Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
La démocratie est le pire des systèmes, mis à part tous les autres
Winston Churchill  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1389,051,45
Silver 22,500,01
Platinum 1451,50-6,00
Palladium 738,003,00
MARCHES MONDIAUX
DOWJONES 15295-6
NASDAQ 3459-4
NIKKEI 14228-256
ASX 5041-101
CAC 40 3967-84
DAX 8352-179
HUI 2592
XAU 97-3
MONNAIES (€)
AUS $ 1,3364
CAN $ 1,3358
US $ 1,2941
GBP (£) 0,8567
Sw Fr 1,2516
YEN 131,5080
RATIOS & INDEXES
Gold / Silver61,74
Gold / Oil14,46
Dowjones / Gold11,01
MATIERES PREMIERES
Copper 3,29-0,01
WTI Oil 96,05-0,11
Nat. Gas 4,280,02
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet
NEWS RELEASE
 
NioGold Mining Corporation
TSX-V Symbol: NOX
FWB Symbol: NG1
 
NIOGOLD CONTINUES TO EXPAND GOLD MINERALISATION
AROUND HISTORIC MARBAN MINE
 
Val-d'Or, Quebec, July 11, 2007. NioGold Mining Corporation (TSX-V: NOX) (FWB: NG1) ("NioGold") reports on first results of the 2007 drilling program on the Marban Block property, located in the Malartic Gold Camp, Quebec.
 
Complete assay results were received for the first four holes (MB-07-003 to MB-07-006) drilled to test the near-surface extent of the Marban Mine Sequence above and to the north of the former Marban mine workings. All holes returned gold mineralised intervals and expanded significant mineralisation reported in 2006 in hole MB 06 001 returning:
  • a near-surface intersection of 5.3 g/t Au over 4.0 metres within a thicker mineralized envelope averaging 1.2 g/t Au over 31.7 metres in hole MB-07-005;
  • a near-surface intersection of 8.5 g/t Au over 2.8 metres within an envelope averaging 2.0 g/t Au over 16.0 metres; and
  • a deeper intersection of 6.2 g/t Au over 3.0 metres within an envelope averaging 1.5 g/t Au over 15.0 metres in hole MB-07-006
Download results table in PDF format: http://www.niogold.com/files/pdf/news/07_07_11.pdf
 
The initial phase of the 35,000-metre 2007 drilling program is targeting the Marban Mine area, one of the several priority targets being investigated on the Marban Block in order to increase gold resources that are presently estimated at the Norlartic and Kierens deposits (see News Release dated June 28, 2007). The results from the first four holes continue to confirm the gold enriched nature of the Marban Mine Sequence and its potential to host disseminated bulk-style of mineralisation.
 
To date, NioGold has completed a north-south fence of ten holes (MB-07-003 to MB-07-012) drilled 450 metres east of the Marban mine shaft (Section 4+50E). The holes investigated the surface and depth extent of the Mine Sequence over a dip extent of 550 metres. All holes intersected disseminated sulphide and vein stockwork zones typical of the gold-bearing intervals cut in hole MB 06 001 drilled on Section 5+00E. Hole MB-06-001 returned a near-surface cut of 3.6 g/t Au over 26.4 metres (incl. 10.8 g/t Au over 4.0 m) and 1.3 g/t Au over 43.0 metres (incl. 6.9 g/t Au over 2.0 m) at depth. Complete assay results are pending for holes MB-07-007 to MB-07-012.
 
The drill rig was moved 100 metres to the east to complete a second fence of holes across the Mine Sequence on Section 5+50E.
 
Quality Assurance / Quality Control and Qualified Persons
 
Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes for the mineralised zones. The core was delivered by the drilling contractor to NioGold's facilities located at the Norlartic mine site. The core was photographed for reference, logged and mineralized sections were sawed in half. Sample lengths varied between 0.5 to 1.5 metres. The half core samples were bagged, sealed and trucked to Activation Laboratories Limited ("Actlabs") in Ancaster, Ontario, an accredited laboratory. Samples were assayed by the fire-assay method using an atomic absorption finish on a 50-gram pulp split.
 
A quality assurance and quality control program (QA/QC) was implemented by NioGold and the laboratory to insure the precision and reproducibility of the analytical method and results. The QA/QC program includes the insertion of standards, blanks and duplicates in the sample batches sent to the laboratory and a systematic re-assaying from the remaining coarse reject fraction by the fire-assay method with an atomic absorption finish for samples returning values of 2 to 5 g/t Au and by gravimetric finish for samples returning values greater than 5 g/t Au. As well, 10% of the pulps are sent to Bourlamaque Assay Laboratories Ltd. in Val-d'Or for check assaying.
 
This press release was prepared by Rock Lefran�ois, P. Geo. (OGQ), the Company's Vice-President and Qualified Person as defined by National Instrument 43-101. The exploration programs are conducted under the supervision of Bertrand Brassard, M.Sc., P.Geo. (OGQ), also a Qualified Person as defined by National Instrument 43-101.
 
NioGold Mining Corporation - � The Golden Highway Runs Through NioGold �
 
NioGold Mining Corporation is a junior exploration company primarily focused on GOLD.  The Company's main properties are the Camflo West and the Marban Block located in the Malartic and Val-d'Or Mining Camps, with a historic production of 25 million ounces of gold. The camps presently encompass several active advanced exploration and mine development projects such as Canadian Malartic (Osisko Exploration), Kiena (Wesdome), Midway (Northern Star Mining), Goldex (Agnico-Eagle) and Lac Herbin (Alexis Minerals). The Marban Block encompasses three former gold producers, namely the Norlartic, Kierens (First Canadian), and Marban mines that collectively produced 592,265 ounces of gold.
 
NioGold's experienced and qualified technical team will ensure the successful advancement of the Company's projects towards the highest quality mineral resources. NioGold invites you to visit the company website at www.niogold.com
 
For information on NioGold Mining Corporation contact:
 
Michael A. Iverson, President & CEO
miverson@niogold.com
Tel: (604) 856-9887
 
Rock Lefrancois, P.Geo., Vice-President
rocklefrancois@niogold.com
Tel: (819) 825-7400
 
This Press Release includes forward-looking statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward looking. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. The TSX Venture Exchange or the Frankfurt Stock Exchange did not approve nor do not accept responsibility for the adequacy or accuracy of this NEWS RELEASE.
Tweet

Niogold Mining Corp

EXPLORATEUR
CODE : NOX.V
ISIN : CA6544851018
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Niogold Mining Corp
2008 Annual Report
Financements de Niogold Mining Corp
15/11/2010Announces $6,000,000 Bought Deal
29/05/2007Updates Exploration Programs and Announces Private Placement...
26/04/2007Completion of Brokered and Non-Brokered Private Placement
23/03/2007ANNOUNCES INCREASE TO BROKERED PRIVATE PLACEMENT
05/03/2007Brokered and non brokered private placement
Attributions d'options de Niogold Mining Corp
06/07/2009 Appoints new VP, Grants stock options
Nominations de Niogold Mining Corp
01/06/2010Appoints Jonathan Richards As Cfo
Projets de Niogold Mining Corp
11/03/2011(Malartic Block)Updated Mineral Resource Technical Report
03/03/2011(Malartic Block)Commences Exploration Drilling in New Sector at Malartic
21/01/2011(Marban Mine)and Aurizon Report 9.06 G/T AU Over 7.3 Metres at Marban
13/01/2011(Marban Mine)to Intensify Drilling in Malartic With Two More Drills
06/07/2010(Marban Mine)And Aurizon Form Partnership To Develop The Marban Block Pro...
18/03/2010NioGold Mining hits high grade gold outside current resource
05/02/2009(Marban Mine)MARBAN WEST EXTENSION DRILLING RETURNS
05/11/2008(Marban Mine)DISCOVERS HIGH-GRADE GOLD ZONE AT MARBAN
03/09/2008(Marban Mine)DRILLING AT MARBAN DELINEATES NEAR-SURFACE WEDGE ZONE
13/05/2008(Marban Mine)WEST EXTENSION TARGET AT MARBAN RETURNS 9.45 G/T GOLD
10/01/2008MARBAN DRILLING RETURNS 9.8 G/T GOLD OVER 3.0 METRES and 13....
05/09/2007CONTINUES TO OUTLINE NEW GOLD MINERALISATION AROUND FORMER M...
11/07/2007Continues to Expand Gold Mineralisation Around Historic Marb...
20/02/2007 NioGold acquires 85 km² land position
Communiqués de Presse de Niogold Mining Corp
07/12/2010and Aurizon Report 20.44 G/T AU Over 3.2 Metres at Marban
18/03/2010 Exploration Drilling at Malartic Returns Values Up to 31 Gr...
11/02/2010To acquire Nicolet-south property adjoining Nevado and Bowmo...
08/02/2010The Gold Report: Jay Taylor Updates NioGold Mining (TSX-V: ...
28/01/2010Reports Significant Increase In Malartic Project’s Gold Reso...
24/12/2009 Completes $2,16M financing and updates activities in the Ma...
14/12/2009Interview with NioGold's President
03/09/2009Resumes drilling in the Malartic Gold camp
21/08/2009Acquires 4 claims in Val d'or
06/08/2009 Siscoe East drilling returns 43,67 g/t Au over 1,9 metres
08/07/2009Shareholder Update
20/02/2009Joins the “AGORACOM 100” and Launches Online IR and Marketin...
01/10/2008OPTIONS STRATEGIC PROPERTY IN THE MALARTIC GOLD CAMP
30/09/2008ATLANTA GOLD INC. AND NIOGOLD MINING CORP. OPTION ABITIBI QU...
12/08/2008MARBAN WEST EXTENSION DRILLING RETURNS UP TO 78.90 G/T GOLD ...
02/07/2008lexandria Minerals and NioGold Mining to Enter JV on Siscoe ...
05/02/2008ACQUIRES 10 CLAIMS IN MALARTIC GOLD CAMP
15/01/2008EXTENDS KIERENS ZONE WITH 9.6 G/T GOLD OVER 3.1 METRES INTER...
20/12/2007Investor Update
06/11/2007MARBAN DRILLING RETURNS 6.05 G/T GOLD OVER 6.5 METRES
02/10/2007ROXANE URANIUM PROSPECT TRACED OVER 2 KM ON PUMP LAKE
25/09/2007DRILLING PROVES STRONG POTENTIAL AROUND FORMER MARBAN MINE
11/09/2007FINDS URANIUM ON PUMP LAKE
06/09/2007Investor Update
08/05/2007FIELD EXPLORATION ON PUMP LAKE COPPER-GOLD-URANIUM PROSPECT
08/05/2007STARTS FIELD EXPLORATION ON PUMP LAKE COPPER-GOLD-URANIUM PR...
26/04/2007INITIATES SIZEABLE DRILL PROGRAM IN THE MALARTIC GOLD CAMP
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (NOX.V)FRANKFURT (NG1.F)
0,160+0.00%0,175+0.00%
TSX-V
CA$ 0,160
23/05 11:51 -
0%
Cours préc. Ouverture
0,160 0,160
Bas haut
0,160 0,160
Année b/h Var. YTD
0,140 -  0,370 -51,52%
52 sem. b/h var. 52 sem.
0,140 -  0,500 -56,76%
Volume var. 1 mois
4 500 -15,79%
24hGold TrendPower© : -31
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-65,96%
201234,29%0,500,32
20110,00%0,550,30
20109,37%0,430,18
2009540,00%0,380,05
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois