Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Polymet Mining Corp

Publié le 25 juin 2010

EIS-Path Forward to Completion Announced

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Nickel | Precious Metals |

 
 
PolyMet Mining Corp.
TSX: POM
NYSE Amex: PLM
Other Recent News

June 25, 2010
PolyMet EIS-Path Forward to Completion Announced
HOYT LAKES, MINNESOTA--(Marketwire - June 25, 2010) - PolyMet Mining Corp. (TSX:POM)(NYSE Amex:PLM) ("PolyMet" or the "Company") announced today that the state and federal government agencies responsible for the Environmental Impact Statement (EIS) reviewing PolyMet's copper-nickel-precious metals project will complete the EIS process by preparing a supplemental draft EIS that incorporates the proposed US Forest Service (USFS) land exchange and expands government agency cooperation.

The USFS will join the US Army Corps of Engineers (USACE) as a federal co-lead agency through the completion of the EIS process. In addition, the U.S. Environmental Protection Agency (EPA) will join the effort as a cooperating agency. The Minnesota Department of Natural Resources (DNR) remains the state co-lead agency.

The supplemental draft EIS will:

--  Define and analyze a specific project alternative as it is expected to
    be built 
--  Fully incorporate the proposed land exchange with the USFS into a
    consolidated EIS process 
--  Reflect applicable comments received on the Draft EIS from the public
    and government agencies including appropriate recommendations from EPA 
--  Integrate key project improvements, modifications, alternatives, and
    mitigation measures to minimize environmental impacts
 
LaTisha Gietzen, Vice President of Public, Government and Environmental Affairs, stated: "We are pleased the US Forest Service and the EPA are more formally involved in the EIS process. The agencies are actively engaged in planning an effective and efficient path forward to completion of environmental review."

Background

The PolyMet project comprises the Erie Plant and the nearby NorthMet copper-nickel-precious metals ore-body, located near Hoyt Lakes in the established mining district of the Mesabi Iron Range in northeastern Minnesota.

PolyMet began the environmental review process in 2004. The analysis is contained in more than 100 technical studies totaling approximately 14,000 pages that were the basis for the draft EIS. The milestones achieved to date are shown in the diagram below.

To view diagram please click on the following link: http://media3.marketwire.com/docs/Diagram1.pdf

In November 2009 the DNR and the USACE published the draft EIS reviewing PolyMet's project, followed by a 90-day public comment period. The agencies received more than 3,700 separate submissions, including comments by the EPA and other government agencies. At the same time as the draft EIS was being prepared and was on public notice, PolyMet was working on a land exchange with the USFS, which holds certain surface rights at the NorthMet mine site.

The supplemental draft EIS will build upon the existing draft EIS by incorporating appropriate comments received on the draft EIS, include project improvements and roll in the USFS land exchange. The following diagram illustrates how the environmental review process will move forward.

To view diagram please click on the following link: http://media3.marketwire.com/docs/Diagram2.pdf

PolyMet anticipates that the lead agencies will establish the timeline for publication of the supplemental draft EIS when they have agreed on all the details of the project. Once the supplemental draft EIS is completed, it will be made available for public review prior to preparation of the final EIS. Completion of the final EIS and a subsequent Adequacy Decision by the DNR and Record of Decision by the federal agencies are necessary before the land exchange can occur and various permits required to construct and operate the project can be issued.

Joe Scipioni, President and CEO of PolyMet, said: "The government agencies involved have put a great deal of effort into developing this plan that incorporates and consolidates the land exchange into the EIS process, considers the EPA's recommendations, and strengthens the partnership among state and federal agencies. The supplemental draft EIS will streamline the process moving forward and provide clarity as to the specific project that we plan to build."

He continued, "The supplemental draft EIS will describe a project that can be built in a way that not only creates the much-needed jobs but also protects our environment and natural resources."

See DNR news release: http://news.dnr.state.mn.us/index.php/2010/06/24/supplemental-draft-eis-to-be-prepared-for-proposed-northmet-mining-project/#more-43684

USACE news release: http://www.mvp.usace.army.mil/regulatory/

About PolyMet

PolyMet Mining Corp. (www.polymetmining.com) is a publicly-traded mine development company that controls 100% of the NorthMet copper-nickel-precious metals ore body through a long-term lease and owns 100% of the Erie Plant, a large processing facility located approximately six miles from the ore body in the established mining district of the Mesabi Range in northeastern Minnesota. PolyMet Mining Corp. has completed its Definitive Feasibility Study and is seeking environmental and operating permits to enable it to commence production. The NorthMet project is expected to require approximately one million man-hours of construction labor and create at least 400 long-term jobs, a level of activity that will have a significant multiplier effect in the local economy.

POLYMET MINING CORP.

Joe Scipioni, President

This news release contains certain forward-looking statements concerning anticipated developments in PolyMet's operations in the future. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", "projects", "plans", and similar expressions, or statements that events, conditions or results "will", "may", "could", or "should" occur or be achieved or their negatives or other comparable words. These forward-looking statements may include statements regarding our beliefs related to the expected proceeds and closing of the registered direct offering, exploration results and budgets, reserve estimates, mineral resource estimates, work programs, capital expenditures, actions by government authorities, including changes in government regulation, the market price of natural resources, costs, or other statements that are not a statement of fact. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those in the forward-looking statements due to risks facing PolyMet or due to actual facts differing from the assumptions underlying its predictions. PolyMet's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and PolyMet does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations and opinions should change.

Specific reference is made to PolyMet's most recent Annual Report on Form 20-F for the fiscal year ended January 31, 2010 and in our other filings with Canadian securities authorities and the Securities and Exchange Commission, including our Report on Form 6-K providing information with respect to our operations for the three months ended April 30, 2010 for a discussion of some of the risk factors and other considerations underlying forward-looking statements.


The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

PolyMet Mining Corp. - Corporate
Douglas Newby
Chief Financial Officer
+1 (646) 879-5970
dnewby@polymetmining.com

or

PolyMet Mining Corp. - Media
LaTisha Gietzen
VP Public, Governmental and Environmental Affairs
+1 (218) 225-4417
Fax: +1 (218) 225-4429
lgietzen@polymetmining.com

or

PolyMet Mining Corp. - Investors
Crystal Agresti
+1 (845) 742-8153
cagresti@polymetmining.com

or

PolyMet Mining Corp.
Alex Macdougall
+1 (226) 663-3000
amacdougall@polymetmining.com
www.polymetmining.com

INDUSTRY: Manufacturing and Production - Mining and Metals


 
 
PolyMet Mining Corp.
TSX: POM
NYSE Amex: PLM
Other Recent News

June 25, 2010
PolyMet EIS-Path Forward to Completion Announced
HOYT LAKES, MINNESOTA--(Marketwire - June 25, 2010) - PolyMet Mining Corp. (TSX:POM)(NYSE Amex:PLM) ("PolyMet" or the "Company") announced today that the state and federal government agencies responsible for the Environmental Impact Statement (EIS) reviewing PolyMet's copper-nickel-precious metals project will complete the EIS process by preparing a supplemental draft EIS that incorporates the proposed US Forest Service (USFS) land exchange and expands government agency cooperation.

The USFS will join the US Army Corps of Engineers (USACE) as a federal co-lead agency through the completion of the EIS process. In addition, the U.S. Environmental Protection Agency (EPA) will join the effort as a cooperating agency. The Minnesota Department of Natural Resources (DNR) remains the state co-lead agency.

The supplemental draft EIS will:

--  Define and analyze a specific project alternative as it is expected to
    be built 
--  Fully incorporate the proposed land exchange with the USFS into a
    consolidated EIS process 
--  Reflect applicable comments received on the Draft EIS from the public
    and government agencies including appropriate recommendations from EPA 
--  Integrate key project improvements, modifications, alternatives, and
    mitigation measures to minimize environmental impacts
 
LaTisha Gietzen, Vice President of Public, Government and Environmental Affairs, stated: "We are pleased the US Forest Service and the EPA are more formally involved in the EIS process. The agencies are actively engaged in planning an effective and efficient path forward to completion of environmental review."

Background

The PolyMet project comprises the Erie Plant and the nearby NorthMet copper-nickel-precious metals ore-body, located near Hoyt Lakes in the established mining district of the Mesabi Iron Range in northeastern Minnesota.

PolyMet began the environmental review process in 2004. The analysis is contained in more than 100 technical studies totaling approximately 14,000 pages that were the basis for the draft EIS. The milestones achieved to date are shown in the diagram below.

To view diagram please click on the following link: http://media3.marketwire.com/docs/Diagram1.pdf

In November 2009 the DNR and the USACE published the draft EIS reviewing PolyMet's project, followed by a 90-day public comment period. The agencies received more than 3,700 separate submissions, including comments by the EPA and other government agencies. At the same time as the draft EIS was being prepared and was on public notice, PolyMet was working on a land exchange with the USFS, which holds certain surface rights at the NorthMet mine site.

The supplemental draft EIS will build upon the existing draft EIS by incorporating appropriate comments received on the draft EIS, include project improvements and roll in the USFS land exchange. The following diagram illustrates how the environmental review process will move forward.

To view diagram please click on the following link: http://media3.marketwire.com/docs/Diagram2.pdf

PolyMet anticipates that the lead agencies will establish the timeline for publication of the supplemental draft EIS when they have agreed on all the details of the project. Once the supplemental draft EIS is completed, it will be made available for public review prior to preparation of the final EIS. Completion of the final EIS and a subsequent Adequacy Decision by the DNR and Record of Decision by the federal agencies are necessary before the land exchange can occur and various permits required to construct and operate the project can be issued.

Joe Scipioni, President and CEO of PolyMet, said: "The government agencies involved have put a great deal of effort into developing this plan that incorporates and consolidates the land exchange into the EIS process, considers the EPA's recommendations, and strengthens the partnership among state and federal agencies. The supplemental draft EIS will streamline the process moving forward and provide clarity as to the specific project that we plan to build."

He continued, "The supplemental draft EIS will describe a project that can be built in a way that not only creates the much-needed jobs but also protects our environment and natural resources."

See DNR news release: http://news.dnr.state.mn.us/index.php/2010/06/24/supplemental-draft-eis-to-be-prepared-for-proposed-northmet-mining-project/#more-43684

USACE news release: http://www.mvp.usace.army.mil/regulatory/

About PolyMet

PolyMet Mining Corp. (www.polymetmining.com) is a publicly-traded mine development company that controls 100% of the NorthMet copper-nickel-precious metals ore body through a long-term lease and owns 100% of the Erie Plant, a large processing facility located approximately six miles from the ore body in the established mining district of the Mesabi Range in northeastern Minnesota. PolyMet Mining Corp. has completed its Definitive Feasibility Study and is seeking environmental and operating permits to enable it to commence production. The NorthMet project is expected to require approximately one million man-hours of construction labor and create at least 400 long-term jobs, a level of activity that will have a significant multiplier effect in the local economy.

POLYMET MINING CORP.

Joe Scipioni, President

This news release contains certain forward-looking statements concerning anticipated developments in PolyMet's operations in the future. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "intends", "estimates", "potential", "possible", "projects", "plans", and similar expressions, or statements that events, conditions or results "will", "may", "could", or "should" occur or be achieved or their negatives or other comparable words. These forward-looking statements may include statements regarding our beliefs related to the expected proceeds and closing of the registered direct offering, exploration results and budgets, reserve estimates, mineral resource estimates, work programs, capital expenditures, actions by government authorities, including changes in government regulation, the market price of natural resources, costs, or other statements that are not a statement of fact. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those in the forward-looking statements due to risks facing PolyMet or due to actual facts differing from the assumptions underlying its predictions. PolyMet's forward-looking statements are based on the beliefs, expectations and opinions of management on the date the statements are made, and PolyMet does not assume any obligation to update forward-looking statements if circumstances or management's beliefs, expectations and opinions should change.

Specific reference is made to PolyMet's most recent Annual Report on Form 20-F for the fiscal year ended January 31, 2010 and in our other filings with Canadian securities authorities and the Securities and Exchange Commission, including our Report on Form 6-K providing information with respect to our operations for the three months ended April 30, 2010 for a discussion of some of the risk factors and other considerations underlying forward-looking statements.


The TSX has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

CONTACT INFORMATION:

PolyMet Mining Corp. - Corporate
Douglas Newby
Chief Financial Officer
+1 (646) 879-5970
dnewby@polymetmining.com

or

PolyMet Mining Corp. - Media
LaTisha Gietzen
VP Public, Governmental and Environmental Affairs
+1 (218) 225-4417
Fax: +1 (218) 225-4429
lgietzen@polymetmining.com

or

PolyMet Mining Corp. - Investors
Crystal Agresti
+1 (845) 742-8153
cagresti@polymetmining.com

or

PolyMet Mining Corp.
Alex Macdougall
+1 (226) 663-3000
amacdougall@polymetmining.com
www.polymetmining.com

INDUSTRY: Manufacturing and Production - Mining and Metals


.

Polymet Mining Corp

CODE : POM.TO
ISIN : CA7319161021
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Polymet est une société développant des projet miniers de cuivre et de nickel basée au Canada.

Polymet détient divers projets d'exploration en USA.

Son principal projet en exploration est NORTHMET en USA.

Polymet est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 909,5 millions CA$ (727,2 millions US$, 690,1 millions €).

La valeur de son action a atteint son plus bas niveau récent le 27 mars 2020 à 0,26 CA$, et son plus haut niveau récent le 04 septembre 2020 à 8,30 CA$.

Polymet possède 318 549 984 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Polymet Mining Corp
05/07/2008Duluth Complex: A World-Class Value Play
07/09/2006Follow up
Financements de Polymet Mining Corp
27/06/2013Reminder to Shareholders Rights Offering Closes at 5:00 pm E...
24/05/2013Announces Terms of US$60=2E5 Million Rights Offering and Fil...
06/12/2011Closes $20 Million Private Placement With Glencore
30/11/2011and Glencore Agree to Extend Debentures
18/01/2011Polymet Closes First $10 Million Tranche of Glencore Financi...
17/11/2009Modifies Terms of Existing Glencore Warrants
Nominations de Polymet Mining Corp
25/01/2011Names Brad Moore Executive VP-Environmental and Governmental...
19/02/2008 Appoints Frank Sims and Joe Scipioni to the Board
13/03/2007Appoints Chief Operating Officer and NorthMet Senior Constru...
Rapports Financiers de Polymet Mining Corp
15/06/2016Reports First Quarter Fiscal 2017 Results
22/04/2016Reports Fiscal 2016 Results
16/12/2015Reports Third Quarter Fiscal 2016 Results
04/09/2015Reports Second Quarter Fiscal 2016 R =?ISO-8859-1?Q?esults,=...
05/12/2013Reports Third Quarter Fiscal 2014 Results
11/09/2013Reports Second Quarter Fiscal 2014 Results
11/06/2013Reports First Quarter Fiscal 2014 Results-Rights Offering Ma...
07/09/2012Reports Second Quarter Fiscal 2013 Results
18/06/2012Reports First Quarter Fiscal 2013 Results
08/09/2011Reports Second Quarter Fiscal 2012 Results
06/07/2011Reports First Quarter Fiscal 2012 Results: Update on State o...
07/05/2011Announces Fiscal 2011 Full-Year Results
30/04/2008Reports Fiscal 2008 Fourth Quarter and Full Year Results
Projets de Polymet Mining Corp
14/07/2016Project Update at Shareholders' Meeting
16/12/2013Federal Wetlands Permit Application Published for PolyMet Pr...
28/08/2013and E&D: Polymetal swings to a loss and Ncondezi gets permit...
29/07/2013and Finance: Polymetal to take writedown of up to US$340m an...
30/05/2013(Northmet)Reports Further Progress at NorthMet Copper-Nickel Project R...
14/02/2013(Northmet)Improves NorthMet Project
07/11/2012Drilling Commences at the Croydon Polymetallic Project
03/02/2011(Northmet)Simplifies Metallurgical Process at NorthMet Project
26/09/2007(Northmet)Reports a 51% Interim Increase in Reserves at NorthMet
09/08/2007(Northmet) Reports a 51% Increase in Mineral Resources at NorthMet
10/07/2007(Northmet) Drill Program Confirms Expansion of "Magenta" Zone and Demo...
Communiqués de Presse de Polymet Mining Corp
14/07/2016PolyMet Project Update at Shareholders’ Meeting
11/07/2016PolyMet Submits Water-Related Permit Applications to the Sta...
15/06/2016PolyMet Reports First Quarter Fiscal 2017 Results
22/04/2016PolyMet Reports Fiscal 2016 Results
27/01/2016PolyMet Secures Additional US$11 Million Loan From Glencore
16/12/2015PolyMet Reports Third Quarter Fiscal 2016 Results
06/11/2015IIROC Trade Resumption - POM
06/11/2015PolyMet Final EIS Completed - Demonstrates Project Meets Env...
06/11/2015IIROC Trading Halt - POM
04/09/2015PolyMet Reports Second Quarter Fiscal 2016 Results, Progress...
17/07/2015PolyMet Reports Accomplishments at Annual Shareholders’ meet...
16/07/2015PolyMet Reports Accomplishments at Annual Shareholders' Meet...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results - Project ...
15/12/2014PolyMet Reports Third Quarter Fiscal 2015 Results Project Up...
08/10/2014PolyMet Final EIS "Early Spring" 2015
09/09/2014PolyMet Reports Second Quarter Fiscal 2015 Results
11/06/2014PolyMet Reports First Quarter Fiscal 2015 Results
25/04/2014PolyMet Reports Fiscal 2014 Results
25/04/2014PolyMet and Glencore Agree to Extend Term of US$32.2 Million...
13/03/2014IIROC Trade Resumption - POM
13/03/2014IIROC Trading Halt - POM (all issues)
24/02/2014DNI Metals - Operating in a Polymetallic Paradise
06/12/2013Achieves Key Milestone in Environmental Review Process
05/12/2013DNI REPORTS POSITIVE PRELIMINARY ECONOMIC ASSESSMENT FOR ITS...
06/11/2013Three-Week Federal Government Shutdown Results in Two-Week P...
11/09/2013DNI'S RESOURCE STUDY REPORT UPDATING AND EXPANDING THE MINER...
27/08/2013DNI EXPANDS BUCKTON ZONE INFERRED RESOURCE TO 4.9 BILLION TO...
26/08/2013Significant Progress for PolyMet Environmental Review
23/08/2013Minnesota DNR Announces Publication Date for PolyMet Supplem...
25/07/2013s Investors With Exclusive Interview With The Wall Street An...
10/07/2013Reports Strong Positioning at Shareholders' Meeting
05/07/2013Closes Successful Rights Offering; Financed to Complete Perm...
19/06/2013on PolyMet Rights Offering-Informationfor Those Who Have Not...
13/05/2013Reports Completion of Drafting of Preliminary EIS
23/04/2013Reports Fiscal 2013 Results
19/04/2013(Northmet)NorthMet News - PolyMet Mining, Inc.
10/04/2013US$60 Million Common Share Rights Offering to All Shareholde...
11/01/2013DNI CONSOLIDATES AND EXPANDS BUCKTON RESOURCE TO 3.49 BILLIO...
11/12/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
01/11/2012s Technical Disclosure
15/10/2012Closes $10 Million Third Tranche of Glencore Financing
10/10/2012Reports Successful Water Treatment Pilot Plant
13/09/2012(Northmet)NorthMet News - PolyMet Mining, Inc.
11/09/2012Strengthens Permitting Expertise
17/07/2012Focuses Corporate Leadership Team in Minnesota
11/07/2012Announces Results of Shareholders' Meeting
28/06/2012Form 20-F Availability
21/06/2012Strengthens Leadership Team
15/06/2012for IMMEDIATE Dissemination - Verbatim - Kootenay and Pinecr...
14/06/2012Reports Technical Disclosure Review
23/05/2012Reports Progress on Environmental Review
01/05/2012Reports Fiscal 2012 Results
19/03/2012DNI EXTRACTS METALS FROM ITS ALBERTA POLYMETALLIC SHALES USI...
29/02/2012Acquires Control of Wetlands
13/02/2012Clarifies Status of Environmental Review Following Misleadin...
01/02/2012s Status of Environmental Review
16/01/2012DNI ANNOUNCES 250 MILLION TON INFERRED RESOURCE FOR REE-Y-Sc...
14/12/2011orate and Project Update; Third Quarter Fiscal 2012 Results
30/11/2011Agrees to Sell US$20 Million of Common Shares to Glencore
12/10/2011Everett Resources Commences Second Phase 2,500 Meter Drill P...
19/09/2011(Northmet)s Progress on NorthMet Environmental Review
15/07/2011Closes Second $10 Million Tranche of Glencore Financing
30/06/2011Closes IRRRB Loan
17/06/2011Reports Mailing of Information Circular
05/05/2011to File Financial Statements on or Before May 9, 2011
03/05/2011Announces Delay in Filing Year-End Financial Statements
15/04/2011s Status of Environmental Review
25/06/2010EIS-Path Forward to Completion Announced
15/03/2010Statement on Environmental Review Timeline
04/03/2010Environmental Review Process Clarified
23/02/2010s NorthMet Environmental Review Progress
26/01/2010Receives Second Installment From Glencore
24/11/2009Closes Financing-Project Update
17/11/2009Sells US$25 Million of Common Shares to Glencore
28/10/2009Environmental Impact Statement Published
05/10/2009Draft EIS Available the Week of October 19, 2009
01/10/2009s EIS Publication Schedule
02/09/2009Draws Fourth Tranche of Loan From Glencore
27/08/2009Files US$500 Million Universal Shelf Registration
19/06/2009Draws Third Tranche of Loan From Glencore
24/12/2008Draws Second Tranche of Loan From Glencore
22/12/2008Receives Draft EIS From Department of Natural Resources
24/09/2008EIS and Glencore Update
04/09/2008and Glencore Sign Strategic Marketing Agreement
12/08/2008Minnesota DNR Updates PolyMet EIS Progress
12/06/2008s EIS Progress
02/06/2008Present at the New York Society of Security Analysts' 8th An...
20/05/2008Capital and Operating Costs
15/02/2008Updates EIS Schedule for Its Copper-Nickel-Precious Metals P...
05/02/2008Strengthens Minnesota Focus
05/11/2007Present at Third Annual Sanders Morris Harris Investor Growt...
04/10/2007Hosts Analyst and Investor Tour
14/09/2007Quarterly Financials
04/09/2007Signs Northmet Construction Labor Agreement
21/08/2007Expands NorthMet Management Team
16/05/2007Updates NorthMet Environmental Review
07/05/2007Research Capital Report
07/05/2007Announces Retirement of Warren Hudelson Receives Approval fo...
21/03/2007Financial Adviser Engages NorthMet Independent Engineer
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (POM.TO)AMEX (PLM)
2,86+0.53%2,09-0.48%
TORONTO
CA$ 2,86
12/10 16:15 0,020
0,53%
Cours préc. Ouverture
2,84 2,82
Bas haut
2,82 2,86
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
1,03 -  2,87 14,86%
Volume var. 1 mois
4 178 0,175%
24hGold TrendPower© : 30
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20241,96%
2023-22,65%3,761,01
20220,56%6,153,05
2021-15,49%6,713,28
20201252,38%8,300,26
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nos flux RSS24hGold Mobile
Gold Data CenterConvertisseur Or Argent
Pièces d'or sur eBayPièces d'argent sur eBay
Minières :
outils techniques
Minières : outils
d'analyse fondamentale
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :
Profil de Polymet Mining Corp | Articles sur Polymet Mining Corp | Indicateurs de marché de Polymet Mining Corp | Projets et ressources de Polymet Mining Corp | Valorisation de Polymet Mining Corp | Voir les mines de Polymet Mining Corp | Présentation de l'entreprise Polymet Mining Corp | Management de Polymet Mining Corp | Graphique interactif de Polymet Mining Corp | Graphiques gratuits de Polymet Mining Corp | Polymet Mining Corp TORONTO | Polymet Mining Corp AMEX | Polymet Mining Corp FRANKFURT