Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

McEwen Mining

Publié le 13 mars 2011

El Gallo Extended in Multiple Directions

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Us Gold |

 

 

 

 

US Gold: El Gallo Extended in Multiple Directions

Recently Discovered Veins Highlight Additional Upside Potential

New Bulk Tonnage-Near Surface Mineralization Discovered

TORONTO, ONTARIO--(Marketwire - March 8, 2011) - US GOLD CORPORATION (NYSE:UXG)(TSX:UXG) is pleased to announce continued exploration success at and surrounding the company's El Gallo project in Sinaloa State, Mexico (Fig. 1). Drilling continues to expand the size of the silver-gold resources and further delineate the mineralization associated with the recently discovered veins. In addition, exploration has intersected near surface, bulk tonnage mineralization in a new area.

EXPLORATION HIGHLIGHTS

1) El Gallo Developments:

 
--  Main Zone extended 60 meters east and 50 meters to the southeast (Fig.
    2). Intersections include: 233.3 gpt silver over 12.4 meters, 515.6 gpt
    silver over 3.2 meters and 77.9 gpt silver over 17.2 meters.  
 
--  Infill drilling, designed to upgrade inferred mineralization to measured
    and indicated categories returns: 1,204.8 gpt silver over 1.1 meters,
    76.9 gpt silver over 21.8 meters and 116.3 gpt silver over 13.0 meters. 
 
--  El Gallo feasibility study and mine permit submittal remain on track for
    year-end.

 

2) New Veins Deliver Continued Success:

 
--  Alamo high grade gold extended at depth: 27.2 gpt gold over 1.0 meter
    and 5.9 gpt gold over 6.0 meters, including 13.7 gpt gold over 1.5
    meters. 
 
--  Chapotillio near surface mineralization extended east and north,
    returning: 114.9 gpt silver, 1.4 gpt gold over 5.9 meters and 72.2 gpt
    silver, 0.8 gpt gold over 9.5 meters. Intersections starting at or near
    surface.

 

3) New Bulk Tonnage Discovery

 
--  Haciendita new near surface, bulk tonnage discovery: 2.1 gpt gold, 31.1
    gpt silver over 16.4 meters and 1.0 gpt gold and 16.4 silver over 34.1
    meters.

 

EL GALLO AND DISTRICT EXPLORATION

US Gold's exploration at and around El Gallo is focused on: 1) increasing the size of the silver-gold resources, 2) upgrading inferred mineralization to the measured and indicated categories, 3) delineation of new veins around El Gallo in order to include them in the updated resource estimate, and 4) discovering El Gallo style mineralization within hauling distance of the proposed process facilities. Nine drills are operating at the project and four more are scheduled to arrive in the coming weeks. US Gold has budgeted $15 million for drilling in Mexico during 2011.

El Gallo Mineralization Expanded in Multiple Directions (Fig. 1 and 2)

Drilling at El Gallo is focused on growing the size of the resource and infilling select areas of the deposit. The expansion holes successfully extended the known mineralization 60 meters east and 50 meters to the southeast. The potential to further extend the mineralization in each of these directions looks encouraging. Follow up drilling is in progress.

The infill drilling, which continues to meet expectations, was designed to upgrade inferred mineralization to the measured and indicated categories for feasibility study purposes.

 
----------------------------------------------------------------------------
Hole #              Silver    Length      From    Silver    Length      From
----------------------------------------------------------------------------
                     (gpt)  (meters)  (meters)     (opt)    (feet)    (feet)
----------------------------------------------------------------------------
Expansion                                                                   
----------------------------------------------------------------------------
GAX-269               86.1      13.0     102.2       2.5      42.7     335.3
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-274               65.9      13.7       0.0       1.9      44.9       0.0
Including            113.6       4.1       0.0       3.3      13.5       0.0
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-282               61.8      10.9      30.7       1.8      35.8     100.7
And                  233.3      12.4     123.4       6.8      40.7     404.9
including            509.6       3.5     127.3      14.9      11.5     417.7
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-285              515.6       3.2      42.6      15.0      10.5     139.8
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-290               77.9      17.2     130.8       2.3      56.4     429.1
Including            456.0       1.2     130.8      13.3       3.9     429.1
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
Infill                                                                      
----------------------------------------------------------------------------
GAX-270              108.6       6.2      14.3       3.2      20.3      46.9
And                  292.2       2.3      43.5       8.5       7.5     142.7
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-271               76.9      21.8      45.7       2.2      71.5     149.9
Including            140.2       8.5      52.6       4.1      27.9     172.6
And                  116.3      13.0     109.0       3.4      42.7     357.6
Including            801.1       1.2     117.5      23.4       3.9     385.5
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
GAX-284            1,204.8       1.1      78.5      35.1       3.6     257.5
----------------------------------------------------------------------------

 

Alamo Vein - High Grade Gold Encountered at Depth (Fig. 1 and 3)

Alamo is one of several new veins that were discovered late in 2010. The initial holes released in December returned encouraging results such as 9.3 gpt gold over 1.7 meters and 7.6 gpt gold over 1.7 meters. Follow-up drilling has successfully extended the higher grades by 30 meters at depth. The zone has been extended from surface to 125 meters and indentified over a strike length measuring 550 meters. Highlights from the drilling are shown below.

 
----------------------------------------------------------------------------
Hole #                Gold    Length      From      Gold    Length      From
----------------------------------------------------------------------------
                     (gpt)  (meters)  (meters)     (opt)    (feet)    (feet)
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
SJX-014               27.2       1.0      54.9      0.79       3.3     180.1
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
SJX-015                5.9       6.0      85.0      0.17      19.7     278.9
Including             13.7       1.5      89.5      0.40       4.9     293.6
----------------------------------------------------------------------------

 

Chapotillo - Near Surface Mineralization Expanded (Fig. 1)

Since returning positive drill results in 2010, exploration has been focused on extending the near surface mineralization. Drilling 50 meters east and up-dip of the known mineralization continues to show the zone is expanding in size. Mineralization encountered in the most recent holes remains near surface and there appears to be good expansion potential. On-going drilling will continue to test for possible extensions. US Gold plans to incorporate Chapotillo in the next updated resource.

In addition, hole GAX-023 successfully tested a geochemical anomaly 700 meters to the southeast. This result highlights further upside potential at Chapotillo.

 
----------------------------------------------------------------------------
                                                  Silver                    
Hole #                        Silver      Gold    Eq.(i)    Length      From
----------------------------------------------------------------------------
                               (gpt)     (gpt)     (gpt)  (meters)  (meters)
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-016                        114.9       1.4     169.7       5.9       0.6
Including                      278.0       3.9     434.8       1.6       2.5
And                             72.2       0.8     105.1       9.5      14.0
Including                      219.4       3.2     347.6       2.1      21.4
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-017                         75.7       1.8     147.0       8.9      34.9
Including                      192.6       6.5     452.4       2.0      34.9
And                             85.4       0.8     116.0       5.6      53.0
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-023                         84.5       0.4     101.6       4.2       8.9
----------------------------------------------------------------------------
 
----------------------------------------------------------------------------
                                                  Silver                    
Hole #                        Silver      Gold    Eq.(i)    Length      From
----------------------------------------------------------------------------
                               (opt)     (opt)     (opt)    (feet)    (feet)
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-016                          3.4      0.04       4.9      19.4       2.0
Including                        8.1      0.11      12.7       5.2       8.2
And                              2.1      0.02       3.1      31.2      45.9
Including                        6.4      0.09      10.1       6.9      70.2
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-017                          2.2      0.05       4.3      29.2     114.5
Including                        5.6      0.19      13.2       6.6     114.5
And                              2.5      0.02       3.4      18.4     173.9
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
CHX-023                          2.5      0.01       3.0      13.8      29.2
----------------------------------------------------------------------------
(i)Silver:Gold Ratio (40:1)

 

Haciendita - New Discovery Showing Bulk Tonnage Potential

Drilling 10 km north of El Gallo has returned wide intersections of lower grade on a new prospect called Haciendita. A total of 10 holes were completed over an area 100 meters x 150 meters. The average grade weighted average of these holes was 0.9 gpt gold and 17.4 gpt silver over 15.7 meters, occurring approximately 25 meters below surface. US Gold believes Haciendita has good potential: 1) the mineralization is near surface and shallow dipping, 2) the zone is open and appears to be thickening to the east, and 3) the area could potentially be mined by open pit and transported to the planned heap leach facility at El Gallo.

Eight additional holes are currently being drilled. Should the results meet expectations, US Gold will begin a series of column tests to determine the ores leachability. Gold deposits in Mexico of similar grade and depth have proven to be low cost operations (Goldcorp's Los Filos Mine - 0.6 gpt gold and Capital Gold's El Chanate Mine - 0.7 gpt gold).

 
----------------------------------------------------------------------------
Hole #          Gold Silver   Length     From    Gold Silver  Length    From
----------------------------------------------------------------------------
               (gpt)  (gpt) (meters) (meters)   (opt)  (opt)  (feet)  (feet)
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-001          1.1   33.7      7.0     42.3    0.03    1.0    23.0   138.8
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-002          0.7    8.9     21.0     40.0    0.02    0.3    68.9   131.2
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-003          0.5    6.7     27.8     35.1    0.01    0.2    91.2   115.2
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-004          0.8  105.1      4.1     14.5    0.02    3.1    13.5    47.6
And              0.7    6.4     16.3     48.3    0.02    0.2    53.5   158.5
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-005          0.8    7.1     21.7     52.6    0.02    0.2    71.2   172.6
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-006          2.1   31.1     16.4      6.9    0.06    0.9    53.8    22.6
Including        6.3   42.3      2.9      9.2    0.18    1.2     9.5    30.2
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-008          2.7   27.9      3.3      0.0    0.08    0.8    10.8     0.0
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-009          1.0   16.4     34.1     28.6    0.03    0.5   111.9    93.8
Including        5.7   28.5      2.8     37.5    0.17    0.8     9.2   123.0
----------------------------------------------------------------------------
                                                                            
----------------------------------------------------------------------------
HCX-010          0.7   28.7     15.3     21.4    0.02    0.8    50.2    70.2
----------------------------------------------------------------------------

 

Feasibility Study and Permitting Update

Since releasing the El Gallo Preliminary Economic Assessment on February 7th, US Gold has advanced work related to the projects feasibility study and mine permitting.

 
a.  Feasibility Study  
 
--  Ausenco Solutions Canada Inc. from Vancouver have been contracted to
    assist with developing the El Gallo feasibility study. Ausenco personnel
    who will be involved in the feasibility have worked on other notable
    projects such as Andean's Cerro Negro project in Argentina and Ivanhoe
    Mines' Oyu Tolgoi project in Mongolia.  
 
--  SRK Consulting and Itasca Consulting Group Inc. have been retained to
    perform studies to determine pit slope stability that will help
    determine the project's strip ratio and also the location of the
    proposed process facilities. Approximately half of the required work has
    been completed. 
 
--  An expanded infill drill program is underway at both El Gallo and
    Palmarito to upgrade inferred mineralization to the measured and
    indicated categories. 
 
--  Half of the proposed grinding tests for the mill and heap leach have
    been completed by SGS Mineral Services in Durango, Mexico. 
 
--  On-going bottle roll testing is being carried out on the different
    mineral zones in order to better quantify the expected mill recoveries.
    Two additional column tests are in progress to help determine heap leach
    recoveries. Column tests are completed or in progress on seven
    composites, and an additional three composite tests are planned. SGS
    Mineral Services is also performing these tests. 
 
--  Feasibility is expected to be completed by year-end.  
 
b.  Mine Permitting 
 
--  Heuristica Ambiental, environmental consultants of Sonora, Mexico has
    been engaged to complete the required environmental studies to mine and
    process ore at El Gallo. Heuristica Ambiental's previous work included
    the successful permitting of Coeur d'Alene's Palmarejo silver-gold mine
    in Chihuahua State, Mexico. Baseline environmental studies commenced
    last December. 
 
--  Permit application is expected to be completed in conjunction with the
    feasibility study.

 

ABOUT US GOLD (www.usgold.com)

US Gold's goal is to qualify for inclusion in the S&P 500 by 2015. US Gold explores for gold and silver in the Americas and is advancing its El Gallo Project in Mexico and its Gold Bar Project in Nevada towards production. US Gold has a strong treasury with approximately $105 million in cash and gold and silver bullion. The Company's shares are listed on the New York (NYSE) and the Toronto Stock Exchange (TSX) under the symbol UXG, trading 1.4 million shares daily during the past twelve months. US Gold's shares are included in S&P/TSX and Russell indices and Van Eck's Junior Gold Miners ETF.

This news release has been viewed and approved by John Read, CPG, US Gold's consulting geologist, who is a Qualified Person as defined by National Instrument 43-101 and is responsible for program design and quality control of exploration undertaken by the Company at its Mexican exploration properties.

Samples from the core drilling were split on-site at the Company's Magistral Mine property. One quarter of the split drill core was shipped to ALS Chemex for sample preparation and analysis by 4-acid digestion with ICP determination for silver and fire assay for gold. Samples returning greater than 10 ppm gold were re-analyzed using gravimetric fire assay. Standards and blanks were inserted every 20 samples.

All holes were drilled with HQ bits and reduced to NTW where required. Samples were taken based on lithologic and/or mineralized intervals and vary in length. The true width of the mineral zone has not yet been determined.

Certain statements contained herein and subsequent oral statements made by and on behalf of the Company may contain "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Such forward-looking statements may be identified by words such as "intends," "anticipates," "believes," "expects" and "hopes" and include, without limitation, statements regarding the Company's results of exploration, plan of business operations, potential contractual arrangements, receipt of working capital, anticipated revenues and related expenditures. Factors that could cause actual results to differ materially include, among others, those set forth in the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2009 and other filings with the Securities and Exchange Commission, under the caption "Risk Factors". Most of these factors are outside the control of the Company. Investors are cautioned not to put undue reliance on forward-looking statements. Except as otherwise required by applicable securities statutes or regulations, the Company disclaims any intent or obligation to update publicly these forward looking statements, whether as a result of new information, future events or otherwise.

To view Table 1, please visit the following link:
http://media3.marketwire.com/docs/uxg0308table1.pdf.

To view Figure 1, please visit the following link:
http://media3.marketwire.com/docs/uxg0308fig1.pdf.

To view Figure 2, please visit the following link:
http://media3.marketwire.com/docs/uxg0308fig2.pdf.

To view Figure 3, please visit the following link:
http://media3.marketwire.com/docs/uxg0308fig3.pdf.

 

CONTACT INFORMATION:

US Gold Corporation
Ian J. Ball
Senior Vice-President
(647) 258-0395 or Toll Free: (866) 441-0690
Fax: (647) 258-0408

or

US Gold Corporation
Mailing Address
99 George Street, 3rd Floor
Toronto, ON M5A 2N4
info@usgold.com
www.usgold.com

 

McEwen Mining

PRODUCTEUR
CODE : MUX
ISIN : US58039P1075
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

McEwen Mining est une société développant des projet miniers d'or basée au Canada.

McEwen Mining est productrice d'or, d'argent au Mexique et en Argentine, en développement de projets d'argent et d'or au Mexique, et détient divers projets d'exploration au Mexique.

Ses principaux projets en production sont MAGISTRAL MINE au Mexique et SAN JOSE ARGENTINA en Argentine, son principal projet en développement est EL GALLO MEXICO au Mexique et ses principaux projets en exploration sont PALMARITO, GOLD PICK AND GOLD RIDGE, TONKIN PROJECT et MAGISTRAL au Mexique et LOS AZULES ARGENTINA et LIMO en Argentine.

McEwen Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,7 milliards US$ (3,5 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 29 juillet 2022 à 0,32 US$, et son plus haut niveau récent le 23 avril 2024 à 11,11 US$.

McEwen Mining possède 337 054 594 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de McEwen Mining
16/04/2010El Gallo Discovery Featured in The Northern Miner
Dans les médias de McEwen Mining
07/03/2019McEwen Mining halts payout over "much lower revenue" this qu...
15/01/2019Canada's McEwen Mining 2018 production exceeds guidance
27/08/2018Rob McEwen and McEwen Mining acquire 18.8% of Canadian miner
30/05/2013Vicious Gold Moves Insignificant for Long-Run
21/07/2010The Mysterious 380-Tonne Gold Swap and Genius Gold Bugs
23/03/2010Bob Prechter Reveals the Most Dangerous Gold & Silver Myths
26/08/2009U.S. Dollar Versus Gold, the Flea on a Bull's Back
28/05/2009US Gold Corporation completes over-allotment of common stock
Financements de McEwen Mining
14/02/2011Announces Common Stock Offering
Nominations de McEwen Mining
27/07/2011Appoints William Faust Chief Operating Officer
31/03/2008Appoints Perry Ing as Chief Financial Officer
Rapports Financiers de McEwen Mining
27/07/2017NOTICE OF Q2 2017 FINANCIAL RESULTS CONFERENCE CALL=C2=A0
05/05/2016Q1 2016 OPERATING & FINANCIAL RESULTS
04/05/2016Q1 2016 FINANCIAL RESULTS CONFERENCE CALL=C2=A0
05/11/2015Q3 2015 OPERATING & FINANCIAL RESULTS
06/08/2015REPORTS 2015 SECOND QUARTER OPERATING & FINANCIAL RESULTS
Projets de McEwen Mining
19/04/2017Reports Q1 2017 Production Results
25/07/2016REPORTS Q2 PRODUCTION RESULTS
02/05/2016(El Gallo Mexico)BUYS ATTRACTIVE EXPLORATION TARGET NEAR EL GALLO MINE=C2=A0
19/04/2016REPORTS Q1 PRODUCTION RESULTS ROYALTY ACQUISITION
12/08/2015Fresnillo denies reports 300 kg of gold stolen from Mexico m...
21/04/20157:31 am McEwen Mining announces drill results that are expec...
07/04/2015McEwen Mining says robbers stole 7,000 ozs of gold from Mexi...
20/02/2014El Gallo 1 Mine Expansion Nears Completion
29/05/2012Attention US Gold Canadian Acquisition Corporation Exchangea...
26/03/2012Canadian Acquisition Corporation Announces Redemption of All...
04/01/2012(El Gallo Mexico)Provides El Gallo Complex Construction & Exploration Update
25/10/2011(El Gallo Mexico)El Gallo Drilling Intersects Impressive Silver Mineralizatio...
31/08/2011(El Gallo Mexico)to Begin Phase 1 Development at El Gallo Project in Mexico
11/08/2011(El Gallo Mexico)oration: El Gallo Infill Drill Results & High Grade Minerali...
29/06/2011(El Gallo Mexico) Drilling Around El Gallo Continues to Build on the Open Pit...
31/05/2011(Limo)Nevada Exploration Update-New Encouraging Results at Limo & ...
26/04/2011(El Gallo Mexico)Encouraging Drill Results Continuefrom El Gallo & Surroundin...
30/03/2011(El Gallo Mexico)El Gallo Continues to Expand East & South
13/03/2011(El Gallo Mexico)El Gallo Extended in Multiple Directions
16/08/2010(El Gallo Mexico) El Gallo Drilling Expan
27/07/2010(El Gallo Mexico)Continues to Grow Regional Drilling Encounters Early Suc
23/06/2010(El Gallo Mexico)El Gallo Expanded at Depth & to the West
09/06/2010(El Gallo Mexico)El Gallo Drilling Continues to Deliver Impressive Results
10/05/2010(Palmarito)Regional Drilling in Mexico Returns 213=2E9 gpt Silver Over ...
03/05/2010(El Gallo Mexico)El Gallo: Drilling 350 Meters Away From Kn
06/04/2010(El Gallo Mexico)El Gallo Continues to Grow Rapidly More Thick Intercepts & G...
24/03/2010(El Gallo Mexico)Significant Grades & Widths Continue at US Gold's El Gallo S...
01/03/2010(El Gallo Mexico)El Gallo: Thick Intersections of Good Grade Continue
11/02/2010(El Gallo Mexico) El Gallo Best Drill Results to Date
28/01/2010(El Gallo Mexico)El Gallo Exploration Off to Excellent Start in 2010
09/09/2009Nevada Cortez Trend Drilling Intersects New Zone
15/07/2009(Limo)Boosts Resources with Limo Project Estimate (Nevada, USA)
07/07/2009(El Gallo Mexico)Continues to Expand 7.9 opt Silver Over 179 Feet
11/06/2009(El Gallo Mexico)Exploration News Release: El Gallo Drilling Continues to Ret...
02/03/2009(El Gallo Mexico)El Gallo Delivers Exceptional High-Grade Core Drill Results ...
12/02/2009(El Gallo Mexico)El Gallo Drill Results Continue to Shine; Initial Four Core ...
09/02/2009(El Gallo Mexico)El Gallo Continues to Grow, Delivering More High-Grade Silve...
06/01/2009El Gallo: Two New High-Grade Areas Discovered
17/12/2008Intersects Impressive High-Grade
04/12/2008(Gold Pick And Gold Ridge)Adds Gold Resources in Nevada
26/11/2008(Magistral)El Gallo Returns Good Results: 43=2E6 optSilver & 0=2E45 opt...
19/11/2008(Magistral)Hits Significant Intercepts in Mexico
05/11/2008(Magistral) Gold & Silver Mineralization Expands at Two Sites in Mexico
25/09/2008(Magistral)Drilling in the Magistral District Returns 23=2E7 Opt Silver...
17/09/2008(Magistral)New Discovery for US Gold in Magistral District
06/08/2008(Magistral)oration: Drill Results Continueto Shine in Mexico's Magistra...
20/05/2008(Tonkin) Tonkin Resource Estimate Increases to 1.76 Million Oz Gold
09/05/2008(Magistral)Provides Mexico & Nevada Exploration Update
21/02/2008(Magistral)Mexico Delivering Positive Results Magistral Mine Exploratio...
23/01/2008(Magistral)Mexico Regional Exploration Update: Ea =?ISO-8859-1?Q?rly=20...
Communiqués de Presse de McEwen Mining
10/08/2017TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
25/07/2016McEwen Mining Reports Q2 Production Results, Cash and Bullio...
14/07/2016Coverage Initiated on Select Gold Stocks
16/06/2016McEwen Mining Inc. Announces Change of Security Position in ...
15/06/2016Market Signals Coverage MeetMe and McEwen Mining Hit 52 week...
02/02/2016McEwen Mining Regains Compliance With NYSE Listing Standards
02/02/20167:01 am McEwen Mining has regained compliance with the NYSE'...
30/01/2016Information Purposes Only: NV Gold Reaches Agreement With Mc...
27/01/2016Evaluating Variations in Equity Market Trading - Complementa...
13/01/2016McEwen Mining Reports Record Production in 2015, Q4 Producti...
04/01/2016McEwen Mining Announces Management Appointment – Colin Suthe...
04/01/201610:15 am McEwen Mining appoints Colin Sutherland as Presiden...
04/01/2016Gold Stocks under Review -- McEwen Mining, Harmony Gold Mini...
29/12/2015Edited Transcript of MUX earnings conference call or present...
15/12/2015McEwen Mining New Financial Management Appointments
06/11/2015McEwen Mining Appoints Interim CFO
06/11/20159:55 am McEwen Mining appoints Rob McEwen as Interim Chief F...
05/11/2015McEwen posts 3Q profit
05/11/2015McEwen Mining Q3 2015 Operating & Financial Results
27/10/20156:31 am McEwen Mining reports Q3 production, showing 43,390 ...
21/10/2015McEwen Mining Announces Positive Feasibility Study for Gold ...
15/10/2015McEwen Mining (MUX) Jumps: Stock Adds 10.2% in Session
01/10/2015McEwen Mining Announces Management Change
01/10/2015McEwen Mining Announces Stock Repurchase Program
01/10/20154:49 pm McEwen Mining announces 15 mln share stock repurchas...
09/09/2015McEwen Mining Increases Production Guidance for 2015
27/08/2015Edited Transcript of MUX earnings conference call or present...
05/08/2015McEwen Mining Reports 2015 Second Quarter Operating & Financ...
22/07/2015Edited Transcript of MUX earnings conference call or present...
16/07/2015McEwen Mining Receives Insurance Proceeds
15/07/2015McEwen Mining Announces Record Quarterly Production at El Ga...
05/07/20154:32 pm McEwen Mining confirms that it has fallen below the ...
23/06/2015McEwen Mining Inc.: Production Update
23/06/20159:34 am McEwen Mining announces that production at the El Ga...
22/04/2015Global Demand Means the World's Most Important Base Metal Ma...
21/04/2015London Metal Exchange Copper Inventory Sees On-Warrant Stock...
21/04/2015McEwen Mining Announces Exploration Update for El Gallo 1, M...
16/04/2015McEwen Mining Announces Q1 2015 Production Results; Full Yea...
13/04/2015Statement by Rob McEwen- Cartel Confusion: Clarification of ...
10/04/2015Mining co. in Mexico has 'good relationship' with cartels
07/04/2015Armed Robbers Steal $8.5 Million of Gold From McEwen Mexico ...
07/04/2015McEwen Mining Reports Armed Robbery at El Gallo 1 Mine
07/04/20155:06 pm McEwen Mining reports armed robbery at El Gallo 1 mi...
20/03/2015BHP Billiton Boosts Growth on Higher Yield, Runs Risks - Ana...
10/03/2015McEwen Mining 2014 Operating & Financial Results
09/03/2015McEwen reports 4Q loss
09/03/2015McEwen Mining 2014 Operating & Financial Results
09/03/2015Announcement: Mcewen Mining Q4 & Full-Year 2014 Conference C...
09/03/2015Announcement: Mcewen Mining Q4 & Full-Year 2014 Conference C...
24/02/2015BHP Billiton 1H15 Results Weak, Down Y/Y on Headwinds - Anal...
13/02/2015Rio Posts Weak 2014 Results, Falls Y/Y on Market Headwinds -...
15/01/2015McEwen Mining Reports Record Production in 2014
15/01/2015McEwen Mining Reports Record Production in 2014
02/01/2015Rob McEwen, Chairman & Chief Owner Exercises Stock Options i...
22/12/2014Rob McEwen, Chairman & Chief Owner Exercises Stock Options i...
20/01/2012and Minera Andes Shareholders Vote to Approve Business Combi...
14/01/2012Responds to Settlement Offer Regardi
21/12/2011Rob McEwen Letter to Shareholders of US Gold and Minera Ande...
28/11/2011Announces Positive Preliminary Feasibi =?ISO-8859-1?Q?lity=2...
23/09/2011and Minera Andes Enter Into Arrangement Agreement to Form Mc...
18/05/2011Exploration Continues to Deliver Growth at El Gallo & Surrou...
19/07/2010Options Listed on Chicago Board of Options Exchange
07/06/2010Annual General Meeting of Shareholders
25/05/2010El Gallo MetallurgicalResults Demonstrate Excellent Silver R...
18/05/2010El Gallo Drilling Expands Silver Mineralization 100 Meters t...
26/04/2010El Gallo Continues to Impress
16/04/2010Announces Positive Preliminary Economi =?ISO-8859-1?Q?c=20As...
01/04/2010Announces 26% Increase in Measured and Indicated Resources a...
14/10/2009Nevada Delivers Good Drill Results
15/09/2009Added to the S&P/TSX Global Gold Index & S&P/TSX Global Mini...
05/08/2009Impressive Results Continue at El Gallo in Three Areas
10/06/2009Rob McEwen Invites Investors to US Gold's =?ISO-8859-1?Q?=20...
31/05/2009in New York City
26/05/2009Announces the Closing of Over-Allotment of Common Stock
19/05/2009Announces the Closing of Its Public Offering of Common Stock
03/12/2008Luncheon Dec 17, 2008
21/11/2008Dow Jones Article: US Gold
25/08/2008Exploration News Release
06/08/2008Outlines Nevada Exploration Program
07/07/2008Mexico Exploration Update
24/06/2008Mexico Exploration Update
14/05/20082008 US Gold AGM
25/03/2008Mexico Exploration Update
20/11/2007 Ann Carpenter has stepped down as President
05/10/2007Nevada Exploration Update
03/07/2007Completes Acquisitions of Target Companies!
04/07/2007& Lexam CEO Rob McEwen Appointed to the Order of Canada; Can...
12/06/2007Open Letter to US Gold Shareholders
12/06/2007Intriguing Grab Sample: Metal Value $2,200 Per Ton(i)
05/06/2007Announces Annual General Meeting
13/04/2007Canadian Acquisition Corporation TSX Listing Approved
10/04/2007Encouraging Results; Best Grade: 0.73 Opt Over 5 Ft.
13/03/2007 Reminds Shareholders of White Knight Resources, Nevada Paci...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
NYSE (MUX)TORONTO (MUX.T)
11,11+2.21%
NYSE
US$ 11,11
23/04 17:00 0,240
2,21%
Cours préc. Ouverture
10,87 10,67
Bas haut
10,57 11,15
Année b/h Var. YTD
5,94 -  11,83 57,14%
52 sem. b/h var. 52 sem.
5,94 -  11,83 33,53%
Volume var. 1 mois
699 688 26,54%
24hGold TrendPower© : 24
Produit Gold - Silver
Développe Gold - Silver
Recherche Copper - Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 17/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :