Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Copper Fox Metals Inc.

Publié le 03 décembre 2014

Copper Fox Announces Preliminary In-Situ Leach Test Results from Van Dyke Oxide Copper Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper |

Copper Fox Announces Preliminary In-Situ Leach Test Results from Van Dyke Oxide Copper Project

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Dec 3, 2014) - Copper Fox Metals Inc. ("Copper Fox" or the "Company") (TSX VENTURE:CUU) and its wholly owned subsidiary Desert Fox Copper Inc. ("Desert Fox") are pleased to announce the preliminary results of the in-situ leaching tests completed on samples of the oxide copper mineralization from the Van Dyke oxide copper project. The main objective of the test work was to evaluate copper dissolution kinetics, total soluble copper extraction, acid consumption and to simulate the underground hydraulic pressure in an in-situ leaching process over a 120 day leach period.

Highlights:

  • Calculated total copper grades ranged from 0.35% to 2.03% and averaged 0.76%,
  • Approximately 89% of the copper contained in the samples reports as soluble copper,
  • Gangue acid consumption ranged from 0.72 kg/kg copper to 23.69 kg/kg copper and averaged 7.72 kg/kg copper,
  • Copper extractions ranged from approximately 87% to 24% and averaged 63%, and
  • The relative difference between the percentage copper extractions and the percentage of soluble copper (acid soluble copper and cyanide soluble copper) reported could be due to lack of solution diffusion, lack of ferric iron generation, mass transfer or solution channeling in the test vessels used to complete the tests.

Mr. Stewart, President of Copper Fox stated, "We are pleased with the preliminary in-situ leach test work results for the Van Dyke oxide copper deposit. The high percentage of soluble copper in the test samples combined with the reported acid consumption is very encouraging and considered a significant milestone in the advancement of the project. These results combined with the resource estimation that is currently underway will be used to determine the next phase of work to be completed at the Van Dyke project."

Van Dyke Project:

The 1,100 acre Van Dyke project is located in the Globe-Miami Mining District, 90 miles east of Phoenix, Arizona. This district hosts the Pinto Valley, Carlota, Miami-East and Miami-Inspiration copper projects and the mined-out Copper Cities and Old Dominion copper deposits. The Van Dyke oxide copper deposit is located immediately adjacent to the Miami-East and Miami-Inspiration copper projects (see the Company's news release dated April 12, 2013 for further detail with respect to the historical work completed on the Van Dyke oxide copper deposit).

Moose Mountain Technical Services is working toward completion of a resource estimate on the Van Dyke oxide copper deposit. The estimate will incorporate results of the 2014 verification drilling program and those elements of the historical data base that are applicable (see the Company's news release dated October 28, 2014 for further details with respect to the resource estimate).

In-Situ Leach Results:

The In-Situ Copper Leaching Simulation Study (the "Study") was completed by SGS E&S Engineering Solutions Inc. ("SGS") located in Tucson, Arizona. The Study was completed on eight samples selected from five of the six confirmation diamond drill holes completed on the Van Dyke project in 2014. These samples were subjected to leaching under a nominal pressure of 120 pounds per square inch ("psi") to maintain carbonates in solution over 120 days of a locked cycle type of leaching regime to simulate the underground hydraulic pressure in the in-situ leaching process. The combination of acid soluble and cyanide soluble copper are used to determine the total soluble copper in the samples.

Sample PRT-03 yielded the lowest (approximately 24%) copper extraction of all samples tested. This sample returned the lowest solubility in sulfuric acid and the highest solubility in cyanide indicating that the main copper mineralization could be chalcocite and covellite. This sample also demonstrated the highest acid consumption of all samples tested. SGS suggests that ferric iron generation will be required for dissolving the cyanide soluble copper contained in this sample.

A mineralogical examination on the test samples showed that chrysocolla and malachite are the primary copper bearing minerals. Native copper, azurite and chalcocite are present in minor concentrations.

Recommendations:

SGS has recommended additional test work on samples from the Van Dyke project to evaluate:

  • the effect of ferric iron addition on dissolution of the secondary copper mineralization (cyanide soluble copper), and
  • the effect of the surfactant addition to modify the surface tension of the lixiviant which may help on the dissolution of the un-leachable soluble copper,

In-Situ Leach Test Work:

The samples of the oxide copper mineralization from the Van Dyke deposit were cut into 60 centimeter long sections, wrapped and inside a stainless steel vessel, sealed with paraffin wax and subjected to pressure leach testing. A 1,000 gram sub-sample of each sample was crushed and submitted for mineralogical examination. On completion of the 120 day leach cycle, each sample (referred to as residue) was dried, crushed and subjected to sequential copper analysis. The soluble copper in the residue combined with the copper extracted during the leach cycle were added to obtain the calculated head grade for each sample. The mineralogical examination was completed at the Center for Advanced Mineral and Metallurgical Processing of the University of Montana. The chemical analysis for all samples was completed by SGS using Induced Couple Plasma ("ICP").

Elmer B. Stewart, MSc. P. Geol., President of Copper Fox, is the Corporation's nominated Qualified Person pursuant to National Instrument 43-101, Standards for Disclosure for Mineral Projects, has reviewed and approved the technical information disclosed in this news release.

About Copper Fox

Copper Fox is a Tier 1 Canadian resource company listed on the TSX-Venture Exchange (TSX VENTURE:CUU) focused on copper exploration and development in North America with offices in Calgary, Alberta and Miami, Arizona.

Copper Fox holds a 25% interest in a joint venture (the "Schaft Creek Joint Venture") with Teck Resources Limited on the Schaft Creek copper-gold-molybdenum-silver project located in northwestern British Columbia. On January 23, 2013, a National Instrument 43-101 Technical Report was prepared by Tetra Tech under the direction of Copper Fox comprising a feasibility study of a 130,000 tonne per day-open pit mine with a Proven and Probable Reserve of 940.8 million tonnes grading 0.27% copper, 0.19 g/t gold, 0.018% molybdenum and 1.72 g/t silver over a 21 year mine life with contained metal of 5.6 billion pounds of copper, 5.8 million ounces of gold, 363.5 million pounds of molybdenum and 51.7 million ounces of silver.

The Schaft Creek deposit hosts a Measured and Indicated Resource of 1.2 billion tonnes grading 0.26% copper, 0.017% molybdenum, 0.19 g/t gold and 1.69 g/t silver and a 597.2 million tonne Inferred Resource grading 0.22% copper, 0.016% molybdenum, 0.17 g/t gold and 1.65 g/t silver. The Proven and Probable Reserves for the Schaft Creek project are included within the stated Measured & Indicated Resources for this project.

In addition to Copper Fox's 25% interest in the Schaft Creek Joint Venture, Copper Fox holds, through Desert Fox and its wholly-owned subsidiaries, a 100% interest in the Sombrero Butte copper project in the Bunker Hill Mining District, Arizona and the Van Dyke oxide copper project in the Globe-Miami Mining District, Arizona. Copper Fox holds, through Northern Fox Copper Inc. (a wholly owned subsidiary of Copper Fox), a 42% interest in the Eaglehead copper/gold/molybdenum project located in northwestern British Columbia through its equity ownership of Carmax Mining Corp. (CXM.V). For further information on these projects, please refer to the Company's website at www.copperfoxmetals.com.

On behalf of the Board of Directors

Elmer B. Stewart, President and Chief Executive Officer

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" within the meaning of the Canadian securities laws. Forward-looking information is generally identifiable by use of the words "believes," "may," "plans," "will," "anticipates," "intends," "budgets", "could", "estimates", "expects", "forecasts", "projects" and similar expressions, and the negative of such expressions. Forward-looking information in this news release includes, but is not limited to, statements about: the results of the Preliminary In-Situ Leach Study on core samples from the Van Dyke project; the commencement and completion of a resource estimate by Desert Fox on the Van Dyke oxide copper project; recommended additional test work on samples from the Van Dyke project; and statements about Copper Fox's strategy, future operations, prospects and the plans of management.

In connection with the forward-looking information contained in this news release, Copper Fox and its subsidiaries have made numerous assumptions. While Copper Fox considers these assumptions to be reasonable, these assumptions are inherently subject to significant uncertainties and contingencies. Additionally, there are known and unknown risk factors which could cause Copper Fox's actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information contained herein. Known risk factors include, among others: the resource estimate by Desert Fox on the Van Dyke oxide copper project may not be completed as currently anticipated, or may not contain mineralization or a resource as favorable as suggested by the historical estimate; the historical estimates for the Van Dyke deposit may not be reliable or indicative of any commercial benefit to Copper Fox; additional metallurgical test work on the Van Dyke copper deposit may not result in copper recoveries as favorable as presented in the historical information or recover any copper at all; fluctuations in copper prices and demand; currency exchange rates; conditions in the financial markets and the overall economy may continue to deteriorate; uncertainties relating to interpretation of the previous drill results and the geology, continuity and grade of Van Dyke deposit; the previous metallurgical test work and metal recovery rates; the need to obtain additional financing and uncertainty of meeting anticipated program milestones; and uncertainty as to timely availability of permits and other governmental approvals. A more complete discussion of the risks and uncertainties facing Copper Fox is disclosed in Copper Fox's continuous disclosure filings with Canadian securities regulatory authorities at www.sedar.com. All forward-looking information herein is qualified in its entirety by this cautionary statement, and Copper Fox disclaims any obligation to revise or update any such forward-looking information or to publicly announce the result of any revisions to any of the forward-looking information contained herein to reflect future results, events or developments, except as required by law.

Lire la suite de l'article sur finance.yahoo.com

Copper Fox Metals Inc.

EN DÉVELOPPEMENT
CODE : CUU.V
ISIN : CA21749Q1046
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Copper Fox est une société développant des projet miniers de cuivre basée au Canada.

Copper Fox est en développement de projets de cuivre, d'argent, de molybdène et d'or au Canada.

Son principal projet en développement est SCHAFT CREEK au Canada.

Copper Fox est cotée au Canada. Sa capitalisation boursière aujourd'hui est 107,0 millions CA$ (78,0 millions US$, 73,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 21 avril 2011 à 2,63 CA$, et son plus bas niveau récent le 13 mars 2020 à 0,01 CA$.

Copper Fox possède 427 809 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Copper Fox Metals Inc.
2007 Annual report
2006 Annual report
Financements de Copper Fox Metals Inc.
01/07/2016Announces Closing of the Second placement
08/04/2013Announces Closing of a $2,653,000 Financing
22/02/2013announces a $2,500,000 Private Placement Unit Offering, insi...
22/01/2013ANNOUNCES the Closing of a $1,500,000 Financing by an Inside...
16/01/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
16/01/2013Announces a $1,500,000 Private Placement Unit Offering, Insi...
24/10/2012ANNOUNCES the Closing of a $2,500,000 Financing by an Inside...
14/09/2012Announces the Closing of a $4,025,000 Financing by an Inside...
23/07/2012ANNOUNCES a $4,025,000 Private Placement Unit Offering, Insi...
18/06/2012Announces A $4,480,000 Private Placement Unit Offering Insid...
30/01/2012Announces The Closing Of $2,200,000 Financing By An Insider
19/01/2012Announces a $2,200,000 Private Placement Unit Offering Insid...
14/12/2011Announces the Closing of $4,000,000 Financing by an Insider
07/12/2011Announces Increase of $2,000,000 to previously announced Pri...
05/10/2011Announces the Closing of $5,000,000 Financing by an Insider
13/09/2011Announces an Additional $2,000,000 Private Placement Unit Of...
08/09/2011announces a $3,000,000 Private Placement Unit Offering. Ins...
31/03/2011ANNOUNCES THE ACCELERATION TERM TO BE APPLIED TO THE EXPIRY ...
17/03/2011CLOSING OF A $3,750,000 NON BROKERED PRIVATE PLACEMENT FLOW-...
17/02/2011Announces a $3,750,000 Non Brokered Private Placement Flow-T...
22/10/2009closing of a $2,000,000 Private Placement Unit Offering
28/09/2009$2,000,000 Private Placement
23/06/2009Provides Update on its $6,000,000 Private Placement
19/06/2009 Updates on its $6,000,000 private placement
02/06/2009announces a $6,000,000 non-brokered Private Placement of whi...
16/12/2008Announces the Withdrawal of a Private Placement Financing
07/11/2008ANNOUNCES PRIVATE PLACEMENT FINANCING
07/11/2008Announces Private Placement Financing
15/05/2008closes Non Brokered Private Placement Financing of $12,398,2...
17/07/2007to raise $10,000,000 in flow-through and non-flow-through fu...
17/07/2007Intends to offer a brokered private placement
Attributions d'options de Copper Fox Metals Inc.
30/04/2012Announces Incentive Stock Option Grants
14/03/2011Grant of 1,700,000 shares at $ 1,69 par share
26/06/2008grant of incentive stock options to Employees, Officers, Con...
Nominations de Copper Fox Metals Inc.
03/05/2011ANNOUNCES RESIGNATION OF CFO, APPOINTMENT OF AN INTERIM CFO
16/07/2009Announces Executive Changes and the Appointment of a Directo...
17/09/2007Announces the appointment of Shane Uren as Vice President
Rapports Financiers de Copper Fox Metals Inc.
22/09/2016Announces 2016 Third Quarter Financial Results
31/03/2016Announces 2016 First Quarter Financial Results
29/09/2015Announces Third Quarter Results
28/09/2013Announces Third Quarter Results
24/06/2013Announces Second Quarter Results
27/09/2012Announces Third Quarter Results
18/06/2012Announces Second Quarter Results
25/04/2012Announces First Quarter Results
29/02/2012Reports 2011 Annual Financial Results and a Corporate Update
29/09/2011Reports 2011 Third Quarter Financial Results and a Corporate...
30/06/2011Advances Feasibility Study and Reports 2011 Second Quarter F...
31/03/2011Announces First Quarter 2011 Highlights and Financial Result...
16/02/2011Announces Fourth Quarter Highlights and 2010 Year-End Financ...
25/02/2010Announces 2009 Year-End Financial Results
06/03/20092008 Year-end Financial Results
04/06/2008Second Quarter Results Three and Six Months Ended April 30, ...
03/06/2008Second Quarter Results
31/03/2008First Quarter Financials
27/03/2008First Quarter Results Three Months Ended January 31, 2008
11/02/20082007 Year-End Financial Results
24/09/2007Announces third quarter results
28/03/2007announces its first quarter results for the three months en...
Projets de Copper Fox Metals Inc.
09/01/2014Outlines 2014 Diamond Drilling Plans for Van Dyke Copper Pro...
19/11/2013Sampling Locates Two Large Areas Of Porphyry Style Copper-M...
12/04/2013Acquires Van Dyke Copper Deposit in Arizona
25/03/2013(Schaft Creek)Enters Into Facilities Study Agreement with BC Hydro for Sch...
04/02/2013(Schaft Creek)Files Positive Feasibility Study on Schaft Creek Project
10/09/2012Completes Acquisition Of Sombrero Butte Copper Project And V...
09/07/2012To Acquire From Bell Copper The Van Dyke Copper Deposit And ...
31/05/2012(Schaft Creek)Schaft Creek Resource Estimate Update
24/05/2012(Schaft Creek)Provides Update on Schaft Creek Project
10/05/2012(Schaft Creek)Announces 2012 Exploration Program And Acquires Additional M...
27/03/2012(Schaft Creek)Completes Land Acquisitions Covering Positive Magnetic Linea...
19/03/2012(Schaft Creek)s Activities on the Schaft Creek-Copper-Gold-Molybdenum-Silv...
03/02/2012(Schaft Creek)Announces Drilling Intersect of 0.96% CuEq Over 110m and Rep...
12/12/2011Drilling Expands Paramount Zone with Intersection of 1.10% C...
13/10/2011(Schaft Creek)Secures Shipping Facilities for Concentrate at Port of Stewa...
23/09/2011(Schaft Creek)Extends Mineralized Zone to the East And Completes Strategic...
06/09/2011Welcomes the Awarding of the Construction Contract for the N...
26/07/2011(Schaft Creek)Drilling Intersects 1.18% Copper Equivalent Over 161M at Sch...
31/05/2011(Schaft Creek)Commences 2011 Drilling Program, Updates Other Activities ...
10/05/2011(Schaft Creek)Welcomes the Federal Government of Canada's Approval of the ...
06/05/2011(Schaft Creek)Provides Update on 2011 Plans for Schaft Creek, Diamond Dril...
05/05/2011(Schaft Creek)FOX PROVIDES UPDATE ON 2011 PLANS FOR SCHAFT CREEK, DIAMOND ...
24/03/2011(Schaft Creek)Announces Strategic Acquisitions to Enlarge Schaft Creek Pro...
28/02/2011(Schaft Creek)Copper Fox Metals Applauds the Announcement of the Province ...
23/02/2011(Schaft Creek)DDH CF405 Tests Chargeability Anomaly And Expands Zone Of De...
14/02/2011(Schaft Creek)News Release
03/02/2011(Schaft Creek)Latest Assay Results Expands Zone of Deep, Higher Grade Mine...
18/06/2010files an amended Preliminary Feasibility Study on SEDAR
01/04/2010s Status of Feasibility Study and Reports 2010 First Quarter...
21/01/2010(Schaft Creek)Awards Feasibility Study On Schaft Creek Project
18/11/2009(Schaft Creek)Geophysical Survey Outlines "8" IP Anomalies at Schaft Creek...
15/09/2008Positive Results of Preliminary Feasibility Study on Schaft ...
15/09/2008Announces Positive Results of Preliminary Feasibility Study ...
14/07/2008(Schaft Creek)Strategic Drilling Program and Greenfield Camp Expansion Hig...
26/06/2008(Schaft Creek)2007 Drilling And Geophysical Results All Show Increased Pot...
20/03/2008(Schaft Creek)Announces Schaft Creek progress
14/01/2008(Schaft Creek)Releases Positive Preliminary Economic Assessment on its Sch...
27/11/2007(Schaft Creek)continues development of its Schaft Creek British Columbia m...
22/10/2007(Schaft Creek)'Pit Optimization Study Demonstrates 65,000-tonne per-day Op...
10/07/2007(Schaft Creek)Updates 2007 Schaft Creek Work Program
04/07/2007(Schaft Creek)Significantly Increases Resources at Schaft Creek
Communiqués de Presse de Copper Fox Metals Inc.
29/06/2016Copper Fox Announces 2016 Second Quarter Financial Results
10/06/2016Copper Fox Announces a $1,000,000 Non-Brokered Private Place...
31/03/2016Copper Fox Announces 2016 First Quarter Financial Results
30/03/2016Copper Fox Annnounces 2016 Schaft Creek Program
25/01/2016Copper Fox Announces Mineral Mountain Copper Project in Ariz...
24/12/2015Copper Fox Files Van Dyke Technical Report on SEDAR
22/12/2015Copper Fox Announces $1,650,000 Non-Brokered Private Placeme...
06/11/2015Copper Fox Provides Update of Activities
29/09/2015Copper Fox Announces Third Quarter Results
25/09/2015Copper Fox Extends Size of Exploration Target on Sombrero Bu...
08/09/2015Copper Fox Reports Large Chargeablity Signature on Sombrero ...
28/07/2015Copper Fox Provides Update of Activities
13/07/2015Copper Fox Commences Titan-24 DCIP Survey at Sombrero Butte ...
15/04/2015Copper Fox Announces Preliminary Results of Metallurgical Te...
08/04/2015Copper Fox Announces Commencement of Preliminary Economic As...
31/03/2015Copper Fox Annnounces First Quarter Results
17/03/2015Copper Fox Annnounces 2015 Schaft Creek Program
13/03/2015Copper Fox Receives $3.63 Million Cash Refund
12/03/2015Copper Fox Extends Warrant Expiry Dates and Announces AGM Da...
27/02/2015Copper Fox Announces Annual Results
09/02/2015Copper Fox Updates Schaft Creek Project Activities
03/02/2015Copper Fox Files Van Dyke Technical Report on SEDAR
15/01/2015Copper Fox Completes Top-Up Investmentin Carmax Mining Corp.
24/12/2014Copper Fox Provides Corporate Update on Project Activities
19/12/2014Copper Fox Completes Inferred Mineral Resource Estimate for ...
03/12/2014Copper Fox Announces Preliminary In-Situ Leach Test Results ...
28/10/2014Copper Fox Announces Commencement of Resource Estimate at Va...
23/10/2014Copper Fox Announces Update on Schaft Creek Project
25/09/2014Copper Fox Completes Top-Up Investment in Carmax Mining Corp...
23/09/2014Copper Fox Announces Third Quarter Results
10/09/2014Copper Fox Announces Van Dyke Drill Results and Provides Oth...
07/08/2014Copper Fox Announces Van Dyke Drill Results and Provides Cor...
21/07/2014Copper Fox Completes Van Dyke Drilling Program and Provides ...
18/06/2014Copper Fox Announces Second Quarter Results
29/05/2014Copper Fox Closes Carmax Investment
23/05/2014Copper Fox Announces Carmax Shareholders Approve Private Pla...
15/05/2014Copper Fox Adds Second Drill to Van Dyke Project and Provide...
03/12/2013s Activities on Van Dyke Copper Deposit in Arizona
19/11/2013Sampling locates two large areas of porphyry style copper-mo...
30/08/2013announces a corporate reorganization
12/08/2013provides update on corporate activities
16/07/2013(Schaft Creek)And Teck Resources Form Schaft Creek Joint Venture
05/06/2013(Schaft Creek)provides update on discussions regarding Schaft Creek
07/02/2013(Schaft Creek)Completes Land Acquisitions at Schaft Creek & Sombrero Butte...
17/01/2013Announces Extension Of Expiry Date Of Certain Stock Options
17/10/2012(Schaft Creek)Reports Diamond Drill Results From the 2012 Drilling Program...
25/09/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
25/09/2012(Schaft Creek)Reports the Status of the Schaft Creek Feasibility Study and...
04/09/2012Drilling Indicates Widespread Mineralization in the Discover...
02/08/2012(Schaft Creek)Drilling Extends Mineralization In Discovery Zone And Acquir...
16/02/2012(Schaft Creek)Locates a New Zone of Copper Mineralization 1,200M North of ...
23/01/2012Announces The Issuance Of 1,272,727 Shares For Outstanding ...
13/01/2012Announces Shares For Debt Agreement
06/09/2011(Schaft Creek)Drilling Intersects 0.81% Copper Equivalent Over 154m at Sch...
11/07/2011(Schaft Creek)Measured and Indicated Resource Estimate Exceeds 1 Billion T...
21/06/2011(Schaft Creek)High Resolution Magnetic Survey at Schaft Creek Confirms Sim...
13/04/2011Announces Completion of 3D Model and Award of High-Resolutio...
13/04/2011ANNOUNCES COMPLETION OF 3D MODEL AND AWARD OF HIGH-RESOLUTIO...
17/06/2010June 17 2010 news release
01/06/2010June 1 2010 News release
02/02/2010Feb 2 2010 news release
21/01/2010Jan 21, 2010
23/10/2009New release attached
22/10/2009announces the closing of a $2,000,000 Private Placement Unit...
17/09/2009Applauds Federal Government’s Support for British Columbia N...
17/09/2009Applauds Federal Government's Support for British Columbia N...
13/07/2009Special Shareholders Meeting Approves a New control Person -...
13/07/2009July 13, 2009 News release
30/06/2009Three and Six Months Ended April 30, 2009
26/06/2009June 25, 2009 news release
03/03/2009Annual Financial
27/02/2009Feb 26, 2009 News release
27/02/2009Lions Gate Metals Inc. and Copper Fox Metals Inc. Announce B...
12/02/2009Correct News release
12/02/2009Feb 11 09 News release
12/02/2009provides an update of Corporate Activities
03/02/2009Highway 37 Power Line Coalition Applauds Premier for Express...
22/01/2009Cambridge House Invitation - Vancouver
18/12/2008December 17 2008 News release
18/12/2008Announces Resignation Of A Director
30/09/2008Sept 30/08
29/09/2008Applauds Advancement of Northwest Power Line
29/09/2008Applauds Advancement of Northwest Power Line
26/09/2008Northwest Power Line Could Create Thousands of Jobs, Attract...
17/09/2008Schaft not Galore says Copper Fox president
02/09/2008LV Hard Assets Conference Personalized Html
17/07/2008from the Ministry of Energy, Mines and Petroleum Resources r...
26/06/2008June 26 2008 Options
26/06/2008June 26, 2008
26/05/2008Register Today for a Discounted Rate to the New Orleans 2008...
04/04/2008Applauds Advancement of Northwest Power Line Study
31/03/2008$16mm offering
15/11/2007announces the renewal of the engagement of Jason Shepherd fo...
12/10/2007Announces is has earned a 70% Direct Interest in the World C...
02/10/2007$400 million to empower B.C.'s far northwest
08/08/2007Drilling to Commence at Copper Flats
12/07/2007Press Release: Augusta Files Plan of Operations for Rosemont...
03/07/2007 2nd Quarter Financials
11/06/2007announces its request for a trading halt
04/05/2007and the Tahltan Nation Development Corporation complete a "M...
22/04/2007Adopts a Shareholder Rights Plan.
27/02/2007Welcomes New Executive to the Team
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CUU.V)
0,250+6.38%
TSX-V
CA$ 0,250
22/04 16:59 0,020
6,38%
Cours préc. Ouverture
0,235 0,240
Bas haut
0,225 0,250
Année b/h Var. YTD
0,160 -  0,250 8,70%
52 sem. b/h var. 52 sem.
0,150 -  0,300 -7,41%
Volume var. 1 mois
436 610 38,89%
24hGold TrendPower© : 40
Produit
Développe Copper - Gold - Molybdenum - Silver
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/07/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202428,21%
202321,88%0,310,15
2022-36,00%0,320,13
2021-25,37%0,660,20
2020346,67%0,470,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,37 CA$-0,42%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,79 CA$-0,32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$+0,54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,13 US$+0,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :