Feasibility Study Progress

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Uranium | Zinc |

Feasibility Study Progress

Microsoft Word - Feasibility Update Oct 2014

Company Announcement, October 23rd, 2014

Update ‐ Feasibility Study Progress

ASX: GGG


Greenland Minerals and Energy ("GMEL", or "the Company") is pleased to update on continued advances to the Feasibility Studies on the Kvanefjeld rare earth - uranium project. The studies form part of the mining licence application for Kvanefjeld. In addition the Feasibility Studies will also be supplied to China Non‐Ferrous Metal Industry's Foreign Engineering and Construction Co. Ltd (NFC) to form a major input into the ongoing co‐operation. GMEL and NFC are working to establish a fully‐ integrated critical rare earth supply chain that will market to end‐users globally.

Process Plant engineering design by Tetra Tech progressing; Concentrator and

Refinery mechanical design is largely complete

Optimal shipping solution study by Denmark's Blue Water Shipping complete

Greenland port study by Danish engineering firm Ramboll on schedule for completion in December, 2014

Residue storage facility design by AMEC advancing and set for completion in

December, 2014

Assay program on previously drilled cores set for completion in November, 2014

Mine design and scheduling commenced with SRK; outputs to include capital and operating costs for an open‐pit mining operation, and establishment of a mining reserve

Update on Feasibility Study Work Programs

Process Plant engineering design is underway with the independent consultant Tetra Tech who is a global engineering services company with extensive cold climate experience. Work has progressed to the point that the Concentrator and Refinery mechanical design is largely complete.
Blue Water Shipping, a highly‐regarded Danish Company, has completed a logistics study that has identified an optimal shipping solution for the project.

This solution will use vessels travelling between Greenland and a major European port for the transport of reagents into, and products out of Greenland.
The Feasibility Study design of the port is being completed by the large engineering consulting company Ramboll. Ramboll is a Denmark‐based company with offices located globally, including in Greenland. They have recently completed a port site location study, and the port is now being designed in detail to meet Feasibility Study standards. Work here is currently on track to be completed by 31st December, 2014.
Plant residue storage facilities are being designed by AMEC out of their office in Ashford, Kent, England. This office has excellent experience in the design of cold climate tailings dams. Work here is on track and will be completed in December, 2014. No issues regarding tailings storage or radioactive elements have been identified, and are not expected based on the studies performed to date.
Some nearby elevated permanent lakes to the northeast of the plant site have been positively evaluated for hydroelectric power supply. GMEL has engaged a company highly experienced in establishing hydropower in Greenland to perform a study to build a hydropower plant specifically for project requirements. This work is being performed currently by Istak/Verkis of Iceland, and is set for completion in December, 2014. The use of hydropower will be provided as an option in the Mining Licence Application Study. Initial investigations highlight substantial operating cost benefits as a result of utilising hydropower, as well as providing greenhouse‐gas free, sustainable energy for the operations.
A geotechnical assessment of the entire project site has been performed by specialist geological consultants 4DG. This will provide suitable locations and design parameters for project facilities and infrastructure to a range of consultants working on the study.
Mine design work and scheduling has commenced with global mining consultants SRK. They will be performing a capital and operating cost estimate for the open pit mining operations. The assaying of previously drilled cores is also nearing completion. These cores are from holes drilled centrally in the Kvanefjeld resource, and are aimed to provide data to establish 'measured' category JORC‐code compliant resources. The SRK work will be ongoing into early next year and aims to result in conversion of some mineral resources into mining reserves.
Acid plant designs and cost information have already been received from SNC Lavalin and Uhde Nora and are ready for periphery cost estimation.
All capital costs will be estimated by NFC who signed a Memorandum of Understanding with GMEL in March 2014. NFC has a design and construction division along with ownership of a rare earth separation plant in China (Zujiang Rare Earth Company in Guangdong). The cost estimate will assume modular construction of the processing plants with installation in Greenland. This project construction methodology is likely to result in a reduced capital cost and reduced construction risks compared to full on site construction. This work by NFC is currently on track with costs received for over 3,000 different equipment items. A final feasibility level cost estimate is expected by the end of this year.
The entire Feasibility Study is being managed cost‐effectively by the in‐house GMEL Technical Team.
ENDS

ABOUT GREENLAND MINERALS AND ENERGY LTD.

Greenland Minerals and Energy Ltd (ASX - GGG) is an exploration and development company focused on developing high‐quality mineral projects in Greenland. The Company's flagship project is the Kvanefjeld multi‐ element deposit (Rare Earth Elements, Uranium, Zinc), that is rapidly emerging as a premier specialty metals project. A comprehensive pre‐feasibility study has demonstrated the potential for a large‐scale, cost‐ competitive, multi‐element mining operation. Through 2014, the Company is focussed on completing a mining license application in order to commence project permitting. For further information on Greenland Minerals

and Energy visit http://www.ggg.gl or contact:

Dr John Mair

David Tasker

Christian Olesen

Managing Director

Professional PR

Rostra Communication

+61 8 9382 2322

+61 8 9388 0944

+45 3336 0429

Greenland Minerals and Energy Ltd will continue to advance the Kvanefjeld project in a manner that is in accord with both Greenlandic Government and local community expectations, and looks forward to being part of continued stakeholder discussions on the social and economic benefits associated with the development of the Kvanefjeld Project.

The information in this report that relates to exploration targets, exploration results, geological interpretations, appropriateness of cut‐off grades, and reasonable expectation of potential viability of quoted rare earth element, uranium, and zinc resources is based on information compiled by Mr Jeremy Whybrow. Mr Whybrow is a director of the Company and a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr Whybrow has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the

2004 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Whybrow consents to the reporting of this information in the form and context in which it appears.

The geological model and geostatistical estimation for the Kvanefjeld, Sorensen and Zone 3 deposits were prepared by Robin Simpson of SRK Consulting. Mr Simpson is a Member of the Australian Institute of Geoscientists (AIG), and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined by the 2004 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Simpson consents to the reporting of information relating to the geological model and geostatistical estimation in the form and context in which it appears.

This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported.

Lire la suite de l'article sur www.noodls.com

Greenland Minerals and Energy Ltd.

EXPLORATEUR
CODE : GGG.AX
ISIN : AU000000GGG4
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Greenland Min. est une société d’exploration minière de zinc et d'uranium basée en Australie.

Greenland Min. détient divers projets d'exploration au Groenland.

Ses principaux projets en exploration sont KVANEFJELD et ZONE 2 au Groenland.

Greenland Min. est cotée en Australie. Sa capitalisation boursière aujourd'hui est 56,3 millions AU$ (40,6 millions US$, 38,6 millions €).

La valeur de son action a atteint son plus haut niveau récent le 18 février 2011 à 1,37 AU$, et son plus bas niveau récent le 01 avril 2016 à 0,02 AU$.

Greenland Min. possède 1 004 770 048 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Greenland Minerals and Energy Ltd.
08/02/2011Appoints New Commercial Manager
Rapports Financiers de Greenland Minerals and Energy Ltd.
02/02/2011Quarterly Report - Q4 2010
Projets de Greenland Minerals and Energy Ltd.
16/10/2013(Kvanefjeld)Progress Environmental and Social Impact Assessments on the ...
26/03/2013(Kvanefjeld)Kvanefjeld Feasibility Study Developments: Mine and Concentr...
17/10/2012(Kvanefjeld)Acquisition of the Outstanding 39% of the Kvanefjeld Multi E...
23/02/2012(Kvanefjeld): Kvanefjeld Project-Major Technical Breakthrough: Atmospher...
05/12/2011(Kvanefjeld)Government Introduces Uranium Licensing Framework for Kvanef...
15/08/2011gains full control of world's largest rare earth project
03/05/2011(Kvanefjeld)Builds First-Class Team to Facilitate the Kvanefjeld Feasibi...
23/03/2011(Kvanefjeld)Releases an Upgraded Resource Estimate for the Kvanefjeld Mu...
17/02/2011(Zone 2)Confirms a Substantial New Rare Earth Element - Uranium Depo...
01/02/2011(Kvanefjeld)Greenland Minerals Awards Contracts for Key Social and Envir...
Communiqués de Presse de Greenland Minerals and Energy Ltd.
09/06/2016Greenland and Denmark Pass Uranium Export Legislation, Solid...
01/02/2016December 2015 Quarterly Report
26/01/2016Greenland rare earth mining to remain contentious due to ura...
25/01/2016Greenland and Denmark Reach Landmark Agreement on Uranium Ex...
14/10/2015Director Appointment
10/04/2015Notice of Annual General Meeting and Explanatory Statement
07/04/2015New Memorandum of Understanding Signed With NFC to Focus on ...
07/04/2015(Kvanefjeld)New Memorandum of Understanding Signed With NFC to Focus on ...
01/04/20152014 Annual Financial report – 20 Mar 2015
01/04/2015Outstanding 2% royalty purchase – 10 Mar 2013
01/04/2015Exploration license renewal – 1 Apr 2015
03/03/2015Company Presentation, March 2015
02/03/2015Company Presentation, March 2015
02/03/2015Update on Current Activities, Outlook and Funding
12/02/2015Kvanefjeld Project – Mineral Resource Update
17/12/2014Assay of Historic Drill Cores at Kvanefjeld Return High-Grad...
03/12/2014Greenland parties in coalition talks, mining in focus
23/10/2014Feasibility Study Progress
09/07/2014Greenland Minerals and Energy Limited: Fully Underwritten $8...
27/10/2013Repeals Zero-Tolerance Uranium Policy
25/07/2013Set for Key Role in EU-Backed Rare Earth Supply Chain Initia...
01/10/2012Completes Capital Raising and Launches Share Purchase Plan
25/09/2012GGG:ASX Bell Potter Securities Initiates Research Coverage o...
20/09/2012(Kvanefjeld)Kvanefjeld Feasibility Study Underway: Metallurgical Develop...
06/08/2012(Kvanefjeld)Finalises Full Ownership of Kvanefjeld Multi-Element Project...
04/07/2012Greenland Minerals Renames Zone 2 Rare Ear
06/06/2012(Kvanefjeld)Zone 3 Grows Kvanefjeld Project Resource Inventory to 575 Ml...
17/05/2012Shaw Stockbroking increases Greenland Minerals valuation to ...
04/05/2012(Kvanefjeld)Kvanefjeld Prefeasibility Study Confirms a Long-Life, Cost C...
19/04/2012RM Research Commences Coverage on Greenland Minerals:
12/04/2012Annual Report: Greenland Minerals and Energy And Controlled ...
27/03/2012'Zone 3' Rare Earth - Uranium Deposit Shapes Up With Solid D...
21/03/2012(Zone 2)Releases Initial 242 Million Tonne Mineral Resource Estimate...
06/10/2011Independent Investment Research - Greenland Minerals and Ene...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (GGG.AX)
0,056+0.00%
AUSTRALIA
AU$ 0,056
06/01 10:00 -
0%
Cours préc. Ouverture
0,056 0,057
Bas haut
0,055 0,057
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,056 -%
Volume var. 1 mois
216 188 -%
24hGold TrendPower© : 34
Produit
Développe
Recherche Uranium - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
2023-9,68%0,070,06
2022-25,30%0,090,05
2021-68,68%0,320,07
2020103,85%0,350,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :