Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

El Nino Ventures Ltd

Publié le 18 septembre 2012

EXPANDS ITS PROJECT INTEREST WITH BRAZIL'S SECOND LARGEST MINING COMPANY

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | Nickel | Report | Zinc |



Dear Mr. Moreau :

By way of introduction, El Ni�o Ventures Inc. ("ELN") is an international exploration company, focused on exploration for zinc, lead, copper, gold and silver in New Brunswick, Canada and copper-cobalt in the Democratic Republic of Congo (DRC). Our geological and business teams have a wealth of experience in project acquisition, exploration and development.

ELN recently announced a non-brokered $3 million unit offering to advance the company's Murray Brook Project (New Brunswick), for which the company now has the option to increase its interest from 35% to 50%.

news release: http://www.elninoventures.com/i/pdf/090612ELN.pdf
subscription agreement: http://www.elninoventures.com/i/pdf/SEP2012ELNSUBAGR.pdf

El Nino Venture's partner in the Murray Brook Project is Votorantim Metals, Brazil's second largest mining company and a leader in zinc production


ELN has three projects: Murray Brook, Bathurst Option JV, and Kasala.

MURRAY BROOK PROJECT -- ELN/Votorantim/Murray Brook Minerals

The Murray Brook project is a polymetallic, massive sulphide deposit. The Murray Brook deposit's recent NI43-101 resource estimation has moved it from the district's fifth largest in the Bathurst Mining Camp, New Brunswick, to the newest, largest NI43-101 deposit in the district. The Murray Brook property is located 60 km west of Bathurst. The Murray Brook Project is open pit and is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.

ELN and Votorantim Metals Canada ("VMC") have advanced the Murray Brook Project to the beginning of the development stage and are planning to complete an updated resource estimation and phase 1 metallurgy studies in 2012, with a Preliminary Economic Assessment Study in 2013 and subject to continued positive results, a Feasibility Study planned for completion by the end of 2014, with the end result being a decision on Commercial Production.

The Votorantim Group is Brazil's second largest mining company and a major producer of zinc, nickel and aluminum with 40,000 employees in 24 countries and net revenues in 2011 of $13.5 billion. See Votorantim's website.

During 2011 and 2012, ELN and VMC completed more than 30,000 metres of drilling. The 2012 drill program was completed in June and over the past couple of months, the company has been announcing strong results from 2012 drilling program. Please see Company's news release. The 2012 drill results have been excellent and will be used to update the NI43-101 before year end.

In February 2012, an NI43-101 resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN's website.

A $3 million budget was approved for the 2012 exploration drill program. It includes $2.5 million for drilling and the plan is to take most of the deposit to measured resources at the Murray Brook deposit. $500,000 is budgeted for 2012 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals.

Metallurgical test-work of bulk sample material from the Murray Brook deposit is currently underway. Three HQ diameter diamond holes were drilled to provide sample materials for metallurgical tests. The test-work is focused on determining potential metal recoveries based on a recommended metals recovery process flow sheet which, subsequently, will form the basis for a small scale metallurgical pilot plant program. Metallurgical results, along with an amended resource estimation incorporating the 2012 drill results, will form the basis of a Preliminary Economic Assessment (or Scoping Study) study planned for completion in Q1 2013.

Based on continued success of the Project, additional metallurgical studies (Phase 2- Pilot Plant), Preliminary Economic Assessment Studies, Geotechnical drilling and Environmental assessment and prefeasibility studies, are slated for completion in 2013. See Project page.


Brunswick 12 Mine and Mill

BATHURST OPTION JV PROJECT (Tri-Party Agreement) -- ELN/Xstrata/Votorantim

ELN and Xstrata Zinc Canada (Xstrata) each hold a 50% interest in the largest base metal claim blocks in New Brunswick. The Bathurst Mining Camp is host to a mine and mill complex and smelter owned by Xstrata Zinc Canada. The claims host several historic polymetallic (zinc, copper, lead, gold and silver) occurrences. The Bathurst Mining Camp is home to the largest underground zinc mine in North America, the Brunswick No. 12 deposit, which contained 295 million tonnes of massive sulphide.

In March 2010, ELN and Xstrata entered into a Tri-Party Option Agreement with VMC, whereby the latter can earn 50% interest in the land holdings by incurring exploration expenditures totaling $10 million over 5 years. VMC can increase its interest to 70% by incurring expenditures of an additional $10 million over 2 years. Approximately $6.65 million has been spent to date.

Votorantim's 2011-2012 expenditures will be $5 million and include up to 12,000 metres of drilling. As part of the $5 million exploration program, Votorantim completed airborne geophysical surveys in order to identify new targets. They commenced drill testing airborne gravity targets and completed approximately 5,000 metres of drilling to date and will continue drilling throughout the remainder of 2012. See Project page.


KASALA -- Democratic Republic of the Congo (DRC)

A new copper discovery has been made on the Kasala project; with high grade mineralization over wide intervals and an apparent mineralized strike length of 2.5 km. ELN's Kasala project is located approximately 70 km northwest of Lubumbashi, the second largest city in the Democratic Republic of Congo (DRC). The area is the centre of the country's massive copper-cobalt mining industry, which produces over 10% of the world's copper and 30% of the world's cobalt.

The Kasala project permits are located adjacent to Anvil Mining's (now Mining and Metals Group) Kinsevere Mine, which is expected to produce 24,000 tonnes (52 million pounds) of copper metal annually for the next 20 years. See Project page.

Kasala Overview

  • 12,000 metres of reverse circulation and 5,500 metres of diamond drilling programs completed on three of El Ni�o's exploration permits

  • High grade mineralization over wide intervals:

  • 22 m @ 3.28% Cu

  • 29 m @ 2.82% Cu

  • 31 m @ 2.19% Cu

  • 11 m @ 3.68% Cu

  • In addition, two major parallel zones identified to the east of Kasala which together have a combined strike length of over 3 km

  • Appeals in opposition to two judgments decided in favour of ELN are expected to be resolved in hearings to be held in the near future. Subsequently, the company expects to resume its exploration and corporate activities.

We consider these projects to have excellent potential for enhancing shareholder value. If you are interested in discussing the details of our announced private placement, we would be happy to arrange a meeting to present our El Ni�o projects and business plan.

Contact: (604) 685-1870 or by email at info@elninoventures.com

Regards,

"Harry Barr"

Harry Barr
Chairman & CEO

El Nino Ventures Inc.
555 West 12th Avenue, Suite 650
City Square, West Tower, Vancouver, B.C.   V5Z 3X7

Toll Free 1.800.667.1870   |   info@elninoventures.com   |   www.elninoventures.com


Safe Harbor Statement

This report includes forward-looking statements covered by the Private Securities Litigation Reform Act of 1995.  Because such statements deal with future events, they are subject to various risks and uncertainties and actual results for fiscal year 2010 and beyond could differ materially from the Company's current expectations.   Forward-looking statements are identified by words such as "anticipates," "projects," "expects," "plans," "intends," "believes," "estimates," "targets," and other similar expressions that indicate trends and future events.

Forward Looking Statement

Certain information presented, including discussions of future plans and operations, contains forward-looking statements involving substantial known and unknown risks and uncertainties. These forward-looking statements are subject to risk and uncertainty, many of which are beyond control of company management. These may include, but are not limited to the influence of general economic conditions, industry conditions, fluctuations of commodity prices and foreign exchange rate conditions, prices, rates, environmental risk, industry competition, availability of qualified staff and management, stock market volatility, timely and cost effective

("ELN") is an international exploration company, focused on exploration for zinc, lead, copper, gold and silver in New Brunswick, Canada and copper-cobalt in the Democratic Republic of Congo (DRC). Our geological and business teams have a wealth of experience in project acquisition, exploration and development.

ELN recently announced a non-brokered $3 million unit offering to advance the company's Murray Brook Project (New Brunswick), for which the company now has the option to increase its interest from 35% to 50%.

news release: http://www.elninoventures.com/i/pdf/090612ELN.pdf
subscription agreement: http://www.elninoventures.com/i/pdf/SEP2012ELNSUBAGR.pdf

El Nino Venture's partner in the Murray Brook Project is Votorantim Metals, Brazil's second largest mining company and a leader in zinc production


ELN has three projects: Murray Brook, Bathurst Option JV, and Kasala.

MURRAY BROOK PROJECT -- ELN/Votorantim/Murray Brook Minerals

The Murray Brook project is a polymetallic, massive sulphide deposit. The Murray Brook deposit's recent NI43-101 resource estimation has moved it from the district's fifth largest in the Bathurst Mining Camp, New Brunswick, to the newest, largest NI43-101 deposit in the district. The Murray Brook property is located 60 km west of Bathurst. The Murray Brook Project is open pit and is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.

ELN and Votorantim Metals Canada ("VMC") have advanced the Murray Brook Project to the beginning of the development stage and are planning to complete an updated resource estimation and phase 1 metallurgy studies in 2012, with a Preliminary Economic Assessment Study in 2013 and subject to continued positive results, a Feasibility Study planned for completion by the end of 2014, with the end result being a decision on Commercial Production.

The Votorantim Group is Brazil's second largest mining company and a major producer of zinc, nickel and aluminum with 40,000 employees in 24 countries and net revenues in 2011 of $13.5 billion. See Votorantim's website.

During 2011 and 2012, ELN and VMC completed more than 30,000 metres of drilling. The 2012 drill program was completed in June and over the past couple of months, the company has been announcing strong results from 2012 drilling program. Please see Company's news release. The 2012 drill results have been excellent and will be used to update the NI43-101 before year end.

In February 2012, an NI43-101 resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN's website.

A $3 million budget was approved for the 2012 exploration drill program. It includes $2.5 million for drilling and the plan is to take most of the deposit to measured resources at the Murray Brook deposit. $500,000 is budgeted for 2012 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals.

Metallurgical test-work of bulk sample material from the Murray Brook deposit is currently underway. Three HQ diameter diamond holes were drilled to provide sample materials for metallurgical tests. The test-work is focused on determining potential metal recoveries based on a recommended metals recovery process flow sheet which, subsequently, will form the basis for a small scale metallurgical pilot plant program. Metallurgical results, along with an amended resource estimation incorporating the 2012 drill results, will form the basis of a Preliminary Economic Assessment (or Scoping Study) study planned for completion in Q1 2013.

Based on continued success of the Project, additional metallurgical studies (Phase 2- Pilot Plant), Preliminary Economic Assessment Studies, Geotechnical drilling and Environmental assessment and prefeasibility studies, are slated for completion in 2013. See Project page.


Brunswick 12 Mine and Mill

BATHURST OPTION JV PROJECT (Tri-Party Agreement) -- ELN/Xstrata/Votorantim

ELN and Xstrata Zinc Canada (Xstrata) each hold a 50% interest in the largest base metal claim blocks in New Brunswick. The Bathurst Mining Camp is host to a mine and mill complex and smelter owned by Xstrata Zinc Canada. The claims host several historic polymetallic (zinc, copper, lead, gold and silver) occurrences. The Bathurst Mining Camp is home to the largest underground zinc mine in North America, the Brunswick No. 12 deposit, which contained 295 million tonnes of massive sulphide.

In March 2010, ELN and Xstrata entered into a Tri-Party Option Agreement with VMC, whereby the latter can earn 50% interest in the land holdings by incurring exploration expenditures totaling $10 million over 5 years. VMC can increase its interest to 70% by incurring expenditures of an additional $10 million over 2 years. Approximately $6.65 million has been spent to date.

Votorantim's 2011-2012 expenditures will be $5 million and include up to 12,000 metres of drilling. As part of the $5 million exploration program, Votorantim completed airborne geophysical surveys in order to identify new targets. They commenced drill testing airborne gravity targets and completed approximately 5,000 metres of drilling to date and will continue drilling throughout the remainder of 2012. See Project page.


KASALA -- Democratic Republic of the Congo (DRC)

A new copper discovery has been made on the Kasala project; with high grade mineralization over wide intervals and an apparent mineralized strike length of 2.5 km. ELN's Kasala project is located approximately 70 km northwest of Lubumbashi, the second largest city in the Democratic Republic of Congo (DRC). The area is the centre of the country's massive copper-cobalt mining industry, which produces over 10% of the world's copper and 30% of the world's cobalt.

The Kasala project permits are located adjacent to Anvil Mining's (now Mining and Metals Group) Kinsevere Mine, which is expected to produce 24,000 tonnes (52 million pounds) of copper metal annually for the next 20 years. See Project page.

Kasala Overview

  • 12,000 metres of reverse circulation and 5,500 metres of diamond drilling programs completed on three of El Ni�o's exploration permits

  • High grade mineralization over wide intervals:

  • 22 m @ 3.28% Cu

  • 29 m @ 2.82% Cu

  • 31 m @ 2.19% Cu

  • 11 m @ 3.68% Cu

  • In addition, two major parallel zones identified to the east of Kasala which together have a combined strike length of over 3 km

  • Appeals in opposition to two judgments decided in favour of ELN are expected to be resolved in hearings to be held in the near future. Subsequently, the company expects to resume its exploration and corporate activities.

We consider these projects to have excellent potential for enhancing shareholder value. If you are interested in discussing the details of our announced private placement, we would be happy to arrange a meeting to present our El Ni�o projects and business plan.

Contact: (604) 685-1870 or by email at info@elninoventures.com

Regards,

"Harry Barr"

Harry Barr
Chairman & CEO

El Nino Ventures Inc.
555 West 12th Avenue, Suite 650
City Square, West Tower, Vancouver, B.C.   V5Z 3X7

Toll Free 1.800.667.1870   |   info@elninoventures.com   |   www.elninoventures.com


Safe Harbor Statement

This report includes forward-looking statements covered by the Private Securities Litigation Reform Act of 1995.  Because such statements deal with future events, they are subject to various risks and uncertainties and actual results for fiscal year 2010 and beyond could differ materially from the Company's current expectations.   Forward-looking statements are identified by words such as "anticipates," "projects," "expects," "plans," "intends," "believes," "estimates," "targets," and other similar expressions that indicate trends and future events.

Forward Looking Statement

Certain information presented, including discussions of future plans and operations, contains forward-looking statements involving substantial known and unknown risks and uncertainties. These forward-looking statements are subject to risk and uncertainty, many of which are beyond control of company management. These may include, but are not limited to the influence of general economic conditions, industry conditions, fluctuations of commodity prices and foreign exchange rate conditions, prices, rates, environmental risk, industry competition, availability of qualified staff and management, stock market volatility, timely and cost effective

This email should not be construed as an offer to buy or sell securities of El Nino Ventures Inc.


subscription agreement: http://www.elninoventures.com/i/pdf/SEP2012ELNSUBAGR.pdf

El Nino Venture's partner in the Murray Brook Project is Votorantim Metals, Brazil's second largest mining company and a leader in zinc production


ELN has three projects: Murray Brook, Bathurst Option JV, and Kasala.

MURRAY BROOK PROJECT -- ELN/Votorantim/Murray Brook Minerals

The Murray Brook project is a polymetallic, massive sulphide deposit. The Murray Brook deposit's recent NI43-101 resource estimation has moved it from the district's fifth largest in the Bathurst Mining Camp, New Brunswick, to the newest, largest NI43-101 deposit in the district. The Murray Brook property is located 60 km west of Bathurst. The Murray Brook Project is open pit and is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.

ELN and Votorantim Metals Canada ("VMC") have advanced the Murray Brook Project to the beginning of the development stage and are planning to complete an updated resource estimation and phase 1 metallurgy studies in 2012, with a Preliminary Economic Assessment Study in 2013 and subject to continued positive results, a Feasibility Study planned for completion by the end of 2014, with the end result being a decision on Commercial Production.

The Votorantim Group is Brazil's second largest mining company and a major producer of zinc, nickel and aluminum with 40,000 employees in 24 countries and net revenues in 2011 of $13.5 billion. See Votorantim's website.

During 2011 and 2012, ELN and VMC completed more than 30,000 metres of drilling. The 2012 drill program was completed in June and over the past couple of months, the company has been announcing strong results from 2012 drilling program. Please see Company's news release. The 2012 drill results have been excellent and will be used to update the NI43-101 before year end.

In February 2012, an NI43-101 resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN's website.

A $3 million budget was approved for the 2012 exploration drill program. It includes $2.5 million for drilling and the plan is to take most of the deposit to measured resources at the Murray Brook deposit. $500,000 is budgeted for 2012 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals.

Metallurgical test-work of bulk sample material from the Murray Brook deposit is currently underway. Three HQ diameter diamond holes were drilled to provide sample materials for metallurgical tests. The test-work is focused on determining potential metal recoveries based on a recommended metals recovery process flow sheet which, subsequently, will form the basis for a small scale metallurgical pilot plant program. Metallurgical results, along with an amended resource estimation incorporating the 2012 drill results, will form the basis of a Preliminary Economic Assessment (or Scoping Study) study planned for completion in Q1 2013.

Based on continued success of the Project, additional metallurgical studies (Phase 2- Pilot Plant), Preliminary Economic Assessment Studies, Geotechnical drilling and Environmental assessment and prefeasibility studies, are slated for completion in 2013. See Project page.


Brunswick 12 Mine and Mill

BATHURST OPTION JV PROJECT (Tri-Party Agreement) -- ELN/Xstrata/Votorantim

ELN and Xstrata Zinc Canada (Xstrata) each hold a 50% interest in the largest base metal claim blocks in New Brunswick. The Bathurst Mining Camp is host to a mine and mill complex and smelter owned by Xstrata Zinc Canada. The claims host several historic polymetallic (zinc, copper, lead, gold and silver) occurrences. The Bathurst Mining Camp is home to the largest underground zinc mine in North America, the Brunswick No. 12 deposit, which contained 295 million tonnes of massive sulphide.

In March 2010, ELN and Xstrata entered into a Tri-Party Option Agreement with VMC, whereby the latter can earn 50% interest in the land holdings by incurring exploration expenditures totaling $10 million over 5 years. VMC can increase its interest to 70% by incurring expenditures of an additional $10 million over 2 years. Approximately $6.65 million has been spent to date.

Votorantim's 2011-2012 expenditures will be $5 million and include up to 12,000 metres of drilling. As part of the $5 million exploration program, Votorantim completed airborne geophysical surveys in order to identify new targets. They commenced drill testing airborne gravity targets and completed approximately 5,000 metres of drilling to date and will continue drilling throughout the remainder of 2012. See Project page.


KASALA -- Democratic Republic of the Congo (DRC)

A new copper discovery has been made on the Kasala project; with high grade mineralization over wide intervals and an apparent mineralized strike length of 2.5 km. ELN's Kasala project is located approximately 70 km northwest of Lubumbashi, the second largest city in the Democratic Republic of Congo (DRC). The area is the centre of the country's massive copper-cobalt mining industry, which produces over 10% of the world's copper and 30% of the world's cobalt.

The Kasala project permits are located adjacent to Anvil Mining's (now Mining and Metals Group) Kinsevere Mine, which is expected to produce 24,000 tonnes (52 million pounds) of copper metal annually for the next 20 years. See Project page.

Kasala Overview

  • 12,000 metres of reverse circulation and 5,500 metres of diamond drilling programs completed on three of El Ni�o's exploration permits

  • High grade mineralization over wide intervals:

  • 22 m @ 3.28% Cu

  • 29 m @ 2.82% Cu

  • 31 m @ 2.19% Cu

  • 11 m @ 3.68% Cu

  • In addition, two major parallel zones identified to the east of Kasala which together have a combined strike length of over 3 km

  • Appeals in opposition to two judgments decided in favour of ELN are expected to be resolved in hearings to be held in the near future. Subsequently, the company expects to resume its exploration and corporate activities.

We consider these projects to have excellent potential for enhancing shareholder value. If you are interested in discussing the details of our announced private placement, we would be happy to arrange a meeting to present our El Ni�o projects and business plan.

Contact: (604) 685-1870 or by email at info@elninoventures.com

Regards,

"Harry Barr"

Harry Barr
Chairman & CEO

El Nino Ventures Inc.
555 West 12th Avenue, Suite 650
City Square, West Tower, Vancouver, B.C.   V5Z 3X7

Toll Free 1.800.667.1870   |   info@elninoventures.com   |   www.elninoventures.com


Safe Harbor Statement

This report includes forward-looking statements covered by the Private Securities Litigation Reform Act of 1995.  Because such statements deal with future events, they are subject to various risks and uncertainties and actual results for fiscal year 2010 and beyond could differ materially from the Company's current expectations.   Forward-looking statements are identified by words such as "anticipates," "projects," "expects," "plans," "intends," "believes," "estimates," "targets," and other similar expressions that indicate trends and future events.

Forward Looking Statement

Certain information presented, including discussions of future plans and operations, contains forward-looking statements involving substantial known and unknown risks and uncertainties. These forward-looking statements are subject to risk and uncertainty, many of which are beyond control of company management. These may include, but are not limited to the influence of general economic conditions, industry conditions, fluctuations of commodity prices and foreign exchange rate conditions, prices, rates, environmental risk, industry competition, availability of qualified staff and management, stock market volatility, timely and cost effective

("ELN") is an international exploration company, focused on exploration for zinc, lead, copper, gold and silver in New Brunswick, Canada and copper-cobalt in the Democratic Republic of Congo (DRC). Our geological and business teams have a wealth of experience in project acquisition, exploration and development.

ELN recently announced a non-brokered $3 million unit offering to advance the company's Murray Brook Project (New Brunswick), for which the company now has the option to increase its interest from 35% to 50%.

news release: http://www.elninoventures.com/i/pdf/090612ELN.pdf
subscription agreement: http://www.elninoventures.com/i/pdf/SEP2012ELNSUBAGR.pdf

El Nino Venture's partner in the Murray Brook Project is Votorantim Metals, Brazil's second largest mining company and a leader in zinc production


ELN has three projects: Murray Brook, Bathurst Option JV, and Kasala.

MURRAY BROOK PROJECT -- ELN/Votorantim/Murray Brook Minerals

The Murray Brook project is a polymetallic, massive sulphide deposit. The Murray Brook deposit's recent NI43-101 resource estimation has moved it from the district's fifth largest in the Bathurst Mining Camp, New Brunswick, to the newest, largest NI43-101 deposit in the district. The Murray Brook property is located 60 km west of Bathurst. The Murray Brook Project is open pit and is supported by excellent infrastructure, including paved roads, grid electricity and communities to provide goods, services and skilled labour.

ELN and Votorantim Metals Canada ("VMC") have advanced the Murray Brook Project to the beginning of the development stage and are planning to complete an updated resource estimation and phase 1 metallurgy studies in 2012, with a Preliminary Economic Assessment Study in 2013 and subject to continued positive results, a Feasibility Study planned for completion by the end of 2014, with the end result being a decision on Commercial Production.

The Votorantim Group is Brazil's second largest mining company and a major producer of zinc, nickel and aluminum with 40,000 employees in 24 countries and net revenues in 2011 of $13.5 billion. See Votorantim's website.

During 2011 and 2012, ELN and VMC completed more than 30,000 metres of drilling. The 2012 drill program was completed in June and over the past couple of months, the company has been announcing strong results from 2012 drilling program. Please see Company's news release. The 2012 drill results have been excellent and will be used to update the NI43-101 before year end.

In February 2012, an NI43-101 resource estimation was announced (see news release). The technical report is filed on SEDAR.com and also available on ELN's website.

A $3 million budget was approved for the 2012 exploration drill program. It includes $2.5 million for drilling and the plan is to take most of the deposit to measured resources at the Murray Brook deposit. $500,000 is budgeted for 2012 for exploration of the Murray Brook and Camel Back properties, both of which are covered by the option agreement with Murray Brook Minerals.

Metallurgical test-work of bulk sample material from the Murray Brook deposit is currently underway. Three HQ diameter diamond holes were drilled to provide sample materials for metallurgical tests. The test-work is focused on determining potential metal recoveries based on a recommended metals recovery process flow sheet which, subsequently, will form the basis for a small scale metallurgical pilot plant program. Metallurgical results, along with an amended resource estimation incorporating the 2012 drill results, will form the basis of a Preliminary Economic Assessment (or Scoping Study) study planned for completion in Q1 2013.

Based on continued success of the Project, additional metallurgical studies (Phase 2- Pilot Plant), Preliminary Economic Assessment Studies, Geotechnical drilling and Environmental assessment and prefeasibility studies, are slated for completion in 2013. See Project page.


Brunswick 12 Mine and Mill

BATHURST OPTION JV PROJECT (Tri-Party Agreement) -- ELN/Xstrata/Votorantim

ELN and Xstrata Zinc Canada (Xstrata) each hold a 50% interest in the largest base metal claim blocks in New Brunswick. The Bathurst Mining Camp is host to a mine and mill complex and smelter owned by Xstrata Zinc Canada. The claims host several historic polymetallic (zinc, copper, lead, gold and silver) occurrences. The Bathurst Mining Camp is home to the largest underground zinc mine in North America, the Brunswick No. 12 deposit, which contained 295 million tonnes of massive sulphide.

In March 2010, ELN and Xstrata entered into a Tri-Party Option Agreement with VMC, whereby the latter can earn 50% interest in the land holdings by incurring exploration expenditures totaling $10 million over 5 years. VMC can increase its interest to 70% by incurring expenditures of an additional $10 million over 2 years. Approximately $6.65 million has been spent to date.

Votorantim's 2011-2012 expenditures will be $5 million and include up to 12,000 metres of drilling. As part of the $5 million exploration program, Votorantim completed airborne geophysical surveys in order to identify new targets. They commenced drill testing airborne gravity targets and completed approximately 5,000 metres of drilling to date and will continue drilling throughout the remainder of 2012. See Project page.


KASALA -- Democratic Republic of the Congo (DRC)

A new copper discovery has been made on the Kasala project; with high grade mineralization over wide intervals and an apparent mineralized strike length of 2.5 km. ELN's Kasala project is located approximately 70 km northwest of Lubumbashi, the second largest city in the Democratic Republic of Congo (DRC). The area is the centre of the country's massive copper-cobalt mining industry, which produces over 10% of the world's copper and 30% of the world's cobalt.

The Kasala project permits are located adjacent to Anvil Mining's (now Mining and Metals Group) Kinsevere Mine, which is expected to produce 24,000 tonnes (52 million pounds) of copper metal annually for the next 20 years. See Project page.

Kasala Overview

  • 12,000 metres of reverse circulation and 5,500 metres of diamond drilling programs completed on three of El Ni�o's exploration permits

  • High grade mineralization over wide intervals:

  • 22 m @ 3.28% Cu

  • 29 m @ 2.82% Cu

  • 31 m @ 2.19% Cu

  • 11 m @ 3.68% Cu

  • In addition, two major parallel zones identified to the east of Kasala which together have a combined strike length of over 3 km

  • Appeals in opposition to two judgments decided in favour of ELN are expected to be resolved in hearings to be held in the near future. Subsequently, the company expects to resume its exploration and corporate activities.

We consider these projects to have excellent potential for enhancing shareholder value. If you are interested in discussing the details of our announced private placement, we would be happy to arrange a meeting to present our El Ni�o projects and business plan.

Contact: (604) 685-1870 or by email at info@elninoventures.com

Regards,

"Harry Barr"

Harry Barr
Chairman & CEO

El Nino Ventures Inc.
555 West 12th Avenue, Suite 650
City Square, West Tower, Vancouver, B.C.   V5Z 3X7

Toll Free 1.800.667.1870   |   info@elninoventures.com   |   www.elninoventures.com


Safe Harbor Statement

This report includes forward-looking statements covered by the Private Securities Litigation Reform Act of 1995.  Because such statements deal with future events, they are subject to various risks and uncertainties and actual results for fiscal year 2010 and beyond could differ materially from the Company's current expectations.   Forward-looking statements are identified by words such as "anticipates," "projects," "expects," "plans," "intends," "believes," "estimates," "targets," and other similar expressions that indicate trends and future events.

Forward Looking Statement

Certain information presented, including discussions of future plans and operations, contains forward-looking statements involving substantial known and unknown risks and uncertainties. These forward-looking statements are subject to risk and uncertainty, many of which are beyond control of company management. These may include, but are not limited to the influence of general economic conditions, industry conditions, fluctuations of commodity prices and foreign exchange rate conditions, prices, rates, environmental risk, industry competition, availability of qualified staff and management, stock market volatility, timely and cost effective

This email should not be construed as an offer to buy or sell securities of El Nino Ventures Inc.

To unsubscribe to our Email list, please click HERE
 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

El Nino Ventures Ltd

EXPLORATEUR
CODE : ELN.V
ISIN : CA28335E3041
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

El Nino Ventures est une société d’exploration minière d'argent et d'or basée au Canada.

El Nino Ventures détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont KASALA en Republique Democratique Du Congo et BATHURST et BANCROFT au Canada.

El Nino Ventures est cotée au Canada et en Allemagne. Sa capitalisation boursière aujourd'hui est 3,1 millions CA$ (2,5 millions US$, 2,3 millions €).

La valeur de son action a atteint son plus haut niveau récent le 15 août 1997 à 9,90 CA$, et son plus bas niveau récent le 24 mars 2016 à 0,01 CA$.

El Nino Ventures possède 61 610 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de El Nino Ventures Ltd
04/10/2013Niño Ventures Inc. Announces Closing of Private Placement an...
11/09/2013and Private Placement - El Nino Ventures
08/04/2011Closes Non Brokered Private Placement
02/12/2009Closes $1.5 Million Non-Brokered Private Placement; Update o...
26/08/2009First Tranche Closing Non-brokered Private Placement
27/07/2009Ammends Terms of Non-Brokered Private Placement
Nominations de El Nino Ventures Ltd
25/09/2009Appoints Mr. Harry Barr as Chairman and Acting CEO
27/03/2008appoints senior geologist to head its exploration program in...
12/10/2007Announces Appointment of New Directors and Chief Executive O...
Projets de El Nino Ventures Ltd
25/02/2014(Bathurst)Exploration Update on the Bathurst Option Joint Venture Zinc...
10/09/2013(Bathurst)$2 Million Exploration Program Approved for Bathurst Option ...
02/05/2013(Bathurst)Development Update on the Murray Brook Zn-Cu-Pb-Ag Deposit, ...
16/01/2013(Bathurst)Releases Phase 1 Metallurgical Results for the Murray Brook ...
23/10/2012(Bathurst)Exploration Update on the Bathurst Option JV Base Metals Pro...
18/09/2012EXPANDS ITS PROJECT INTEREST WITH BRAZIL'S SECOND LARGEST MI...
07/09/2012Announces completion of its 35% Earn-In, Receives Notice of ...
28/08/2012announces a 122 metre thick mineralized interval of massive ...
17/07/2012(Bathurst)Drills 9.23 % Zinc, 108.7 gpt Silver, 0.18 % Copper, 0.336 g...
24/04/2012(Bathurst)Exploration Update on the Bathurst Mining Camp (BMC) Base Me...
27/03/20122012 Exploration Program on the Murray Brook Polymetallic Ba...
04/03/2012Northern Miner article: El Nino Ventures posts new resource ...
23/02/2011(Bathurst)2011 Exploration Program on the Bathurst Mining Camp, New Br...
11/03/2010(Kasala)Reports Soil Geochemistry Sampling Results on the Kasala Cop...
24/07/2009(Bathurst)Options Bathurst Project to VotorantimMetals Canada Inc.
25/02/2009(Kasala)Identifies Additional Targets On The Company's Kasala Projec...
01/02/2008intersects 10 meters of 3.50% Cu and 5 meters of 1.90% Cu, i...
17/10/2007Acquires Significant Land Position in Ireland
Communiqués de Presse de El Nino Ventures Ltd
20/06/2016EL NINO CLOSES PRIVATE PLACEMENT AND ISSUES EARLY WARNING RE...
20/06/2016Early Warning Report
16/06/2016El Nino announces extension of private placement and issues ...
22/04/2016El Nino Announces Private Placement of up to $500,000; Negot...
10/07/2015Democratic Republic of the Congo (DRC) Corporate Update
09/04/2015MMG Limited Terminates Option Agreement with El Nino
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
27/10/2014El Nino Receives DRC Supreme Court Approval for All Arbitrat...
23/09/2014El Nino Seeks Joint Venture Partner for Zinc-Lead Exploratio...
20/05/2014El Nino Options the Kasala Project to MMG Limited
02/04/2014El Nino Ventures Wins Final Award on all Costs of the Intern...
20/03/2014El Nino Ventures Inc. Grants Options
06/01/2014Wins International Commercial Arbitration Against George Kav...
23/07/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
05/06/2013(Bathurst)Positive Preliminary Economic Assessment for Murray Brook Zn...
13/11/2012Update from the Chairman
31/10/2012(Bathurst)Developing Bathurst's Largest NI 43-101 Polymetallic Deposit
02/10/2012Ni=F1o Ventures Inc. announces a 45.4 metre drill intersecti...
26/09/2012Niño Ventures retains Renmark Financial Communications
14/08/2012announces a 4.3% Zinc, 1.4% Lead and 54 g/t Silver over 81 M...
30/07/2012announces a 10.34 % Zinc, 126.0 gpt Silver, 0.29 % Copper, 1...
27/06/2012(Bathurst)continues to intersect High Grade Zinc, Gold and Silver Over...
05/06/2012(Bathurst)Announces High Grade Zinc, Gold and Silver intersections ove...
17/05/2012(Bathurst)Announces High Grade Zinc, Lead and Silver on Phase II 18,00...
11/05/2012(Bathurst)Ni=F1o Announces Initial 50% Earn-In for Murray Brook Projec...
17/04/2012Ni=F1o Ventures Inc. Announces SEDAR Filing of NI 43-101 Min...
28/02/2012(Bathurst)Announces an Initial NI 43-101 Mineral Resource Estimate for...
23/01/2012(Bathurst)Announces Additional High Grade Zinc, Lead and Silver Over B...
16/01/2012(Bathurst)Continues to Intersect High Grade Zinc, Lead and Silver Over...
28/11/2011(Bathurst)Reports High Grade Zinc, Lead and Silver over Broad intercep...
16/09/2011Joins OTCQX -- "ELNOF"
30/08/2011(Bathurst)Significant drill results continue to be intersected in the ...
12/07/2011Ni=F1o Ventures Announces $1=2C000=2C000=2C 6650 MeterDrill ...
24/05/2011amends press release of April 26, 2011
11/05/2011Up to 27 Metres (88.6 ft) of 9.56% Zinc; 122.1 g/t (3.56 opt...
25/04/2011An Interview of Harry Barr, Chairman and Acting CEO of El Ni...
11/04/2011DEMOCRATIC REPUBLIC OF CONGO (DRC) COURT RULES IN FAVOUR OF ...
07/03/2011Increases Private Placement to $2,000,000
04/03/2011Ni=F1o Ventures Appoints Colin Bird to Advisory Board
05/01/2011Hearing Update Regarding Claims Against George Kavvadias and...
24/06/2010Litigation in the DRC Dismissed; El Nino Files $850,000 Coun...
04/05/2010Votorantim Metals Canada Inc. finalizes Option/Joint Venture...
10/12/2009joins Agoracom and launches Online IR and Marketing Program
18/02/2009Joins the "Agoracom 100" and Launches Online IR and Marketin...
16/12/2008Completes Acquisition in the DRC
03/09/2008 at the Las Vegas Hard Assets Investment Conference
21/07/2008makes new Acquisition in the DRC
26/06/2008DRC Exploration Program Review and Update
13/05/2008DRC Exploration Program Update
05/05/2008Commences Irish Drill Program
14/04/200825,000 meter drill program underway in the Democratic Republ...
21/02/2008Update on Democratic Republic of Congo Projects
11/02/2008to Drill Irish Licences
04/02/2008acquires new Copper Project in the Democratic Republic of Co...
21/01/2008Update on Exploration Program in the Democratic Republic of ...
10/12/2007Update on Exploration program Project in the Democratic Repu...
28/11/2007 Completes 7,000 Meter Drill Program on Copper Project in th...
13/11/2007update on their drill program in the Democratic Republic of ...
06/11/2007New Office
25/10/2007expands drill program to 7,000 meters using a second drill r...
09/10/2007 5,000 meter drilling program in the Democratic Republic of ...
20/09/2007Identifies New Copper Mineralized Zone on Properties in the ...
20/08/2007to start 5,000 Meter Drill Program on their Democratic Repub...
02/08/2007to Commence Airborne Geophysics, Followed by Initial Drill P...
25/06/2007& Xstrata Zinc to Commence 25,000 m Drill Program on Bathurs...
22/06/2007Mining expertise helps El Nino Ventures find success
14/06/2007Begins Work on Copper Mountain Project in Democratic Republi...
11/06/2007Starts Operations in the (DRC) Congo and the Government of N...
20/04/2007Outlook for 2007 -2008 Work Program and Report on the Bathur...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (ELN.V)FRANKFURT (E7Q.F)
0,050+150.00%0,031+14.81%
TSX-V
CA$ 0,050
30/12 09:30 0,030
150%
Cours préc. Ouverture
0,020 0,050
Bas haut
0,050 0,050
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,050 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -25
Produit
Développe
Recherche Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/04/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022100,00%0,050,02
2021-44,44%0,060,03
202080,00%0,070,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nos flux RSS24hGold Mobile
Gold Data CenterConvertisseur Or Argent
Pièces d'or sur eBayPièces d'argent sur eBay
Minières :
outils techniques
Minières : outils
d'analyse fondamentale
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,72 US$+0,20%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :
Profil de El Nino Ventures Ltd | Articles sur El Nino Ventures Ltd | Indicateurs de marché de El Nino Ventures Ltd | Projets et ressources de El Nino Ventures Ltd | Valorisation de El Nino Ventures Ltd | Voir les mines de El Nino Ventures Ltd | Présentation de l'entreprise El Nino Ventures Ltd | Rapport annuel de El Nino Ventures Ltd | Management de El Nino Ventures Ltd | Graphique interactif de El Nino Ventures Ltd | Graphiques gratuits de El Nino Ventures Ltd | El Nino Ventures Ltd TSX-V | El Nino Ventures Ltd FRANKFURT