Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Dynasty Metals and Mining Inc

Publié le 18 septembre 2014

Dynasty Announces Updated Zaruma Gold Project Resource Estimate and Preliminary Economic Assessment

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Dollar |

Dynasty Announces Updated Zaruma Gold Project Resource Estimate and Preliminary Economic Assessment

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Sep 18, 2014) - Dynasty Metals & Mining Inc. ("Dynasty" or the "Company") (DMM.TO)(DMMIF) is pleased to announce that it has filed a technical report entitled "Independent Preliminary Assessment - Zaruma Gold Project" (the "Technical Report") dated September 17, 2014, which contains a Preliminary Economic Assessment ("PEA") based upon an updated mineral resource Estimate on its Zaruma Gold Project (the "Zaruma Project") in El Oro Province, Ecuador.

The Technical Report was prepared by Consulting Mining Engineer Mr RL Procter BSc (Eng), MBA, MIMMM, CEng, and Consulting Geologists Mr AJ Maynard, BAppSc (Geol) MAIG, MAusIMM and Mr PA Jones, BAppSc (Geol), MAIG, all of whom are independent "qualified persons" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"). The Technical Report has been prepared in accordance with NI 43-101 and is available on the Company's website (www.dynastymining.com) and on SEDAR (www.sedar.com).

The selected information presented herein is qualified in its entirety by, and should be read in conjunction with, the Technical Report. All dollar amounts in United States dollars unless otherwise stated.

Zaruma Project

The Zaruma Project is situated in El Oro Province of southern Ecuador, about 175 kilometres south and 60 kilometres southeast of the major port cities of Guayaquil and Machala respectively.

The Zaruma Project comprises 41 concessions covering a total area of 10,121.47 hectares in a readily accessible region of southern Ecuador. The gold mineralization found on the concessions is associated with extensive high grade gold and silver epithermal vein systems.

Updated Resource Estimate

The Company's updated mineral resource estimate was calculated using data related to concessions that cover a relatively small section of the total concession area that makes up the Zaruma Project. Such additional area is considered by the authors of the Technical Report to be highly prospective for additional mineralized veins, which may become the focus of future exploration work.

Estimated mineral resources at the Zaruma Project as contained in the Technical Report are as follows:

Measured Indicated Inferred
Location Tonnes (million) Grade Au (g/t) Contained Au (Ozs) Tonnes (million) Grade Au (g/t) Contained Au (Ozs) Tonnes (million) Grade Au (g/t) Contained Au (Ozs)
Cabo de Hornos 1.30 13.99 585,000 0.86 12.46 343,000 3.0 12.30 1,201,000
Barbasco 0.19 11.05 66,000 0.09 10.81 33,000 0.3 12.13 128,000
Ayapamba 0.07 12.64 30,000 0.06 11.63 23,000 0.2 12.40 96,000
Vizcaya 0.03 8.40 8,000 0.02 8.40 6,000 0.1 8.40 23,000
Total 1.59 13.48 689,000 1.03 12.18 405,000 3.7 12.2 1,448,000
Notes: - Mineral Resources that are not Mineral Reserves have not demonstrated economic viability.
- A cut-off grade of 2.06 was used to derive the Mineral Resource estimate.

Updated Preliminary Economic Analysis

An updated PEA has been prepared based upon the updated mineral resource estimate. Highlights of the PEA as set out in the Technical Report are as follows:

Unit Value
Gold Price Used $/oz Au 1,300
Gold Recovered(1) Au (oz) 1,081,108
Total Mined Resources (undiluted)(1)
- Measured + Indicated tonnes 2,590,000
- Inferred tonnes 935,000
Operating Revenue $M 1,459.5
Operating Cash Flow (EBITDA) $M 682.5
Net Cash Flow (untaxed) $M 653.4
Net Cash Flow (taxed) $M 440.9
NPV(2) (untaxed) $M 321.6
NPV(2) (taxed) $M 218.2
Unit Operating Cost (untaxed) $/oz Au 658
Unit Operating Cost (taxed) $/oz Au 855
1. It is assumed that 100% of the measured and indicated resource and 25% of the inferred resource is mined.
2. At 10% base case discount rate

As required by NI 43-101, it should be noted that these evaluations are preliminary in nature and that the Inferred Mineral Resources in particular are considered too speculative geologically to have economic considerations applied to them that would enable them to be categorized as Mineral Reserves. As such there is no certainty that the PEA will be realised.

The Zaruma Project has sufficient Measured and Indicated Mineral Resources for a mine life of about 10.5 years. The Project also has available to it a significant inventory of Inferred Mineral Resource (59% of all tonnes and 57% in gold content). Adding only 27% of the Inferred Mineral Resource (equating to 25% of gold output) to the Zaruma Project's production schedule increases mine life to 15 years, which is considered to be a reasonable mine life period to assess the Project on a discounted cash flow basis. This is the base case evaluated for the PEA.

The Inferred Mineral Resource is also assumed to be processed at the end of the mine's life (i.e. after all Measured and Indicated material has been treated), so it suffers the greatest discounted cash flow effect in the analysis.

The salient information for the Zaruma Project from the PEA contained in the Technical Report is the following:

  • it produces an earnings before interest, tax, depreciation and amortisation of $683 million;
  • at a 10% discount rate, it produces a taxed net present value (NPV) of $218 million and untaxed NPV of $322 million;
  • it produces a taxed net cash flow of $441 million and an untaxed net cash flow of $653 million;
  • it has a total unit cash operating cost of $855/oz (taxed) and $658/oz (untaxed);
  • the overall operating costs equate to 51% of total revenue;
  • total capital expenditure is estimated at $29 million; and
  • it pays $66 million in royalties and $213 million in taxes, over its estimated 15 year mine life.

Company Comment

Company President and Chief Executive Officer, Robert Washer, commented: "The updated PEA provides an encouraging financial model that supports management's belief that Zaruma is a world class asset. We have worked extremely hard to develop Zaruma under very difficult operating circumstances primarily with proceeds from the pre-commercial processing and sale of gold. We look forward to increasing mine production over time to meet plant capacity in order to enhance shareholder value."

About Dynasty Metals & Mining

Dynasty is a Canadian based mining company involved in the exploration and development of mineral properties in Ecuador.

The Company is currently focused on developing its Zaruma Gold Project, at which the Company is in production. The Company also has the following non-producing assets: the Jerusalem Project and Dynasty Goldfield Project.

The technical information of this news release has been reviewed and approved by Brian Speechly, a Fellow of AUSIMM (Australian Institute of Mining and Metallurgy), a director of the Company and a "qualified person" within the definition of that term in the NI 43-101.

For further information please visit the Company's website at www.dynastymining.com

Forward-Looking Information

This news release contains statements which are, or may be deemed to be, "forward-looking information" which are prospective in nature. Often, but not always, forward-looking information can be identified by the use of forward-looking words such as "plans", "expects" or "does not expect", "is expected", "scheduled", "estimates", "forecasts", "projects", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "should", "would", "might" or "will" be taken, occur or be achieved. Such information in this news release includes, without limitation, statements regarding Dynasty's future plans and expectations relating to the future exploration work at the Zaruma Project; Zaruma mine development and mineral extraction; and analyses and other information that are based on expectations of future performance as outlined in the updated mineral resource estimate and PEA. Statements concerning mineral resource estimates may also constitute forward-looking statements to the extent that they involve estimates of the mineralization that will be encountered if the Zaruma Project is developed. Forward-looking information is not based on historical facts, but rather on then current expectations, beliefs, assumptions, estimates and forecasts about the business and the industry and markets in which the Company operates, including assumptions relating to the Company's ability to continue progress through its declines with minimal or no interruption; that the Company will be able to continue its progress in respect of its mines as planned; that the Company will continue to sell processed gold and silver at levels that allow it to fund the continued development of its mining projects and sustain its operations; that the Company will have access to capital if required; that all necessary approvals and arrangements will be obtained, renewed and/or finalized in a satisfactory manner in order to continue developing the Company's projects; and that the Company's equipment will operate at expected levels. Such statements are qualified in their entirety by the inherent risks and uncertainties surrounding future expectations. Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause Dynasty's actual results, revenues, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements.

Important risks that could cause Dynasty's actual results, revenues, performance or achievements to differ materially from Dynasty's expectations include, among other things: risks related to fluctuations in the price of gold; risks related to fluctuations in currency markets; risks related to the inherently dangerous activity of mining; uncertainty in the Company's ability to fund the development of the Zaruma Project pursuant to the PEA, including the availability of capital on satisfactory terms; uncertainty as to actual capital costs, operating costs, production and economic returns, and uncertainty that development activities will result in a profitable mining operation at the Zaruma Project; risks related to mineral resource figures being estimates based on interpretations and assumptions which may result in less mineral production under actual conditions than is currently estimated and to diminishing quantities or grades of mineral resources as properties are mined; risks related to governmental regulations and obtaining necessary licenses and permits; risks related to the business being subject to environmental laws and regulations which may increase costs of doing business and restrict our operations; risks related to the Zaruma Project being located in Ecuador, including political, economic, social and regulatory instability; and other risks found in Dynasty's Annual Information Form for the year ended December 31, 2013 and other public filings which are available on SEDAR at www.sedar.com. For the reasons set forth above, investors should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward looking information, except in accordance with applicable securities laws.

Lire la suite de l'article sur finance.yahoo.com

Dynasty Metals and Mining Inc

PRODUCTEUR
CODE : DMM.TO
ISIN : CA26813S1002
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Dynasty Metals est une société développant des projet miniers d'or et d'argent basée au Canada.

Dynasty Metals est en développement de projets d'or, d'argent, de cuivre et de zinc en Equateur, et détient divers projets d'exploration en Equateur.

Son principal projet en production est ZARUMA en Equateur, ses principaux projets en développement sont JERUSALEM et JERUSALEM en Equateur et son principal projet en exploration est DYNASTY en Equateur.

Dynasty Metals est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 28,1 millions CA$ (20,7 millions US$, 19,0 millions €).

La valeur de son action a atteint son plus haut niveau récent le 17 août 2007 à 9,50 CA$, et son plus bas niveau récent le 22 avril 2016 à 0,10 CA$.

Dynasty Metals possède 87 810 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Dynasty Metals and Mining Inc
09/06/2006Follow up N° 6
Rapports annuels de Dynasty Metals and Mining Inc
Annual Report 2007
Financements de Dynasty Metals and Mining Inc
21/10/2009$6,000,000 bought deal financing
Nominations de Dynasty Metals and Mining Inc
09/01/2013Announces Director Resignation
17/05/2011Appoints New Director
12/03/2008APPOINTS NEW DIRECTOR
31/07/2007Ecuador Appoints New Undersecretary Of Mines
25/07/2007 ECUADOR APPOINTS NEW MINISTER OF MINES & PETROLEUM
28/06/2007Management Appointments
Rapports Financiers de Dynasty Metals and Mining Inc
15/08/2013Reports Financial Results for the Three and Six Months Ended...
16/05/2013Reports Financial Results for the Three Months Ended March 3...
29/03/2013Reports Financial Results for the Year Ended December 31, 20...
15/08/2012Reports Financial Results for the Three and Six Months Ended...
02/04/2012Releases 2011 Financial Statements
Projets de Dynasty Metals and Mining Inc
23/07/2012(Zaruma)Announces Armed Robbery at Zaruma Gold Project
21/01/2011(Zaruma)Commences Formal Contract Negotiations
02/02/2010(Zaruma)President's Update on Zaruma
28/09/2009(Zaruma)Dynasty Pours First Gold
20/08/2009(Zaruma)Provides update on ecuador gold projects
17/04/2007RECEIVES FINAL PERMITTING TO CONSTRUCT AND OPERATE ZARUMA GO...
Communiqués de Presse de Dynasty Metals and Mining Inc
29/07/2016Dynasty Receives Forbearance Period on Vertex One Asset Mana...
09/07/2016Dynasty Provides Corporate Update
06/07/2016Dynasty Announces Annual General Meeting Voting Results
15/06/2016Dynasty Provides Corporate Update
31/05/2016Dynasty Mining Engages a Financial Advisor to the Special Co...
17/05/2016Dynasty Reports Financial Results for the Quarter Ended Marc...
27/04/2016Dynasty Metals & Mining Announces Dynasty Goldfield Project ...
20/04/2016Dynasty Reports 2,785 Ounces of Gold Sold and 2,221 Ounces o...
11/04/2016Dynasty Announces Temporary Work Delay at the Zaruma Gold Pr...
05/04/2016Dynasty Provides Corporate Update
23/01/2016Dynasty Reports 5,634 Ounces of Gold Sold and 4,133 Ounces o...
02/11/2015DYNASTY ANNOUNCES AMENDMENTS TO THE TERMS OF DEBT FINANCING
14/10/2015DYNASTY REPORTS 6,285 OUNCES OF GOLD PRODUCED IN Q3 2015 & P...
15/09/2015DYNASTY SETTLES US$1.44 MILLION OF SHORT TERM DEBT BY WAY OF...
14/09/2015Dynasty Settles US$1.44 Million of Short Term Debt By Way of...
14/08/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE SIX AND THREE MONT...
22/06/2015DYNASTY CLOSES US$4 MILLION DEBT FINANCING & PROVIDES OPERAT...
13/04/2015DYNASTY METALS AND MINING ANNOUNCES THE APPOINTMENT OF NAOMI...
08/04/2015Dynasty Metals and Mining Announces the Appointment of Naomi...
08/04/2015Announces the Appointment of Naomi Nemeth to the Role of Vic...
01/04/2015DYNASTY REPORTS FINANCIAL RESULTS FOR THE YEAR ENDED DECEMBE...
24/01/2015DYNASTY ANNOUNCES GOLD PRODUCTION OF 25,868 OUNCES AND GOLD ...
18/01/2015Dynasty Announces Gold Production of 25,868 Ounces and Gold ...
14/11/2014DYNASTY REPORTS FINANCIAL RESULTS FOR THE THREE AND NINE MON...
14/11/2014Dynasty Reports Financial Results for the Three and Nine Mon...
06/11/2014DYNASTY ANNOUNCES UPDATED DYNASTY GOLDFIELD PROJECT AND JERU...
06/11/2014Dynasty Announces Updated Dynasty Goldfield Project and Jeru...
18/09/2014Dynasty Announces Updated Zaruma Gold Project Resource Estim...
15/08/2014Dynasty Reports Financial Results for the Three and Six Mont...
30/06/2014Dynasty Provides Update on Preparation of Revised Technical ...
25/06/2014Dynasty Announces Annual General Meeting Voting Results
02/06/2014Dynasty Provides Update on Preparation of Revised Technical ...
16/05/2014Dynasty Reports Financial Results for the Three Months Ended...
02/05/2014DYNASTY PROVIDES UPDATE ON PREPARATION OF REVISED TECHNICAL ...
30/04/2014Dynasty Provides Update on Preparation of Revised Technical ...
21/04/2014Dynasty Reports Mine Incident
01/04/2014Dynasty Reports Financial Results for the Year Ended Decembe...
20/06/2013Announces Annual General and Special Meeting Voting Results
16/10/2012(Zaruma)Qualifies Key Zaruma Concessions for Small Scale Mining Lice...
06/09/2012Insurance Claim Settled
07/10/2011(Dynasty)Director Retires From Dynasty's Board
30/11/2009Comments on Ecuadorian Mining Regulations
03/11/2009Completes $6,000,000 equity financing
07/07/2009Welcomes Ecuador Vice Minister of Mines to Its Zaruma Gold P...
01/07/2009Dynasty and IAMGOLD Extend Option Period
03/03/2009CEO Interviewed on BNN
17/12/2008 plans to commission gold plant by the end of March
28/04/2008WELCOMES ECUADOR PRESIDENT TO ITS ZARUMA PROJECT
25/04/2008COMMENTS ON RECENT DEVELOPMENTS IN ECUADOR
23/04/2008 SEEKS CLARIFICATION ON NEW MINING MANDATE
15/04/2008ENTERS INTO REVISED AGREEMENT
10/03/2008Completes $18,750,000 Equity Financing
20/02/2008SPROTT ASSET MANAGEMENT TO INCREASE ITS DYNASTY STAKE TO 22....
29/01/2008PRESIDENT'S UPDATE
25/01/2008CONCESSIONS IN GOOD STANDING
18/12/2007Exercises Option to Buy Back Royalty at Its Near Production ...
12/12/2007MOURNS PASSING OF DIRECTOR PAUL MACNEILL
20/11/2007Increases Gold and Silver Resource Estimate
25/10/2007 RECEIVES CONDITIONAL APPROVAL OF COPPER DUKE SPIN-OFF
01/08/2007To Trade On The Toronto Stock Exchange
18/07/2007New Optimized Zaruma Plant Design
16/07/2007Receives Conditional Approval to Trade on Toronto Stock Exch...
12/06/2007 Provides Zaruma Gold Project Update
24/02/2007Engages Brisco Capital Partners
01/10/2005Follow up N° 4
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (DMM.TO)OTC BB (DMMIF)
0,320-3.03%0,267+4.21%
TORONTO
CA$ 0,320
26/04 13:46 -0,010
-3,03%
Cours préc. Ouverture
0,330 0,320
Bas haut
0,320 0,320
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,320 -%
Volume var. 1 mois
8 150 -%
24hGold TrendPower© : 2
Produit Gold
Développe Gold
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 05/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,68 AU$-0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,89 US$-1,36%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,36 CA$-3,28%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,64 CA$+2,69%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,17%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+7,89%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+6,25%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,67 US$-0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$-2,94%Trend Power :