Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Arizona Mining Inc.

Publié le 22 septembre 2016

continues expansion of the Taylor Deposit intersects 8 mineralized zones with a cumu

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   9/11 | Canada | Copper | Manganese | Zinc |
Arizona Mining Inc.

Arizona Mining continues expansion of the Taylor Deposit � HDS-363 intersects 8 mineralized zones with a cumulative thickness of 421.5 feet including a 13 foot thick interval assaying 15.5% zinc, 11.8% lead, 3.3% copper and 14.3 opt silver

September 22nd, 2016

Vancouver, B.C., September 22, 2016 � Arizona Mining Inc. (TSX: AZ) (�Arizona Mining� or the �Company�) is pleased to announce the results of a further three (3) exploration drill holes from its current program targeting the expansion of the Taylor Zn-Pb-Ag sulfide deposit located on its 100% owned Hermosa Project in Santa Cruz County, Arizona. These and the other recently completed drill holes continue to expand the maiden resource announced on February 1, 2016 of 39.4 million inferred tonnes grading 11% zinc equivalent.

HDS-363 is a step out drill hole on the northeastern edge of the previous resource (See Drill Hole Location Map, attached). The drill hole encountered 8 distinct mineralized horizons with a cumulative mineralized thickness of 421.5 feet. Most notable is a 13 foot thick horizon near the bottom of the hole that assayed 15.5% zinc, 11.8% lead, 3.3% copper and 14.3 ounces per ton (�opt�) silver. Also intersected in the drill hole was a 15.5 foot thick interval (within a broader 118.5 foot mineralized zone) that assayed 5.6% zinc, 10.7% lead, 0.07% copper and 4.0 opt silver. Also intersected in the drill hole is a 21.5 foot interval (within a broader 74 foot mineralized zone) that assayed 4.8% zinc, 8.9% lead, 0.2% copper and 2.5 opt silver.

HDS-364 is an exploration step out hole located approximately 750 feet northwest of the existing resource area. This drill hole, coupled with HDS-365 (see below), are important in extending the mineralization and infilling mineralization between recently completed and press released drill holes HDS-338, HDS-354 and HDS-344 (See Drill Hole Location Map attached). HDS-364 encountered intense alteration and recrystallization of the carbonate host and eight (8) distinct mineralized intervals including a 23 foot interval, which assayed 3.4% zinc, 10.6% lead, 0.01% copper and 2.9 opt silver within a 56 foot thick broader zone of mineralization.

HDS-365, similar to HDS-364, is an exploration step out hole located approximately 450 feet northwest of the existing resource area Both of these drill holes are important to indicate the widespread continuity of the carbonate hosted mineralization. HDS-365 encountered five (5) distinct mineralized intervals including a 34 foot mineralized zone which contained a 5 foot interval assaying 25.1% zinc, 10.8% lead, 0.04% copper and 6.6 opt silver.

Arizona Mining CEO Jim Gowans commented, �The drill program and results continue to support our belief that the Taylor Deposit will be one of the more significant base metal deposits. The drilling continues to expand the mineralization and highlights the robust zinc, lead and silver grades. As we increase the number of drill rigs to 15 we will accelerate the data collection to determine the ultimate size and tenor of the deposit.�

Table I. Assay summaries for HDS-363, HDS-364 & HDS-365

DH_ID From (feet) To (feet) Interval (in feet) From (meters) To (meters) Interval (meters) Ag opt Pb% Zn% Cu% Ore Zone
HDS-363 1990 1998 8 606.5 609.0 2.4 1.51 1.88 3.93 0.08 CRD
HDS-363 2129 2247.5 118.5 648.9 685.0 36.1 0.98 2.78 2.58 0.03 CRD
HDS-363 Including 2191.5 2207 15.5 667.9 672.7 4.7 4.03 10.73 5.66 0.07 CRD
HDS-363 2387 2402 15 727.5 732.1 4.6 1.74 3.43 1.12 0.05 CRD
HDS-363 2589 2663 74 789.1 811.6 22.6 1.39 4.49 3.21 0.08 CRD
HDS-363 Including 2629 2650.5 21.5 801.3 807.8 6.6 2.56 8.96 4.82 0.21 CRD
HDS-363 3371.5 3407 35.5 1027.6 1038.4 10.8 6.96 21.11 5.84 0.58 CRD
HDS-363 3434 3549.5 115.5 1046.6 1081.8 35.2 0.81 2.30 1.84 0.07 CRD
HDS-363 Including 3456 3470 14 1053.3 1057.6 4.3 2.37 7.35 5.12 0.37 CRD
HDS-363 3597 3639 42 1096.3 1109.1 12.8 0.49 1.40 0.45 0.01 CRD
HDS-363 3700.5 3713.5 13 1127.9 1131.8 4.0 14.38 11.81 15.58 3.31 CRD
HDS-364 932 936 4 284.1 285.3 1.2 5.86 0.43 0.11 0.15 CRD
HDS-364 1814 1819 5 552.9 554.4 1.5 3.53 2.55 5.68 0.22 CRD
HDS-364 1856 1892 36 565.7 576.7 11.0 1.84 1.44 0.30 0.07 CRD
HDS-364 2522 2525 3 768.7 769.6 0.9 6.21 0.11 2.07 0.32 CRD
HDS-364 3179 3191 12 968.9 972.6 3.7 7.42 14.37 1.84 0.15 CRD
HDS-364 3349 3360 11 1020.7 1024.1 3.4 1.99 1.81 2.53 0.23 CRD
HDS-364 3409 3465 56 1039.0 1056.1 17.1 2.86 6.10 1.77 0.07 CRD
HDS-364 Including 3442 3465 23 1049.1 1056.1 7.0 2.91 10.64 3.39 0.01 CRD
HDS-364 3511 3515 4 1070.1 1071.3 1.2 1.45 4.17 8.24 0.03 CRD
HDS-365 951 970 19 289.9 295.6 5.8 4.36 2.00 2.31 0.24 CRD
HDS-365 2768 2802 34 843.6 854.0 10.4 1.62 2.09 4.36 0.02 CRD
HDS-365 Including 2768 2773 5 843.6 845.2 1.5 6.59 10.85 25.10 0.04 CRD
HDS-365 3474.5 3525 50.5 1059.0 1074.4 15.4 2.23 3.42 1.88 0.04 CRD
HDS-365 3560 3610 50 1085.0 1100.3 15.2 0.40 1.29 1.31 0.10 CRD
HDS-365 3686.5 3689 2.5 1123.6 1124.4 0.8 3.12 7.47 10.55 0.74 CRD

(Drill intersections with combined Zinc and Lead>9% highlighted. Drill intervals are down the hole drill width but are considered to be within 5% of true width)

Qualified Person

The results of the Arizona Mining Inc. drilling results have been reviewed, verified and compiled by Donald R. Taylor, MSc., PG, Chief Operating Officer for Arizona Mining Inc., a qualified person as defined by National Instrument 43-101 (NI 43-101). Mr. Taylor has more than 25 years of mineral exploration and mining experience, and is a Registered Professional Geologist through the SME (registered member #4029597).

Assays and Quality Assurance/Quality Control

To ensure reliable sample results, the Company has a rigorous QA/QC program in place that monitors the chain-of-custody of samples and includes the insertion of blanks, duplicates, and certified reference standards at statistically derived intervals within each batch of samples. Core is photographed and split in half with one-half retained in a secured facility for verification purposes.

Sample preparation (crushing and pulverizing) has been performed at ALS Minerals Laboratories, an ISO/IEC accredited lab located in Tucson, Arizona. ALS Minerals Laboratories prepares a pulp of all samples and sends the pulps to their analytical laboratory in Vancouver, B.C. Canada for analysis. ALS analyzes the pulp sample by ICP following a 4-acid digestion (ME-ICP61 for 33 elements) including Cu (copper), Pb (lead), and Zn (zinc). All samples in which Cu (copper), Pb (lead), or Zn (zinc) are greater than 10,000 ppm are rerun using four acid digestion with an ICP � AES finish (Cu-OG62;Pb-OG62; and Zn-OG62) with the elements reported in percentage (%). Silver values are determined by ICP (ME-ICP61) with all samples with silver values greater than 100 ppm repeated using four acid digestion with an ICP-AES finish (Ag-OG62) calibrated for higher levels of silver contained. Any values over 1,500 ppm Ag triggers a fire assay with gravimetric finish analysis. Gold values are determined by a 30 gm fire assay with an ICP-AES finish (Au-ICP21).

About Arizona Mining

Arizona Mining Inc. is a Canadian mineral exploration and development company focused on the exploration and development of its 100% owned Hermosa Project located in Santa Cruz County, Arizona. The Taylor Deposit, a lead-zinc-silver carbonate replacement deposit, has a resource of 39.4 million tonnes in the Inferred Mineral Resource category grading 11% zinc equivalent (�ZnEq�) utilizing a 6% ZnEq cutoff grade calculated in accordance with CIM definitions for mineral resources. The Taylor Deposit remains open to the north, west and south over land controlled by the Company and will be aggressively drilled to test the limits of the resource. The Company recently completed metallurgical test work on drill core from the Taylor Deposit that projects overall recoveries of 92.9% Pb; 85.5% Zn and 91% Ag using industry standard froth flotation processing technology. The Company�s other project on the Hermosa property is the Central Deposit, a silver-manganese manto oxide development project that has a prefeasibility study which was released in December 2013.

For additional information please contact:

Susan Muir

Vice-President, Investor Relations & Corporate Communications

Telephone: 416-505-7606

Email: smuir@arizonamining.com

Donald Taylor

Chief Operator Officer

Telephone: 520-485-1300

Email: info@arizonamining.com

Cautionary Note Regarding Forward-Looking Information

Certain information contained in this press release constitutes forward-looking statements. All statements, other than statements of historical facts, are forward looking statements including statements with respect to the Company�s intentions for its Hermosa Project in Arizona, USA including, without limitation, performing additional drilling on the Taylor Deposit. Forward-looking statements are often, but not always, identified by the use of words such as may, will, seek, anticipate, believe, plan, estimate, budget, schedule, forecast, project, expect, intend, or similar expressions.

The forward-looking statements are based on a number of assumptions which, while considered reasonable by Arizona Mining, are subject to risks and uncertainties. In addition to the assumptions herein, these assumptions include the assumptions described in Arizona Mining�s management�s discussion and analysis for the year ended December 31, 2015 (�MD&A�). Arizona Mining cautions readers that forward-looking statements involve and are subject to known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements to differ materially from those expressed in or implied by such forward-looking statements and forward-looking statements are not guarantees of future results, performance or achievement. These risks, uncertainties and factors include general business, economic, competitive, political, regulatory and social uncertainties; actual results of exploration activities and economic evaluations; fluctuations in currency exchange rates; changes in project parameters; changes in costs, including labour, infrastructure, operating and production costs; future prices of zinc, lead, silver and other minerals; variations of mineral grade or recovery rates; operating or technical difficulties in connection with exploration, development or mining activities, including the failure of plant, equipment or processes to operate as anticipated; delays in completion of exploration, development or construction activities; changes in government legislation and regulation; the ability to maintain and renew existing licenses and permits or obtain required licenses and permits in a timely manner; the ability to obtain financing on acceptable terms in a timely manner; contests over title to properties; employee relations and shortages of skilled personnel and contractors; the speculative nature of, and the risks involved in, the exploration, development and mining business; and the factors discussed in the section entitled �Risks and Uncertainties� in the MD&A.

Although Arizona Mining has attempted to identify important risks, uncertainties and other factors that could cause actual performance, achievements, actions, events, results or conditions to differ materially from those expressed in or implied by the forward-looking information, there may be other risks, uncertainties and other factors that cause performance, achievements, actions, events, results or conditions to differ from those anticipated, estimated or intended. Unless otherwise indicated, forward-looking statements contained herein are as of the date hereof and Arizona Mining disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable law.

DRILL LOCATION MAP

2016-09-22_-_NR_-_Drill_Location_Map.jpg



View in PDF Format






This email was sent to newsrelease@24hgold.com
why did I get this?        
Arizona Mining Inc. � 555-999 Canada Place � Vancouver, BC V6C3E1 � Canada

Email Marketing Powered by MailChimp
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Arizona Mining Inc.

CODE : AZ
ISIN : CA0405211065
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Arizona Mining est une société d’exploration minière basée au Canada.

Arizona Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 99,9 millions CA$ (72,7 millions US$, 68,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 07 janvier 2022 à 9,84 CA$, et son plus bas niveau récent le 19 avril 2024 à 0,40 CA$.

Arizona Mining possède 249 670 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Arizona Mining Inc.
20/06/2018Former speaker Boehner earns a cool million on Arizona minin...
Projets de Arizona Mining Inc.
22/09/2016continues expansion of the Taylor Deposit intersects 8 mine...
05/08/2016drilling continues to expand Taylor Deposit
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (AZ)
0,400-3.38%
TORONTO
CA$ 0,400
19/04 12:56 -0,010
-3,38%
Cours préc. Ouverture
0,414 0,412
Bas haut
0,390 0,412
Année b/h Var. YTD
0,385 -  1,39 -69,92%
52 sem. b/h var. 52 sem.
0,385 -  2,93 -63,96%
Volume var. 1 mois
41 311 -42,86%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-76,47%
202332,81%3,041,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,27 US$+2,08%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+3,70%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,49 CA$-1,19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,89 CA$-1,00%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,02 US$+1,14%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :