Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

First Majestic Silver Corp.

Publié le 14 octobre 2015

First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3'15

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   G Mexico | Zinc |

First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3'15

VANCOUVER, BRITISH COLUMBIA--(Marketwired - Oct 14, 2015) - First Majestic Silver Corp. ("First Majestic" or the "Company") (FR.TO)(AG)(FMV.F)(AG) is pleased to announce that total production at its five operating silver mines in Mexico for the third quarter ended September 30, 2015 reached 3,558,035 equivalent ounces of silver, relatively unchanged compared to the same quarter in 2014.

"Our third quarter results saw overall improvements in silver recoveries and throughput rates primarily due to the recent expansion of the La Encantada plant to 3,000 tonnes per day. At San Martin and La Guitarra, we continue to encounter high grades of silver and gold which resulted in record quarterly production at both operations," stated Keith Neumeyer, President & CEO of First Majestic. "However, due to the continued weakness in metal prices, we are modifying our operations in order to ensure free cash flow is generated across the entire business. These changes include additional layoffs and mine plan revisions. Once these changes are fully implemented, and with the addition of the newly acquired Santa Elena Mine, the Company is expected to benefit from improved operating margins, increased cash flows and greater economies of scale."

Consolidated Production Results:

Q3 Q3 Y/Y Q2 Q/Q
2015 2014 Change 2015 Change
Ore processed/tonnes milled 675,032 621,196 9% 662,637 2%
Total production - ounces of silver equivalent 3,558,035 3,523,536 1% 3,802,558 -6%
Total silver ounces produced 2,593,309 2,680,439 -3% 2,716,503 -5%
Silver grade (g/t) 167 196 -15% 182 -8%
Silver recovery (%) 72 68 5% 70 2%
Pounds of lead produced 8,743,453 9,703,792 -10% 11,078,235 -21%
Pounds of zinc produced 3,122,498 3,222,877 -3% 3,824,737 -18%
Gold ounces produced 4,434 2,781 59% 3,528 26%

*Certain amounts shown in this news release may not add exactly to the total amount due to rounding differences.

Quarterly Operational Review:

The total ore processed during the quarter at the Company's five operating silver mines: La Encantada, La Parrilla, Del Toro, San Martin and La Guitarra, amounted to 675,032 tonnes, representing a 9% increase compared to the third quarter of the prior year and a 2% increase from the previous quarter. The increase in tonnes compared to the prior quarter was primarily due to a 33% increase in throughput rates at La Encantada following the completion of the plant expansion to 3,000 tpd, however, offset by a 23% decrease in throughput rates at Del Toro which was affected by ventilation issues during the quarter.

Average silver grades in the quarter for the five mines decreased to 167 g/t compared to 196 g/t in the third quarter of 2014 and decreased 8% compared with the previous quarter. Combined silver recoveries averaged 72% during the quarter, up from 68% in the same quarter of the prior year and above the second quarter average of 70%.

The Company's underground development in the third quarter consisted of 8,231 metres, a 20% decrease compared to 10,259 metres completed in the previous quarter.

During the quarter, 13 diamond drill rigs were operating at the Company's five operations. The Company completed 8,586 metres of diamond drilling in the quarter compared to 16,268 metres in the prior quarter, representing a 47% decrease primarily due to a cost reduction strategy in response to the low and volatile silver price environment.

The table below represents the operating parameters at each of the Company's five producing silver mines.

Mine by Mine Quarterly Production Table:

Mine Ore Processed Tonnes per Day Silver Grade (g/t) Silver Recovery % Silver Oz Produced Gold Oz Produced Pounds of Lead Pounds of Zinc Equivalent Silver Ounces
La Encantada 252,377 2,743 142 58% 668,124 25 - - 669,994
La Parrilla 166,815 1,813 141 78% 585,414 331 2,580,988 3,122,498 919,167
Del Toro 124,093 1,349 148 72% 424,413 55 6,162,466 - 750,458
San Martin 87,883 955 282 81% 642,473 1,648 - - 766,733
La Guitarra 43,864 477 232 83% 272,885 2,375 - - 451,684
Total 675,032 7,337 167 72% 2,593,309 4,434 8,743,453 3,122,498 3,558,035

The following prices were used in the calculation of silver equivalent ounces: Silver: $14.91 per ounce; Gold: $1,123 per ounce; Lead: $0.78 per pound; Zinc $0.83 per pound.

At the La Encantada Silver Mine:

  • For the quarter, total silver production was 668,124 silver ounces representing an 11% increase over the previous quarter. The increase was primarily due to a 33% increase in processed ore and 4% higher recoveries, however, offset by a 20% decrease in grade.

  • In an effort to reduce energy costs, the Company signed a 2-year contract with a gas supplier to convert the entire operation's power generation from diesel to natural gas, at no cost to First Majestic. The Company estimates La Encantada will realize a reduction in energy costs of approximately 20% as a result of the fuel conversion. The conversion is expected to be fully operational by the end of November.

  • The Company is also reviewing the possibility of implementing the same natural gas power generation at the recently acquired Santa Elena Mine.

  • A total of 1,290 metres of underground development were completed in the third quarter compared to 2,021 metres of development in the previous quarter.

  • Four drill rigs consisting of two underground and two on surface were active at La Encantada during the quarter. A total of 4,680 metres of exploration drilling was completed in the third quarter compared to 5,309 metres of drilling in the previous quarter. The Company anticipates the release of an updated NI 43-101 Technical Report by the end of the November.

At the La Parrilla Silver Mine:

  • During the quarter, the flotation circuit processed 92,710 tonnes with an average silver grade of 156 g/t and an 87% recovery while the cyanidation circuit processed 74,105 tonnes with an average silver grade of 121 g/t and a 62% recovery.

  • The lead circuit processed an average lead grade of 1.6% with recoveries of 80% for total lead production of 2,580,988 lbs, representing a 26% increase compared to the previous quarter. The increase in lead production was primarily attributed to 7% higher recoveries and 14% increase in grade.

  • The zinc circuit processed an average zinc grade of 2.4% with recoveries of 65% for total zinc production of 3,122,498 lbs, representing an 18% decrease compared to the previous quarter. The decrease in zinc production was primarily due to 10% lower grades and 12% lower recoveries.

  • As a result of the current low silver price, cut off grades for the oxide circuit need to be increased in order to produce profitable ounces. This higher cut off will result in lower throughputs of approximately 500 tpd in the fourth quarter. The Company has also signed an ore purchase program with a local small producer to supply high grade oxide ore to La Parrilla. Furthermore, the Company is in the planning stage to increase the La Parrilla sulphide circuit by approximately 20% to 1,300 tpd beginning in 2016.

  • Underground development completed in the quarter totaled 1,701 metres compared with 1,901 metres developed in the previous quarter.

  • Two underground drill rigs were active within the La Parrilla property during the quarter. A total of 1,367 metres were drilled in the third quarter compared to 4,356 metres in the previous quarter.

At the Del Toro Silver Mine:

  • For the quarter, Del Toro produced a total of 750,458 silver equivalent ounces representing a 35% decrease compared to the previous quarter. The decrease in total production was primarily due to a 23% decrease in throughput due to ventilation issues and a 17% decrease in silver grades.

  • Lead grades and recoveries averaged 3.7% and 62%, respectively, producing a total of 6,162,466 pounds of lead, representing a 32% decrease compared to the previous quarter. The decrease was primarily related to lower throughput rates.

  • Underground development completed in the quarter totaled 1,091 metres compared with 1,813 metres developed in the previous quarter.

  • Three drill rigs consisting of two underground and one on surface were active in the third quarter at Del Toro. Total exploration metres drilled in the quarter amounted to 1,644 metres compared to 5,200 metres drilled in the previous quarter.

At the San Martin Silver Mine:

  • During the quarter, San Martin produced 642,473 silver ounces and 1,648 ounces of gold for a total quarterly production of 766,733 silver equivalent ounces, representing a new quarterly production record. Compared to the previous quarter, total production increased 10% due to a 5% increase in silver grades and a 4% increase in silver recoveries.

  • Underground development completed in the third quarter totaled 1,974 metres compared with 2,208 metres of development in the previous quarter.

  • Two underground drill rigs were active within the San Martin property during the quarter. Total metres drilled in the third quarter amounted to 482 metres compared to 833 metres of drilling in the previous quarter.

At the La Guitarra Silver Mine:

  • During the quarter, La Guitarra produced 272,885 silver ounces and 2,375 gold ounces for a total quarterly production of 451,684 silver equivalent ounces representing the highest quarterly production since the Company took over operations in 2012. The increase in total production is primarily due to a 14% increase in silver grades and a 29% increase in gold grades from El Coloso compared to the prior quarter.

  • At the end of the quarter, the underground drift to access the Nazareno area had advanced a total of 333 metres. The first known structure within the Nazareno area, called Comales, is approximately 157 metres away from the current development and is expected to be accessed and explored by the end of the fourth quarter.

  • A total of 2,175 metres of development were completed in the third quarter compared to 2,316 metres of development in the previous quarter.

  • Two underground drill rigs were active in the third quarter within the La Guitarra property. Total metres drilled in the quarter amounted to 414 metres compared to 569 metres drilled in the previous quarter.

Corporate Update:

As of October 1, 2015, First Majestic assumed full operations at the Santa Elena Mine in Sonora, Mexico, as a result of the acquisition of SilverCrest Mines. The Santa Elena operation is now the Company's sixth operating mine and is expected to increase annual silver equivalent production by over 25%. However, with the continued weakness in metal prices, the Company is reviewing all operating mine plans which may result in reduced production targets at some of the operations in order to improve profitability. Management believes leaving higher cost ounces in the ground is a prudent choice for its shareholders until silver prices improve. The Company is expected to provide further details with the release of the unaudited third quarter financial results on November 16, 2015.

First Majestic is a mining company focused on silver production in Mexico and is aggressively pursuing the development of its existing mineral property assets and the pursuit through acquisition of additional mineral assets which contribute to the Company achieving its corporate growth objectives.

FIRST MAJESTIC SILVER CORP.

Keith Neumeyer, President & CEO

Cautionary Note Regarding Forward Looking Statements

This press release contains "forward-looking statements", within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities legislation, concerning the business, operations and financial performance and condition of First Majestic Silver Corp. Forward-looking statements include, but are not limited to, statements with respect to the future price of silver and other metals, the estimation of mineral reserves and resources, the realization of mineral reserve estimates, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, hedging practices, currency exchange rate fluctuations, requirements for additional capital, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, timing and possible outcome of pending litigation, title disputes or claims and limitations on insurance coverage. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of First Majestic Silver Corp. to be materially different from those expressed or implied by such forward-looking statements, including but not limited to: risks related to the integration of acquisitions; risks related to international operations; risks related to joint venture operations; actual results of current exploration activities; actual results of current reclamation activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of metals; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing or in the completion of development or construction activities, as well as those factors discussed in the section entitled "Description of the Business - Risk Factors" in First Majestic Silver Corp.'s Annual Information Form for the year ended December 31, 2014, available on www.sedar.com, and Form 40-F on file with the United States Securities and Exchange Commission in Washington, D.C.

Although First Majestic Silver Corp. has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. First Majestic Silver Corp. does not undertake to update any forward-looking statements that are incorporated by reference herein, except in accordance with applicable securities laws.

Lire la suite de l'article sur finance.yahoo.com

First Majestic Silver Corp.

PRODUCTEUR
CODE : FR.TO
ISIN : CA32076R1029
CUSIP : 32076R1029
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

First Majestic est une société de production minière d'argent basée au Canada.

First Majestic est productrice d'argent, d'or, de plomb et de zinc au Mexique, et détient divers projets d'exploration au Canada et au Mexique.

Ses principaux projets en production sont LA PARRILLA SILVER MINE, LA ENCANTADA (FIRST MAJESTIC SILVER), SAN MARTIN et LA ENCANTADA SILVER MINE au Mexique et ses principaux projets en exploration sont REAL DE CATORCE, DEL TORO et CUITABOCA au Mexique et PITT ISLAND, PINCOURT, DOMPIERRE et DESJARDINS au Canada.

First Majestic est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 1,6 milliards CA$ (1,1 milliards US$, 1,1 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 02 novembre 2001 à 0,01 CA$, et son plus haut niveau récent le 22 décembre 2017 à 9,99 CA$.

First Majestic possède 164 340 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de First Majestic Silver Corp.
13/08/2018First Majestic shares hammered after reporting $40 million-l...
21/01/2009Follow up N° 1
Rapports annuels de First Majestic Silver Corp.
Files Form 40-F Annual Report
2008 Annual report
2007 Annual Report
Financements de First Majestic Silver Corp.
20/08/2009Tranche of Non-Brokered Private Placement Closes
12/08/2009Non-Brokered Private Placement and Debt Settlement
Nominations de First Majestic Silver Corp.
04/04/2014Appoints VP of Technical Services
24/12/2013Announces Retirement of Robert Young from Board of Directors
05/01/2012Appoints Chief Information Officer
30/12/2011Names Douglas Penrose as Chairman
Rapports Financiers de First Majestic Silver Corp.
25/02/2016First Majestic Announces Financial Results for Q4 and Year E...
03/02/2014Fourth Quarter and Year End Financial Results to be Released...
12/11/2013Reports Third Quarter Financial Results
31/10/2013Third Quarter Financial Results to be Released on November 1...
15/07/2013Second Quarter Financial Results to be Released on August 13...
15/05/2013Reports First Quarter Earnings of $26.5 million on Revenues ...
07/05/2013Quarter Financial Results to be Released on May 15th
14/11/2012Earns $24.9M in Third Quarter; Revenues of $63.6M, an Increa...
07/11/2012Third Quarter Financial Results to Be Released on November 1...
07/08/2012Second Quarter Financial Results to be Released on August 14...
10/05/2012Reports Strong Earnings of $26.4M in Q1 2012, Up 10% Compare...
04/05/2012First Quarter Financial Results to Be Released on May 10th
05/03/2012Announces New Record Earnings & Cash Flows for 2011
24/02/2012to Announce Fourth Quarter and Year End 2011 Financial Resul...
26/10/2011Third Quarter Financial Results to be Released on November 9...
03/08/2011Second Quarter Financial Results to be Released on August 11...
17/05/2011Earns a Record $23.9 million in First Quarter of 2011
11/05/2011Quarter Financial Results to Be Released on May 16, 2011-Con...
01/03/20112010 Audited Financial Results show Record Earnings & Cash F...
23/03/2010Year End & Fourth Quarter Financial Results
12/11/2009Record Third Quarter Financial Results
14/08/2009Second Quarter Financial Results
15/08/2008Second Quarter Financial Results
16/05/2008CORRECTION- MISSING TEXT - Record First Quarter Financial Re...
18/04/20082007 Year End Financial Results
Projets de First Majestic Silver Corp.
14/01/2014becomes a Senior Silver Producer; Produces 10.64M Ounces of ...
04/12/2013(Del Toro)Dor=E9 Production Commences at the Del Toro SilverMine
09/04/2013(Del Toro)Del Toro Silver Mine Flotation Circuit Deemed Commercial
09/01/2013Achieved Record Production of 2.6M Silver Eqv. Ounces (2.3M ...
27/09/2012Mine Videos - Just Released
24/01/2012(Del Toro)-La Parrilla Mill Expansion to 2,000 tpd Completed: Del Toro...
12/01/2012Achieved Record Production of 1.96M Silver Ounces (2.1M Silv...
13/10/2011(La Parrilla Silver Mine)Announces Q3 Production Results and Commences Commercial Pro...
22/09/2011(La Parrilla Silver Mine)First Stage of Expansion at the La Parrilla Processing Plant...
13/09/2011(La Parrilla Silver Mine)Mill Capacity at La Parrilla to Reach 2,000 tpd Following Po...
01/03/2011(San Martin)2010 Audited Financial Results show Record Earnings & Cash F...
08/04/2010(La Encantada (first Majestic Silver))La Encantada Achieves Commercial Production
26/11/2009(La Encantada (first Majestic Silver))La Encantada Opening Ceremony & Production of First Silver P...
13/10/2009(La Encantada (first Majestic Silver))La Encantada Expansion Nearing Completion
06/10/2009Third Quarter Production Results
17/02/2009(La Parrilla Silver Mine)La Parrilla Silver Mine Updates NI 43-101 Resource
20/01/2009(San Martin)San Martin Updated NI 43-101 Report Increasing Reserves/Reso...
17/07/2008(San Juan Silver Mine)Major Intersection At San Juan Silver Mine Drill Hole Inters...
29/04/20081st Quarter Production Results
23/04/2008(San Martin Silver Mine)Commissioning of Flotation Circuit at the San Martin Silver ...
01/04/2008(La Parrilla Silver Mine)Discovery of New High Grade Ore Shoot on the Vacas Vein at t...
08/01/2008(La Encantada Silver Mine)La Encantada Silver Mine Update and New NI 43-101 Resource
02/07/2007(La Parrilla Silver Mine)La Parilla Technical Report
Communiqués de Presse de First Majestic Silver Corp.
27/07/2016Coverage Initiated on Silver Stocks First Majestic Silver, S...
25/07/2016Second Quarter Financial Results to be Released on August 10
20/07/2016Here’s Why These Five Stocks Are on the Move on Wednesday
12/07/2016First Majestic Produces 4.7 Million Silver Eqv. Ounces in Se...
29/01/2016Silver Could Spike $10 In A Day In Global Collapse Scenario
28/11/2015How Top Traders Are Shifting Western Asst High Incm Opprtnty...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
14/10/2015First Majestic Produces 3.6 Million Silver Eqv. Ounces in Q3...
13/10/2015A Silver Lining in October 2015?
02/10/2015First Majestic Completes Acquisition of Silvercrest
01/10/2015First Majestic Completes Acquisition of SilverCrest
25/09/2015First Majestic and SilverCrest Announce Shareholder Approval...
15/09/2015Leading Independent Advisory Firms ISS and Glass Lewis Recom...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
27/08/2015First Majestic and SilverCrest Announce Receipt of Interim O...
11/08/2015First Majestic reports 2Q loss
11/08/2015First Majestic Reports Second Quarter Financial Results and ...
10/08/2015Why Earnings Season Could Be Great for First Majestic Silver...
30/07/2015Second Quarter Financial Results to be Released on August 11
30/07/2015First Majestic Silver: Second Quarter Financial Results to B...
27/07/2015First Majestic Announces Friendly Acquisition of Silvercrest...
27/07/2015announces friendly acquisition of Silvercrest Mines
09/07/2015First Majestic Produces 3.8 Million Silver Eqv. Ounces in Q2...
23/04/2015NYSE stocks posting largest percentage decreases
23/04/2015First Quarter Financial Results to be Released on May 7
23/04/2015First Majestic Silver Corp. First Quarter Financial Results ...
22/04/2015First Majestic Silver Corp. Announces Closing of C$30 Millio...
20/04/2015NYSE stocks posting largest percentage decreases
13/04/2015NYSE stocks posting largest percentage decreases
13/04/2015First Majestic Produces 3.9 Million Silver Eqv. Ounces in Q1...
09/04/2015NYSE stocks posting largest percentage decreases
06/04/2015First Majestic Silver Corp. Announces C$30 Million Bought De...
06/04/2015Announces C$30 Million Bought Deal Financing
06/04/2015First Majestic Announces Promotion of Martin Palacios to Chi...
06/04/2015First Majestic Announces Acquisition of Shares of First Mini...
01/04/2015NYSE stocks posting largest percentage increases
01/04/2015First Majestic Updates Mineral Reserve and Resource Estimate...
31/03/2015Announces New La Guitarra NI 43-101 Technical Report
31/03/2015First Majestic Announces New La Guitarra NI 43-101 Technical...
11/03/2015First Majestic Renews Share Repurchase Program
11/03/2015First Majestic Renews Share Repurchase Program
22/08/2014to List on the Mexican Stock Exchange
24/10/2013Appeal Against First Majestic Dismissed
30/09/2013Applies to Dismiss Appeal of Positive Judgment for US$93.84 ...
10/07/2013Produces a New Quarterly Record of 3.27 Million Silver Eqv. ...
02/07/2013Payment of CDN$14.85 million Received in Court Litigation
02/05/2013Announces Completion of La Guitarra's Expansion to 500 tpd
26/04/2013Receives Positive Judgment for US$89.6 in Court Litigation
17/04/2013Earns Socially Responsible Business Distinction Award for Fi...
15/04/2013Produces Another Quarterly Record 2.73 Million Silver Eqv. O...
11/03/2013Announces Share Repurchase Program
19/02/2013Elects Not to Exercise Right to Match Coeur's Offer for Orko
14/02/2013Considering Superior Offer from Coeur to Acquire Orko Silver
25/01/2013(Del Toro)Production Commences at the Del Toro Silver Mine
10/10/2012Produces a Record 2.44 Million Silver Equivalent Ounces in T...
26/09/2012New Look! New Features! First Majestic Bullion Store
06/09/2012Keith Neumeyer's Interview With Minesite.com
27/08/2012Announces Appointment of VP of Exploration
21/08/2012(Del Toro)Updated Del Toro NI 43-101 Technical Report & Final Permit R...
16/08/2012Recognized as a Leader in Corporate Social Responsibility
17/07/2012Produces 2.1 Million Silver Equivalent Ounces in Second Quar...
03/07/2012Completes Acquisition of Silvermex Resources
26/06/2012mex Securityholders Approve Plan of Arrangement With First M...
22/05/2012(Del Toro)Del Toro NI 43-101 Technical Report & Pre-Feasibility Study
16/04/2012First Quarter Production Results and Full Commencement of Co...
03/04/2012Announces Friendly Acquisition of Silvermex Resources
30/03/2012Files Form 40-F Annual Report
07/10/2011Third Quarter Production Results to Be Released on October 1...
11/08/2011Record Earnings of $30.6 million in Second Quarter
07/07/2011Another Record Quarter of Silver Production
08/04/2011Silver Production Up 25%; Reaches 97% Pure Silver and Mainta...
16/08/2010Record Earnings and Cash Flows. Purest Silver Producer with ...
22/04/20102nd Year Running for Mexican Distinction as a "Socially Resp...
12/04/2010Production Increases by 30% to 1,619,403 Equivalent Ounces S...
12/01/2010Production Increases by 18%, Reaches New Record
13/11/2009Completes Acquisition of Normabec Mining Resources; Normabec...
14/09/2009to Acquire Normabec Mining Resources
13/08/2009Joins OTCQX
26/06/2009offering for purchase 0.999 fine 1oz. silver rounds, and 5oz...
05/03/2009Closing of $21.2 Million Offering
19/11/2008Operations Update
11/09/2008Many Positive Developments Underway
15/07/20082nd Quarter Production Shows Continued Ramp-up
25/03/2008Closing of $45,475,000 Offering
17/01/2008Another Record Quarter of Silver Production
14/12/2007TSX Conditional Approval
05/12/2007Update on the Chalchihuites Group of Properties
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (FR.TO)OTHER OTC (FRMSF)
9,47+1.72%
TORONTO
CA$ 9,47
25/04 17:00 0,160
1,72%
Cours préc. Ouverture
9,31 9,30
Bas haut
9,14 9,57
Année b/h Var. YTD
5,74 -  10,95 18,67%
52 sem. b/h var. 52 sem.
5,74 -  10,95 -0,941%
Volume var. 1 mois
899 785 32,63%
24hGold TrendPower© : -17
Produit Lead - Silver - Zinc
Développe
Recherche Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 27/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202424,77%
2023-32,71%9,9510,07
2022-23,32%9,9610,00
2021-13,88%30,7512,74
20209,63%9,8610,08
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :