty)Extends $17.5 Million Credit Facility
25/02/2013Discovers New Gold Mineralization at Reward
05/02/2013(Pinson)Receives Large Mine Expansion Permit for Pinson
16/01/2013Reports 2012 Production Results and 2013 Outlook
11/12/2012(Pinson)Drilling at Pinson Continues to Confirm High Gold Grades
06/11/2012(Pinson)Development Drilling at Pinson Returns 60 feet of 1.38 oz/to...
16/04/2012(Pinson)Reports Progress on Development of the Pinson Mine
19/01/2012(Briggs)Increases Briggs Gold Resource and Replaces Mined Ounces
24/10/2011Drilling Increases Size of Reward Gold Deposit
13/10/2011(Briggs)Completes Briggs Drilling with Strong Gold Intercepts
13/09/2011(Briggs)North Main Zone Expanding at Atna's Briggs Mine
02/09/2011(Pinson)Completes Acquisition of Pinson Gold Mine
11/08/2011(Pinson)Acquires Pinson Gold Mine
01/07/2011(Ty)Enters Agreement to Sell its Atlanta Property
25/05/2011(Briggs)Drills 100 feet (30.5 m) grading 0.058 oz/ton gold (1.97 g/t...
02/05/2011(Briggs)Expands New Reserve Area
07/04/2011(Briggs)Announces Expansion of Deep Briggs Zone
23/03/2011(Briggs)Reports Additional Positive Drill Results at Briggs Mine
03/03/2011(Briggs)Reports Updated Gold Reserves at Briggs and Reward Mines
28/02/2011(Briggs)Reports Initial Drill Results at Briggs Mine
27/01/2011(Briggs)Commences Briggs Mine Exploration
24/01/2011(Briggs)Reports Increased Gold Production and Lower Costs at Briggs ...
02/03/2010Provides NI-43-101 Resource Estimate for Cecil R Project
26/02/2010(Briggs)Reaches Commercial Production Levels at the Briggs Mine
22/02/2010(Briggs)Updates Reserve Estimates for Briggs and Reward
10/09/2009(Columbia Property)Reports Significant Gold Resource for its Columbia Gold Proj...
24/08/2009(Reward Property)Receives Approval for Development of Reward Gold Mine
11/08/2009(Briggs)Increases Gold Resources at Briggs Mine
08/06/2009(Briggs)Expands Mineralization at Briggs Mine
04/06/2009(Pinson)Reports Additional Pinson Drill Results
13/05/2009(Briggs)Makes First Gold Pour at Briggs Mine
27/02/2009(Briggs)Confirms New Gold Zone at Briggs Mine
18/02/2009(Briggs)Reports Reserve Increase and Updated Mine Plan for the Brigg...
04/02/2009(Clover)Provides Update on Exploration Venture Properties
28/01/2009(Briggs)Commences Mining Gold Ore at Briggs
15/01/2009(Pinson)Receives Notice of Completion of $30 Million Expenditure at ...
22/07/2008(Mcdonald): Mountain States Legal Foundation Files Petition With US Su...
16/06/2008(Ty)COMPLETES CONSOLIDATION OF SEVEN-UP PETE GOLD PROPERTY
09/05/2008TECHNICAL REPORT RECOMMENDS RE-START OF BRIGGS MINE IN CALIF...
24/04/2008(Pinson)REPORTS ACCELERATED DEVELOPMENT AT PINSON GOLD PROJECT
23/04/2008(Mcdonald)RECEIVES COURT OPINION ON ITS MCDONALD TAKINGS CLAIM
16/04/2008(Briggs)Drilling Extends Gold Mineralization At Briggs Mine
03/04/2008ATNA TECHNICAL REPORT RECOMMENDS DEVELOPMENT OF REWARD GOLD ...
11/03/2008(Jarbridge)Terminates Option Agreement at Jarbidge, Nevada
20/02/2008(Clover)Gold Intersected at Atna's Clover Project
08/01/2008(Pinson)Reports Progress at Pinson Gold Mine, Nevada
21/12/2007(Jarbridge) Completes First Phase of Drilling at Jarbidge, Nevada
16/11/2007(Clover) Meridian Gold Commences Drilling Atna's Clover Project
18/09/2007(Pinson)Reports Work Underway at Pinson Project
11/07/2007(Pinson)Increases Resource at Pinson
03/07/2007(Pinson)Reports Pinson Mining Company to Begin Work at Pinson Gold P...
14/06/2007(Jarbridge)Commences Drilling at Jarbidge, Nevada
Communiqués de Presse de Atna Resources Ltd
18/01/2016Atna Reports on 2015 Mining Operations
25/11/2015TSX Delisting Review - Atna Resources Ltd. (Symbol: ATN)
25/11/2015Atna Resources Ltd. To Be Delisted From TSX
04/08/2015Atna Resources Ltd. Reports Second Quarter 2015 Results
15/07/2015Atna Reports 75% Quarterly Increase in Pinson Gold Ore Shipm...
18/06/2015Atna Resources' CEO James Hesketh Interviewed by The Gold Re...
09/03/2015Atna Provides Update on Pinson Mine
15/01/2015Reports Update on 2014 Operations and Provides Production Ta...
15/01/2015Atna Reports Update on 2014 Operations and Provides Producti...
26/11/2014Atna Closes Sale of Reward and Clover Properties
17/11/2014Atna Announces Sale of Reward and Clover Properties for US$1...
12/11/2014Atna Reports Third Quarter 2014 Earnings and Operations Resu...
21/10/2014(Pinson)Files NI 43-101 Technical Report for the Pinson Underground ...
21/10/2014Atna Files NI 43-101 Technical Report for the Pinson Undergr...
14/10/2014Atna Provides Update on Pinson and Success of Long-Hole Mini...
15/09/2014Atna Provides Technical Report Results for the Pinson Underg...
04/09/2014Atna Provides Update on Pinson Production
22/08/2014Announces Closing Of $2.0 Million Private Placement
22/08/2014Atna Announces Closing Of $2.0 Million Private Placement
11/08/2014. Announces $2.0 Million Private Placement
11/08/2014Atna Resources Ltd. Announces $2.0 Million Private Placement
02/04/2014(Pinson)Commences Optimization Study on Pinson Underground
25/02/2014Increases Reward Gold Resource
31/01/2014(Ty)Announces $22,000,000 Secured Credit Facility
02/01/2014Makes Final Payment on Guaranteed Gold Participating Bonds
20/12/2013(Ty)Completes Amendment to Sprott Credit Facility
10/10/2013(Briggs)Briggs Mine Reports Strong Third Quarter Production Results
08/10/2013(Ty)Amends $17.5 Million Sprott Credit Facility
17/09/2013Reports Positive Metallurgical Studies on Mag Open Pit
10/09/2013. Announces $5.8 Million Bought Deal Private Placement
26/06/2013(Pinson)Suspends Operations at Pinson
26/06/2013(Pinson)Suspends Operations at Pinson
06/05/2013(Pinson)Increases Productivity at its Pinson Mine
25/04/2013Replaces Duplicated Table in its 2012 Annual MD&A
20/02/2013(Ty)Announces Annual General Meeting & Adoption of Advance Notic...
11/10/2012Drills 305 Feet Grading 0.074 oz/ton Gold at Columbia Gold P...
11/07/2012(Briggs)Provides Update on Briggs Operations
22/05/2012(Briggs)Completes New NI 43-101 Report on the Briggs Gold Mine
26/09/2011Rod Gloss Joins Atna Resources as Chief Financial Officer
02/09/2011Featured on CNBC
11/07/2011Options to Sell Three Canadian Properties
22/06/2011(Briggs)Completes Leach Pad Expansion at Briggs
20/06/2011(Briggs)North Main Briggs Zone Expanding
09/05/2011Announces Results of AGM
06/08/2010Announces Resignation of Director
05/07/2010Announces Gold Participating Bond Offering
18/05/2010To Our Shareholders...
15/04/2010Presents at European Gold Forum!
28/01/2010Provides Update on Exploration and Venture Projects
09/12/2009Announces Closing of Gold Participating Bond Offering
23/11/2009Announces Gold Participating Bond Offering
07/10/2009John Theobald Joins Atna's Board of Directors
07/08/2009Announces Changes to Board of Directors
02/06/2009Enters Into New Agreement in the Sand Creek Uranium Joint Ve...
19/12/2008Announces Management Changes and Option Grants
09/09/2008Accelerates Briggs Gold Mine Re-Start
04/09/2008Agrees to Sell Royalty Portfolio for US$20 Million
05/08/2008Reports 2nd Quarter Progress at Pinson Gold Project, Nevada
15/05/2008Reports AGM Results
14/05/2008Delays Filing Interim Financial Statements Due To Recent Mer...
06/05/2008Reminds Shareholders of its Annual General Meeting and Web C...
19/03/2008 and Canyon Announce Closing of Merger
13/03/2008Canyon Stockholders Approve Agreement and Plan of Merger wit...
07/03/2008Announces Postponement of Canyon Shareholders Meeting Relati...
03/03/2008Underground Drifting Commences at Pinson Mine, Nevada
28/02/2008President and CEO Interview
23/01/2008Advances Towards Merging With Canyon Resources
19/11/2007Correction - Atna and Canyon Agree to Merge
19/11/2007 Agree to Merge
06/06/2007Completes Drilling at Beowawe Project, Nevada
28/04/2007Reports AGM Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ATN.TO)Other OTC (ATNAF)
0,050+0.00%0,068-19.55%
TORONTO
CA$ 0,050
29/12 15:55 -
0%
Cours préc. Ouverture
0,050 0,050
Bas haut
0,050 0,050
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
147 201 -%
24hGold TrendPower© : -27
Produit Gold
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Copper - Gold - Lead - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 09/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,84 AU$+1,75%Trend Power :
OceanaGold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,22 US$-0,92%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,71 GBX+4,41%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,12 CA$+1,13%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,22 AU$+7,50%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,91 CA$-4,02%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
50,06 US$-1,54%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$-5,26%Trend Power :