Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Frontline Gold Corp.

Publié le 22 juin 2016

Frontline announces an increase to the Loan funding to advance production at its Keban and Kambertepe Tailing Projects

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Facebook | Junior | Mali | Zinc |

Frontline announces an increase to the Loan funding to advance production at its Keban and Kambertepe Tailing Projects

Frontline announces an increase to the Loan funding to advance production at its Keban and Kambertepe Tailing Projects

Toronto, Ontario -- (June 22, 2016)
-- Frontline Gold Corporation (TSX-V:FGC) ('Frontline' or the 'Company') is pleased to announce that it has negotiated a $200,000 increase to the previously announced unsecured loan ('Loan') in the amount of $250,000 that was highlighted in its April 20, 2016 press release ('Frontline secures funding to advance to production at its Kambertepe and Keban Tailings Projects) www.stockwatch.com/News/Item.aspx?bid=U-nf20193_136-U%3AFLDPF-20160420&symbol=FLDPF®ion=U. The Loan, which will now total $450,000, is being advanced by two private investors (the 'investors') who are both arm's length to the Corporation. The additional funds will be used primarily to allow the Company to expedite production from its tailings projects at Kambertepe.

The proceeds from the $450,000 loan will be used for the following:

  1. a minimum of $360,000 will be used for developing the Tailings Projects. Work at the Kambertepe copper tailings, up to 20,000 tonnes, as previous announced, is underway. Preparation for work at Keban started as well;
  2. up to $45,000 can be used to fund the pursuit of additional tailings projects that exist in Turkey, and;
  3. up to $45,000 can be used to make option payments and advance exploration on the Company's Red Lake and Rainy River projects, in addition to acquiring additional strategic land positions within the Red Lake Mining Camp.
Commentary

Mr. Walter Henry, President and CEO of Frontline commented, 'Given the increase in the Kambertepe tailing tonnage from 6,000 tonnes to approximately 20,000 as previous reported, the $200,000 increase in the Loan funding is warranted to continue the ongoing transportation of the tailings to the processing site. Based upon the significant increase in tailings tonnage and overall grade at both Keban and Kambertepe, the economic in-situ value of both tailings projects has dramatically increased, resulting in continued interest in funding the on-going development of our tailings operations in addition to the other tailings projects that exist within the Elazig region.

As previously highlighted, and given Frontline's balance sheet, the signing of an unsecured loan with 1) no debt or working capital covenants, and 2) a six-month principal and interest holiday is an ideal funding structure for the Company to fund and expedite work at both the Kambertepe and Keban projects.

The Company's current tailings projects, combined with the potential to add two to three new tailings areas are rapidly transforming the Company into a tailings processor with the ability to generate positive cash flow in the near future.

Highlights of the Amended Loan:

  1. Will be unsecured and no debt or working capital covenants.
  2. The additional $200,000 will be fully advanced by June 20, 2016. The original $250,000 was fully advanced by April 30, 2016. The term on the Loan will be for a term of 18 months from June 30, 2016 and will bear interest at the rate of 12%, payable monthly in arrears, which remains unchanged from the original Loan terms. FGC shall start repaying the Loan at the end of December 2016, by way of 12 monthly payments of $37,500.
  3. FGC will also pay to the Investors a royalty (the 'Royalty') equal to 3.5% of the net proceeds, calculated as gross revenue less excavating and transportation costs and processing costs, received from the Keban and Kambertepe tailings projects in Turkey. This is an increase of 1.5% from the 2% previously announced. FGC shall have the right to buy back of 0.5% of the Royalty at a purchase price of $90,000 for a 30-day period following the first anniversary of the first Royalty payment.
  4. FGC will issue to the Investors a total of 10 million common share purchase warrants (the 'Warrants'). The Warrants shall have an exercise price of 2 cents and a term of 3 years from the date of issue. The Warrants are subject to the approval of the TSX Venture Exchange. FGC shall use its best effort to obtain regulatory approval to issue the Warrants with an exercise price of 2 cents, but if it is unable to do so, then FGC shall, within a year, use its best efforts to cause its common shares to be consolidated on a 5-1 basis, subject to shareholder approval, and the Warrants shall be issued with an exercise price of 10 cents. If, during the term of the Warrants, the shares of FGC trade at 5 cents or higher for a period of 30 consecutive trading days, then FGC shall be entitled to give notice that half the Warrants have been accelerated to a date not less than 20 business days after such notice has been provided.
  5. FGC shall provide the Investors with a two-year right of first refusal ('ROFR') to provide financing to FGC in connection with any additional tailing deposits acquired by FGC in Turkey.
The loan and warrants remain subject to the receipt of all regulatory approvals, including approval of the Toronto Stock Venture Exchange.

Update

The following is a brief summary of the current developments of the Company both in Turkey and the Red Lake:

  1. The excavating and transportation of the Kambertepe tailings to the processing site continues; The completion of the processing and receipt of revenue is expected within the next two months;
  2. We are currently in final negotiations regarding the signing of a process agreement for the processing of the Kambertepe copper tailings;
  3. Third party metallurgical testing on both the Kambertepe and Keban are underway to identify the optimal process of recovery of both the Kambertepe and Keban tailings. Additional information on the ideal recovery processes will be provided when the metallurgical testing is completed; and
  4. The Company is continuing to evaluate other potential tailings opportunities in Turkey in addition to evaluating strategic land packages within the Red Lake mining camp in northern Ontario.
Keban Tailings Project

The Keban tailings project is located approximately 45 km northwest from the city of Elazig, via paved highway, is fully permitted, and includes the exclusive rights to process a minimum 114,000 tonnes of mineralized milled tailings stored in two areas within the defined tailings boundaries. Current tailings tonnage is now estimated to be approximately 150,000 tonnes.

Kambertepe Tailings Project

The Kambertepe Tailings Project includes the exclusive rights to process mineralized tailings, initially estimated at approximately 6,000 tonnes, with the following average reported grades per tonne of tailings: 2.1% Copper, 21 g/t Silver, 1.9% Zinc, 0.5% Titanium and over 50% Iron, as noted from a Firat University report on the project dated March 15th, 2016. As discussed above, current tailings tonnage is now estimated to be in the range of 15,000 to 20,000 tonnes.

Frontline did not complete the work required to verify the historical mining estimates noted above and is not treating these historical estimates as being compliant with current standards under NI 43-101 and as such these historical estimates should not be relied upon. Caution should be used when evaluating these resources as they were calculated prior to NI 43-101 existing and a qualified person has not done work to classify the historical estimate as a current mineral resource.

Frontline continues to actively seek additional investor/partner(s) 1) to continue to expedite the full tailings and contained metal recovery at both the Keban and Kambertepe tailings projects; 2) to jointly fund the new tailings projects that the Company has been in discussions to acquire and 3) to fund development on all its properties in the Red Lake and Rainy River areas. To contact Frontline, please call Walter Henry at 416-414-5825 or visit the company's website.

The technical information herein was reviewed by Mr. Greg Isenor, P. Geo., who acts as Frontline's Qualified Person as defined by National Instrument 43-101.

About Frontline Gold Corporation

Frontline is a Canadian junior mineral exploration company with an experienced discovery team and a proven record of accomplishment. The Company's principal properties include the Menderes gold project in the Izmir province of Western Turkey, the Flint Lake and Sandhill Lake gold projects which are adjacent to Chalice Gold's Cameron Lake Gold Deposit in Ontario and the Niaouleni gold project in southern Mali in the heart of West Africa's prolific gold belt. Other Canadian exploration properties include its Red Lake (gold) property groups that include the Whitehorse Island Mining Patents.

Further information about the Company is available on the Company's website, www.frontlinegold.com , or our social media sites listed below:
Facebook: https://www.facebook.com/Frontline Gold Corp./
Twitter: https://twitter.com/frontlinegold

This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company's actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company's control. These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

'Walter Henry'
Walter Henry, President & CEOFRONTLINE GOLD CORP.
Contact: Walter Henry
Telephone: (416) 362-9100
Fax: (416) 362-9300
Email:
Website: www.frontlinegold.com

Frontline Gold Corp. (TSX-V: FGC)
1 Toronto Street, Suite 201
Toronto, Ontario M5C 2V6


NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE U.S.

Neither TSX Venture Exchange nor its Regulation Services Provider (as defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Lire la suite de l'article sur www.publicnow.com
Données et statistiques pour les pays mentionnés : Mali | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Mali | Tous

Frontline Gold Corp.

EXPLORATEUR
CODE : FGC.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Frontline Gold est une société d’exploration minière d'or basée au Canada.

Frontline Gold détient divers projets d'exploration au Mali et en Turquie.

Ses principaux projets en exploration sont JUBILEE au Canada, NIAOULENI au Mali et MENDERES en Turquie.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Frontline Gold Corp.
30/09/2013Announces Closing of Private Placement
30/05/2013Extends Private Placement
17/04/2013Extends Private Placement
22/02/2013Announces a $500,000 Non-Brokered Private Placement
08/06/2011Announces Closing of First Tranche of Private Placement
04/05/2011Announces Private Placement
Attributions d'options de Frontline Gold Corp.
19/03/2013Announces Stock Option Grant
25/10/2011Announces Stock Option Grant
Nominations de Frontline Gold Corp.
26/08/2011Announces Appointment of Tom Hussey as Board Member
Projets de Frontline Gold Corp.
06/05/2016Frontline announces acquisition of Rainy River Properties St...
02/04/2013(Menderes)Completes 100% Interest in Menderes Turkey Asset
30/01/2013(Menderes)Amends the Terms of Its Option Agreement Regarding the Mende...
22/05/2012Expands Poly Project in the Stewart Gold Camp, NW BC
19/04/2012highlights planned 2012 Exploration Programs at its Poly and...
22/02/2012(Menderes)Commences Diamond Drill Program on the Menderes Gold Project...
12/01/2012Provides an Update on the 2011 Exploration Programs at the P...
04/01/2012(Menderes)Announces Drill Contract for Menderes Gold Project, Located ...
25/10/2011Provides an Update on the 2011 Exploration Program on the Po...
13/10/2011(Niaouleni)intersects 1.76 g/t Au over 8.5 metres and extends the R1 go...
22/09/2011announces the commencement of the 2011 diamond drill program...
24/08/2011Announces Drill Contract for the Poly Project in the Stewart...
30/06/2011Reports the Initiation of the 2011 Exploration Programs on t...
29/06/2011(Menderes)Completes Soil Geochemistry Analysis and Commences IP Survey...
30/05/2011(Menderes)Advances Initial Exploration at Menderes Gold Project, Izmi...
05/05/2011Frontline Gold Stewart Camp Property Payments
27/04/2011Stewart Camp Property Payments
12/04/2011Stewart Camp Property Payments
01/04/2011(Menderes)Renames Turkish Gold Project
22/02/2011(Niaouleni)Confirms 4 Gold Structures at Niaouleni and Intersects 21.56...
Communiqués de Presse de Frontline Gold Corp.
22/06/2016Frontline announces an increase to the Loan funding to advan...
31/05/2016Frontline Announces Keban Tailings Assays, (including signif...
10/05/2016Frontline Announces Increase in Keban Tailings Tonnage and P...
20/04/2016Frontline secures funding to advance production at its Kambe...
07/04/2016Frontline Acquires Fully Permitted Keban and Kambertepe Tail...
22/07/2015Frontline Provides Update on its Menderes Gold Project, Plan...
18/12/2014Frontline Options Baird Property Along Pure Gold's Madsen Go...
18/12/2014Frontline Options Chukuni Property Along Goldcorp's Red Lake...
28/08/2014Frontline Gold - Results of Annual and Special General Meeti...
13/08/2014TSX Venture Exchange Daily Bulletins
28/05/2014IIROC Trading Resumption - FGC
21/05/2014IIROC Trading Halt - FGC
07/06/2013Announces Shares for Debt Agreement for US$200,000
07/06/2013Announces Shares for Debt Agreement for US$200,000
29/05/2013Defending Claim
28/05/2013-Results of Annual and Special General Meeting of Shareholde...
28/05/2013-Results of Annual and Special General Meeting of Shareholde...
27/03/2013Announces Shares for Debt Transaction
14/03/2013Initiates Strategic Review Process
13/03/2013Announces Significant Drill Ready Base-Precious Metal VMS Ta...
08/11/2012(Menderes)Announces Discussions Regarding Menderes Turkey Asset
02/10/2012Announces Completion of Phase 1, 2012 Follow-Up Program on t...
04/07/2012Results of the Annual and Special General Meeting of Shareh...
05/06/2012(Menderes)Submits Application for Operating License on the Menderes Pr...
23/08/2011Identifies 2 IP Anomalies from IP/Resistivity Survey
17/08/2011Divests Share Position held in Merrex Gold Inc.
17/08/2011Edison Investment Research report on Frontline Gold
13/07/2011-Results of the 2011 Annual and Special General Meeting of S...
23/06/2011Annual and Special Meeting of Shareholders
22/06/2011Announces Loan from President and CEO
15/06/2011Announces Initiation of Edison Investment Analyst Coverage
19/05/2011(Niaouleni)New Gold Discovery and Resumption of Diamond Drilling at Nia...
05/05/2011Engages Auburn Partners as Investor Relations Consultants
27/04/2011Stewart Property Payments
12/04/2011Frontline Gold Corp.
07/04/2011Adds Darryl Sittler as an Independent Director to Board
07/04/2011(Niaouleni)Makes a Gold Discovery, Completes RC Drilling Program and Re...
03/03/2011Announces $500,000 Exploration Program at Efemcukuru
23/02/2011Frontline Gold Corporation
23/02/2011-Stock Options
23/02/2011Stock Options
22/02/2011Frontline Gold Corporation
11/02/2011Frontline Gold Corporation
01/02/2011Frontline Gold Corporation
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (FGC.V)
0,020+0.00%
TSX-V
CA$ 0,020
01/08 10:30 -
0%
Cours préc. Ouverture
0,020 0,020
Bas haut
0,020 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
0,015 -  0,020 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -27
Produit
Développe
Recherche Lead - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
2023100,00%0,030,01
2022-33,33%0,030,01
2021-50,00%0,040,02
2020200,00%0,040,01
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,72 AU$-0,19%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,87 US$-3,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,56 GBX+0,18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-4,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,79 CA$-0,32%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,86 CA$+0,54%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,13 US$+0,58%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,88%Trend Power :