Doolgunna Project - Assay Results

Microsoft Word - 21 July 2015 TLDD0005 Assay Results FINAL

ASX/MediaRelease

www.s2a1ndJfuirley.c2o0m1.5au

DOOLGUNNA PROJECT - ASSAY RESULTS

Step-out diamond hole TLDD0005 intersection 9.2m grading 11.8% Cu and 2.9g/t Au

Sandfire Resources NL (ASX: SFR; "Sandfire") is pleased to report assay results for step-out diamond drill hole TLDD0005 at the emerging VMS prospect located ~10km east of its DeGrussa Copper Mine in WA, part of its joint venture with Talisman Mining Limited (ASX: TLM; "Talisman") (Figure 1).

TLDD0005, which intersected the mineralised horizon approximately 70 metres south-west of the discovery hole TLDD0004A, has returned an outstanding high-grade massive sulphide intercept of:

• 9.2 metres grading 11.8% Cu and 2.9 g/t Au from 417.0m to 426.2m down-hole

(not true width, from 370m below surface vertical depth)

This intercept occurs within a broader mineralised zone of:

• 13.1 metres grading 8.4% Cu and 2.1 g/t Au from 416.7m to 429.8m down-hole

This latest assay result provides further evidence of a highly significant new copper-gold discovery in this emerging area. It follows the exceptional massive sulphide intersection of 16.5 metres grading 18.9% Cu and 2.1g/t Au from 409.5m for TLDD0004A (ASX Announcement - 25 June 2015) and the 18 metre intersection from TLRC0004 reported yesterday (assays pending) 200 metres along strike from TLDD0004A (ASX Announcement - 20 July 2015).

It should be noted that drilling is still at an early stage and further work is required to fully understand the geological setting, orientation and scale of the mineralisation.

Hole TLRC0004 has now been completed to a final depth of 306 metres down-hole and will provide an optimal platform for down-hole EM (DHEM) surveys. Drilling of step-out diamond hole TLDD0006 is continuing while a further step-out RC hole, TLRC0005, has been collared approximately 160m further along strike to the south-west from TLRC0004 (see Figure 2).

Sandfire is earning a 70% interest in the Talisman Mining's Doolgunna Project, which forms part of its Greater Doolgunna Project comprising a 1,700 square kilometre package of contiguous tenements surrounding the DeGrussa Copper Mine.

ENDS

For further information contact:

Sandfire Resources NL

Karl Simich - Managing Director/CEO

Office: +61 8 6430 3800

Read Corporate

Mobile: +61 419 929 046 (Nicholas Read) Mobile: +61 421 619 084 (Paul Armstrong)

Table 1 - Drill-hole Information Summary, Springfield Project

Details and coordinates of the historical drill-hole SPD021 and recent drill holes completed by Sandfire at the Springfield Project, TLDD0001, TLDD0002A, TLDD0003 and TLDD0004A, together with details of step-out drill holes TLDD0005 and TLDD0006 and the new RC holes TLRC0004 and TLRC0005, are provided below:

Hole ID

Depth

Dip

Azimuth

Grid_ID

East

North

RL

Lease ID

Hole Status

SPD021

553

-60°

180°

MGA94_50

743598

7171437

598

E52/2282

Complete

TLDD0001

1099

-62°

357°

MGA94_50

740146

7174149

589

E52/2313

Complete

TLDD0002A

463

-61°

110°

MGA94_50

743544

7171211

602

E52/2282

Complete

TLDD0003

658

-62°

355°

MGA94_50

740596

7174550

589

E52/2313

Complete

TLDD0004A

817

-60°

148°

MGA94_50

743588

7171281

601

E52/2282

Complete

TLDD0005

478

-62°

139°

MGA94_50

743544

7171211

602

E52/2282

Complete

TLDD0006

Ongoing

-62°

138°

MGA94_50

743479

7171160

602

E52/2282

In Progress

TLRC0004

306

-62°

143°

MGA94_50

743497

7171025

605

E52/2282

Complete

TLRC0005

Ongoing

-62°

138°

MGA94_50

743321

7170993

602

E52/2282

In Progress

Table 2 - Detailed Assay Results, TLDD0005

Intersection

Mineralisation

From (m)

To (m)

Intercept

Down Hole

Cu (pct)

Au

(ppm)

Ag

(ppm)

Zn (pct)

Sample Type

416.7

417.0

0.3

0.6

0.4

2.0

0.1

Half Core

417.0

417.3

0.3

8.1

4.0

18.9

5.1

Half Core

417.3

418.1

0.8

22.2

2.2

18.0

1.7

Half Core

418.1

418.7

0.6

13.9

5.6

22.9

3.4

Half Core

418.7

419.1

0.4

4.6

4.0

15.9

2.7

Half Core

419.1

419.9

0.9

6.7

5.2

14.1

3.6

Half Core

419.9

420.8

0.9

20.5

1.9

23.4

2.1

Half Core

420.8

421.6

0.8

8.9

2.1

11.8

1.3

Half Core

421.6

422.4

0.8

6.8

2.7

10.4

1.0

Half Core

422.4

423.3

0.9

10.3

1.8

14.1

1.7

Half Core

423.3

423.7

0.4

2.7

0.6

4.7

0.7

Half Core

423.7

424.3

0.6

0.5

1.7

6.9

1.4

Half Core

424.3

425.2

0.9

17.4

3.6

42.8

3.6

Half Core

425.2

425.6

0.3

3.6

5.1

36.1

5.3

Half Core

425.6

426.2

0.6

22.7

1.3

32.1

0.8

Half Core

426.2

426.5

0.3

0.4

0.5

2.5

0.3

Half Core

426.5

427.3

0.8

1.0

1.0

0.1

Half Core

427.3

427.8

0.5

1.0

1.3

4.3

0.1

Half Core

427.8

428.5

0.7

0.7

0.3

1.1

Half Core

428.5

429.4

0.9

0.4

0.1

0.5

0.1

Half Core

429.4

429.8

0.4

3.4

0.1

2.2

0.1

Half Core

429.8

430.5

0.7

0.1

0.3

0.1

Half Core

430.5

431.5

1.0

0.2

0.2

0.1

Half Core

431.5

432.4

0.9

0.5

0.8

0.1

Half Core

432.4

433.2

0.8

0.1

0.1

Half Core

433.2

434.0

0.8

Half Core

Note: Calculation is based on a 0.5% cut-off, no more than 3m of internal dilution and a minimum composite grade of 1%. Intersection length (m), Cu (%), Au (ppm), Ag (ppm) and Zn (%) are rounded to 1 decimal point.

2

Figure 1 - Sandfire's Greater Doolgunna Project, showing the Springfield Project and the location of recent drilling

Figure 2 - Location of recent drilling relative to the DeGrussa Copper Mine, including recent and current diamond and

RC drilling and the newly reported assay result for TLDD0005

3

Competent Person's Statement - Exploration Results

The information in this report that relates to Exploration Results is based on information compiled by Mr. Shannan Bamforth who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bamforth is a permanent employee of Sandfire Resources and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Bamforth consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Exploration and Resource Targets

Any discussion in relation to the potential quantity and grade of Exploration Targets is only conceptual in nature. While Sandfire is confident that it will report additional JORC compliant resources for the DeGrussa Project, there has been insufficient exploration to define mineral resources in addition to the current JORC compliant Mineral Resource inventory and it is uncertain if further exploration will result in the determination of additional JORC compliant Mineral Resources.

Forward-Looking Statements

Certain statements made during or in connection with this statement contain or comprise certain forward-looking statements regarding Sandfire's Mineral Resources and Reserves, exploration operations, project development operations, production rates, life of mine, projected cash flow, capital expenditure, operating costs and other economic performance and financial condition as well as general market outlook. Although Sandfire believes that the expectations reflected in such forward-looking statements are reasonable, such expectations are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward looking statements and no assurance can be given that such expectations will prove to have been correct. Accordingly, results could differ materially from those set out in the forward-looking statements as a result of, among other factors, changes in economic and market conditions, delays or changes in project development, success of business and operating initiatives, changes in the regulatory environment and other government actions, fluctuations in metals prices and exchange rates and business and operational risk management. Except for statutory liability which cannot be excluded, each of Sandfire, its officers, employees and advisors expressly disclaim any responsibility for the accuracy or completeness of the material contained in this statement and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this statement or any error or omission. Sandfire undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events other than required by the Corporations Act and ASX Listing Rules. Accordingly you should not place undue reliance on any forward looking statement.

JORC Compliance Statement

A summary of the information used in this release is as follows.
The DeGrussa VHMS (volcanic-hosted massive sulphide) copper-gold deposit is located 900 kilometres north of Perth and 150 kilometres north of Meekatharra in the Peak Hill Mineral Field. The system is hosted within a sequence of metasediments and mafic intrusions situated in the Bryah Basin that have been metamorphosed and structurally disrupted.
The sulphide mineralisation consists of massive sulphide and semi-massive sulphide mineralisation. Primary sulphide minerals present are pyrite, chalcopyrite, pyrrhotite and sphalerite, together with magnetite. The sulphide mineralisation is interpreted to be derived from volcanic activity. The deposit shares characteristics with numerous VHMS deposits worldwide.
Sandfire Resources are currently exploring the defined prospective sequence in its 100% held tenements and within the Talisman Mining earn in and joint Venture agreement.

4

JORC 2012 TABLE 1 - EXPLORATION RESULTS

Section 1: Sampling Techniques and Data

Criteria

JORC Code Explanation

Commentary

Sampling

techniques

• Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

• Sampling method is half-core sampling of NQ2 core diamond drilling (DD).

Sampling

techniques

• Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

• Sampling is guided by Sandfire protocols as per industry standard.

Sampling

techniques

• Aspects of the determination of mineralisation that are

Material to the Public Report.

• In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

• Sample size reduction is through a Jaques jaw crusher to -10mm and all samples Boyd crushed to -4mm and pulverised via LM5 to nominal 90% passing -75µm using wet sieving technique.

• Samples are assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and

MAD Hotbox 0.15g charge methods with ICPOES or ICPMS.

• Fire Assay is completed by firing 40g portion of the sample with ICPMS finish.

Drilling

techniques

• Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

• DD is completed using NQ2 size coring equipment.

• All drill collars are surveyed using RTK GPS with downhole surveying.

• All core where possible is oriented using a Reflex ACT II RD orientation tool.

• Downhole surveying is undertaken using a gyroscopic survey instrument.

Drill sample

recovery

• Method of recording and assessing core and chip sample recoveries and results assessed.

• Diamond core recovery is logged and captured into the database. Core recoveries are measured by drillers for every drill run. The core length recovered is physically measured for each run and recorded and used to calculate the core recovery as a perecentage core recovered.

Drill sample

recovery

• Measures taken to maximise sample recovery and ensure representative nature of the samples.

• Appropriate measures are taken to maximise sample recovery and ensure the representative nature of the samples. This includes diamond core being reconstructed into continuous intervals on angle iron racks for orientation,

Criteria

JORC Code Explanation

Commentary

metre marking and reconciled against core block markers.

• Samples are routinely weighed and captured into the central secured database.

• Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

• No sample recovery issues have impacted on potential sample bias.

Logging

• Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

• Geological logging is completed for all holes and representative across the orebody. The lithology, alteration and structural characteristics of core are logged directly to a digital format following procedures and using Sandfire NL geologic codes. Data is imported into Sandfire NL's central database after validation in LogChief™.

Logging

• Whether logging is qualitative or quantitative in nature. Core

(or costean, channel, etc) photography.

• Logging is both qualitative and quantitative depending on field being logged.

• All cores are photographed.

Logging

• The total length and percentage of the relevant intersections logged.

• All drillholes are fully logged.

Sub-sampling

techniques and sample preparation

• If core, whether cut or sawn and whether quarter, half or all core taken.

• Core orientation are completed where possible and all were marked prior to sampling. Half core samples are produced using Almonte Core Saw. Samples are weighed and recorded.

Sub-sampling

techniques and sample preparation

• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

• All samples are half-core.

Sub-sampling

techniques and sample preparation

• For all sample types, the nature, quality and appropriateness of the sample preparation technique.

• All samples are sorted, dried at 80° for up to 24 hours and weighed. Samples are then crushed through Jaques crusher to nominal -10mm. A second stage crushing is through Boyd crusher to nominal -4mm. Sample splits are weighed at a frequency of 1:20 and entered into the job results file. Pulverising is completed using LM5 mill to 90% passing 75%µm using wet sieving technique.

Sub-sampling

techniques and sample preparation

• Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

• 1:20 grind quality checks are completed for 90% passing 75%µm criteria to ensure representativeness of sub-samples.

• Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

• Sampling is carried out in accordance with Sandfire protocols as per industry best practice.

• No field duplicates have been taken.

6

Criteria

JORC Code Explanation

Commentary

• Whether sample sizes are appropriate to the grain size of the material being sampled

• The sample sizes are considered appropriate for the VHMS and Gold mineralisation types.

Quality of assay data and

laboratory tests

• The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

• Samples are assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and MAD Hotbox 0.15g charge methods with ICPOES or ICPMS. The samples are digested and refluxed with a mixture of acids including Hydrofluoric, Nitric, Hydrochloric and Perchloric acids and conducted for multi elements including Cu, Pb, Zn, Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn, Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V, Sn, W and Ba. The MAD Hotbox method is an extended digest method that approaches a total digest for many elements however some refractory minerals are not completely attacked. The elements S, Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti, K, Na, V are determined by ICPOES, and Ag, Pb, As, Sb, Bi, Cd, Se, Te, Mo, Re, Zr, Ba, Sn, W are determined by ICPMS. Samples are analysed for Au, Pd and Pt by firing a 40g of sample with ICP AES/MS finish. Lower sample weights are employed where samples have very high S contents. This is a classical FA process and results in total separation of Au, Pt and Pd in the samples.

• The analytical methods are considered appropriate for this mineralisation styles.

• For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

• No geophysical tools are used in the analysis.

• Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

• Sandfire DeGrussa QAQC protocol is considered industry standard with standard reference material (SRM) submitted on regular basis with routine samples. SRMs and blanks are inserted at a minimum of 5% frequency rate.

Verification of

sampling and assaying

• The verification of significant intersections by either independent or alternative company personnel.

• Significant intersections have been verified by alternative company personnel.

Verification of

sampling and assaying

• The use of twinned holes.

• None of the drillholes in this report is twinned.

7

Criteria

JORC Code Explanation

Commentary

• Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

• Primary data are captured on field tough book laptops using Logchief™ Software. The software has validation routines and data is then imported into a secure central database.

• Discuss any adjustment to assay data.

• The primary data is always kept and is never replaced by adjusted or interpreted data.

Location of data

points

• Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

• Sandfire Survey team undertakes survey works under the guidelines of best industry practice.

• All drill collars are accurately surveyed using RTK GPS system within +/-

50mm of accuracy (X, Y, Z).

• Coordinates are based on control previously established by MHR Surveyors which was derived by ties into the Government SSM/BM network.

• Downhole survey completed by gyroscopic downhole methods at regular intervals.

Location of data

points

• Specification of the grid system used.

• Coordinate and azimuth are reported in MGA 94 Zone 50.

Location of data

points

• Quality and adequacy of topographic control.

• Topographic control was established from aerial photography using a series of

33 surveyed control points.

Data spacing and distribution

• Data spacing for reporting of Exploration Results.

• TLDD0004A was the first drill hole to intersect the modelled EM plate.

• TLDD0005 has intersected massive sulphide mineralisation approximately 70 metres along strike to the south west from TLDD0004A.

Data spacing and distribution

• Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

• TLDD0004A was the first drillhole to intersect the modelled EM plate.

• TLDD0005 has intersected massive sulphide mineralisation approximately 70 metres along strike to the south west from TLDD0004A.

• It is not possible to make any conclusion regarding sample spacing and distribution.

Data spacing and distribution

• Whether sample compositing has been applied.

• No sample compositing have been applied to the Exploration Results.

Orientation of

data in relation to geological

• Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

• Drillholes TLDD0004A and TLDD0005 were oriented to intersect the modelled EM plate. The drillhole may not necessarily be perpendicular to the orientation on the intersected mineralisation.

8

Criteria

JORC Code Explanation

Commentary

structure

• If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

• No significant orientation based sampling bias is known at this time. Drillhole TLDD004A was oriented to intersect a modelled EM plate. The drillhole may not neccesarily be perpendicular to the orientation of the intersected minerlisation. All reported intervals are downhole intervals not true widths.

Sample security

• The measures taken to ensure sample security.

• Appropriate security measures are taken to dispatch samples to the laboratory. Chain of custody of samples is being managed by Sandfire Resources NL. Samples are stored onsite and transported to laboratory by a licence transport company in sealed bulka bags. The laboratory receipts received samples against the sample dispatch documents and issues a reconciliation report for every sample batch.

Audits or

reviews

• The results of any audits or reviews of sampling techniques and data.

• No external audits or reviews of the sampling techniques and data have been completed.

Section 2: Reporting of Exploration Results

Criteria

Commentary

Mineral

tenement and land tenure status

• Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

• The Talisman project encompasses E52/2282, E52/2313 and E52/2466 which are wholly owned by Talisman Mining Ltd, with no known third party encumberances. Sandfire is currently farming into the project on a staged basis with the right to earn 70% interest in the project area.

Mineral

tenement and land tenure status

• The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

• All tenements are current and in good standing.

• The Talisman tenements are currently subject to a Native Title Claim by the Yungunga-Nya People (WAD6132/98). Sandfire currently has a Land Access Agreement in place with the Yungunga-Nya Native Title Claimants and have assumed management of Heritage Agreements which were executed by Talisman. These agremeents allow Sandfire to carry out mining and exploration activities on their traditional land.

Exploration

done by other parties

• Acknowledgment and appraisal of exploration by other parties.

• Aside from Sandfire Resources and Talisman Mining Limited there has been no recent exploration undertaken on the Talisman Project.

• Exploration work completed prior to Talisman's tenure included geochemical soil and rock chip sampling combined with geological mapping. Some targeted RC was completed over gold and diamond targets.

9

Criteria

JORC Code Explanation

Commentary

Geology

• Deposit type, geological setting and style of mineralisation.

• The Doolgunna Talisman's Project lies within the Proterozoic-aged Bryah rift basin enclosed between the Archaean Marym ia Inkier to the north and the Proterozoic Yerrida basin to the south.

• The principal exploration targets at the Doolgunna Projects are the Volcanogenic Massive Sulphide (VMS) deposit located with the Proterozoic Bryah Basin of W estern Australia.

Drill hole

Information

A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres)

of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

• Refer to Appendix 1 of this accompanying document.

Data

aggregation methods

• In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

• Significant intersections are based on greater than 0.5% Cu and may include up to a maximum of 3.0m of internal dilution, with a minimum composite grade of 1.0% Cu.

• Cu grades used for calculating significant intersections are uncut.

Data

aggregation methods

• Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

• Reported intersections are based on a regular sample interval of 1m or 5m composites in regular drilling subject to location of geological boundaries.

• Minimum and maximum sample intervals used for intersection calculation are

0.3m and 1.2m respectively.

Data

aggregation methods

• The assumptions used for any reporting of metal equivalent values should be clearly stated.

• No metal equivalents are used in the intersection calculation.

• Where core loss occurs; the average length-weighted grade of the two adjacent samples are attributed to the interval for the purpose of calculating the intersection. The maximum interval of missing core which can be incorporated with the reported intersection is 1m.

10

Criteria

JORC Code Explanation

Commentary

Relationship

between mineralisation

widths and

intercept lengths

• These relationships are particularly important in the reporting of Exploration Results.

• Downhole intercepts of mineralisation reported in this release are from a drillhole orientated perpendicular to a modelled EM plate. The drillhole may not necessarily be perpendicular to the mineralised zone. All widths reported are downhole intervals.

Relationship

between mineralisation

widths and

intercept lengths

• If the geometry of the mineralisation with respect to the drill- hole angle is known, its nature should be reported.

• The geometry of the mineralisation, relative to the drillhole, is unknown at this stage.

Relationship

between mineralisation

widths and

intercept lengths

• If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

• All intersections reported in this release are downhole intervals. True widths are not known.

Diagrams

• Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

• Appropriate maps are included within the body of the accompanying document.

Balanced

reporting

• Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

• The accompanying document is considered to represent a balanced report.

Other

substantive exploration data

• Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

• Other exploration data collected is not considered as material to this document at this stage. Further data collection will be reviewed and reported when considered material.

Further work

• The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

• Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

• Additional down hole geophysics (DHEM) and drilling will occur to define the extent of the intersected mineralisation.

11

Lire la suite de l'article sur www.noodls.com

Sandfire Resources NL

EN DÉVELOPPEMENT
CODE : SFR.AX
ISIN : AU000000SFR8
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sandfire est une société d’exploration minière de cuivre et d'or basée en Australie.

Sandfire est en développement de projets de cuivre, d'or et d'argent en Australie, et détient divers projets d'exploration en Australie.

Son principal projet en développement est DEGRUSSA en Australie et ses principaux projets en exploration sont URANDY, YANNARIE, BORROLOOLA et DOOLGUNNA en Australie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Sandfire Resources NL
22/01/2019Australia's MOD rejects Sandfire bid as undervalued, willing...
Nominations de Sandfire Resources NL
30/07/2010Appointment of Independent Non-Executive Director
Projets de Sandfire Resources NL
08/11/2015PMY: Drilling Halted at Coppermine Creek & DHEM to Commence
06/08/2015PMY: Coppermine Creek Results
27/04/2011(Degrussa)DeGrussa underground development commences
01/04/2011(Degrussa)DeGrussa Project: Maiden Open Pit Ore Reserve
23/03/2011(Degrussa)Orders Key Long-Lead Items for DeGrussa Copper-Gold Project
21/01/2010(Doolgunna)Offers Significant Upside
22/12/2009(Doolgunna)Further Outstanding Results
27/11/2009(Doolgunna)Drilling Strengthens Third Vms Copper-Gold Discovery
09/11/2009(Doolgunna)New Results Confirm Third High-Grade Copper-Gold Discovery
22/10/2009(Doolgunna)Fresh Results Point to Exciting New Discovery
15/10/2009(Doolgunna)Spectacular New Drilling Results
09/11/2009(Doolgunna)New results confirm third high-grade copper-gold discovery a...
01/10/2009(Doolgunna)Bell Potter Research Update on Sandfire Resources
23/09/2009(Doolgunna)Doolgunna Drilling Continues to Deliver
17/09/2009(Doolgunna)Looking like a terrific discovery at Doolgunna
02/09/2009(Doolgunna)DOOLGUNNA: 93.6 METRE MINERALISED INTERSECTION
19/08/2009(Doolgunna)Doolgunna: Further Drilling Success
10/08/2009(Doolgunna)Drilling at Doolgunna Returns More Promising Results
23/07/2009(Doolgunna)Further Outstanding Copper Intersections From Doolgunna
21/07/2009(Doolgunna)21.35m of Sulphides Intersected in Third Diamond Hole
20/07/2009(Doolgunna)27 % Copper intersected over 8 metres at Doolgunna
15/07/2009(Doolgunna)Drilling Extends Known Limits of Conductor 1 Mineralisation
08/07/2009(Doolgunna)More Evidence of a Substantial Discovery at Doolgunna
06/07/2009(Doolgunna)High Grade Intersections Point to Significant Discovery at D...
17/06/2009(Doolgunna)New massive sulphide discovery north of Degrussa opens up Do...
21/05/2009(Doolgunna)Degrussa Drilling Returns +100 Metres of Copper Sulphide Min...
18/05/2009(Doolgunna)New high-grade Gold and Copper discovery at Degrussa
18/05/2009New High-Grade Gold and Copper Discovery at Degrussa Prospec...
Communiqués de Presse de Sandfire Resources NL
01/08/20162016 Diggers and Dealers Presentation
28/07/2016Quarterly Activities and Cashflow Report
27/07/2016Sandfire June 2016 Quarterly Report Presentation
27/07/2016Sandfire June 2016 Quarterly Report
26/07/2016Ceasing to be a substantial holder
25/07/2016Quarterly Activities Report
13/07/2016Monty Mining Lease Application
13/07/2016TLM: Monty Mining Lease Application
13/07/2016Ceasing to be a substantial holder from CBA
07/07/2016Sandfire Achieves Record Annual Copper Production
30/06/2016Appendix 3B
30/06/2016PMY: Zinc and Copper Exploration to Commence Immediately
08/06/2016TLM: Springfield Project Update
08/06/2016PEA: Completion of Largest Hybrid Power Station in Australia
08/06/2016DeGrussa Solar Project
03/06/2016Change of Director's Interest Notice
31/05/2016Change in substantial holding
29/01/2016Quarterly Report and Appendix 5B
29/01/2016Quarterly Activities and Cashflow Report
29/01/2016Becoming a substantial holder from CBA
28/01/2016Quarterly Activities Report
27/01/2016Sandfire December 2015 Quarterly Report
27/01/2016Sandfire December 2015 Quarterly Report Presentation
27/01/2016Quarterly Report Period Ended 31 December 2015
19/01/2016Doolgunna Project - Monty Update
19/01/2016TLM: Monty Exploration Update
15/01/2016Appendix 3B
15/01/2016AIS: COMPLETION OF SALE OF EXPLORATION PROJECTS
07/01/2016COMPLETION OF SALE OF EXPLORATION PROJECTS
18/12/2015Initial Director's Interest Notice
18/12/2015Non-Executive Director Appointment
16/12/2015TLM: Monty Exploration Update
16/12/2015Doolgunna Project - Monty Update
30/11/2015DeGrussa Solar Project Update
24/11/2015Change of Director's Interest Notice
24/11/2015Appendix 3B
18/11/20152015 AGM Presentation
04/11/2015TLM: Monty - Assay Results and Exploration Update
04/11/2015Doolgunna Project - Monty Exploration Update
02/11/2015Ceasing to be a substantial holder from IFL
29/10/2015Quarterly Activities Report
27/10/2015Change in substantial holding from IFL
23/10/2015OZ Minerals boosts forecast copper output, weak Aussie dolla...
22/10/2015Sandfire September 2015 Quarterly Report
22/10/2015Sandfire September 2015 Quarterly Report Presentation
21/10/2015Annual Report - including Shareholder Information
20/10/20152015 Annual Report
20/10/2015Notice of Annual General Meeting/Proxy Form
20/10/20152015 Appendix 4G
16/10/2015Ceasing to be a substantial holder from CBA
14/10/2015TLM: Monty - Exploration Update
14/10/2015Doolgunna Project - Monty Exploration Update
14/10/2015Change in substantial holding from IFL
07/10/20152015 Sustainability Report
06/10/2015VRX: Diamond Drilling at Thaduna Green Dragon
05/10/2015SRQ: SALE OF TEMORA AND CURRUMBURRAMA EXPLORATION PROJECTS
02/10/2015VRX: Sandfire RC Drilling at Thaduna Copper Project
01/10/2015Doolgunna Project - Monty Exploration Update
01/10/2015TLM: Monty - Exploration Update
30/09/2015Annual Report to shareholders
30/09/2015Change in substantial holding from IFL
30/09/2015Ceasing to be a substantial holder
28/09/2015Becoming a substantial holder from CBA
24/09/2015Resources Rising Stars Investor Presentation
24/09/2015PMY: Earns 51% in Borroloola and Drilling to Commence
21/09/2015TLM: Monty Update
21/09/2015Doolgunna Project - Drilling Update
17/09/2015Doolgunna Project - Drilling Update
17/09/2015TLM: Monty - Drilling Update
13/09/2015Doolgunna Project - Drilling Update
13/09/2015TLM: Monty - Drilling Update
09/09/2015MEP: SFR continues earn-in at Altia project, Cloncurry
08/09/2015Change in substantial holding
08/09/2015PMY: Work continues Ahead of Diamond Drilling
07/09/2015TLM: Monty - Assay Results
07/09/2015Doolgunna Project - Assay Results
03/09/2015Ceasing to be a substantial holder
01/09/2015Investor Presentation
31/08/2015Change in substantial holding
23/08/2015TLM: Monty -Drilling Update
23/08/2015Doolgunna Project - Drilling Update
17/08/2015Becoming a substantial holder from IFL
12/08/2015Doolgunna Project - Assay Results
12/08/2015TLM: Monty - Assay Results
02/08/2015DeGrussa Copper Mine Site Visit Presentation
02/08/20152015 Diggers and Dealers Presentation
02/08/2015TLM: Monty -Drilling Update
02/08/2015Doolgunna Project - Drilling Update
30/07/2015Ceasing to be a substantial holder
28/07/2015Sandfire June 2015 Quarterly Report Presentation
28/07/2015Sandfire June 2015 Quarterly Report
28/07/2015Change in substantial holding
26/07/2015TLM: Monty Prospect Drilling Update
26/07/2015Doolgunna Project - Drilling Update
22/07/2015Becoming a substantial holder
20/07/2015Doolgunna Project - Assay Results
20/07/2015TLM: Monty Prospect - Assay Results
20/07/2015Change in substantial holding from NAB
19/07/2015TLM: Monty Drilling Update
19/07/2015Doolgunna Project - Drilling Update
17/07/2015Becoming a substantial holder
17/07/2015Ceasing to be a substantial holder from IFL
15/07/2015DeGrussa Solar Power Project Construction
03/07/2015Becoming a substantial holder - NAB
16/06/2015Doolgunna Project - Exploration Update
16/06/2015TLM: Springfield Exploration Update
16/06/2015Ceasing to be a substantial holder - NAB
16/06/2015Change of Director's Interest Notice
16/06/2015Lapse of Unlisted Options
15/06/2015Appendix 3B
10/06/2015Becoming a substantial holder from NAB
23/04/2015Appendix 3B
22/04/2015Sandfire March 2015 Quarterly Report
22/04/2015Sandfire March 2015 Quarterly Report Presentation
22/04/2015Sandfire Completes Restructure of DeGrussa Finance Facility
21/04/2015Executive Long Term Incentive Plan
19/04/2015OZL: OZ Minerals New Strategy Announced
13/04/2015Becoming a substantial holder from IFL
31/03/2015Finance Facility Repayment Profile
27/03/2015Ceasing to be a substantial holder from CBA
25/03/2015Sale of shares by OZ Minerals
25/03/2015Sandfire Announce 2014 Half Year Results
25/03/20152014 Half Year Results Presentation and Operations Update
25/03/20152014 Half Year Report and Appendix 4D
25/03/2015Ceasing to be a substantial holder from OZL
25/03/2015Ceasing to be a substantial holder from MQG
25/03/2015Becoming a substantial holder from MQG
25/03/2015OZL: Sale of equity investment complete
25/03/2015Trading Halt
25/03/2015Becoming a substantial holder from CBA
28/12/2014SRI: Sipa Reaches Agreement to Divest Thaduna
23/12/2014Change of Director's Interest Notice
20/11/2014Chairman's Address to Shareholders
20/11/2014AGM Presentation
13/11/2014Change of Director's Interest Notice
12/11/2014Appendix 3B
05/11/2014Cancellation of Unlisted Options
28/10/2014Change of Director's Interest Notice
15/10/2014Sandfire September 2014 Quarterly Report
02/09/2014Australian company to buy $16M in Tintina shares
30/08/2014Sandfire Resources NL - Early Warning Report
19/12/2013Talisman Secures $15M Farm-in deal with Sandfire
09/12/2013Horseshoe awarded WA Govt Grant for Kumarina Project
12/11/2013New Potentially Mineralised Structure at Kumarina Project
03/06/2011(Degrussa)Awards underground mining and process plant contracts for De...
03/06/2011(Degrussa)Delivers DeGrussa Feasibility Study
13/04/2011Quarterly Report for the Period Ending 31 March 2011
04/03/2011(Degrussa)DeGrussa Project: Approved for development
30/07/2010Quarterly Report for the Period Ending 30 June 2010
30/07/2010Chairman's Letter to Shareholders
23/07/2010Raises $93.9M to Fund Unprecedented Exploration Campaign and...
07/07/2010New Discovery at Degrussa Copper-Gold Project
04/05/2010Degrussa Chalcocite Grades to 52% Copper
29/03/2010Embarks on $8M Exploration Drive
19/03/2010Mining lease application for Degrussa
05/03/2010GLOBAL INVESTOR ROADSHOW PRESENTATION
02/03/2010RESULTS OF MEETING
08/02/2010DeGrussa Project and Company Update
08/02/2010Alchemy set for aggressive exploration program on Sandfire b...
22/12/2009Board Announcement
22/02/2010Phase I Degrussa Resource: 372,000 Tonnes Of Copper And 439,...
22/01/2010BROKER RESEARCH
18/01/2010DECEMBER 2009 QUARTERLY ACTIVITIES REPORT
18/01/2010Quarterly Report For The Period Ended 31 December 2009
22/12/2009ASX RELEASE 22/12/2009
21/10/2009SEPTEMBER 2009 QUARTERLY ACTIVITIES REPORT
16/10/200915-10-2009
30/09/2009Enters into Manganese Agreement with Mineral Resources
19/08/2009ASX RELEASE 19 AUGUST 2009
03/08/2009ASX ANOUNCEMENT
29/07/2009June 2009 Quarterly Report
24/07/2009ASX ANNOUNCEMENT 22 JULY 2009
24/07/2009ASX RELEASE
22/07/2009Non-Renounceable Entitlement Offer
21/07/2009Amendment to Previous Announcement
06/07/20096-7-2009
22/06/2009Additional Massive Sulphide Intersection Recorded In Newly D...
22/06/2009ASX RELEASE 22/6/09
09/06/2009Degrussa Prospect - Update
11/12/2008MANGANESE – DRILLING PROGRESS REPORT BORROLOOLA PROJECT, NOR...
24/10/2008http://www.asx.com.au/asxpdf/20081020/pdf/31cztt41g7yzb6.pdf
17/09/2008COMMENCES DRILLING ON THE BORROLOOLA PROJECT
20/06/2008Results of 19 June 2008 General Meeting
22/05/2008Notice of General Meeting
05/05/2008 Secures Strategic Alliance with Korea's Posco
31/01/2008Quaterly activities report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (SFR.AX)
9,28+1.20%
AUSTRALIA
AU$ 9,28
26/04 15:48 0,110
1,2%
Cours préc. Ouverture
9,17 9,32
Bas haut
9,18 9,32
Année b/h Var. YTD
6,54 -  9,28 25,92%
52 sem. b/h var. 52 sem.
5,49 -  9,28 40,18%
Volume var. 1 mois
895 959 4,39%
24hGold TrendPower© : 40
Produit
Développe Copper - Gold
Recherche Copper - Gold - Lead - Silica - Silver - Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202444,77%
202317,83%7,225,29
2022-17,33%7,500,00
202122,99%7,834,64
2020-12,30%6,272,75
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :