Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent
SEMAFO: Delineation Drilling at Mana's Siou Sector Confirms Mineralization and Extension
Published : May 01, 2013

On track to Issue Mineral Reserve Estimate in Q3 2013

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Burkina Faso | Niger |

MONTREAL, QUEBEC--(Marketwired - May 1, 2013) - SEMAFO Inc. (News - Market indicators)(OMX:SMF) today announced that approximately 70% of the delineation drilling, at 50 meter x 25 meter spacing, was completed over the first 150 meters of vertical depth on the Siou Sector at Mana. Results confirm good continuity and predictability of the mineralization when compared to the 2012 year-end results. The gram-meter contour longitudinal sections for both the Siou Zone and the Nine Zone (Figure 1) are very similar to those originally produced. Based on the excellent results from the Siou Sector, SEMAFO's entire 2012 exploration budget of $22 million has been allocated to Mana. The main exploration focus will be within the 20-kilometer radius of the Mana processing plant.

Phase I delineation drilling at 50 meters x 25 meters commenced in January 2013 and to date includes 8,400 meters of RC drilling in 75 holes and 4,950 meters of core drilling in 34 holes. An additional 34 core holes must still be drilled to complete Phase 1 over the first 150 meters of vertical depth. The objective of this program is to better define the Siou Zone and the Nine Zone mineralization within the limits of the pit outline used for the 2012 year-end inferred resources.

The following table presents recent drilling program results that returned values greater than 20 gram-meters for the Siou Zone and the Nine Zone only.

DDH No. Zone Section (N) From To Au* / Length**
MRC13-2744 Nine 1321150 119.00 126.00 5.86 g/t / 7.0 m
MRC13-2856 Siou 1321250 126.00 129.00 14.68 g/t / 3.0 m
MRC13-2856 Nine 1321250 151.00 153.00 22.09 g/t / 2.0 m
MRC13-2861 Nine 1321350 128.00 136.00 7.82 g/t / 8.0 m
MRC13-2867 Siou 1321500 70.00 74.00 11.17 g/t / 4.0 m
MRC13-2867 Nine 1321500 108.00 111.00 22.12 g/t / 3.0 m
MRC13-2868 Siou 1321500 38.00 43.00 11.20 g/t / 5.0 m
MRC13-2869 Siou 1321550 69.00 75.00 14.55 g/t / 6.0 m
MRC13-2941 Siou 1321600 75.00 80.00 24.01 g/t / 5.0 m
MRC13-2944 Siou 1321650 103.00 108.00 4.28 g/t / 5.0 m
MRC13-2945 Siou 1321700 95.00 99.00 21.84 g/t / 4.0 m
MRC13-2947 Siou 1321750 99.00 107.00 12.97 g/t / 8.0 m
MRC13-2948 Siou 1321750 60.00 63.00 19.05 g/t / 3.0 m
MRC13-2949 Siou 1321750 20.00 23.00 8.85 g/t / 3.0 m
MRC13-3200 Siou 1321800 122.00 126.00 20.51 g/t / 4.0 m
MRC13-3201 Siou 1321800 82.00 87.00 21.41 g/t / 5.0 m
MRC13-3202 Siou 1321800 42.00 47.00 8.46 g/t / 5.0 m
MRC13-3203 Nine 1321850 147.00 153.00 3.86 g/t / 6.0 m
MRC13-3205 Siou 1321900 115.00 118.00 11.28 g/t / 3.0 m
MRC13-3205 Nine 1321900 129.00 133.00 18.05 g/t / 4.0 m
MRC13-3214 Nine 1322100 93.00 96.00 8.13 g/t / 3.0 m
MRC13-3217 Siou 1322150 80.00 81.00 22.65 g/t / 1.0 m
WDC661 Siou 1321500 23.50 27.80 11.16 g/t / 4.3 m
WDC662 Siou 1321700 112.00 118.00 7.35 g/t / 6.0 m
WDC663 Siou 1321800 23.50 30.00 11.51 g/t / 6.5 m
WDC665 Nine 1321900 139.50 146.00 9.20 g/t / 6.5 m
WDC681 Siou 1321000 211.00 218.30 3.88 g/t / 7.3 m
WDC681 Nine 1321000 228.00 232.10 8.66 g/t / 4.1 m
WDC682 Siou 1321100 157.00 165.00 11.04 g/t / 8.0 m
WDC682 Nine 1321100 166.90 168.50 20.56 g/t / 1.6 m
WDC684 Siou 1322000 165.00 167.00 13.09 g/t / 2.0 m
WDC685 Siou 1321200 164.00 164.60 40.00 g/t / 0.6 m
WDC685 Nine 1321200 171.50 175.60 5.19 g/t / 4.1 m
WDC690 Nine 1322050 144.10 153.00 2.93 g/t / 8.9 m
WDC691 Siou 1321300 90.00 91.60 13.60 g/t / 1.6 m
WDC692 Nine 1322050 192.70 196.40 6.87 g/t / 3.7 m
WDC695 Nine 1322100 179.00 188.00 5.66 g/t / 9.0 m
WDC696 Siou 1321550 30.50 33.00 13.36 g/t / 2.5 m
WDC697 Siou 1322150 123.80 124.50 40.00 g/t / 0.7 m
WDC698 Siou 1321650 26.70 35.00 6.96 g/t / 8.3 m
WDC699 Siou 1321700 52.50 54.00 17.13 g/t / 1.5 m
WDC701 Siou 1321850 37.00 41.00 10.73 g/t / 4.0 m
               
* All individual samples are cut at 40 g/t for the Siou Zone and the Nine Zone. Uncut assays are not presented.
**All lengths are measured along the hole axis; which is interpreted to be roughly equivalent to true widths.

The core drilling program also includes two follow-up holes (WDC-681 and WDC-667) on the deeper cut encountered in hole WDC-660 (ref. SEMAFO's press release dated March 20, 2013).

Holes WDC-681 and WDC-667 (Figure 1) confirm the potential of both the Siou Zone and the Nine Zone. The best result, hole WDC-681 (8.66 g/t Au over 4.1 meters in the Nine Zone and 3.88 g/t Au over 7.3 meters in the Siou Zone), extends the up-dip potential of the south area. In addition hole WDC-682, which corresponds to the deepest hole of the 50 meter x 25 meter program on the same section, suggests that the south mineralization on both the Siou Zone and the Nine Zone could extend the depth limits of an ultimate pit. Further drilling will be required in this area to better establish its pertinence for inclusion to the in-pit resources.

Four core rigs and two RC rigs are currently active on the Siou Zone and the Nine Zone to complete the 25 meter x 25 meter spacing program (Phase II), which should be sufficient to establish mineable reserves for this area as planned by the end of the third quarter of 2013.

Data compilation and other activities for the Environmental Impact Assement (EIA) and the permitting process at Siou have been initiated. Siou is a priority for the Corporation in 2013 and every possible effort will be made to fast-track the sector to production.

Michel Crevier, P.Geo MScA, Vice-President Exploration and Mine Geology is SEMAFO's Qualified Person and has reviewed this press release for accuracy and compliance with National Instrument 43-101.

All individual samples represent approximately one-meter in length of core, which was sawn in half. Half of the core is kept on site for reference and its counterpart is sent for preparation and gold assaying to the ALS Mineral Division laboratories in Ouagadougou, Burkina Faso or to SEMAFO's Mana Mine Lab, which uses separate preparation equipment exclusive to exploration samples. For RC drilling, all individual samples represent approximately one-meter in length of rock chips homogenized and riffle-split to an approximately two-kilogram sub-sample, which is sent for preparation and gold assaying to the ALS Mineral Division laboratories in Ouagadougou, Burkina Faso or to SEMAFO's Mana Mine Lab. Each sample (core and RC) is fire-assayed for gold content on a 50-gram sub-sample. In addition to ALS Mineral Division laboratories' own QA/QC (Quality Assurance/Quality Control) program and Mana Lab's own QA/QC program, an internal quality control and quality assurance program is in place throughout the sampling program, using blind duplicates, blanks and recognized industry standards at both ALS samples and Mana Lab samples.

About SEMAFO

SEMAFO is a Canadian-based mining company with gold production and exploration activities in West Africa. The Corporation currently operates three gold mines: the Mana Mine in Burkina Faso, the Samira Hill Mine in Niger and the Kiniero Mine in Guinea. SEMAFO is committed to evolve in a conscientious manner to become a major player in its geographical area of interest. SEMAFO's strategic focus is to maximize shareholder value by effectively managing its existing assets as well as pursuing organic and strategic growth opportunities.

CAUTION CONCERNING FORWARD-LOOKING STATEMENTS 

This press release contains forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and assumptions and accordingly, actual results and future events could differ materially from those expressed or implied in such statements. You are hence cautioned not to place undue reliance on forward-looking statements. Forward-looking statements include words or expressions such  as "will", "objective", "potential", "suggests", "could", "should", "planned", "committed", "evolve", "become", "pursuing", "growth", "opportunities" and other similar words or expressions. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include the ability of the program to better define the Siou Zone and the Nine Zone mineralization within the limits of the pit outline used for the 2012 year-end inferred resources, the ability of hole WDC-681 to extend the up-dip potential of the south area, the ability of hole WDC-682 to suggest that the south mineralization on both the Siou Zone and the Nine Zone could extend the depth limits of an ultimate pit, the ability of further drilling to better establish its pertinence for inclusion to the in-pit resources, the ability to establish mineable reserves by the end of the third quarter of 2013, the ability to fast-track the Siou Sector to production, the ability to execute on our strategic focus, fluctuation in the price of currencies, gold or operating costs, mining industry risks, uncertainty as to calculation of mineral reserves and resources, delays, political and social stability in Africa (including our ability to maintain or renew licenses and permits) and other risks described in SEMAFO's documents filed with Canadian securities regulatory authorities. You can find further information with respect to these and other risks in SEMAFO's 2012 Annual MD&A and other filings made with Canadian securities regulatory authorities and available at www.sedar.com. These documents are also available on our website at www.semafo.com. SEMAFO disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law. 

The above information has been made public in accordance with the Swedish Securities Market Act and/or the Financial Instruments Trading Act

Figure 1 is available at this address: http://media3.marketwire.com/docs/figure1_0501.pdf



SEMAFO
Robert LaValliere
Vice-President, Investor Relations
Cell: +1 (514) 240 2780
robert.lavalliere@semafo.com
or
Sofia St Laurent
Communications & Investor Relations
sofia.stlaurent@semafo.com
or
Tel. local & overseas: +1 (514) 744 4408
North America Toll-Free: 1 (888) 744 4408
www.semafo.com
or
Maria Bang
Brunswick Group Stockholm
+46 (8) 410 32 189
mbang@brunswickgroup.com
Données et statistiques pour les pays mentionnés : Burkina Faso | Niger | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Burkina Faso | Niger | Tous

Semafo Inc

PRODUCTEUR
CODE : SMF.TO
ISIN : CA8169221089
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Semafo est une société de production minière d'or basée au Canada.

Semafo détient divers projets d'exploration au Burkina Faso.

Ses principaux projets en production sont KINIERO en Guinee, SAMIRA HILL au Niger et MANA au Burkina Faso.

Semafo est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,5 milliards CA$ (1,1 milliards US$, 1,0 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 14 décembre 2001 à 0,10 CA$, et son plus haut niveau récent le 16 septembre 2011 à 10,00 CA$.

Semafo possède 324 860 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Semafo Inc
11/03/2019SEMAFO and Savary Gold join forces to expand in Burkina Faso
04/12/2018Semafo reports third security incident in Burkina Faso
18/08/2018Armed bandits kill SEMAFO mine workers
Rapports annuels de Semafo Inc
2007 Annual Report
Financements de Semafo Inc
11/02/2015. Announces Upsize of Previously Announced "Bought Deal" Fin...
11/02/2015. Announces C$20,350,000 "Bought Deal" Financing
Attributions d'options de Semafo Inc
16/05/2012Declares a Second Dividend of CA $0.02 per Share
Nominations de Semafo Inc
11/06/2007 Appointments to Management and Board of Directors
Rapports Financiers de Semafo Inc
07/08/2013Releases Second Quarter 2013 Results
13/05/2013Releases First Quarter 2013 Results
14/03/2012Reports 2011 Cash Flow from Operations of $172 Million
17/03/2011Reports Record 2010 Cash Flow from Operations of $147.5 Mill...
12/11/2008Reports Net Earnings of $11.3 Million for the Third Quarter ...
12/08/2008Reports Net Earnings of $11.7 Million for the Second Quarter...
23/07/2008to Release Second Quarter Financial Results on August 12, 20...
15/05/2008Reports Net Earnings of $12.5 Million for the First Quarter ...
01/05/2008 to Release First Quarter Financial Results on May 14, 2008
15/04/2008Reports First Quarter 2008 Gold Production - Q1 Production E...
25/03/20082007 Financial Results - Gold production up by 12%
07/02/2008 Reports Operating Results for 2007 and Guidance for 2008
14/11/2007 Reports Third Quarter 2007 Results - 3rd Quarter Gold Produ...
14/08/2007Reports Second Quarter 2007 Financial Results
10/05/2007Reports First Quarter 2007 Financial Results
Projets de Semafo Inc
30/09/2013(Mana)New Technical Report for Mana Property
26/08/2013(Samira Hill)Suspends Operations at the Samira Hill Mine
17/07/2013(Samira Hill)Enters into Heads of Agreement for the Sale of the Samira Hi...
22/01/2013Achieves 2012 Production Guidance; Provides 2013 Production ...
29/08/2012(Mana)Discovers High Grade Siou Zone at Mana
19/06/2012(Samira Hill)Discovers New Mineralized Horizon at Samira Hill in Niger
30/05/2012(Mana)Further Expands the Wona-Kona Deposit at Mana
27/03/2012(Mana)Auger Drilling Identifies Six Important Trends at Mana
21/03/2012(Mana)On-site Exploration Laboratory at Mana Begins Opeations
03/10/2011(Mana)Enters Into an Agreement with Sonabel to Connect the Mana Mi...
08/09/2011(Mana)Plans to Increase Mana's Processing Capacity by 6,000 Tonnes...
09/08/2011(Mana)Initial Drill Results at Mana's Massala-Saoura Include 6.77 ...
22/07/2011(Mana)Drills 4.29 g/t Au over 25 Meters at Mana's Fofina Area
28/06/2011(Mana)Yaho Zone More Than Doubles Strike Length to Over 1.5 kilome...
12/05/2011(Mana)Further Expands Mana's Wona SW Zone Results Include 4.17 g/t...
31/03/2011(Mana)Announces Completion of Mana Underground Feasibility Study: ...
13/03/2011(Mana)Discovers New Gold Zone with 2.27 g/t Au Across 54 Meters
28/02/2011(Samira Hill)Total Reserves and M&I Resources Top 6.0 Million Ounces, Inf...
08/02/2011(Mana)to Augment Mana Plant Capacity
01/02/2011(Mana) Fobiri Area Returns Mineralization Over 1.4 Kilometers at M...
01/06/2010(Mana)Phase II of Plant Expansion on Track
14/04/2010(Mana)Auger Drilling Programs Generate More Than 9.5 kilometers of...
25/02/2009(Mana)to Proceed With Deep Drilling Exploration Program at Mana
08/01/2009(Mana): Record Gold Production of 195 500 ounces for 2008, 84% Hig...
30/12/2008(Kiniero)Guinea - Kiniero Operations Update
04/09/2008(Mana)New Ball Mill at Mana Increases Production
07/08/2008At-depth High-grade Extension Results at Mana
29/07/2008(Mana)Commissions 4,000 Tonne-per-Day Ball Mill at Mana
17/06/2008Drilling Results Continue to Extend Gold Mineralization at M...
03/06/2008(Mana)Declares Commercial Production at Mana Gold Mine
06/05/2008(Mana)Mana Mine Achieves Production Target
24/03/2008High Grade Zone Deepening at Mana
19/02/2008(Mana)Mana Mill Starts Up
29/01/2008(Mana)MANA START-UP SCHEDULED FOR FEBRUARY
17/01/2008(Kiniero)Extends West Balan Gold Zone 700m to Reach 1.6 km
10/01/2008(Kiniero)Granted West Balan Mining License
20/11/2007(Mana) Reports Definition Drilling Results on Mana Nyafe Deposit
20/06/2007Highlights of Exploration Progams: Kiniero, Guinea and Sami...
13/06/2007Mana - Extension Of The Wona Deposit Intersects 3.42 G/T Au ...
08/05/2007(Mana)Mana Mine Construction Update
06/06/2006More high grade results from Mana's Nyafe deposit
Communiqués de Presse de Semafo Inc
29/07/2016Changed Number of Shares and Votes in SEMAFO
27/07/2016SEMAFO Provides Notice of Second Quarter 2016 Results Releas...
30/06/2016Changed Number of Shares and Votes in SEMAFO
20/06/2016SEMAFO Reports Results of Delineation Drilling at Yama
31/05/2016Changed Number of Shares and Votes in SEMAFO
13/05/2016SEMAFO Announces Re-Election of Directors (disponible en ang...
13/05/2016SEMAFO Announces Re-Election of Directors
11/05/2016SEMAFO: Cash Flow From Operations of $35.2 Million in First ...
20/01/2016SEMAFO Achieves 2015 Guidance; Provides 2016 Outlook
18/01/2016SEMAFO: Update on Burkina Faso Situation
31/12/2015Changed Number of Shares and Votes in SEMAFO
14/10/2015SEMAFO Provides Notice of Third Quarter 2015 Results Release...
17/09/2015Business as Usual at SEMAFO's Mana Mine in Burkina Faso
05/08/2015Edited Transcript of SMF.TO earnings conference call or pres...
05/08/2015SEMAFO's Net Income Increases to $22.1 Million in Second Qua...
30/07/2015SEMAFO Provides Notice of Second Quarter 2015 Results Releas...
28/07/2015Proximal Exploration on SEMAFO'S Natougou Returns Promising ...
14/07/2015Delineation Drill Results at SEMAFO's Natougou Match Expecta...
15/04/2015Provides Notice of First Quarter 2015 Results Release and Co...
15/04/2015SEMAFO Provides Notice of First Quarter 2015 Results Release...
31/03/2015SEMAFO Reports Indicated Resources at Natougou of 1.1 Millio...
31/03/2015Reports Indicated Resources at Natougou of 1.1 Million Ounce...
12/03/2015Reports Net Income for the Year of $17.7 Million
12/03/2015SEMAFO Reports Net Income for the Year of $17.7 Million
05/03/2015avslutar C$57.9 miljoner "avklarad affär" finansiering säkra...
04/03/2015SEMAFO Closes C$57.9 Million "Bought Deal" Financing Secures...
04/03/2015SEMAFO Closes C$57.9 Million “Bought Deal” Financing Secures...
24/02/2015SEMAFO: Mana SAG Mill Up and Running
20/02/2015SEMAFO Discloses Historical Mineral Resources on the Natougo...
19/02/2015Les réserves et les ressources mesurées et indiquées de SEMA...
19/02/2015SEMAFO's Reserves and Measured and Indicated Resources Incre...
12/02/2015. tillkännager en ökad finansiering av "genomförd affär" på ...
12/02/2015Orbis Gold-styrelse enhälligt rekommenderar ökat SEMAFO-erbj...
12/02/2015. tillkännager $20 350 000 CAN finansiering av "genomförd af...
11/02/2015SEMAFO Inc. Announces C$20,350,000 "Bought Deal" Financing
11/02/2015Orbis Gold Board Unanimously Recommends Increased SEMAFO Off...
30/01/2015Changed Number of Shares and Votes in SEMAFO
21/01/2015SEMAFO: 2014 Production Increased by 48%, Total Cash Cost De...
30/12/2014Changed Number of Shares and Votes in SEMAFO
03/12/2014SEMAFO Reports Resumption of Operations at Mana Mine
01/12/2014SEMAFO Reports Illegal Work Stoppage at Mana Mine
01/12/2014SEMAFO Lodges Bidder’s Statement for Orbis Gold Secures Cred...
01/12/2014SEMAFO Lodges Bidder's Statement for Orbis Gold-Secures Cred...
11/11/2014SEMAFO Announces Solid Third Quarter 2014 Results
06/11/2014SEMAFO Provides Its Observations to Orbis' Notice of AGM and...
30/10/2014Business as Usual for SEMAFO’s Mana Mine in Burkina Faso
30/10/2014Business as Usual for SEMAFO's Mana Mine in Burkina Faso
15/10/2014SEMAFO: A $0.65 Cash Bid for Orbis Gold
14/10/2014SEMAFO Announces Strong Q3 Production Results
12/10/2014SEMAFO: Proposal to Acquire Orbis Gold
29/08/2014Changed Number of Shares and Votes in SEMAFO
19/09/2013(Mana)Siou Adds 769,300 Ounces at 4.94 g/t Au to Mana's Gold Reser...
01/08/2013Delineation Drilling at Siou Extends Mineralization: Results...
23/07/2013Provides Notice of Second Quarter 2013 Results Release and C...
23/07/2013Provides Notice of Second Quarter 2013 Results Release and C...
04/06/2013(Mana)Reports Fatal Incident at Mana
07/05/2013Provides Notice of First Quarter 2013 Results Release and Co...
01/05/2013(Mana)Delineation Drilling at Mana's Siou Sector Confirms Minerali...
20/03/2013Siou Deep Drilling Opens South Extension Potential
12/03/2013(Samira Hill)to Include a Non-Cash Impairment Charge for Samira Hill in t...
21/02/2013/One Million Ounces of Initial In-pit Inferred Resources at ...
07/02/2013Reports Continuous Near-Surface High Grades at Siou: Shallow...
28/01/2013Over 95% Gold Recovery at Siou in Both Oxide and Sulphide Ro...
11/12/2012(Mana)Provides Production Update: Additional Exploration Budget of...
06/11/2012Declares Dividend of C$0.02 per Share
18/10/2012Intersects Higher Grade Mineralization at Yaho
10/10/2012Announces Third Quarter Gold Production of 52,300 Ounces
28/09/2012Changed Number of Shares and Votes in SEMAFO
13/09/2012Appoints Robert LaValliere, Vice-President Investor Relation...
11/07/2012Mineral Reserves and Resources Increase to 7.3 Million Gold ...
05/07/2012Announces Second Quarter Gold Production of 60,500 Ounces
29/06/2012Changed Number of Shares and Votes in SEMAFO
30/04/2012Changed Number of Shares and Votes in SEMAFO
10/04/2012Announces First Quarter 2012 Gold Production of 60,900 Ounce...
06/03/2012to Release 2011 Fourth Quarter and Year-End Financial Result...
16/02/2012Leads in Corporate Social Responsibility and Becomes a Signa...
30/01/2012Provides 2012 Outlook
11/01/2012Meets 2011 Annual Guidance with Production of 250,100 Ounces...
30/12/2011Changed Number of Shares and Votes in SEMAFO
06/07/2011Announces Second Quarter Production of 63,800 Ounces of Gold
30/05/2011Net Income Increases 70% to $20.4 Million for the First Quar...
11/04/2011Produces 60,000 Ounces of Gold in Q1 2011
27/01/2011Provides 2011 Outlook
09/03/2009Managing Director of Semafo Guinea Elected President of the ...
29/01/2009to Produce Up to 240,000 Ounces of Gold in 2009
04/12/2008Announces Record Gold Production for November
09/09/2008: Potential Plant Capacity Increases at Mana
08/07/2008Produces 54,500 Ounces of Gold in Q2
02/07/2008Announces Inauguration of its Mana Mine
23/06/2008Elects John LeBoutillier Lead Director; Jean Lamarre Becomes...
20/05/2008Receives 2008 Alpha Award - Award of Distinction for Environ...
29/04/2008Commended for Corporate Social Responsibility
16/04/2008Q1 PRODUCTION EXCEEDS GUIDANCE
02/04/2008First Gold Pour at Mana
25/03/2008 Gold Reserves and Resources Update
19/03/2008 Mana Mill Commissioning on Schedule
28/02/2008and GoviEx Close Uranium Transaction
14/02/2008and GoviEx Join Forces to Advance Uranium Exploration and Pr...
15/01/2008Discovers Two New Gold Zones at Samira Hill, Niger
24/10/2007 Kiniero Mine Update
11/10/2007Concludes Mana Gold Project Mining Convention
11/09/2007: Action Plan Implemented at Kiniero Mine
04/05/2007Forms Technical Team To Manage Uranium Exploration Activitie...
10/04/2007Awarded 5 Uranium Exploration Permits In Niger
30/03/2006Results for December 31, 2005
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SMF.TO)OTHER OTC (SEMFF)
4,77+4.61%3,47+4.46%
TORONTO
CA$ 4,77
06/07 17:00 0,210
4,61%
Cours préc. Ouverture
4,56 4,61
Bas haut
4,61 4,84
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  4,77 -%
Volume var. 1 mois
940 381 -%
24hGold TrendPower© : -7
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 29/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202069,75%4,841,57
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !