First Majestic Silver Corp.: Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
Published : May 22, 2012
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar | G Mexico | Zinc |

VANCOUVER, BRITISH COLUMBIA--(Marketwire - May 22, 2012) - FIRST MAJESTIC SILVER CORP. (News - Market indicators)(NYSE:AG)(FRANKFURT:FMV)(WKN:A0LHKJ) (the "Company" or "First Majestic") is pleased to announce a new NI 43-101 Technical Report (TR) and Pre-Feasibility Study (PFS) for the Del Toro Silver Mine.

REPORTED HIGHLIGHTS

  • Silver Equivalent Measured & Indicated Resources increased by 186% to 74.5 million ounces
  • Silver Equivalent Inferred Resources increased by 79% to 79.0 million ounces
  • Total estimated production to reach 9.7 million silver equivalent ounces in 2014
  • Estimated total operating costs at $34.96 per tonne and cash costs of $7.32 per ounce of silver on a by-product basis
  • Post Tax NPV at 5% discount = US$147.1 million using a US$25 silver price
  • Internal Rate of Return (IRR) is 43% with a payback period of 2.5 years from completion
  • Life of Mine (LOM) currently estimated at 6.5 years taking into consideration mine dilution from underground mining operations and metallurgical silver recoveries of 77% in Sulfides and 81% in Oxides
  • Total capital requirement over three years of $124.2 million including a 5% contingency
  • The Del Toro Silver Mine is 100% owned by First Majestic Silver and there are no Royalties payable

This new NI 43-101 TR and PFS considers exploration and development work completed as at the cut-off date of March 31, 2012. These estimates include all work completed as at the cut-off date, including a total of 35,230 metres of diamond drilling over 117 holes and development metres totalling 7,133. Assays for 33 holes did not make the cut-off date and were not included in this report. Seven drill rigs remain actively drilling on site. The new Resource estimates as at the cut-off consists of 74.5 million ounces of silver equivalent in Measured and Indicated Resources, representing an increase of 186% from the 2008 estimates plus an additional 79.0 million ounces contained in Inferred Resources representing a 79% increase from the previous estimate.

Construction of the new 4,000 tpd dual circuit processing mill commenced in April 2011. As of today's date, construction remains on time with first phase of production scheduled to commence in the fourth quarter 2012. Ramp up of production used in the PFS was as follows; Phase 1 - starting in October 2012 through the first half of 2013 includes only sulfide ore processing through the flotation circuit at a capacity of 1,000 tpd; Phase 2 - includes the last half of 2013 through 2017 which includes oxide ore processing through cyanide leaching at a capacity of 2,000 tpd plus sulfide ore processing through flotation at a capacity of 2,000 tpd for total throughput of 4,000 tpd; Phase 3 - Year 2018 includes only 4,000 tpd of sulfide ore though flotation.

Total estimated throughput, described in more detail in the table below, reaches a production level in 2014 of approximately 9.7 million equivalent ounces of silver represented by 6.7 million ounces of pure silver annually plus approximately 39.4 million pounds of lead and 39.9 million pounds of zinc. Life of Mine (LOM) calculated in the Report is estimated at 6.5 years taking into consideration mine dilution and metallurgical silver recoveries of 77% in sulfides and 81% in oxides and lead and zinc recoveries from sulfides of 50% and 40%, respectively.

Keith Neumeyer, CEO and President of First Majestic Silver, states: "It should be apparent from the great strides being made with Del Toro that First Majestic is well on its way to achieving its objective of becoming the next senior silver producer. Our greatest challenge with the Del Toro is keeping ahead of reporting the rapid growth in the underground resources. As we continue to drill and further define the resources we anticipate it will be necessary to file yet another Technical Report by the end of this year. When we commission Del Toro later this year, and with the pending acquisition of Silvermex, First Majestic will have five producing mines with annual silver production exceeding ten million ounces and rapidly ramping up to over 15 million ounces by 2014. Our primary focus remains to continually expand production while driving costs downward to maintain our status of having our costs within the first quartile amongst our mid-tier and senior peers. As always, my continuing congratulations go out to our entire First Majestic team for its outstanding achievements."

Total Resources as at the cut-off date reached a silver equivalent Measured & Indicated Resource of 74.5 million ounces plus an additional silver equivalent Inferred Resources of 79.0 million ounces. More details can be seen in the table below.

The following three summary tables were taken from the complete Del Toro Silver Mine NI 43-101 TR and PFS prepared by Pincock Allan & Holt, Lakewood, Colorado (PAH). Shareholders and interested parties are encouraged to read this positive report in its entirety which can be viewed on SEDAR (www.sedar.com) and the Company's web site at www.firstmajestic.com.

Mineral Resources "In-Situ" as of March 31, 2012
 
 
Deposit
 
Tonnes M
Width
m
Au
g/t
Ag
g/t
 Pb
%
 Zn
%
Ag
(only)

oz
 
Ag
oz eq
Total
Ag
oz eq
Measured Sulfide Resources 1,042,705 6.73 0.00 90 1.66 3.72 3,021,927 4,448,816 7,470,744
Indicated Sulfide Resources 5,457,078 9.03 0.11 155 2.55 3.12 27,158,770 25,716,434 52,875,205
Total Measured + Inidicated Sulfides 6,499,783 8.66 0.09 144 2.40 3.21 30,180,698 30,165,251 60,345,948
Measured Oxide Resources 1,111,441 10.03 0.00 136 1.38 1.74 4,866,988 526 4,867,514
Indicated Oxide Resources 1,837,759 11.54 0.01 156 1.98 2.08 9,222,395 24,421 9,246,816
Total Measured + Indicated Oxides 2,949,200 10.97 0.00 149 1.75 1.95 14,089,383 24,947 14,114,330
Total Measured + Indicated Sulfides + Oxides 9,448,983 9.38 0.06 146 2.20 2.82 44,270,081 30,190,198 74,460,278
Inferred Sulfide Resources 8,617,965 8.42 0.09 120 2.12 3.83 33,233,695 42,234,881 75,468,576
Inferred Oxide Resources 641,136 6.49 0.00 173 2.33 1.86 3,573,464 0 3,573,464
Total Inferred Sulfides + Oxides 9,259,101 8.29 0.08 124 2.12 3.83 36,807,159 42,234,881 79,042,040
PAH review = Mineral Resources "In Situ", including mine dilution, but no mine and metallurgical recoveries.
Resource estimate based on Cutoff grade of Ag eqv. = Sulfides 118 g/tonne; Oxides 63 g/tonne. Metal prices: Silver $25/oz, Gold $1600/oz, Lead $0.90/lb, Zinc $0.90/lb.
Due to the uncertainty that may be attached to Inferred Mineral Resources, it cannot be assumed that all or any part of an Inferred Mineral Resource will be upgraded to an Indicated or Measured Mineral Resource as a result of continued exploration.
Inferred Mineral Resources do not have economic value and these have not been included in this TR as part of the economic analysis.

In PAH's opinion, and as described in the Report, numerous prospective mineralized structures and alteration zones within the Del Toro property holdings remain either under-explored or unexplored such as the already know areas of San Juan, Perseverancia and San Nicolas and the areas for future exploration such as the extension to depth of the Perseverancia chimney, the extension to the Northeast of the San Nicolas Vein, the newly purchased Dolores mine, in addition to Lourdes, Las Cotorras, La Nueva, India, Tayoltita, El Huitrón, and La Verdiosa structures.

Estimated Capital Expenditures
 
  YEARS  
Category 2012 2013 2014 TOTALS
Mine Development $ 5,259,339 $ 3,707,559 $ 1,322,283 $ 10,289,181
Exploration $ 4,000,000 $ 2,000,000 $ 2,000,000 $ 8,000,000
San Francisco Shaft and Mine Equipment $ 12,510,000 $ 7,715,000     $ 20,225,000
Process Plant $ 32,227,500 $ 44,345,295     $ 76,572,795
Total Direct Costs $ 53,996,839 $ 57,767,854 $ 3,322,283 $ 115,086,976
Owner Costs $ 1,200,000         $ 1,200,000
First Fills (Process + Mine) $ 500,000 $ 1,000,000 $ 500,000 $ 2,000,000
Total Indirect Costs $ 1,700,000 $ 1,000,000 $ 500,000 $ 3,200,000
Subtotal Capital Expenditures $ 55,696,839 $ 58,767,854 $ 3,822,283 $ 118,286,976
Contingencies @ 5% $ 2,784,842 $ 2,938,393 $ 191,114 $ 5,914,349
TOTAL CAPITAL EXPENDITURE $ 58,481,681 $ 61,706,247 $ 4,013,397 $ 124,201,325
Life of Mine Production Schedule         
 
  YEARS  
CATEGORY 2012 2013 2014 2015 2016 2017 2018 2019 TOTALS
Total Sulfide Tonnes Mined/Milled 82,000 350,000 660,000 660,000 660,000 851,381 1,234,158 131,375 4,628,914
Average Head Grades                  
  Silver - gpt 173 178 173 173 179 179 170 167 174
  Lead - % 2.71 2.80 2.71 2.71 2.81 2.82 2.65 2.60 2.73
  Zinc - % 2.74 2.68 2.74 2.74 2.67 2.66 2.78 2.82 2.72
  Gold - gpt 0.11 0.09 0.11 0.11 0.09 0.10 0.12 0.13 0.11
Total Oxide Tonnes Mined/Milled   240,000 660,000 660,000 660,000 468,619 85,842   2,774,461
Head Grades *                  
  Silver - gpt   146 141 141 141 144 140   142
Total Sulfide + Oxide Tonnes Mined & Milled 82,000 590,000 1,320,000 1,320,000 1,320,000 1,320,000 1,320,000 131,375 7,403,375
Average Head Grades                  
  Silver - gpt 173 165 157 157 160 167 168 167 162
  Lead - % ** 2.71 2.33 2.19 2.19 2.24 2.40 2.59 2.60 2.33
  Zinc - % ** 2.74 2.30 2.31 2.31 2.27 2.36 2.73 2.82 2.40
  Gold - gpt** 0.11 0.06 0.06 0.06 0.05 0.06 0.11 0.13 0.07
Annual Production                  
  Silver ounces 456,214 3,130,257 6,665,423 6,665,423 6,790,157 7,077,160 7,127,143 706,185 38,617,962
  Pounds of Lead 4,891,963 21,603,721 39,380,449 39,380,449 40,954,419 52,943,786 72,055,528 7,525,497 278,735,812
  Pounds of Zinc 4,959,313 20,649,525 39,912,041 39,912,041 38,784,370 49,949,239 75,767,342 8,169,082 278,102,953
  Gold ounces 311 1,119 2,412 2,412 1,967 2,463 4,804 550 16,038
TOTAL Equivalent Ounces of Silver Produced 829,511 4,720,236 9,675,393 9,675,393 9,789,405 10,941,694 12,756,980 1,306,383 59,694,995
* PAH has not reported Pb, Zn grades of oxide ores because no mill recovery of them will be done. San Juan Zinc deposit is not included in the Reserves.
** Average grades for sulfide ore only.
Metal average price assumptions for calculating equivalent ounces: Silver $25.00/oz, Lead $0.90/lb, Zinc $0.90/lb, Gold $1,600/oz

For the purposes of this PFS, Measured and Indicated Resources have been treated as Reserves therefore are inclusive of the estimated Mineral Reserves after deducting 12% of ore left in pillars and adding back 5% for mining dilution, and also deducting an ore body of zinc that is in the process of being defined. The result of these changes reduces the Measured and Indicated Resources of 9.4 million tonnes or 74.5 million ounces to 7.4 million tonnes equaling 59.7 million ounces of silver equivalent.

Current Construction Program

Mine and mill production is planned at 4,000 tpd, based on 330 working days per year. Full production is planned to be about 660,000 tonnes per year of sulfide ore and 660,000 tonnes per year of oxide ore. Achievement of this production rate is scheduled for 2014, with a ramp-up period commencing in late 2012 to early 2014.

The estimated remaining capital costs for 2012 as at March 31, 2012 to bring the Del Toro mine on stream and achieve the Phase 1 production rate of 1,000 tpd is estimated at an additional $47.8 million. To achieve full production at a rate of 4,000 tpd (1,320,000 tonnes per year) total estimated capital is $124.2 million, consisting of $38.5 million for the mine, $76.6 million for the mill facility, $3.2 million indirect cost, and $5.9 million contingency. Of the $124.2 million of capital investment, about $9.0 million (without contingency) is budgeted for developing and equipping the main San Francisco Shaft and ancillary installations, including an underground crusher station. LOM sustaining capital is estimated at about $17.48 million. Of the $124.2 million budget, $10.7 million has been spent in 2012 up to March 31, 2012. The remainder of the $124.2 capital expenditure from April 1, 2012 onward is planned to be spent as follows; $47.8 million for the balance of 2012, $61.7 is budgeted for 2013 and the balance of $4.0 is planned on being spent in 2014. It is expected that current cash flows and cash on hand are sufficient to finance this expenditure.

Total operating costs are projected at US$34.97 per tonne for LOM and cash costs of $7.32 per ounce of silver on a by-product basis including smelting and refining costs. Mine operating costs are estimated at an average of US$19.88 per tonne and mill operating costs are budgeted at US$13.56 per tonne with indirect cost at US$1.56 per tonne. Mine development is a very small component of the operating costs as most Del Toro mine development will be capitalized over LOM. The mine development, construction of the mill and process plant for both sulfide and oxide ore and construction of ancillary facilities is currently underway. The processing plant is scheduled to initiate operations at a rate of 1,000 tpd by Q4 2012 and ramp up to 4,000 tpd by mid-2014.

The Company's independent Qualified Person under the policies of National Instrument 43-101 who has reviewed the contents of this news release and who is responsible for the preparation of this Technical Report is Leonel López, C.P.G., P.G., who is an employee of Pincock Allen & Holt, and is independent of the Company.

First Majestic is a producing silver company focused on silver production in México and is aggressively pursuing its business plan of becoming a senior silver producer through the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its aggressive corporate growth objectives.

FIRST MAJESTIC SILVER CORP.

Keith Neumeyer, President & CEO

SPECIAL NOTE REGARDING FORWARD-LOOKING INFORMATION

This news release includes certain "Forward-Looking Statements" within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words "anticipate", "believe", "estimate", "expect", "target", "plan", "forecast", "may", "schedule" and similar words or expressions, identify forward-looking statements or information. These forward-looking statements or information relate to, among other things: the price of silver and other metals; the accuracy of mineral reserve and resource estimates and estimates of future production and costs of production at our properties; estimated production rates for silver and other payable metals produced by us, the estimated cost of development of our development projects; the effects of laws, regulations and government policies on our operations, including, without limitation, the laws in Mexico which currently have significant restrictions related to mining; obtaining or maintaining necessary permits, licences and approvals from government authorities; and continued access to necessary infrastructure, including, without limitation, access to power, land, water and roads to carry on activities as planned.

These statements reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements or information and the Company has made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation: fluctuations in the spot and forward price of silver, gold, base metals or certain other commodities (such as natural gas, fuel oil and electricity); fluctuations in the currency markets (such as the Canadian dollar and Mexican peso versus the U.S. dollar); changes in national and local government, legislation, taxation, controls, regulations and political or economic developments in Canada, Mexico; operating or technical difficulties in connection with mining or development activities; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inability to obtain adequate insurance to cover risks and hazards; and the presence of laws and regulations that may impose restrictions on mining, including those currently enacted in Mexico; employee relations; relationships with and claims by local communities and indigenous populations; availability and increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development, including the risks of obtaining necessary licenses, permits and approvals from government authorities; diminishing quantities or grades of mineral reserves as properties are mined; the Company's title to properties; and the factors identified under the caption "Risk Factors" in the Company's Annual Information Form, under the caption "Risks Relating to First Majestic's Business".

Investors are cautioned against attributing undue certainty to forward-looking statements or information. Although the Company has attempted to identify important factors that could cause actual results to differ materially, there may be other factors that cause results not to be anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements or information, other than as required by applicable law.



First Majestic Silver Corp.
Keith Neumeyer
President & CEO
(604) 688-3033 or Toll Free: 1-866-529-2807
(604) 639-8873 (FAX)
info@firstmajestic.com
www.firstmajestic.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

First Majestic Silver Corp.

PRODUCTEUR
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

First Majestic est une société de production minière d'argent basée au Canada.

First Majestic est productrice d'argent, d'or, de plomb et de zinc au Mexique, et détient divers projets d'exploration au Canada et au Mexique.

Ses principaux projets en production sont LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN et LA ENCANTADA SILVER MINE au Mexique et ses principaux projets en exploration sont REAL DE CATORCE, DEL TORO et CUITABOCA au Mexique et PITT ISLAND, PINCOURT, DESJARDINS et DOMPIERRE au Canada.

First Majestic est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,6 milliards CA$ (1,2 milliards US$, 1,1 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 02 novembre 2001 à 0,01 CA$, et son plus haut niveau récent le 22 décembre 2017 à 9,99 CA$.

First Majestic possède 164 340 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de First Majestic Silver Corp.
13/08/2018First Majestic shares hammered after reporting $40 million-l...
21/01/2009Follow up N° 1
Rapports annuels de First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financements de First Majestic Silver Corp.
20/08/2009Tranche of Non-Brokered Private Placement Closes
12/08/2009Non-Brokered Private Placement and Debt Settlement
Nominations de First Majestic Silver Corp.
04/04/2014Appoints VP of Technical Services
24/12/2013Announces Retirement of Robert Young from Board of Directors
05/01/2012Appoints Chief Information Officer
30/12/2011Names Douglas Penrose as Chairman
Rapports Financiers de First Majestic Silver Corp.
25/02/2016First Majestic Announces Financial Results for Q4 and Year E...
03/02/2014Fourth Quarter and Year End Financial Results to be Released...
12/11/2013Reports Third Quarter Financial Results
31/10/2013Third Quarter Financial Results to be Released on November 1...
15/07/2013Second Quarter Financial Results to be Released on August 13...
15/05/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
07/05/2013Quarter Financial Results to be Released on May 15th
14/11/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
07/11/2012Third Quarter Financial Results to Be Released on November 1...
07/08/2012Second Quarter Financial Results to be Released on August 14...
10/05/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
04/05/2012First Quarter Financial Results to Be Released on May 10th
05/03/2012Announces New Record Earnings & Cash Flows for 2011
24/02/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
26/10/2011Third Quarter Financial Results to be Released on November 9...
03/08/2011Second Quarter Financial Results to be Released on August 11...
17/05/2011Earns a Record $23.9 million in First Quarter of 2011
11/05/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
01/03/20112010 Audited Financial Results show Record Earnings & Cash F...
23/03/2010Year End & Fourth Quarter Financial Results
12/11/2009Record Third Quarter Financial Results
14/08/2009Second Quarter Financial Results
15/08/2008Second Quarter Financial Results
16/05/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
18/04/20082007 Year End Financial Results
Projets de First Majestic Silver Corp.
14/01/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
04/12/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
09/04/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
09/01/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
27/09/2012Mine Videos - Just Released
24/01/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
12/01/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
13/10/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
22/09/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
13/09/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
01/03/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
08/04/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
26/11/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
13/10/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
06/10/2009Third Quarter Production Results
17/02/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
20/01/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
17/07/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
29/04/20081st Quarter Production Results
23/04/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
01/04/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
08/01/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
02/07/2007(La Parrilla Silver Mine)La Parilla Technical Report
Communiqués de Presse de First Majestic Silver Corp.
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
25/07/2016Second Quarter Financial Results to be Released on August 10
20/07/2016Here’s Why These Five Stocks Are on the Move on Wednesday
12/07/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
29/01/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
28/11/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
13/10/2015A Silver Lining in October 2015?
02/10/2015First Majestic Completes Acquisition of Silvercrest
01/10/2015First Majestic Completes Acquisition of SilverCrest
25/09/2015First Majestic and SilverCrest Announce Shareholder Approval...
15/09/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
11/08/2015First Majestic reports 2Q loss
11/08/2015First Majestic Reports Second Quarter Financial Results and ...
10/08/2015Why Earnings Season Could Be Great for First Majestic Silver...
30/07/2015Second Quarter Financial Results to be Released on August 11
30/07/2015First Majestic Silver: Second Quarter Financial Results to B...
27/07/2015First Majestic Announces Friendly Acquisition of Silvercrest...
27/07/2015announces friendly acquisition of Silvercrest Mines
09/07/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
23/04/2015NYSE stocks posting largest percentage decreases
23/04/2015First Quarter Financial Results to be Released on May 7
23/04/2015First Majestic Silver Corp. First Quarter Financial Results ...
22/04/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
20/04/2015NYSE stocks posting largest percentage decreases
13/04/2015NYSE stocks posting largest percentage decreases
13/04/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
09/04/2015NYSE stocks posting largest percentage decreases
06/04/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
06/04/2015Announces C$30 Million Bought Deal Financing
06/04/2015First Majestic Announces Promotion of Martin Palacios to Chi...
06/04/2015First Majestic Announces Acquisition of Shares of First Mini...
01/04/2015NYSE stocks posting largest percentage increases
01/04/2015First Majestic Updates Mineral Reserve and Resource Estimate...
31/03/2015Announces New La Guitarra NI 43-101 Technical Report
31/03/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
11/03/2015First Majestic Renews Share Repurchase Program
11/03/2015First Majestic Renews Share Repurchase Program
22/08/2014to List on the Mexican Stock Exchange
24/10/2013Appeal Against First Majestic Dismissed
30/09/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
10/07/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
02/07/2013Payment of CDN$14.85 million Received in Court Litigation
02/05/2013Announces Completion of La Guitarra's Expansion to 500 tpd
26/04/2013Receives Positive Judgment for US$89.6 in Court Litigation
17/04/2013Earns Socially Responsible Business Distinction Award for Fi...
15/04/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
11/03/2013Announces Share Repurchase Program
19/02/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
14/02/2013Considering Superior Offer from Coeur to Acquire Orko Silver
25/01/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
26/09/2012New Look! New Features! First Majestic Bullion Store
06/09/2012Keith Neumeyer's Interview With Minesite.com
27/08/2012Announces Appointment of VP of Exploration
21/08/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
16/08/2012Recognized as a Leader in Corporate Social Responsibility
17/07/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
03/07/2012Completes Acquisition of Silvermex Resources
26/06/2012mex Securityholders Approve Plan of Arrangement With First M...
22/05/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
16/04/2012First Quarter Production Results and Full Commencement of Co...
03/04/2012Announces Friendly Acquisition of Silvermex Resources
30/03/2012Files Form 40-F Annual Report
07/10/2011Third Quarter Production Results to Be Released on October 1...
11/08/2011Record Earnings of $30.6 million in Second Quarter
07/07/2011Another Record Quarter of Silver Production
08/04/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
16/08/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
22/04/20102nd Year Running for Mexican Distinction as a "Socially Resp...
12/04/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
12/01/2010Production Increases by 18%, Reaches New Record
13/11/2009Completes Acquisition of Normabec Mining Resources; Normabec...
14/09/2009to Acquire Normabec Mining Resources
13/08/2009Joins OTCQX
26/06/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
05/03/2009Closing of $21.2 Million Offering
19/11/2008Operations Update
11/09/2008Many Positive Developments Underway
15/07/20082nd Quarter Production Shows Continued Ramp-up
25/03/2008Closing of $45,475,000 Offering
17/01/2008Another Record Quarter of Silver Production
14/12/2007TSX Conditional Approval
05/12/2007Update on the Chalchihuites Group of Properties
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FR.TO)OTHER OTC (FRMSF)
9,47-8.15%
TORONTO
CA$ 9,47
16/04 16:29 -0,840
-8,15%
Cours préc. Ouverture
10,31 9,94
Bas haut
9,29 9,94
Année b/h Var. YTD
5,74 -  10,95 18,67%
52 sem. b/h var. 52 sem.
5,74 -  10,95 -4,05%
Volume var. 1 mois
2 071 168 23,79%
24hGold TrendPower© : -17
Produit Lead - Silver - Zinc
Développe
Recherche Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202424,77%
2023-32,71%9,9510,07
2022-23,32%9,9610,00
2021-13,88%30,7512,74
20209,63%9,8610,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,98 US$-2,44%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX-3,12%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,44 CA$-2,01%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,29 CA$-0,78%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,74 CA$+0,87%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,35 US$-0,63%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :