Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Diamcor Mining Inc

Publié le 21 juillet 2015

Diamcor First Quarter Diamond Sales and Operational Update at Krone-Endora at Venetia

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Carats |

Diamcor First Quarter Diamond Sales and Operational Update at Krone-Endora at Venetia

KELOWNA, July 20, 2015 - Diamcor Mining Inc. (TSX-V.DMI / OTCQX-DMIFF), (the "Company") provides an operational update, and announces the results of rough diamond sales for the first fiscal quarter ended June 30, 2015, for its Krone-Endora at Venetia project in South Africa (the "Project").

Operational efforts during the first fiscal quarter ended June 30, 2015 focused on the completion, commissioning, and refinements of the previously announced upgrades and expansions to the Project's processing plant which included; the installation of a large autonomous mill/wet scrubbing unit to enhance the liberation of all material, the expansion of the treatment plant's feed bin capacity and conveyor structures to support added processing capacity, the installation of nuclear density measurement equipment to increase operational efficiencies and controls associated with the plant's pre-concentrating pans, the installation of expanded tailings storage and automated conveyor loading systems and, the installation and calibration of additional weightometer systems on various conveyor structures located throughout the Project. These Project upgrades have achieved the desired goals of increasing the liberation of the conglomerated material in all size fractions, and enhancing the overall operational efficiency of the treatment plant. The Project's large in-field dry-screening plant developed for the removal of fine material

The Company participated in one rough diamond tender selling 2,856.24 carats generating gross revenues of (US) $455,227.66, yielding an average price of (US) $159.38 per carat during the first fiscal quarter ended June 30, 2015. An additional ~2,050 carats of rough diamonds were recovered during the period and are being prepared for sale at upcoming tenders along with rough diamonds expected to be recovered in the current fiscal quarter. Rough diamonds recovered and sold during the period were primarily the result of the continued processing of material in the +1.0mm to -26mm size fractions early in the period, along with limited processing of material from various larger size fractions throughout the later part of the period. The initial processing of larger size fractions during the commissioning of the upgrades provided the company with important insight into the processing of this material, its impact on the processing of other sized material, and the combined impact on operational efficiencies overall. The Company's focus during the current quarter will now shift to increasing processing volumes, the size fractions of material being processed (with consideration for above larger material cut-off size), and a move towards advancing objectives consistent with the recommendations of the updated NI43-101 Technical Report ("Updated Technical Report") filed by the Company on April 28, 2015.

The recovery of all rough diamonds during the fiscal quarter ended June 30, 2015, were incidental to the ongoing commissioning and testing exercises performed at the Company's Krone-Endora at Venetia Project. The above-noted testing exercises and incidental recoveries do not form part of the updated NI43-101 Technical Report filed by the Company on April 28, 2015, and thus no general grade, price, or quality determination is intended by the Company at this time due to the nature and purpose of the processing of this material.

The Company's audited financial results and associated Management Discussion and Analysis for its Fiscal year ended March 31, 2015, will be available at www.sedar.com, or on the Company's website at www.diamcormining.com on or before July 28, 2015. The Company's financial results and associated Management Discussion and Analysis for its first quarter ended June 30, 2015, will be available at www.sedar.com, or on the Company's website at www.diamcormining.com on or before August 29th, 2015.

About Diamcor Mining Inc.

Diamcor Mining Inc. is a fully reporting publically traded junior diamond mining company which is listed on the TSX Venture Exchange under the symbol V.DMI, and on the OTC QX International under the symbol DMIFF. The Company has a well-established operational and production history in South Africa and extensive prior experience supplying rough diamonds to the world market.

About the Tiffany & Co. Alliance

The Company has established a long-term strategic alliance and first right of refusal with Tiffany & Co. Canada, a subsidiary of world famous New York based Tiffany & Co., to purchase up to 100% of the future production of rough diamonds from the Krone-Endora at Venetia Project at then current prices to be determined by the parties on an ongoing basis. In conjunction with this first right of refusal, Tiffany & Co. Canada also provided the Company with financing to advance the Project. Tiffany & Co. is a publically traded company which is listed on the New York Stock Exchange under the symbol TIF. For additional information on Tiffany & Co., please visit their website at www.tiffany.com.

About Krone-Endora at Venetia

In February 2011, Diamcor acquired the Krone-Endora at Venetia Project from De Beers Consolidated Mines Limited, consisting of the prospecting rights over the farms Krone 104 and Endora 66, which represent a combined surface area of approximately 5,888 hectares directly adjacent to De Beers' flagship Venetia Diamond Mine in South Africa. On September 11, 2014, the Company announced that the South African Department of Mineral Resources had granted a Mining Right for the Krone-Endora at Venetia Project encompassing 657.71 hectares of the Project's total area of 5,888 hectares. The Company has also submitted an application for a mining right over the remaining areas of the Project. The deposits which occur on the properties of Krone and Endora have been identified as a higher-grade "Alluvial" basal deposit which is covered by a lower-grade upper "Eluvial" deposit. The deposits are proposed to be the result of the direct-shift (in respect to the "Eluvial" deposit) and erosion (in respect to the "Alluvial" deposit) of material from the higher grounds of the adjacent Venetia Kimberlite areas. The deposits on Krone-Endora occur in two layers with an average total depth of less than 15.0 metres from surface to bedrock, allowing for a very low-cost mining operation to be employed with the potential for near-term diamond production from a known high-quality source. Krone-Endora also benefits from the significant development of infrastructure and services already in place due to its location directly adjacent to the Venetia Mine.

Qualified Person Statement:

Mr. James P. Hawkins (BSc., P.Geo), is Manager of Exploration & Special Projects for Diamcor Mining Inc., and the Qualified Person in accordance with National Instrument 43-101 responsible for overseeing the execution of Diamcor's exploration programmes and a Member of the Association of Professional Engineers and Geoscientists of Alberta ("APEGA"). Mr. Hawkins has reviewed this press release and approved of its contents.

On behalf of the Board of Directors

Mr. Dean H. Taylor
President & CEO
Diamcor Mining Inc.
[email protected]
Tel (250) 864-3326
www.diamcormining.com

This press release contains certain forward-looking statements. While these forward-looking statements represent our best current judgement, they are subject to a variety of risks and uncertainties that are beyond the Company's ability to control or predict and which could cause actual events or results to differ materially from those anticipated in such forward-looking statements. Further, the Company expressly disclaims any obligation to update any forward looking statements. Accordingly, readers should not place undue reliance on forward-looking statements.

WE SEEK SAFE HARBOUR

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Diamcor Mining Inc

PRODUCTEUR
CODE : DMI.V
ISIN : CA2525312070
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Diamcor Mining est une société d’exploration minière de diamants basée au Canada.

Diamcor Mining détient divers projets d'exploration au Canada et en Afrique Du Sud.

Ses principaux projets en production sont SO VER et LENA / SCHULLER MINE en Afrique Du Sud et ses principaux projets en exploration sont KRONE-ENDORA et DOORNKLOOF en Afrique Du Sud et SOBEL LAKE et MERRY WIDOW au Canada.

Diamcor Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 2,5 millions CA$ (1,8 millions US$, 1,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 24 novembre 2006 à 0,03 CA$, et son plus haut niveau récent le 01 novembre 2013 à 1,90 CA$.

Diamcor Mining possède 49 700 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Diamcor Mining Inc
28/02/2011(Krone-endora)CLOSES ACQUISITION OF KRONE-ENDORA PROJECT AT VENETIA FROM D...
Communiqués de Presse de Diamcor Mining Inc
27/06/2016Diamcor Provides Final Update on Rough Diamond Tenders for F...
02/06/2016Diamcor Provides Update on Rough Diamond Tenders for First F...
24/05/2016Diamcor Provides Update on Krone-Endora at Venetia Project P...
11/04/2016Diamcor Secures Long-Term Water Use License
22/03/2016Diamcor Announces Operational Update, Recovery of Specials, ...
20/01/2016Diamcor Arranges Loan Deferral
22/12/2015Diamcor Commences Processing Oversized Stockpile With Tomra ...
18/12/2015Diamcor Announces Second Rough Diamond Tender Results of its...
06/10/2015Diamcor Second Fiscal Quarter Sales and Operational Update a...
21/07/2015Diamcor First Quarter Diamond Sales and Operational Update a...
20/07/2015Diamcor First Quarter Diamond Sales and Operational Update a...
20/04/2015Diamcor Retains MZ Group as Investor Relations Advisor
15/04/2015Diamcor Fourth Quarter Diamond Sales and Upgrade Progress at...
26/02/2015Diamcor Third Quarter Fiscal 2015 Results
05/02/2015Diamcor Commences Expansion / Targets Implementation
05/02/2015Diamcor Commences Expansion / Targets Implementation
01/01/2015Diamcor Closes Private Placement of CDN$3,133,600
31/12/2014Diamcor Closes Private Placement of CDN$3,133,600
24/12/2014Diamcor Announces Private Placement of up to CDN$3.0M
24/12/2014Diamcor Announces Private Placement of up to CDN$3.0M
04/12/2014Diamcor Achieves Significant Milestone in Second Fiscal Quar...
04/12/2014Diamcor Achieves Significant Milestone in Second Fiscal Quar...
11/09/2014Mining Right Issued for Diamcor's Krone-Endora at Venetia Pr...
08/07/2014Diamcor Completes Planned Plant Expansion at Krone-Endora at...
31/03/2014Diamcor Announces Results of Fourth Quarter Diamond Sales
24/03/2014Diamcor Announces Closing of Private Placement Financing
13/01/2014reases Revenues for Third Consecutive Quarter in Fiscal 2014
07/09/2010(Krone-endora)Receives Confirmation Of Section 11 Consent For Krone-Endora...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (DMI.V)
0,050+0.00%
TSX-V
CA$ 0,050
26/04 16:33 -
0%
Cours préc. Ouverture
0,050 0,050
Bas haut
0,045 0,050
Année b/h Var. YTD
0,050 -  0,070 -16,67%
52 sem. b/h var. 52 sem.
0,050 -  0,150 -62,96%
Volume var. 1 mois
88 000 -16,67%
24hGold TrendPower© : -11
Produit Diamonds
Développe
Recherche Diamonds
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-50,00%
2023-50,00%0,220,09
2022-39,39%0,360,16
2021340,00%0,520,08
2020-21,05%0,200,06
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :