Iluka Resources Ltd

Publié le 20 janvier 2009

December Quarter 2008 Production and Development Report

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

Attached is Iluka's December Quarterly Production and Development Report.

 

Key features include the following:

 

          Mineral Sands Sales Revenue (ex Mining Area C Royalty, as well as by-product and other revenues) for the 12 months (pre- currency hedging) increased by 16.7% to $1,008 million and by 9.0% to $979m after currency hedging -refer page 4 of attachment for further detail.

          Higher revenue reflects higher zircon sales volumes, an increase in high grade Ti02 (rutile and synthetic rutile) prices, a marginally lower average full year A$/US$ currency (0.08535 cents compared with 0.8390 cents) influenced in part by a significantly lower fourth quarter average A$/US$ exchange rate (0.6746 cents compared with September 2008 quarter of 0.8907 cents), offset by lower first half zircon prices.

          Zircon production for the 12 months down by 14.8% to 438,000 tonnes (“kt”) (2007: 514kt), including a reduction of approximately 15kt associated with the gas supply disruption in Western Australia. December quarter zircon production increased 2.2 per cent from the September 2008 quarter. Approximately 25% of Iluka’s zircon production is now sourced from Murray Basin, a level which is expected to increase with the commencement of Murray Basin Stage 2 in the first half of this year.

          Rutile production was stable (down 0.9%) at 214kt on an annual basis, despite the loss of approximately 8kt associated with the gas supply disruption in Western Australia. The Murray Basin now contributes approximately 30% of Iluka’s rutile production and this level will increase with the commencement of production from Murray Basin Stage 2.

          Synthetic rutile production declined 11.3 per cent year-on-year to 467kt, with production adversely affected by approximately 45kt associated with the Western Australian gas supply disruption, as well as major maintenance outages in the first quarter of the two South West kilns. December quarter production at 133kt was marginally lower than the September 2008 quarter at 136kt.

 

          Iluka advised on 15 Oct 2008  that it expected 4th quarter 2008 zircon production to be in the range of 100kt to 120kt (actual: 110kt), with sales volumes expected to exceed production by around 25 per cent. Fourth quarter zircon sales were broadly in line with this guidance, with only minor volumes of planned zircon sales not taken up by customers in the period. 

          Zircon sales exceeded production by over 20% (or more than 100kt) for the full year through the draw-down of inventory. Given 2009 zircon production is expected to be in line with 2008 levels and zircon sales volumes in 2009 are expected to be more closely aligned to production volumes, Iluka’s lower zircon volume available for sale in 2009 is expected to contribute to overall industry supply tightness for this product.

          Iluka advised on 15 Oct 2008 that it expected 4th quarter rutile production of 45kt to 55kt (actual: 50kt), and indicated it expected rutile sales in the fourth quarter to be in line with production. Sales volumes were at the low end of this range, influenced by an 11kt rutile shipment which occurred in early January 2009 rather than December 2008. Iluka now expects 2009 rutile production to be 30 to 40% higher than 2008 levels vs the 15 Oct 2008 expectation of approximately 40%.

          Iluka also advised that it expected 4th quarter synthetic rutile production to be between 130kt to 140kt (actual: 133kt), with synthetic rutile sales expected to be roughly 30% higher than production in the quarter, which was the outcome. Iluka also advised that it expected 2009 production of synthetic rutile to be similar to 2008 levels, which remains the case.

          Iluka’s capital expenditure for the full year was $252m, of which $194m was committed to the growth projects of Murray Basin Stage 2 (Victoria), Jacinth-Ambrosia (South Australia) and Brink, (Virginia, United States). The lower expenditure level compared with October 2008 guidance of $310m reflects slower cash capital expenditure rates (as opposes to committed expenditure) than previously forecast in the major projects.

          Each of these projects is within budget and on-schedule, with Murray Basin Stage 2 and Brink commissioning to be followed by production ramp up in the second quarter this financial year, and Jacinth-Ambrosia expected to commence operations by mid 2010. Iluka’s strong balance sheet situation provides the capacity on current forecasts to fund comfortably the remaining expenditure for these projects.

          Iluka has commenced arrangements to close its Wagerup mine site, south of Perth, during January 2009. Mining at Wagerup commenced in 2005. In addition, Iluka plans to complete its mining operations at Waroona in the fourth quarter of 2009, following the exhaustion of higher value synthetic rutile feedstock ilmenite. During 2008, mining operations at Cloverdale also ceased.

          The decision to cease mining operations early at Wagerup and Waroona is aligned with Iluka’s focus on generating acceptable returns from its operations. Both of these operations are now at the stage where the production output is mainly lower value sulphate ilmenite.  A number of closure costs and provisions for these decisions will be reflected in the full year results.

 

Iluka's full year results are expected to be released on 19 February.

 

If I can assist with any further information related to the Production Report please let me know.

 

Regards

 

Rob

 

Robert Porter | General Manager Investor Relations and Corporate Affairs
Iluka Resources Limited | Level 23, 140 St Georges Terrace |
Perth WA 6000
Phone +61 8 9360 4751 |
Mobile 0407 391 829 | Fax + 61 8 9360 4336

robert.porter@iluka.com

<

Iluka Resources Ltd

EN DÉVELOPPEMENT
CODE : ILU.AX
ISIN : AU000000ILU1
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Iluka est une société développant des projet miniers de zircon basée en Australie.

Iluka détient divers projets d'exploration en Australie.

Son principal projet en développement est TRIPITAKA en Australie et ses principaux projets en exploration sont ECHO, TUTUNUP SOUTH, TUTUNUP, MURRAY BASIN, EUCLEA BASIN et ENEABBA en Australie.

Iluka est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,2 milliards AU$ (2,1 milliards US$, 1,9 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 28 novembre 1997 à 1,22 AU$, et son plus haut niveau récent le 14 juin 2013 à 9,99 AU$.

Iluka possède 418 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Iluka Resources Ltd
24/11/2008China Market Overview
Rapports annuels de Iluka Resources Ltd
2010 Annual Report documentation
2009 Annual Report
Rapports Financiers de Iluka Resources Ltd
13/10/2011(ILU): Quarterly Production Report to 30 September 2011
Projets de Iluka Resources Ltd
12/04/2012March 2012 Quarterly Production Report
22/02/2012Ore Reserves and Mineral Resources Increases
31/01/2012Invitation to 2011 Full Year Results Teleconference Thursday...
11/01/2012Quarterly Production Report to 31 December 2011
07/12/2011High Grade Titanium Dioxide Pricing
14/07/2011June 2011 Quarterly Production Report
12/04/2011(ILU) - March 2011 Quarterly Production Report
15/07/2010(Euclea Basin)Typhoon Mineral Resource Estimate
19/11/2009(Euclea Basin)Jacinth-Ambrosia Commences Production
13/10/2009(Murray Basin)Murray Basin Stage 2 Production Commencement
30/01/2009(Murray Basin)Correction - ASX Announcement - Further Murray Basin Heavy M...
30/01/2009(Murray Basin)Further Murray Basin Heavy Mineral Resource Discovery
20/01/2009(Murray Basin)December Quarter 2008 Production and Development Report
07/01/2009(Murray Basin) FINAL REGULATORY APPROVALS FOR MURRAY BASIN STAGE 2 PROJECT
07/07/2008(Scm Vallenar Iron)KEY PROJECT MILESTONE FOR JACINTH-AMBROSIA PROJECT ACHIEVED
21/05/2008(Scm Vallenar Iron)Jacinth-Ambrosia Mineral Sands Development
Communiqués de Presse de Iluka Resources Ltd
01/08/2016Recommended proposal for Sierra Rutile by Iluka
01/08/2016Recommended proposal for Iluka by Sierra Rutile
31/07/2016Iluka Acquisition of Sierra Rutile Limited
31/07/2016Acquisition of Sierra Rutile Presentation
29/07/2016ANNOUNCEMENT RE ILUKA RESOURCES LIMITED
19/05/2016Iluka 2016 AGM Results of Meeting
18/05/2016Iluka 2016 AGM Addresses
07/04/2016Iluka Reference Price - Zircon
23/03/2016Notice of Annual General Meeting and Proxy Form
21/03/2016Iluka Managing Director Succession
20/01/2016December 2015 Production Report
16/12/2015Full Year Physical and Financial Update
07/12/2015Omani sovereign wealth fund holds talks to invest in Kenmare
19/08/2015Edited Transcript of ILU.AX earnings conference call or pres...
17/08/2015Iluka 2015 4D Commentary (18 Aug 2015)
17/08/2015Iluka 2015 Half Year Results Slide Pack (18 Aug 2015)
17/08/2015Iluka Half Year Results to 30 June 2015 (18 Aug 2015)
15/07/2015June 2015 Quarterly Production Report (16 Jul 2015)
18/03/2015Appendix 4G and 2014 Corporate Governance Statement (18 Mar ...
18/03/2015Term Sheet Signed with Iluka for Phar Lap IOCG Project
17/03/2015Iluka Executive Management Changes (17 Mar 2015)
26/02/2015Form 8.3 - Iluka Resources Ltd
19/02/2015Synthetic Rutile Kiln to Recommence (19 Feb 2015)
19/02/20152015 Key Physical and Financial Parameters (19 Feb 2015)
05/08/2013and Finance: Iluka secures Sri Lankan mineral sands and Gemf...
12/12/2012Market Update
27/03/2012Lodgement of Full Year Results
20/02/2012REMINDER: Iluka Resources - Invitation to 2011 Full Year Res...
25/08/2011(ILU) - Half Year Results to 30 June 2011
02/08/20112011 Half Year Results Announcement and Teleconference - Thu...
26/07/2011(Eneabba)Eneabba Mining Re-Start and 2 Kiln Operation
14/07/2011Key Physical and Financial Parameters - July update
03/06/2011Jacinth-Ambrosia Site Visit
25/05/20112011 Annual General Meeting - Chairman and Managing Director...
23/05/2011News Release
31/03/2011Response to ASX Price and Volume Query
04/03/2011Managing Director - Performance and Retention Plan
24/02/2011Full Year Results to 31 December 2010
14/02/20112010 Full Year Results announcement and investment presentat...
20/07/2010June 2010 Quarterly Production Report
05/07/2010Mining Area C Iron Ore Royalty and Zircon Demand in China
20/05/20102010 Annual General Meeting
17/05/2010Launches On-line Zircon Sales Site
22/04/2010March 2010 Quarterly Production Report
24/02/20102010-2013 Business Trends Commentary
24/02/2010Full Year Results to 31 December 2009
16/02/20102009 Full Year Results Announcement
10/02/2010Jacinth-Ambrosia Mineral Sands Project
19/01/2010December Quarter 2009 Production and Development Report
22/10/2009Extract from David Robb's TZMI Key Note Presentation
14/10/2009September 2009 Quarterly Production and Development Report
07/10/2009Mineral Sands Briefing Material
19/08/2009Half Year Results to 30 June 2009
27/07/2009Board Changes
16/07/2009June 2009 Quarterly Production and Development Report
28/05/2009Annual General Meeting
20/05/2009Final Regulatory Approval Received for Jacinth-Ambrosia Proj...
18/02/2009Full Year Results to 31 December 2008
19/02/20092009 COMMENTARY
19/12/2008Announces Early Closure of Wagerup and Waroona Mine Sites
09/12/2008FURTHER ILUKA PROFIT UPGRADE
03/12/2008WA Parliamentary Passage of Bill to Facilitate Investment in...
17/11/2008Heavy Mineral Exploration Update, Eucla Basin, South Austral...
17/11/2008Key Regulatory Approval Received for Jacinth-Ambrosia Projec...
10/11/2008 KEY REGULATORY APPROVAL RECEIVED FOR MURRAY BASIN STAGE 2 P...
29/08/2008Open Briefing Interview with David Robb, Managing Director o...
21/08/2008Half Year Results to 30 June 2008
17/07/2008June Quarter 2008 Production and Development Report
30/06/2008TO RESTART WESTERN AUSTRALIAN OPERATIONS
05/06/2008DISRUPTION OF GAS AND ELECTRICITY SUPPLY
05/06/2008Interruption to the Supply of Gas to Iluka’s WA Operations
21/05/2008DEVELOPMENT APPROVAL FOR JACINTH-AMBROSIA MINERAL SANDS PROJ...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (ILU.AX)FRANKFURT (ILZ.F)
7,62+5.62%4,57+5.91%
AUSTRALIA
AU$ 7,62
23/04 15:50 0,410
5,62%
Cours préc. Ouverture
7,21 7,28
Bas haut
7,26 7,63
Année b/h Var. YTD
6,29 -  7,63 14,76%
52 sem. b/h var. 52 sem.
6,29 -  11,94 -31,47%
Volume var. 1 mois
1 101 977 5,83%
24hGold TrendPower© : 23
Produit
Développe Zircon
Recherche Ilmenite - Rutile - Zircon
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-6,68%
2023-14,38%9,9610,00
2022-5,64%9,9910,00
202155,62%9,9910,10
2020-31,76%9,9610,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,03 US$+1,47%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$+4,20%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,20 CA$-3,74%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-2,15%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,58 US$+0,87%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :