Dear VMS Followers,

Today's release is to inform the market that the Reed prefeasibility study is now available for review on SEDAR (www.sedar.com) and we invite you to do so, if you wish.

The release outlines the economic validity of the Reed Copper deposit with diluted indicated reserve tonnage and grade. Initial production is slated for the last quarter in 2013 with full production scheduled in the first quarter of 2014.

Reed Copper Deposit Mineral Reserves1 - March 30, 2012
Category Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%)
Probable 2,157,000 0.48 6.02 3.83 0.59
1Shown as 100% of the mineral reserves; VMS has a 30% interest in the Reed Copper project joint venture

Below is the economic model results based on 100% ownership of Reed with metal price assumptions from the prefeasibility study.

We will continue to update shareholders with project advancements on a regular basis.

Best regards,

Neil Richardson
COO
VMS Ventures Inc.


VMS FILES PREFEASIBILITY STUDY FOR THE REED LAKE DEPOSIT, NEAR SNOW LAKE, MANITOBA

Vancouver, B.C., May 16, 2012. VMS Ventures Inc. (TSX-V:VMS) (“VMS”) is pleased to announce the Prefeasibility Study of the Reed Lake polymetallic deposit near Snow Lake, Manitoba with Joint Venture partner Hudbay Minerals Inc. (TSX : HBM) (NYSE : HBM) is available for viewing on www.sedar.com.

Reed Copper Deposit Mineral Reserves1 - March 30, 2012
Category Tonnes Au (g/t) Ag (g/t) Cu (%) Zn (%)
Probable 2,157,000 0.48 6.02 3.83 0.59
1Shown as 100% of the mineral reserves; VMS has a 30% interest in the Reed Copper project joint venture

The pre-feasibility study prepared by Hudbay and Stantec in respect of the Reed deposit demonstrates that the indicated resources can be converted to reserves and economically viable for extraction by long-hole open stoping at a rate of 1300 TPD. Reed Copper Project Assumptions and Qualifications

Production at Reed is scheduled to begin at the 260 metre level from Zones 10 and 20 and in Zone 30 from the 135 metre level. Mining is expected to finish in Zone 30 from the 85 metre level, in Zone 20 from the 110 metre level and in Zone 10 on the 285 metre level.

Run of mine ore will be transported by truck directly to Flin Flon where it will be crushed to less than 150 millimeters. The Reed ore will be batched independently through the Flin Flon concentrator with assumed metal recoveries of 94% copper, 58% gold and 62% silver producing a copper concentrate.

Access to the underground mineral resources will be via a trench, portal and decline located near the center of the surface site. The decline will be excavated 6 metres wide and 5 metres high to a depth of 510 metres from surface and be able to accommodate a 60 tonne truck. Ore and development waste will be hauled to surface via the decline. Each mining level, spaced 25 metres vertically, will be accessed from the decline and will be 5.5 metres wide by 4.5 metres high to accommodate a 10 yard load, haul and dump scooptram.

The project will be powered by diesel generators and power distributed to surface buildings and underground.

Stantec provided capital estimates for: surface infrastructure, underground dewatering, indirect costs (contractor, construction management). Hudbay provided capital estimates for underground development and construction, mine equipment, all other indirect costs, operating costs, sustaining capital, production schedule and metal price forecast. CLICK HERE TO READ MORE

-------------------
To unsubscribe from this list please visit the email alert section of the VMS site.




Date Sent: 5/16/2012 3:20:15 PM Powered by Q4 Web Systems

VMS Ventures Inc.

EXPLORATEUR
CODE : VMS.V
ISIN : CA91828R1091
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

VMS Ventures est une société d’exploration minière de zinc et d'or basée au Canada.

VMS Ventures détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont REED LAKE, LYNN LAKE GABBROS, PUELLA BAY et COVER au Canada.

VMS Ventures est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 19,8 millions CA$ (14,4 millions US$, 13,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,76 CA$, et son plus bas niveau récent le 22 janvier 2016 à 0,05 CA$.

VMS Ventures possède 146 480 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de VMS Ventures Inc.
05/03/2011VMS Ventures – Focused on Discovery
Financements de VMS Ventures Inc.
09/11/2007ANNOUNCES COMPLETION OF A PRIVATE PLACEMENT
Nominations de VMS Ventures Inc.
05/07/2011Appoints John Pattison Chief Geologist
Projets de VMS Ventures Inc.
20/01/2014Provides Reed Mine December Update
23/09/2013Canada's Next Copper Mine
18/09/2013Reed on plan; exploration stock cycles
21/08/2013(Copper Project)Reed Copper Project Update
24/07/2013(Copper Project)Reed Copper Project Update/New VMS website
24/07/2013(Copper Project)s Progress at the Reed Copper Project
24/05/2013(Copper Project)APRIL AT REED COPPER PROJECT; PRODUCTION EXPECTED IN Q4/13
15/02/2013Reed Mine Tour Pictures
31/01/2013CONTRACTS WESTCORE DRILLING FOR 2013 WINTER DRILL PROGRAM
09/11/2012Global Copper Production Under Stress
31/10/2012Reed Copper Mine Update; Winter Drilling Budget Set
31/10/2012(Copper Project)s the Reed Copper Project Which Remains Within Budget and on...
18/09/2012ANNOUNCES TRENCHING RESULTS AND SURFACE TDEM SURVEY ON ITS S...
13/09/2012(Copper Project)Provides Update on Reed Copper Project in Manitoba
21/08/2012(Copper Project)Reed Copper Project
14/08/2012and Hudbay Break Ground at New Copper Mine in Manitoba
19/07/2012(Copper Project)S PROGRESS AT THE REED COPPER PROJECT NEAR SNOW LAKE, MANITO...
21/06/2012ACQUIRES LARGE LAND PACKAGE ADJACENT TO THE REED COPPER MINE...
16/05/2012(Reed Lake)FILES PREFEASIBILITY STUDY FOR THE REED LAKE DEPOSIT, NEAR S...
10/05/2012Harvest Gold Signs Letter of Intent(LOI) on Esker Project in...
10/05/2012VMS Ventures Updates Progress on the Development of the Reed...
26/04/2012and the Reed Deposit
25/04/2012(Copper Project)REED COPPER PROJECT AND REED NORTH AREA EXPLORATION UPDATE, ...
03/04/2012(Copper Project)Reed Copper Project Positive Pre-Feasibility Study Completed
22/02/2012100% Owned Cowan River Project Drilling begins
15/02/2012Drills 8.90 Metres of 1.00 g/t Gold/NAN PowerPoint
06/02/2012HudBay CEO on Production at Reed and Copper Demand
27/10/2011Introduces Exploration Programs for its Sudbury, Ontario Pro...
28/07/2011INTERSECTS SECOND COPPER OCCURANCE AT COWAN RIVER, SNOW LAKE...
08/06/2011(Sails)Drills 13=2E41 Metres of 1=2E48 g/t Go =?ISO-8859-1?Q?ld=20a...
13/05/2011(Reed Lake)FILES NI 43-101 MINERAL RESOURCE FOR THE REED LAKE DEPOSIT A...
20/04/2011(Cover)Reports on Two Additional Holes at Its Cowan River Copper-Zi...
13/04/2011(Cover)Discovers High Grade Copper Zone Near Surface: 9.81% Copper ...
01/04/2011(Reed Lake)Announces NI 43-101 Mineral Resource for the Reed Lake Depos...
22/03/2011s Progress With Ongoing Exploration Programs on Its 100% Own...
17/03/2011(Reed Lake)Reports 50.08 Metres of 6.85% Copper in Hole RLD030 at Reed ...
23/02/2011(Reed Lake)Reports 37.10 Metres of 5.60% Copper From In-Fill Hole RLD02...
10/03/2008(Reed Lake)Rising on Reed Lake Results
29/01/2008(Reed Lake)6 HOLES INTERSECT NEAR SOLID SULPHIDES; ASSAY RESULTS FOR TW...
27/10/2007(Reed Lake) DISCOVERY EXTENDED, DRILL EQUIPMENT ARRIVES ON REED LAKE PR...
16/10/2007(Reed Lake)2ND DRILL PROGRAM PLANNED AT REED LAKE DISCOVERY ZONE, SNOW ...
05/10/2007(Reed Lake)10.50 METRES of 11.19% COPPER WITHIN 43.05 METRES OF 4.38% C...
18/09/2007(Reed Lake)EXPLORATION UPDATE AT REED LAKE PROPERTY, MANITOBA
09/08/2007(Reed Lake)ANNOUNCES PROPERTY AGREEMENT DEAL WITH HUDBAY MINERALS INC.
Communiqués de Presse de VMS Ventures Inc.
27/04/2016Vms Announces Completion of Plan of Arrangement
25/04/2016VMS Announces Shareholder Approval for Plan of Arrangement
01/04/2016VMS Reports Update on Reserves and Resources at Reed Mine
31/03/2016VMS Files Materials in Connection with Special Meeting of Sh...
01/02/2016VMS Ventures Announces Plan of Arrangement With Royal Nickel
04/11/2015VMS Ventures Announces Drill Program Update on Exploration T...
02/11/2015VMS Considers Strategic Options
09/09/2015VMS Ventures Adopts Fixed Option Plan
28/07/2015VMS Ventures Inc. Patrick Evans and Blair Schultz Join VMS B...
15/04/2015VMS Provides Reed Mine Operations Update
15/04/2015Provides Reed Mine Operations Update
10/04/2015VMS Announces Closing of Acquisition of Assean Lake Claims
10/04/2015Announces Closing of Acquisition of Assean Lake Claims
01/04/2015VMS Reports Update on Reserves and Resources at Reed Mine
01/04/2015Reports Update on Reserves and Resources at Reed Mine
19/03/2015Provides Reed Mine Operations Update
19/03/2015VMS Provides Reed Mine Operations Update
25/02/2015VMS Provides Reed Mine Operations Update
25/02/2015VMS Provides Reed Mine Operations Update
18/02/2015VMS ANNOUNCES ACQUISITION OF ASSEAN LAKE CLAIMS
22/01/2015VMS Provides Reed Mine Operations Update
18/12/2014VMS Provides Reed Mine Update
18/12/2014VMS Provides Reed Mine Update
03/12/2014VMS Provides Reed Mine Update
03/12/2014VMS Provides Reed Mine Update
24/11/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
24/11/2014VMS Announces Approval and Adoption of Shareholder Rights Pl...
19/11/2014VMS Announces Third Quarter Reed Mine Financial Performance
19/11/2014VMS Announces Third Quarter Reed Mine Financial Performance
30/10/2014VMS Provides Reed Mine Update
30/10/2014VMS Provides Reed Mine Update
26/08/2014VMS Appoints Two New Directors to Its Board
11/07/2014VMS Ventures Grants Incentive Stock Options
24/06/2014VMS Reports Reed Mine Update
17/06/2014VMS Ventures Announces Management Changes
05/06/2014VMS Ventures Completes Ore Sales and Purchase Agreement With...
29/05/2014VMS Ventures Inc.: North American Nickel Inc. Closes $9.38M ...
13/02/2014Announces Annual Meeting, Record Date and Adopts Advance Not...
13/11/2013Ahead of the Herd: Copper Catch Up
01/11/2013Provides Update on Reed Mine
23/10/2013(Cover)North American Nickel Discovers High Grade Nickel Sulphide M...
10/10/2013High Grade Nickel-Copper-Cobalt Sulphides Confirmed at Imiak...
01/10/2013(Copper Project)Reed Copper Project Commences Initial Production
30/09/2013Dr. Tony Naldrett, Internationally Acclaimed Expert on Magma...
12/09/2013Mid=2DDay Breaking News From VMS Ventures=2C Freegold=2C Nat...
10/09/2013Base Metals and Bulk Commodities - TOP 10 Reasons the Next U...
15/08/2013(Cover)Media Coverage
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
15/07/2013North American Nickel Acquiring Additional Ground at the Man...
17/06/2013ROCK TALK WITH RICK MARK AND NEIL RICHARDSON/PODCAST #5 WITH...
11/06/2013(Cover)Potential for High Nickel Recoveries at Imiak and Spotty Hil...
06/06/2013Mining matters to us all
04/06/2013Jaclyn Ruptash Joins NSMG Team
30/05/2013Ahead of the Herd - Riding A Copper Horse
24/05/2013(Copper Project)s Progress in April at the Reed Copper Project; Production E...
16/05/2013/NAN 2013 Podcast Series: Introduction to John Roozendaal
08/05/2013Introduction to Neil Richardson, COO of VMS and NAN
01/05/2013s 2013 Winter Drill Programs, Snow Lake, Manitoba and Sudbur...
25/04/2013and North American Nickel Inc. in the Metals Report
24/04/2013/North American Nickel Podcast Series
22/04/2013Exercises Full Right of First Refusal Allocation in North Am...
11/04/2013(Copper Project)REED COPPER PROJECT ON TIME/BUDGET FOR Q4 PRODUCTION
26/03/2013(Cover)Media Coverage
05/02/2013Kevin Puil: $4/lb Copper Is on Its Way
17/01/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
17/01/2013Finalizes Upcoming 2013 Winter Drill Program on Its 100% Own...
09/01/2013(Copper Project)REED COPPER PROJECT: CONSTRUCTION ON SCHEDULE
06/11/2012Dundee Capital Markets: HudBay Minerals Inc. - three mines u...
23/10/2012Announces Reed Exploration Properties Joint Venture With Hud...
16/10/2012Copper Price Rising?
07/06/2012Files Statement of Defense
09/05/2012Media and Social Media exposure
03/05/2012The TSX Venture is Trading at the Same Level it Did Nearly 9...
27/04/2012Announces Filing of Statement of Claim in Manitoba
27/04/2012Letter to Shareholders Regarding the Dunlop Legal Claim
23/02/2012(Cover)and Media Coverage
16/02/2012Secutor Capital Management Reports on VMS Ventures Inc.
08/02/2012(Sails)Trenching Program Returns Assays of Up To 61.73 g/t Gold at ...
31/01/2012Copper Continues to Confound the Commodities Crowd
30/01/2012Dundee Rates VMS a BUY
24/01/2012Mentioned in The Gold Report, January 18, 2012
18/01/2012Provides Exploration Target Update at the Reed Copper Deposi...
20/12/2011Merry Christmas from the North Shore Mining Group of Compani...
19/12/2011Reed Mine Decision Made/New Geophysical Targets at Reed Copp...
25/10/2011COO,Neil Richardson, is interviewed
20/09/2011ENGAGES HUASHAN CAPITAL TO PROVIDE ADVISORY SERVICES IN ASIA
18/08/2011(Copper Project)Intersects 1.61 Metres Grading 2.13 G/T Gold in Hole CP-11-0...
09/08/2011REPORTS 5.94% COPPER OVER 2.23 METRES IN DRILL HOLE RLE007 F...
07/07/2011Reports HudBay Minerals Completes Exploration Expenditures f...
19/05/2011Commodity Bulls speak; NAN close to trading
17/05/20117=2E44% Copper Over 7=2E18 Metres in Hole RLE006 Located 1=2...
09/05/2011s Progress on its 2011 Exploration Programs in the Flin Flon...
27/04/2011(Copper Project)Discovers Massive Sulphide Horizon With Zinc-Silver-Gold Min...
20/04/2011(Cover)Reports on Two Additional Holes =?ISO-8859-1?Q?=20at=20Its=2...
07/04/2011Al O'Grady interviews Rick Mark
17/03/2011Reports 50=2E08 Metres of 6=2E85% Copp =?ISO-8859-1?Q?er=20i...
23/02/2011(Reed Lake)Reports 37=2E10 Metres of 5=2E60% Copper from In-Fill Hole R...
18/02/2011HudBay Minerals Acquires 6,667,000 Shares of VMS Ventures In...
14/05/2009Discusses exploration strategy and project plans through 201...
28/02/2009(Video) NEW INTERVIEW WITH CEO CLIPS
12/06/2008Proposes to Spin Off Nickel Assets
09/04/2008Discovery Zone Page Launched on VMS Website
27/02/2008Don Coxe's, "The Music of the Metal Markets"
19/02/2008-Holes RD 08-25, RD 08-26 and RD 08-30-30 Intersect Near Sol...
08/02/2008Stock Market Volatility
14/12/2007Additional Information about a VMS Opportunity
10/11/2007(Audio) Interview with President John Roozendaal
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (VMS.V)FRANKFURT (R4E.F)
0,135+3.85%0,018-21.74%
TSX-V
CA$ 0,135
24/04 16:58 0,010
3,85%
Cours préc. Ouverture
0,130 0,130
Bas haut
0,130 0,135
Année b/h Var. YTD
0,080 -  0,135 35,00%
52 sem. b/h var. 52 sem.
0,080 -  0,165 -15,62%
Volume var. 1 mois
82 500 50,00%
24hGold TrendPower© : 34
Produit
Développe
Recherche Copper - Gold - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202422,73%
2023-26,67%0,190,09
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,99 US$+0,64%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-1,82%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,45 CA$+2,94%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,47 CA$+0,98%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,83 CA$+3,39%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,55 US$-1,06%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :