Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Tinka Resources Ltd

Publié le 18 décembre 2013

Drills 12 Metres of 4.22% Zinc and Intercepts Mineralization to the Northeast at Ayawilca Project, P

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Zinc |

Re:        News - Wednesday, December 18, 2013
Title:     Tinka Drills 12 Metres of 4.22% Zinc and Intercepts Mineralization to the Northeast at Ayawilca Project, Peru


Vancouver, Canada - Tinka Resources Limited (the "Company"), (TSXV: TK), announces the analytical results for holes A13-10 to A13-13 and visual results for holes A13-15 to A13-17 drilled at the Company's 100% owned Ayawilca project, located in west-central Peru. See table below for a list of significant mineralized intervals.

Mr Carter said: "The Company is pleased with these intercepts of zinc mineralization as they continue to demonstrate the potential of the Ayawilca project. Of great interest are the visual results of hole A13-16 and A13-17 which were collared 570 metres to the northeast of hole A12-08. This is a significant step as it confirms the presence of mineralization a substantial distance from previous drilling."

Hole A13-15 is located on section 333300E, about 100 m west of the significant intercept of 70 m of 4.8% zinc found in hole A12-08 (see press release dated Jan. 8, 2013.) Massive and semi-massive sulphides were intersected between 321.1 m and 344.4 m depth with locally moderate concentrations of sphalerite in a matrix dominated by pyrite and pyrrhotite.

Drill holes A13-16 and A13-17 were collared along section 333900E, about 570 m northeast of A12-08. Both of these holes targeted an area where old workings are located along mineralized fault structures that cut the overlying sandstone formation. In addition, this site is also along the western margin of large coincidental magnetic and chargeability (IP) anomalies measuring about 700 m east-west and 700 m north-south, respectively.

In hole A13-16 (-60 degrees north), semi-massive sulphides were intersected between 354.9 m and 359.1 m and consisted of sphalerite and pyrite associated with strong chlorite and moderate magnetite alteration. Semi-massive sulphides, consisting of weak to moderate sphalerite mineralization, accompanied by strong chlorite and moderate magnetite alteration occurs between 376.3 m and 394.1 m and again from 436.0 m to 436.4 m and from 440.6 m to 443.5 m. The massive pyrrhotite horizon found above the metamorphic basement rocks in many of the holes is absent here.

Semi-massive sulphides (pyrite and sphalerite), along with moderate chlorite and magnetite alteration, occur between 329.6 m and 352.6 m depth in hole A13-17 (-75 degrees north). Sphalerite, plus some galena, were found between 373.1 m and 378.9 m with the same style of alteration. Massive pyrrhotite, containing pyrite, sphalerite and lesser chalcopyrite, occurs from 380.1 m and 405.6 m depth.

Hole A13-12A (Section 333700E) intercepted large intervals of intense chlorite and argillic alteration admixed with sulphides. This may be an indication that another strongly mineralized plume, like that encountered in holes A12-08 and A13-05, may present nearby. This area is being considered for further drill testing.

Except for A13-13, all returned moderately to highly anomalous copper values near the bottoms of the holes.

The Company cautions that visual results for these holes are preliminary and the Company is waiting for assay results to determine the level of mineralization intercepted. Assay results for holes A13-14 to A13-17 are expected to be available in early January 2014.

Significant mineralized intervals using 15 g/t Ag, 1% Pb and 1% Zn as lower cut-off levels are shown below:
Hole
#
Easting
(m)
Northing
(m)
Elev
(m)
Azimuth
(deg)
Dip
(deg)
Depth
(m)
From
(m)
To
(m)
Interval
(m)
Ag
(g/t)
Cu
(%)
Pb
(%)
Zn
(%)
A13-10 333500 8845870 4168 360 -70 326.1 100 101.4 1.4 156 2.83 14.02
              156 160 4 2.06
              164 168 4 1.25
              172 173.7 1.7 62.6 4.60 4.05
              238 240 2 2.41
              248 254 6 2.06
              304 306 2 1.76
              308 310 2 1.40
A13-11 333500 8845870 4168 180 -70 344.2 148 152 4 1.86
              154 160 6 3.06
              162 164 2 1.31
              170 172 2 1.21
              179.2 184 4.8 2.42
              330 332 2 76.7 2.07 --
A13-12A 333691 8846005 4133 180 -70 356.8 148.7 152 3.3 4.57
              154 156 2 1.31
              162 164 2 2.34
              172 178 6 5.83
              184 186 2 49.3 2.2 1.75
              196 198 2 2.97
              212 216 4 5.08
              218 226 8 2.19
              228 232 4 1.23
              238 240 2 2.56
              250 268 18 3.84
              280 292 12 4.22
              302 310 8 2.09
              312 316 4 2.13
              318 320 2 2.11
A13-13 333797 8845950 4118 180 -65 386.8 172 174 2 1.89
              180 182 2 1.30
              188 194 6 3.42
              200 202 2 81.7
              214 216 2 34.2
              218 222 4 29.1 1.06
              375.1 377 1.9 1.44

The geometry of and controls to the mineralization are not yet fully understood, but a series of intersecting fault structures that underlie Ayawilca are believed to be the source conduits. The 3-D inversion anomalies follow these structures closely. The irregular nature of this replacement style mineralization hampers any meaningful interpretation of the strike, dip and true thickness of the zone(s), intercepted in these and previously reported drill holes, at this time.

Readers are invited to visit the Company's website to view diagrams of the drill hole locations and geophysical anomalies in the corporate and technical presentations.

All diamond drilling has been performed using HQ diameter drill rods, reducing to NQ diameter if required. All core has been logged and split on site under the supervision of Tinka geologists with sampling done on nominal two metre intervals. All the samples have been transported by Company staff to SGS Laboratories in Lima, Peru, for ICP analyses using multi-acid digestion. Analytical standards and blanks were routinely introduced in the sample suites sent to the laboratory, and samples that exceeded their respective threshold levels for Ag, Zn and Pb were re-assayed by specific atomic absorption techniques.

The qualified person for the Company's projects, Mr. John Nebocat (P.Eng.), V.P. of Exploration for the Company, has reviewed and approved the contents of this news release.

About Tinka Resources Limited (TSXV:TK):
Tinka is a junior resource acquisition and exploration company. Tinka's focus is on its 100% owned Colquipucro and Ayawilca projects located in the highly mineralized silver-lead-zinc belt of Central Peru.

On behalf of the Board,

Andrew Carter
Andrew Carter, President & CEO
Company Contact:
Mariana Bermudez at (604) 699 0202 or
email: mbermudez@chasemgt.com

Investor Information:
Reg Advocaat at (604) 219 8911 or
email: radvocaat@tinkaresources.com

website: www.tinkaresources.com

Forward Looking Statements This Company news release contains certain "forward-looking" statements and information relating to the Company that are based on the beliefs of the Company's management as well as assumptions made by and information available to the Company's management as of the date of this news release. Such statements reflect the current risks, uncertainties and assumptions related to certain factors including, without limitations, competitive factors, general economic conditions, customer relations, relationships with vendors and strategic partners including local communities and landholders, the interest rate environment, governmental regulation and supervision, seasonality, technological change, changes in industry practices, and one-time events. Should any one or more of these risks or uncertainties materialize, or should any underlying assumptions prove incorrect, actual results may vary materially from those described herein.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.


View News Release in PDF Format


Copyright � 2013 TINKA RESOURCES LIMITED (TK) All rights reserved. For more information visit our website at http://www.tinkaresources.com/ or send email to info@tinkaresources.com ..

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Tinka Resources Ltd

EXPLORATEUR
CODE : TK.V
ISIN : CA8875221001
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tinka Resources est une société d’exploration minière d'argent et de zinc basée au Canada.

Tinka Resources détient divers projets d'exploration au Perou.

Ses principaux projets en exploration sont COLQUIPUCRO et TIBILLOS au Perou.

Tinka Resources est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,9 millions CA$ (20,4 millions US$, 19,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 09 janvier 2009 à 0,03 CA$, et son plus haut niveau récent le 22 mars 2013 à 1,25 CA$.

Tinka Resources possède 206 720 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Tinka Resources Ltd
Annual Report 2008
Financements de Tinka Resources Ltd
08/11/2013Provides Update on Private Placement Financing
08/10/2013Announces First Tranche Non-Brokered Private Placement Closi...
23/09/2013Announces Non-Brokered Private Placement Financing
14/05/2013Closes Private Placement Financing
11/12/2012Tinka Announces Non-Brokered Private Placement Financing
11/12/2012Announces Non-Brokered Private Placement Financing
22/06/2011TINKA AMENDS TERMS OF PRIVATE PLACEMENT
02/06/2011TINKA ANNOUNCES $5 MILLION FINANCING
Nominations de Tinka Resources Ltd
07/02/2013Tinka Announces Appointment of Mr. Allen Morton to its Advis...
02/02/2013Tinka Announces Appointment of New Investor Relations Consul...
Projets de Tinka Resources Ltd
29/09/2015Tinka extends zinc, tin, copper mineralization at Ayawilca
23/02/2015Tinka confirms indium with zinc mineralization at Ayawilca, ...
10/02/2015Tinka expands zinc, tin, copper mineralization at Ayawilca, ...
15/01/2015(Colquipucro)announces results of 1,600 metre ten-hole drill program at C...
18/02/2014Drills 36 Metres of 5.93% Zinc and 22.8 Metres of 5.80% Zinc...
15/01/2014Drills 24 Metres of 2.8% Zinc and 6.3 Metres of 6.19% Zinc a...
25/09/2013Mobilizes Drill Rig to Ayawilca Project, Peru
10/09/2013Resumes Work at Ayawilca Project in Preparation for Drilling
11/06/2013Tinka Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% ...
11/06/2013Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% Zinc ...
22/05/2013Tinka Drills 60 Metres of 7.75% Zinc (Including 24 Metres of...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc (Including 8 Metres of ...
26/03/2013Tinka Drills 18.7 Metres of 165 g/t Ag
13/02/2013Tinka Resources Named to TSX Venture Top 50
29/01/2013Tinka Commences Third IP Survey At Ayawilca Project And Init...
10/01/2013Tinka Resumes Drilling at Colquipucro and Ayawilca Projects,...
10/01/2013(Colquipucro)Resumes Drilling at Colquipucro and Ayawilca Projects, Peru
15/10/2012Tinka Increases Inferred Silver Resource To 32.7 Million Oun...
02/10/2012Tinka Resumes Exploration At The Chaucha Zone, Colquipucro, ...
02/10/2012(Colquipucro)Resumes Exploration At The Chaucha Zone, Colquipucro, Peru
17/09/2012Tinka Identifies Further Surface Mineralization At Zone 1, C...
10/09/2012Tinka Resumes Drilling At The Ayawilca Zone,
10/09/2012(Colquipucro)Resumes Drilling At The Ayawilca Zone, Colquipucro, Peru
01/05/2012Tinka Drills 20 m of 85.9 g/t Silver At
13/03/2012Tinka Drills 92.7 m of 92 g/t Silver,
21/02/2012Tinka drills 42 m of 165 g/t silver
27/05/2011(Colquipucro)DRILLING COMMENCES AT TINKA'S COLQUIPUCRO SILVER PROJECT, PE...
24/05/2011DRILLING COMMENCES AT TINKA'S COLQUIPUCRO
07/03/2011(Colquipucro)SIGNS DIAMOND DRILL CONTRACT FOR COLQUIPUCRO SILVER PROJECT,...
24/01/2011(Tibillos)IDENTIFIES DRILL TARGETS AT TIBILLOS COPPER PORPHYRY PROJECT...
28/08/2007(Colquipucro)Announces Positive Silver Results, Colquipucro Silver-Zinc P...
15/08/2007(Colquipucro)Update on Drill Program at Colquipucro Silver-Zinc Project, ...
15/05/2007(Colquipucro)Starts Drilling Colquipucro Silver Project, Peru
Communiqués de Presse de Tinka Resources Ltd
25/07/2016Tinka Appoints Investor Relations Consultant
29/06/2016Tinka Announces Filing Of NI 43-101 Technical Report On The ...
27/06/2016Tinka Commences Property-Wide Airborne Geophysics At Ayawilc...
21/04/2016Tinka Announces AGM Results
04/04/2016Tinka Announces Grant Of Stock Options
23/03/2016Tinka Resources Appoints Mary L. Little To Board Of Director...
21/03/2016Tinka Announces Passing Of Director William Lee
20/01/2016Tinka Continues to Expand Zinc and Tin Footprint at Ayawilca
28/10/2015Tinka Drills 14.9 Metres at 1.1% Tin & 0.36% Copper at Ayawi...
13/10/2015Tinka Drills 50.5 Metres at 1.23% Tin & 0.16% Copper at Ayaw...
28/07/2015commences 10,000 metre drill program at Ayawilca zinc projec...
27/07/2015Hot Maden – Continues to Deliver Significant Results
20/04/2015announces appointment of new Vice President Exploration
20/04/2015announces appointment of new Vice President Exploration
20/04/2015Tinka announces appointment of new Vice President Exploratio...
13/04/2015Tinka Announces C$7.0 Million Private Placement Financing wi...
27/03/2015Tinka Announces Filing of NI 43-101 Technical Report on the ...
27/02/2015Tinka Announces AGM Results
27/02/2015IIROC Trading Resumption - TK
26/02/2015Tinka Announces Initial Inferred Zinc Resource of 13.3 Milli...
26/02/2015IIROC Trading Halt - TK
15/01/2015Tinka announces results of 1,600 metre ten-hole drill progra...
18/12/2014(Colquipucro)provides update on drill programs at Ayawilca-Colquipucro, P...
18/12/2014Tinka provides update on drill programs at Ayawilca-Colquipu...
11/12/2014Tinka announces release from escrow following Tier 1 graduat...
25/11/2014Tinka Discovers Tin - Copper Mineralization Beneath High-Gra...
25/11/2014Discovers Tin - Copper Mineralization Beneath High-Grade Zin...
13/11/2014Tinka announces graduation to Tier 1 on the TSX Venture Exch...
12/11/2014Tinka Intersects Thick High-grade Zinc Mineralization in Fou...
12/11/2014Intersects Thick High-grade Zinc Mineralization in Four Dril...
22/09/2014Tinka Starts Drilling With Third Rig at Colquipucro-Ayawilca...
11/09/2014Tinka Announces Start of Drilling at Colquipucro, Peru
08/09/2014Tinka Starts Drilling at Ayawilca; Farms Out Rurimarac Gold ...
26/08/2014Tinka Mobilizes First of Three Drill Rigs to Ayawilca-Colqui...
06/08/2014Tinka Provides Exploration Update; Grants Stock Options; Ret...
21/05/2014Tinka to Commence Geophysical Surveying to Cover 26 km2 at A...
18/12/2013Drills 12 Metres of 4.22% Zinc and Intercepts Mineralization...
16/12/2013Adopts Advance Notice Policy for Director Nominations
30/11/2013Announces Appointment of Corporate Development - Investor Re...
24/10/2013Resumes Drilling at Ayawilca Project, Peru
03/09/2013(Colquipucro)Receives Return to Work Permit for Ayawilca Project and Dril...
23/07/2013Tinka Announces the Approval of Its Environmental Impact Ass...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/05/2013Tinka Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/...
23/05/2013(Colquipucro)Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/t Ag a...
22/05/2013Drills 60 Metres of 7.75% Zinc (Including 24 Metres of 13.85...
10/05/2013Announces Oversubscription in Private Placement Financing
23/04/2013Tinka Identifies 1.7 Km Anomalous Geophysical Strike Length ...
23/04/2013Identifies 1.7 Km Anomalous Geophysical Strike Length At Aya...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc
02/04/2013Drills 16 Metres of 4.62% Zinc (Including 8 Metres of 6.62% ...
26/03/2013Drills 18.7 Metres of 165 g/t Ag (Including 8 Metres of 298 ...
21/03/2013Tinka Announces Results of AGM
12/03/2013Tinka Drills 12 Metres of 5.84% Zinc
13/02/2013Named to TSX Venture Top 50
08/01/2013Tinka Drills 70 metres of 4.8% Zinc (Including 19 metres of ...
08/11/2012Tinka Drills 20 m of 7.1% Zinc Including 14 m of 9.6% Zinc a...
18/10/2012Tinka Releases Independent NI 43-101 Report for the Colquipu...
15/10/2012(Colquipucro)Increases Inferred Silver Resource To 32.7 Million Ounces At...
02/08/2012Tinka Secures Surface Agreement With
05/03/2012Tinka Extends IP Anomaly at Ayawilca Zone to
23/02/2012Tinka Drills 10.4 metres of 7% Zn at
07/02/2012Tinka commences second IP survey at Ayawilca
04/08/2011Tinka Resources drilling update
01/06/2011ANNOUNCES $5 MILLION FINANCING
19/05/2011DRILL RIG MOBILIZED TO TINKA'S COLQUIPUCRO
19/05/2011GUYANA PRECIOUS METALS ANNOUNCES TAKARA RESOURCES PROVIDES ...
07/03/2011TINKA SIGNS DIAMOND DRILL CONTRACT FOR
03/10/2007Drills 66m Grading 83 g/t Silver from Surface at Colquipucro...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TK.V)Other OTC (TKRFF)
0,135+3.85%0,100+3.09%
TSX-V
CA$ 0,135
24/04 16:11 0,010
3,85%
Cours préc. Ouverture
0,130 0,135
Bas haut
0,135 0,135
Année b/h Var. YTD
0,100 -  0,140 12,50%
52 sem. b/h var. 52 sem.
0,100 -  0,180 3,85%
Volume var. 1 mois
11 000 12,50%
24hGold TrendPower© : 44
Produit
Développe
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20248,00%
2023-7,41%0,170,11
2022-15,63%0,220,12
2021-28,89%0,300,16
202015,38%0,250,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :