Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Frontline Gold Corp.

Publié le 07 avril 2016

Frontline Acquires Fully Permitted Keban and Kambertepe Tailing Projects

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Junior | Mali | Zinc |

Frontline Acquires Fully Permitted Keban and Kambertepe Tailing Projects

Toronto, Ontario - (April 7, 2016)
- Frontline Gold Corporation (TSX-V:FGC) ('Frontline' or the 'Corporation') is pleased to announce that on March 29th, 2016, through its Tender Process Agent, AHSA Muh. Mut. ins Mad San Tic Ltd Sti ('AHSA'), the Corporation was awarded and purchased both the fully permitted Keban and Kambertepe Tailings Projects for the processing of the tailings, which are both located in the Elazig Province of Turkey in the Central East Anatolia region.

The acquisition includes the following:

  1. The Keban Tailings Project, approximately 45 km northwest from the city of Elazig, via paved highway, which is fully permitted, which includes the exclusive rights to process a minimum 114,000 tonnes of mineralized milled tailings stored in two areas within the property boundary (see attachment 'Keban Tailings'). The regional government of Elazig retains the responsibility for remediation of this site.

    An independent comprehensive report, including a metallurgical assessment of the mineralized tailings, was completed by Dr. Sasmaz, Phd, Geologist, Firat University, dated June 2015. Per the report, 40 assay samples were collected at Keban and assays completed, for 34 element ICP - MS analysis, by Bureau Vertias Mineral Laboratories in Vancouver, Canada on behalf of the Firat University in Elazig. According to the Bureau Vertias assayed analysis, the Firat University report of June 2015 noted that all the assays averaged Au 1.78 g/t, Ag 96 g/t, Pb 2.94%/t and Zn 0.63%/t.

    A location map of the Keban tailings areas, location of the assays taken and the assays results are attached.

  1. The Kambertepe Tailings Project, approximately 100 km east from the city of Elazig, via paved highway, includes the exclusive rights to process approximately up to 6,000 tonnes of mineralized tailings, with the following average reported grades per tonne of tailings: 2.1% Copper, 21 g/t Silver, 1.9% Zinc, 0.5% Titanium and over 50% Iron, as noted from a Firat University report on the project dated March 15th, 2016.

    Kambertepe Tailings excavation and transport to begin in the next 15 days and scheduled completion is expected approximately 2-week following the start of operations.

Commentary

Mr. Walter Henry, President and CEO of Frontline commented, 'This is a marquee transaction for Frontline. We feel very fortunate to have secured these two opportunities. With both projects being fully permitted for exploitation and all the assay work done by both Acme, Bureau Vertias AGAT labs in Canada, Frontline is an excellent position to transition to a revenue generating entity within the next 60 days. Additionally, because of the transportation agreement that we signed (details provided below) and the way we are able to structure the payment terms of the tailing projects and the processing agreements, we have created an opportunity to generate revenue in the very near term in light of the challenging environment for raising exploration funds.'

'The revenue from the tailings projects will enable us to 1) organically advance our other projects in Turkey, Mali and Red Lake, 2) allow Frontline to capitalize on other strategic acquisitions, and 4) seek opportunities and regulatory approvals to restructure Frontline's capital structure.'

Acquisition Terms

The terms of the tender agreements require Frontline to pay the following for each tailing project:

  1. Keban - the payment of 2,550,000 Turkish Lira, approximately C$1,200,000, payable over 12-months starting 30 days following start of operations. Frontline will have 24 months to complete the exploitation of the Keban tailings.
  2. Kambertepe - the payment of 80,000 Turkish Lira, approximately C$37,000, payable over the next 90 days.
Historical Mining conducted at Keban Tailings Project

The Keban tailings Project is the site of an old lead/zinc/silver mine where between 1940-1983 nearly 800,000 tonnes of ore was mined and Pb/Zn/Ag recovered by floatation with tailings of possibly 200,000-300,000 tonnes being dumped onto the banks of the Firat (Euphrates) River. Frontline's sole focus will be the processing of only the land based tailings.

About The Keban Property

The Keban Property is approximately 45 km northwest from centre of the Elazig city via paved highway. The Keban tailings have been stored in 2 different locations (KA and KY) (see attachment) within the Keban property boundary. The total area of tailings is approximately 5,660 square metres. According to drilling of the tailings area completed as per the independent Firat University report on the Keban tailings, the average depth of the KY area calculated from 8 drill holes is 6.5 metres and the average depth of the KA area calculated from 3 drill holes is 1.6 metres.

Keban Tailings Assays

The following is a summary of the assayed results for gold, silver, lead, copper and zinc. Note that out of the 40 assayed samples, 12 assays show Au g/t over 2.5 g/t, with the highest Au g/t assay over 3.7 g/t. In addition to the significant gold assays, there were significant silver and lead assays noted. See attachment - Keban Tailiings to get the coordinates of each assay taken.

Assay ID Au g/t Ag g/t Pb %/t Zn %/t
KY-1 1.834 73 1.70% 0.31%
KY-2 1.411 48 1.17% 1.78%
KY-3 1.795 180 5.26% 0.12%
KY-4 3.221 152 3.64% 0.50%
KY-5 2.659 300 7.04% 0.24%
KY-6 3.244 101 2.49% 0.43%
KY-7 3.754 300 8.79% 0.16%
KY-8 0.924 71 1.64% 0.37%
KY-9 1.974 93 2.01% 0.77%
KY-10 0.456 55 1.46% 0.88%
KY-11 0.631 42 0.92% 0.45%
KY-12 0.676 55 1.41% 5.38%
KY-13 1.158 108 2.79% 0.00%
KY-14 0.193 10 0.26% 1.49%
KY-15 1.595 94 2.29% 0.55%
KY-16 1.341 300 10.00% 0.53%
KY-17 0.444 28 0.65% 0.18%
KY-18 3.206 107 2.46% 0.19%
KY-19 1.295 216 4.94% 4.39%
KY-20 2.659 251 6.95% 0.81%
KY-21 1.071 154 4.68% 1.29%
KA-1 1.121 62 1.40% 0.93%
KA-2 1.955 81 1.54% 0.15%
KA-3 1.504 67 1.33% 0.39%
KA-4 1.742 47 1.16% 0.14%
KA-5 2.658 171 5.25% 0.59%
KA-6 2.477 139 3.46% 0.08%
KA-7 2.704 169 3.81% 0.04%
KA-8 3.474 153 3.32% 0.05%
KA-9 0.458 22 0.49% 0.07%
KA-10 1.952 102 2.27% 0.25%
KA-11 2.041 110 2.41% 0.22%
KA-12 2.717 110 2.15% 0.08%
KA-13 1.29 56 1.36% 0.43%
KA-14 2.556 110 2.50% 0.25%
KA-15 2.59 88 1.61% 0.14%
KA-16 0.297 14 0.30% 0.13%
KA-17 1.117 46 0.97% 0.14%
KA-18 0.815 67 1.71% 0.25%
KA-19 2.011 100 2.14% 0.14%

According to the Bureau Vertias assayed analysis, the Firat University report of June 2015 noted that all the assays averaged Au 1.78 g/t, Ag 96 g/t, Pb 2.94%/t and Zn 0.63%/t.

In support of its due diligence, Frontline independently took and submitted 12 samples to AGAT Labs, for assay; the results which are as follows:

Au g/t Ag g/t Pb %/t Zn %/t
16-0106 AFS 2016-01 No 1 2.83 129.0 2.52% 0.39%
16-0107 AFS 2016-01 No 2 1.90 78.5 2.00% 0.38%
16-0107 AFS 2016-01 No 3 2.97 142.0 4.06% 0.27%
16-0107 AFS 2016-01 No 4 2.90 110.0 2.43% 0.26%
16-0107 AFS 2016-01 No 5 3.24 150.0 3.53% 0.37%
16-0107 AFS 2016-01 No 6 1.54 55.5 1.31% 0.27%
16-0107 AFS 2016-01 No 7 2.10 64.0 1.37% 0.16%
16-0107 AFS 2016-01 No 8 1.87 77.4 2.64% 1.24%
16-0107 AFS 2016-01 No 9 2.59 97.7 2.61% 0.42%
16-0107 AFS 2016-01 No 10 2.49 90.1 2.28% 0.35%
16-0107 AFS 2016-01 No 11 0.57 41.0 0.94% 0.67%
16-0107 AFS 2016-01 No 12 0.84 59.5 1.44% 2.93%
Based on the reported AGAT assays in above table the 12 assays averaged Au 2.15 g/t, Ag 91.22 g/t, Pb 2.26%/t and Zn 0.64%/t.

Keban Tailing Processing

Frontline is in final negotiations with a processing company which is proposing toll processing at its existing plant approximately 80km away with tank leaching in cyanide so only Au and Ag would be recovered and Pb to report to waste (it is possible this could be recovered by floatation/gravity in another circuit). The processing cost is US$10 per tonne.

Keban Tailing Production Timeline

The tailings production schedule is approximately 18 months with average daily tailings excavation ranging from 250 to 400 tonnes per day. The excavating and transportation costs per tonne is US$17.75 per tonne.

Frontline has entered into an excavating and transportation agreement with AHSA who was the Corporation's Tender Agent during the tender process as noted above.

Frontline has not completed the work required to verify the historical mining estimates noted above and is not treating these historical estimates as being compliant with current standards under NI 43-101 and as such these historical estimates should not be relied upon. Caution should be used when evaluating these resources as they were calculated prior to NI 43-101 existing and a qualified person has not done work to classify the historical estimate as a current mineral resource.

Frontline is actively searching for investor/partner(s) in order to expedite the full tailings recovery at both the Keban and Kambertepe tailings projects. To contact Frontline, please call Walter Henry at 416-414-5825 or visit the company's website.

The technical information herein was reviewed by Mr. Greg Isenor, P. Geo., who acts as Frontline's Qualified Person as defined by National Instrument 43-101.

About Frontline Gold Corporation

Frontline is a Canadian junior mineral exploration company with an experienced discovery team and a proven record of accomplishment. The Company's principal properties include the Menderes gold project in the Izmir province of Western Turkey, the Flint Lake and Sandhill Lake gold projects which are adjacent to Chalice Gold's Cameron Lake Gold Deposit in Ontario and the Niaouleni gold project in southern Mali in the heart of West Africa's prolific gold belt. Other Canadian exploration properties include its Red Lake (gold) property groups which include the Whitehorse Island Mining Patents.

For further information, please visit the Company's website at www.frontlinegold.com to view the most recent corporate presentation.

This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company's actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company's control. These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

'Walter Henry'
Walter Henry, President & CEOFRONTLINE GOLD CORP.
Contact: Walter Henry
Telephone: (416) 362-9100
Fax: (416) 362-9300
Email:
Website: www.frontlinegold.com

Frontline Gold Corp. (TSX-V: FGC)
1 Toronto Street, Suite 201
Toronto, Ontario M5C 2V6


NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.

Neither TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Lire la suite de l'article sur www.publicnow.com
Données et statistiques pour les pays mentionnés : Mali | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Mali | Tous

Frontline Gold Corp.

EXPLORATEUR
CODE : FGC.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Frontline Gold est une société d’exploration minière d'or basée au Canada.

Frontline Gold détient divers projets d'exploration au Mali et en Turquie.

Ses principaux projets en exploration sont JUBILEE au Canada, NIAOULENI au Mali et MENDERES en Turquie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Frontline Gold Corp.
30/09/2013Announces Closing of Private Placement
30/05/2013Extends Private Placement
17/04/2013Extends Private Placement
22/02/2013Announces a $500,000 Non-Brokered Private Placement
08/06/2011Announces Closing of First Tranche of Private Placement
04/05/2011Announces Private Placement
Attributions d'options de Frontline Gold Corp.
19/03/2013Announces Stock Option Grant
25/10/2011Announces Stock Option Grant
Nominations de Frontline Gold Corp.
26/08/2011Announces Appointment of Tom Hussey as Board Member
Projets de Frontline Gold Corp.
06/05/2016Frontline announces acquisition of Rainy River Properties St...
02/04/2013(Menderes)Completes 100% Interest in Menderes Turkey Asset
30/01/2013(Menderes)Amends the Terms of Its Option Agreement Regarding the Mende...
22/05/2012Expands Poly Project in the Stewart Gold Camp, NW BC
19/04/2012highlights planned 2012 Exploration Programs at its Poly and...
22/02/2012(Menderes)Commences Diamond Drill Program on the Menderes Gold Project...
12/01/2012Provides an Update on the 2011 Exploration Programs at the P...
04/01/2012(Menderes)Announces Drill Contract for Menderes Gold Project, Located ...
25/10/2011Provides an Update on the 2011 Exploration Program on the Po...
13/10/2011(Niaouleni)intersects 1.76 g/t Au over 8.5 metres and extends the R1 go...
22/09/2011announces the commencement of the 2011 diamond drill program...
24/08/2011Announces Drill Contract for the Poly Project in the Stewart...
30/06/2011Reports the Initiation of the 2011 Exploration Programs on t...
29/06/2011(Menderes)Completes Soil Geochemistry Analysis and Commences IP Survey...
30/05/2011(Menderes)Advances Initial Exploration at Menderes Gold Project, Izmi...
05/05/2011Frontline Gold Stewart Camp Property Payments
27/04/2011Stewart Camp Property Payments
12/04/2011Stewart Camp Property Payments
01/04/2011(Menderes)Renames Turkish Gold Project
22/02/2011(Niaouleni)Confirms 4 Gold Structures at Niaouleni and Intersects 21.56...
Communiqués de Presse de Frontline Gold Corp.
22/06/2016Frontline announces an increase to the Loan funding to advan...
31/05/2016Frontline Announces Keban Tailings Assays, (including signif...
10/05/2016Frontline Announces Increase in Keban Tailings Tonnage and P...
20/04/2016Frontline secures funding to advance production at its Kambe...
07/04/2016Frontline Acquires Fully Permitted Keban and Kambertepe Tail...
22/07/2015Frontline Provides Update on its Menderes Gold Project, Plan...
18/12/2014Frontline Options Baird Property Along Pure Gold's Madsen Go...
18/12/2014Frontline Options Chukuni Property Along Goldcorp's Red Lake...
28/08/2014Frontline Gold - Results of Annual and Special General Meeti...
13/08/2014TSX Venture Exchange Daily Bulletins
28/05/2014IIROC Trading Resumption - FGC
21/05/2014IIROC Trading Halt - FGC
07/06/2013Announces Shares for Debt Agreement for US$200,000
07/06/2013Announces Shares for Debt Agreement for US$200,000
29/05/2013Defending Claim
28/05/2013-Results of Annual and Special General Meeting of Shareholde...
28/05/2013-Results of Annual and Special General Meeting of Shareholde...
27/03/2013Announces Shares for Debt Transaction
14/03/2013Initiates Strategic Review Process
13/03/2013Announces Significant Drill Ready Base-Precious Metal VMS Ta...
08/11/2012(Menderes)Announces Discussions Regarding Menderes Turkey Asset
02/10/2012Announces Completion of Phase 1, 2012 Follow-Up Program on t...
04/07/2012Results of the Annual and Special General Meeting of Shareh...
05/06/2012(Menderes)Submits Application for Operating License on the Menderes Pr...
23/08/2011Identifies 2 IP Anomalies from IP/Resistivity Survey
17/08/2011Divests Share Position held in Merrex Gold Inc.
17/08/2011Edison Investment Research report on Frontline Gold
13/07/2011-Results of the 2011 Annual and Special General Meeting of S...
23/06/2011Annual and Special Meeting of Shareholders
22/06/2011Announces Loan from President and CEO
15/06/2011Announces Initiation of Edison Investment Analyst Coverage
19/05/2011(Niaouleni)New Gold Discovery and Resumption of Diamond Drilling at Nia...
05/05/2011Engages Auburn Partners as Investor Relations Consultants
27/04/2011Stewart Property Payments
12/04/2011Frontline Gold Corp.
07/04/2011Adds Darryl Sittler as an Independent Director to Board
07/04/2011(Niaouleni)Makes a Gold Discovery, Completes RC Drilling Program and Re...
03/03/2011Announces $500,000 Exploration Program at Efemcukuru
23/02/2011Frontline Gold Corporation
23/02/2011-Stock Options
23/02/2011Stock Options
22/02/2011Frontline Gold Corporation
11/02/2011Frontline Gold Corporation
01/02/2011Frontline Gold Corporation
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FGC.V)
0,020+0.00%
TSX-V
CA$ 0,020
01/08 10:30 -
0%
Cours préc. Ouverture
0,020 0,020
Bas haut
0,020 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
0,015 -  0,020 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -27
Produit
Développe
Recherche Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
2023100,00%0,030,01
2022-33,33%0,030,01
2021-50,00%0,040,02
2020200,00%0,040,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,71 AU$+0,00%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+5,26%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :