Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
La plupart des gens manquent les opportunités parce qu’elles sont habillées en bleu et qu’elles ressemblent à du travail
Thomas Edison  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1359,60-27,44
Silver 22,25-0,41
Platinum 1451,52-31,48
Palladium 735,25-1,25
MARCHES MONDIAUX
DOWJONES 15354120
NASDAQ 349934
NIKKEI 15138101
ASX 516016
CAC 40 400122
DAX 839828
HUI 246-10
XAU 97-3
MONNAIES (€)
AUS $ 1,3162
CAN $ 1,3193
US $ 1,2827
GBP (£) 0,8461
Sw Fr 1,2479
YEN 132,4800
RATIOS & INDEXES
Gold / Silver61,11
Gold / Oil14,16
Dowjones / Gold11,29
MATIERES PREMIERES
Copper 3,300,01
WTI Oil 96,020,86
Nat. Gas 4,060,13
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

Drilling Results Continue to Extend Gold Mineralization at Mana

Significant Gold Values Include 21 meters at 5.71 g/t Au

Montreal, Quebec, June 17, 2008. � SEMAFO (TSX: SMF)  today announced the results of the recent exploration program at the Mana mine in Burkina Faso, identifying significant new mineralization over a 1.2-km strike length, confirming the extension of the Wona northeast deposit.

The 2008 exploration program included RC drilling on the previously identified sub-surface targets of the northeast extension of the Wona mineralization.  Initial reference was made to this potential mineralization in our press release of March 24, 2006, in which mention was made of the potential for two small open pits.   Further investigation of this mineralization included IP geophysics; diamond drill and RC drill holes.  Recent 2008 RC drilling, including 67 holes covering 7,609m, confirms the presence of continuous mineralized zones and further expands at shallow depths the extension of the main Wona deposit. Similarly to the in-depth mineralization, continuity of mineralization can be found in spite of NW oriented offsets with respect to the main Wona deposit. The new zone extends from the end-point of the present open pit limits, from 16850N up to 18100N, for a strike length of 1.2 kms. Planning for a 1 km extension of the current pit has already started. In some areas, mineralization is seen to branch out in double structures. In addition, a new horizontal structure of a tubular shape appears as identified by the 2nd intersection of holes WRC364 and WRC358, as well as in the WRC399 intersection (see table below). This structure can be followed for more than 900m, thus warranting the commissioning of more substantial exploration.

The area herein described is shown on the attached longitudinal section displaying contoured grade-thickness product values in progressive cold to hot colors.  (CLICK HERE TO VIEW MAP)

The following table presents the drilling results including the main mineralization intersected and high-grade values.

TABLE OF GOLD INTERSECTIONS ? NEAR SURFACE WONA NE EXTENSION

HOLE No.

FROM (m)

TO (m)

SECTION

Au / Length*

WRC352

62

69

16950

2.07g/t / 7m

WRC352

75

80

16950

2.27g/t / 5m

WRC353

98

122

16950

2.33g/t / 24m

WRC357

55

62

17100

5.76g/t / 7m

WRC358

40

51

17150

4.97g/t / 11m

WRC358

60

109

17150

1.15g/t / 49m

WRC360

59

65

17200

3.85g/t / 6m

WRC361

40

49

17250

5.63g/t / 9m

WRC364

37

60

17350

3.97g/t / 23m

WRC364

72

113

17350

3.73g/t / 41m

WRC365

110

118

17350

2.1g/t / 8m

WRC368

24

45

17450

5.71g/t / 21m

WRC371

96

106

17500

3.72g/t / 10m

WRC373

94

111

17550

4.24g/t / 17m

WRC374

111

119

17600

2.68g/t / 8m

WRC380

29

37

17950

6.12g/t / 8m

WRC382

128

141

17050

3.1g/t / 13m

WRC384

86

93

16750

2.4g/t / 7m

WRC388

88

118

18050

1.8g/t / 30m

WRC399

64

83

18050

3.21g/t / 19m

WRC399

121

152

18050

1.47g/t / 31m

WRC405

27

35

17100

3.59g/t / 8m

WRC406

43

50

17200

3.29g/t / 7m

WRC407

11

26

17250

7.8g/t / 15m

WRC408

9

19

17350

4.13g/t / 10m

WRC409

89

99

17350

2.95g/t / 10m

WRC410

45

56

17325

2.95g/t / 11m

WRC411

40

53

17375

3.27g/t / 13m

WRC412

56

66

17400

3.43g/t / 10m

WRC413

71

83

17450

4.37g/t / 12m

WRC415

59

69

17550

5.11g/t / 10m

WRC419

24

30

17800

4.06g/t / 6m

WRC422

13

21

17155

7.58g/t / 8m

WRC425

68

75

18075

2.39g/t / 7m

* All lengths are down-the-hole lengths; additional information is required to determine true widths.

Semafo�s properties in Burkina Faso are within the Hound� volcano-sedimentary belt. As described in previous technical reports, more than one mineralization type has been recognized in the area, such as the Nyaf� deposit which is of vein-type in sheared volcanics and the Wona deposit, which lies in meta-sediments. The latter is related to silicification which is often brecciated and generally at proximity of a graphitic horizon.

The drilling programs were designed and managed locally by Dofinta Bond�, Mana Mineral�s Exploration Chief Geologist and guided and supervised under the direction of Michel Crevier P.Geo MScA, Geology Manager and Semafo�s Qualified Person who has reviewed this press release for accuracy and compliance with the Canadian Instrument 43-101.

All individual samples represented one-meter length of core drilling which was sawn in half or one-meter length RC drilling riffle spit to end to 1 Kg sample.  One half core or 1 Kg RC sample is kept on site as a control with the identical sample sent for preparation and gold assaying at the ALS Chemex laboratories in Ouagadougou, Burkina Faso.  Each sample was fire assayed for gold content on a 50-gram sub-sample at the same ALS Chemex laboratories.  Complementing ALS Chemex�s own QA/QC (Quality Assurance / Quality Control) program, an internal quality control and quality assurance program was in place throughout the sampling program, using blind duplicates and recognized industry standards.

Mana is Semafo�s newest mine located in Burkina Faso, approximately 200 km west of the capital Ouagadougou.  The Mana mine�s first gold pour took place on March 31, with commercial production declared during the second quarter 2008 .  Mana has a total of 924,600 ounces of gold mineral reserves, 317,800 ounces of measured and indicated resources and 1,867,100 ounces of inferred resources. The Mana start-up marked the third time Semafo has successfully brought a West African gold project into production.

About SEMAFO
Semafo is a Canadian-based mining company with gold production and exploration activities in West Africa. The Company currently operates three gold mines in Burkina Faso, Niger and Guinea.  Semafo is committed to evolve in a conscientious manner to become a major player in its geographical area of interest, while maintaining principles and strengthening relationships to increase shareholder value.

FORWARD-LOOKING STATEMENTS
This press release may contain forward-looking statements. These forward-looking statements include, but are not limited to, statements regarding expectations of the Company as to the market price of gold, strategic plans, future commercial production, production targets, timetables, mining operating expenses, capital expenditures, and mineral reserve and resource estimates. Forward-looking statements involve known and unknown risks and uncertainties and accordingly, actual results and future events could differ materially from those anticipated in such statements. Factors that could cause future results or events to differ materially from current expectations expressed or implied by the forward-looking statements include, but are not limited to, fluctuations in the market price of precious metals, mining industry risks, uncertainty as to calculation of mineral reserves and resources, risks related t o hedging strategies, risks of delays in construction, requirements of additional financing and other risks described in the Company�s documents filed from time to time with Canadian securities regulatory authorities. Although the Company is of the opinion that these forward-looking statements are based on reasonable assumptions, those assumptions may prove to be incorrect. Accordingly, readers should not place undue reliance on forward-looking statements. Readers can find further information with respect to risks in the Annual Information Form of the Company and other filings of the Company with Canadian securities regulatory authorities available at
www.sedar.com. The Company disclaims any obligation to update or revise these forward-looking statements, except as required by applicable law.

For more information contact :

SEMAFO:
Benoit La Salle,
President & CEO
Tel :  (514) 744-4408
E-Mail : 
blasalle@semafo.com 

Renmark Financial Communications Inc. :
Maurice Dagenais :
mdagenais@renmarkfinancial.com
Jason Roy : jroy@renmarkfinancial.com
Tel :  (514) 939-3989
Fax : (514) 939-3717
www.renmarkfinancial.com

Tweet

Semafo Inc

PRODUCTEUR
CODE : SMF.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Semafo Inc
24/01/2013Haywood lowers target on Semafo, but calls shares ‘cheap’
12/12/2012Semafo regains footing at gold mines as Q4 unfolds
12/07/2012Semafo's 30% investor dressing down - is it overkill?
05/07/2012Semafo holds steady on production guidance
19/06/2012Semafo hits gold over 10 kilometre strike
05/06/2012Semafo shuns Quebec for Africa to double gold output
14/03/2012Semafo posts 25% profit rise on higher gold output, price
01/11/2011Recognized as One of Canada's Most Admired Corporate Culture...
06/10/2011Semafo Q3 sales rise on higher gold output
04/10/2011Semafo to get grid power for Mana mine
07/07/2011Semafo says Q2 production in line with guidance
31/05/2011Semafo misses Q1 profit estimates
20/01/2011Semafo considers dual listing in Sweden
10/12/2010Semafo completes latest expansion at Burkina Faso mine
13/07/2010SEMAFO makes strong case on Niger gold mine agreement
12/07/2010SEMAFO Compliant with World Bank Extractive Industries Trans...
12/07/2010Niger committee says studies Semafo gold contract
09/07/2010Is Semafo facing an African gold take-away?
29/06/2010Reserves at Semafo's Mana mine increase
26/04/2010Sees better recovery in Burkina Faso
14/01/2010Semafo says '09 production up 24 pct, gives '10 outlook
10/11/2009Semafo profits up 18% on improved production and higher sale...
18/08/2009Semafo eyeing acquisitions in West Africa - CEO
21/05/2009Semafo's gold to generate solar power for inhabitants of Bur...
21/05/2009Semafo to develop solar power in Burkina Faso
29/01/2009Semafo to produce up to 240,000 ounces of gold in 2009
15/08/2008SEMAFO: Junior Gold Miner Shines
04/07/2008Burkina Faso opens its third gold mine in a year
Rapports annuels de Semafo Inc
2008 Annual report
2007 Annual Report
Annual Report 2006
Financements de Semafo Inc
02/06/2009Semafo raises C$40,5m in bought deal offering
Attributions d'options de Semafo Inc
16/05/2012Declares a Second Dividend of CA $0.02 per Share
Nominations de Semafo Inc
13/09/2007Appoints Mana Mine Manager
11/06/2007 Appointments to Management and Board of Directors
Rapports Financiers de Semafo Inc
13/05/2013Releases First Quarter 2013 Results
08/08/2012Releases Second Quarter 2012 Results
14/03/2012Reports 2011 Cash Flow from Operations of $172 Million
09/11/2011Reports Record Third Quarter Revenues, Operating Income and ...
17/03/2011Reports Record 2010 Cash Flow from Operations of $147.5 Mill...
12/11/2008Reports Net Earnings of $11.3 Million for the Third Quarter ...
12/08/2008Reports Net Earnings of $11.7 Million for the Second Quarter...
23/07/2008to Release Second Quarter Financial Results on August 12, 20...
15/05/2008Reports Net Earnings of $12.5 Million for the First Quarter ...
01/05/2008 to Release First Quarter Financial Results on May 14, 2008
15/04/2008Reports First Quarter 2008 Gold Production - Q1 Production E...
25/03/20082007 Financial Results - Gold production up by 12%
07/02/2008 Reports Operating Results for 2007 and Guidance for 2008
14/11/2007 Reports Third Quarter 2007 Results - 3rd Quarter Gold Produ...
14/08/2007Reports Second Quarter 2007 Financial Results
10/05/2007Reports First Quarter 2007 Financial Results
Projets de Semafo Inc
22/01/2013Achieves 2012 Production Guidance; Provides 2013 Production ...
27/10/2011(Mana)Infill Drilling Confirms High-Grade Mineralization at Mana's...
18/10/2011(Mana)Drills 4.07 g/t Au Over 43 Meters to Further Expand Wona SW ...
08/09/2011(Mana)Plans to Increase Mana's Processing Capacity by 6,000 Tonnes...
09/08/2011(Mana)Initial Drill Results at Mana's Massala-Saoura Include 6.77 ...
22/07/2011(Mana)Drills 4.29 g/t Au over 25 Meters at Mana's Fofina Area
28/06/2011(Mana)Yaho Zone More Than Doubles Strike Length to Over 1.5 kilome...
12/05/2011(Mana)Further Expands Mana's Wona SW Zone Results Include 4.17 g/t...
18/04/2011(Mana)Business as Usual for SEMAFO's Mana Mine in Burkina Faso
31/03/2011(Mana)Announces Completion of Mana Underground Feasibility Study: ...
13/03/2011(Mana)Discovers New Gold Zone with 2.27 g/t Au Across 54 Meters
28/02/2011(Kiniero)Total Reserves and M&I Resources Top 6.0 Million Ounces, Inf...
28/02/2011(Mana)Total Reserves and M&I Resources Top 6.0 Million Ounces, Inf...
28/02/2011(Samira Hill)Total Reserves and M&I Resources Top 6.0 Million Ounces, Inf...
08/02/2011(Mana)to Augment Mana Plant Capacity
01/02/2011(Mana) Fobiri Area Returns Mineralization Over 1.4 Kilometers at M...
18/01/2011(Mana) Geophysical Surveys Add New Prospective Targets at Mana
11/01/2011(Mana)Delivers Record Gold Production in 2010
09/12/2010(Mana)Successfully Completes Phase III of Mana Plant Expansion
09/09/2010(Mana)Confirms Continuity of Mineralization at Mana's Kona Zone De...
17/06/2010(Mana)Discovers New Fofina Gold Zone with Intersects of up to 4.12...
01/06/2010(Mana)Phase II of Plant Expansion on Track
14/04/2010(Mana)Auger Drilling Programs Generate More Than 9.5 kilometers of...
23/03/2009(Kiniero)Gold Reserves and Resources Update
25/02/2009(Mana)to Proceed With Deep Drilling Exploration Program at Mana
08/01/2009(Mana): Record Gold Production of 195 500 ounces for 2008, 84% Hig...
30/12/2008(Kiniero)Guinea - Kiniero Operations Update
04/09/2008(Mana)New Ball Mill at Mana Increases Production
07/08/2008At-depth High-grade Extension Results at Mana
29/07/2008(Mana)Commissions 4,000 Tonne-per-Day Ball Mill at Mana
17/06/2008Drilling Results Continue to Extend Gold Mineralization at M...
06/05/2008(Mana)Mana Mine Achieves Production Target
24/03/2008High Grade Zone Deepening at Mana
29/01/2008(Mana)MANA START-UP SCHEDULED FOR FEBRUARY
17/01/2008(Kiniero)Extends West Balan Gold Zone 700m to Reach 1.6 km
10/01/2008(Kiniero)Granted West Balan Mining License
20/11/2007(Mana) Reports Definition Drilling Results on Mana Nyafe Deposit
18/09/2007(Mana)Mana Mine Construction Update
20/06/2007Highlights of Exploration Progams: Kiniero, Guinea and Sami...
13/06/2007Mana - Extension Of The Wona Deposit Intersects 3.42 G/T Au ...
08/05/2007(Mana)Mana Mine Construction Update
06/06/2006More high grade results from Mana's Nyafe deposit
Communiqués de Presse de Semafo Inc
07/05/2013Provides Notice of First Quarter 2013 Results Release and Co...
01/05/2013(Mana)Delineation Drilling at Mana's Siou Sector Confirms Minerali...
20/03/2013Siou Deep Drilling Opens South Extension Potential
12/03/2013(Samira Hill)to Include a Non-Cash Impairment Charge for Samira Hill in t...
28/02/2013Changed Number of Shares and Votes in SEMAFO
21/02/2013/One Million Ounces of Initial In-pit Inferred Resources at ...
07/02/2013Reports Continuous Near-Surface High Grades at Siou: Shallow...
28/01/2013Over 95% Gold Recovery at Siou in Both Oxide and Sulphide Ro...
11/12/2012(Mana)Provides Production Update: Additional Exploration Budget of...
20/11/2012Confirms Continuity of the High Grade Siou Zone: Including V...
06/11/2012Declares Dividend of C$0.02 per Share
18/10/2012Intersects Higher Grade Mineralization at Yaho
10/10/2012Announces Third Quarter Gold Production of 52,300 Ounces
28/09/2012Changed Number of Shares and Votes in SEMAFO
13/09/2012Appoints Robert LaValliere, Vice-President Investor Relation...
05/07/2012Announces Second Quarter Gold Production of 60,500 Ounces
10/04/2012Announces First Quarter 2012 Gold Production of 60,900 Ounce...
06/03/2012to Release 2011 Fourth Quarter and Year-End Financial Result...
30/01/2012Provides 2012 Outlook
11/01/2012Meets 2011 Annual Guidance with Production of 250,100 Ounces...
28/09/2011Applies for Secondary Listing on NASDAQ OMX
06/07/2011Announces Second Quarter Production of 63,800 Ounces of Gold
30/05/2011Net Income Increases 70% to $20.4 Million for the First Quar...
11/04/2011Produces 60,000 Ounces of Gold in Q1 2011
27/01/2011Provides 2011 Outlook
20/01/2011Explores Possible Dual Listing in Europe
17/03/2009Reports Record Net Earnings of $39.5 Million for 2008
09/03/2009Managing Director of Semafo Guinea Elected President of the ...
29/01/2009to Produce Up to 240,000 Ounces of Gold in 2009
04/12/2008Announces Record Gold Production for November
07/10/2008Another Strong Quarter for Semafo - Q3 Gold Production Total...
09/09/2008: Potential Plant Capacity Increases at Mana
08/07/2008Produces 54,500 Ounces of Gold in Q2
02/07/2008Announces Inauguration of its Mana Mine
23/06/2008Elects John LeBoutillier Lead Director; Jean Lamarre Becomes...
20/05/2008Receives 2008 Alpha Award - Award of Distinction for Environ...
29/04/2008Commended for Corporate Social Responsibility
16/04/2008Q1 PRODUCTION EXCEEDS GUIDANCE
02/04/2008First Gold Pour at Mana
25/03/2008 Gold Reserves and Resources Update
19/03/2008 Mana Mill Commissioning on Schedule
15/01/2008Discovers Two New Gold Zones at Samira Hill, Niger
24/10/2007 Kiniero Mine Update
11/10/2007Concludes Mana Gold Project Mining Convention
11/09/2007: Action Plan Implemented at Kiniero Mine
16/07/2007Mana Mine Construction Update
04/05/2007Forms Technical Team To Manage Uranium Exploration Activitie...
10/04/2007Awarded 5 Uranium Exploration Permits In Niger
30/03/2006Results for December 31, 2005
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (SMF.TO)OTHER OTC (SEMFF.PK)
1,55-12.43%1,73+2.37%
TORONTO
CA$ 1,55
17/05 16:00 -0,220
-12,43%
Cours préc. Ouverture
1,77 1,73
Bas haut
1,55 1,75
Année b/h Var. YTD
1,49 -  3,53 -56,09%
52 sem. b/h var. 52 sem.
1,49 -  6,08 -66,52%
Volume var. 1 mois
2 513 223 -7,74%
24hGold TrendPower© : -37
Produit Gold
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-65,48%
2012-29,84%8,272,92
2011-42,19%9,8910,04
2010146,00%9,8810,44
2009254,33%5,031,14
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Recevez les dossiers Investisseur
High Desert Gold
Sélectionnez
& cliquez