ASX RELEASE                                23 JUNE 2009

Hellyer Mine Lease Transfer & Tails Resource Update

 

 

Bass Metals Ltd (ASX:BSM) is pleased to provide the following update on the Company’s acquisition of the Hellyer mill, associated infrastructure and Hellyer Mine Lease located in NW Tasmania.

 

Key Points

 

1.    Ministerial consent has been granted for the transfer of the Hellyer Mine lease from Intec Ltd to Bass Metals subsidiary, Hellyer Mill Operations Pty Ltd.

  1. Estimate of the Hellyer Tails Mineral Resource, part of the Hellyer acquisition has been updated to:

JORC classification

Tonnes

(m)

lead

%

zinc

%

copper

%

silver

g/t

gold

g/t

Measured

4.9

3.1

2.8

0.2

105

2.7

Indicated

2.5

3.0

2.6

0.2

104

2.6

Inferred

2.1

2.9

1.7

0.2

103

2.4

Total

9.5

2.8

2.5

0.2

104

2.6

                Note rounding errors will occur.

 

Contained metal comprises:

lead

kt

zinc

kt

copper

kt

silver

Moz

gold

Moz

290

240

20

32

0.8

                Note rounding errors will occur.

 

Introduction

 

On 11 December 2008, BSM announced that it had signed a binding agreement to purchase from Intec Ltd (ASX:INL) the Hellyer processing plant, associated infrastructure and the Hellyer Mining lease for $4.0 million plus a Processing Royalty of $2.50/tonne ore processed, capped at $5.0 million. 

 

The assets acquired include:

  • the 1.5mtpa crushing, grinding, flotation concentrator plant currently on care and maintenance, all associated supporting infrastructure including grid power, storage sheds, spares inventory, warehouses, water treatment facilities and railway line access.

  • The Hellyer Mine Lease (CML103/1987), which Bass Metals already held a sublease over giving it the mineral rights.  
  • The Hellyer tails resource as described below
  • A cutter suction dredge and spares recently utilised to reclaim tailings to produce a bulk lead-zinc concentrate (which was suspended in September 2008).

 

Settlement of the acquisition occurred in March 2009, with BSM paying the remainder of the $4.0 million cash payment into a solicitor’s trust account pending final completion, at which time it will be paid to Macquarie Bank Limited, Intec’s secured lender.  Final completion of the purchase occurs on receipt of Ministerial approval for the transfer of the Mining Lease and extension of the Mining Lease for 21 years. 

 

Ministerial Consent and Extension of the Mining Lease

 

Bass Metals has now received written advice that the application to transfer the Hellyer Mine Lease from Intec Hellyer Metals Pty Ltd to Hellyer Mill Operations Pty Ltd (a 100% owned subsidiary of Bass Metals) has been approved by the Minister.  Extension of the Mining Lease is pending submission of the Hellyer Mine Project development and environmental management plan, which is scheduled to occur in July, 2009.

 

Hellyer Tails Mineral Resource Update

 

Transfer of the Mine Lease includes the ownership of the Hellyer tails storage facility and mineral resource.  A revised Mineral Resource estimate is required to form the basis of further assessments of re-treatment options.

 

AMC Consultants Pty. Ltd. (AMC) was appointed to undertake a review of the historic drilling, production and survey data to revise its Hellyer Tails Mineral Resource estimate of 2005 accounting for the recent tails re-treatment operation.  This operation reclaimed tailings from the main Hellyer tails dam using a dredge for reprocessing in the Hellyer Mill to produce a bulk lead-zinc concentrate for approximately 18 months until September 2008,(refer Figure 1).  Figure 2 illustrates the location of the Hellyer tails storage facility and other site infrastructure. 

 

The revised Mineral Resource, reported in accordance with the JORC Code is presented in Table 1 below.  A more detailed breakdown of the Mineral Resource classified as Inferred is provided in Table 2; much of this material represents the reprocessed tailings which were deposited into new sites (Shale Pit Dam & Western Arm), with less well defined survey control.

 

Table 1: Hellyer Tails Mineral Resource Estimate, June 2009 

JORC classification

Tonnes

(m)

lead

%

zinc

%

copper

%

silver

g/t

gold

g/t

Density

g/cm3

Measured

4.9

3.1

2.8

0.2

104.9

2.7

1.93

Indicated

2.5

3.0

2.6

0.2

103.9

2.6

1.93

Inferred

2.1

2.9

1.7

0.2

102.9

2.4

1.74

Total

9.5

2.8

2.5

0.2

104.0

2.6

1.89

Reference: Model MDHL1AOK - 2000 Drillhole Data only, 2009 tailings surface survey constrained

 

The figures in the tables have been estimated using the drillhole data collected in 2000.  An empty block volume model was created using the original pre-deposition topography and tailings surfaces for 1998, 2000 and 2009.  Grade was estimated into the empty blocks by ordinary kriging, using the 2000 drillhole data only (as with the 2005 resource estimate).


Table 2: Inferred Material by location

Location

Tonnes

(m)

lead

%

zinc

%

copper

%

silver

g/t

gold

g/t

Density

g/cm3

Main Dam Area

0.7

3.0

2.7

0.2

104.4

2.74

1.93

Shale Pit

1.0

2.8

1.2

0.2

102.2

2.23

1.64

Western Arm Dam Area

0.4

2.8

1.2

0.2

102.2

2.23

1.64

Total Inferred

2.1

2.9

1.7

0.2

102.9

2.40

1.74

 

The material mined by Intec Hellyer Metals Pty Ltd. between 2007 and 2008 was treated to produce 89,700 tonnes of concentrate, with the tailings from this process re-deposited in the Shale Pit and the Western Arm Dam area.  According to the GHD Pty Ltd. (GHD) report, this re-treated tailings material would have a bulk density of approximately 15% less than the original tailings material.  Thus AMC has assigned a bulk density of 1.64 g/cm3 to this material.

 

Gold grades in the re-treated tailings material have been set at 2.23 g/t as advised by Bass Metals based on production records from the tails re-treatment project.

 

Commentary

 

Bass Metals has initiated several programmes to review the potential mining and processing opportunities for this mineral resource including:

1.    Update of the Mineral Resource estimate;

2.    Review of operating cost model to retreat the tailing to produce a bulk lead-zinc concentrate and possible off-take terms; and

3.    Metallurgical testwork on tailings sample to test the concept of producing a separate gold-sulphide concentrate as part of a bulk concentrate process flow sheet.

 

The Mineral Resource estimate highlights a large inventory of base and precious metals.  Bass Metals is interested to evaluate the potential reprocessing of the tails as a value enhancing side project to the main focus of developing the Hellyer Mine Project.

 

Retreatment of the tails was successfully achieved on a technical basis between November 2007 and September 2008 with recorded production of approximately 90kt of a bulk lead-zinc concentrate.  All of the equipment required to restart this operation is on site and owned by Bass including the cutter suction dredge. 

 

Several commercial factors converge to determine the viability of restarting this project, namely; metal prices, operating costs and the global market for bulk lead-zinc concentrates.  Bass Metals notes the current improved lead and zinc prices and the improving metal price outlooks emanating from a variety of respected industry analysts and continues to liaise with potential off-take parties for possible sales contracts.

 

Bass Metals continues to investigate various potential enhancements to the tailings re-treatment project including the possible recovery of a gold-sulphide concentrate.  Metallurgical testwork is currently underway examining selective recovery of gold bearing arsenopyrite minerals from the largely pyritic tails.  This has not been tested previously at Hellyer and the work is in progress.  With an insitu endowment of 800,000 ounces contained gold, recovery of even a modest portion into a saleable product could significantly enhance an overall tails retreatment programme.

 

The Company’s main focus is the completion of the Hellyer Mine project Feasibility study, now expected in July 2009.  An important component of this is the ability to utilise the newly acquired Hellyer Mill to process its ore, albeit at significantly reduced throughput rates-based on the proposed mine production.  Therefore co-treatment of Hellyer tails, on a campaign basis is regarded as a high priority opportunity to fully utilise the Hellyer Mill with cost benefits flowing to both projects. 

 

I look forward to reporting further on the Company’s progress and outcomes on these issues.

 

Yours Sincerely

MR signature

Mike Rosenstreich

Managing Director

 

 

JORC COMPLIANCE STATEMENT

The information in this report that relates to Mineral Resources is based on information compiled by John Tyrrell who is a full-time employee of AMC Consultants Pty Limited and a Member of the Australasian Institute of Mining and Metallurgy. John Tyrrell has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity that he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code)". John Tyrrell consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

Figure 1: The BSM Crew aboard the cutter suction dredge on care & maintenance on the Hellyer TSF.

DSC00758


Figure 2: Hellyer location plan showing location of Hellyer Tails Storage facility (TSF).

Que-Hellyer Cartoon

 

 

Bass Metals Ltd

PRODUCTEUR
CODE : BSM.AX
ISIN : AU000000BSM8
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Bass Metals est une société de production minière de plomb et de zinc basée en Australie.

Bass Metals est productrice de plomb, de zinc, d'argent, de cuivre et d'or en Australie, en développement de projets d'argent, de cuivre, d'or, de plomb et de zinc en Australie.

Son principal projet en production est QUE RIVER MINE en Australie, son principal projet en développement est HELLYER MINE en Australie et ses principaux projets en exploration sont WHYTE RIVER, HEAZLEWOOD, STERLING VALLEY, MAGNET JV, LYNCHFORD JV, LEVEN RIVER JV, OONAH JV, MT CHARTER et FARRELL en Australie.

Bass Metals est cotée en Australie. Sa capitalisation boursière aujourd'hui est 417,3 millions AU$ (299,4 millions US$, 257,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 18 février 2011 à 0,47 AU$, et son plus bas niveau récent le 27 juin 2014 à 0,00 AU$.

Bass Metals possède 1 368 150 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Nominations de Bass Metals Ltd
28/08/2008Appointment of new Exploration Manager
Projets de Bass Metals Ltd
09/12/2011Commercial Robustness of Hellyer Gold Project
20/10/2011McKay High-Grade Hit
28/07/2010(Hellyer Mine)Positive Gold Processing Scoping Study Outcomes
27/01/2010(Hellyer Mine)to Develop its Second Base Metals Mine in Tasmania
18/08/2009(Hellyer Mine)Updated Fossey Zone Resource
23/06/2009(Hellyer Mine)Hellyer Mine Lease Transfer & Tails Resource Update
17/02/2009(Que River Mine)Que River Drilling Update
10/02/2009(Que River Mine)Que River Ore Reserve Upgrade
04/02/2009(Hellyer Mine)Fossey Zone Drilling Update
11/12/2008(Hellyer Mine)Expands Growth Horizons With Landmark $4m Hellyer Mill Acqui...
14/11/2008(Hellyer Mine)High grade drill intercepts at Fossey Zone
30/09/2008(Hellyer Mine)Fossey Zone Resource - Doubles Hellyer Resources
26/09/2008(Que River Mine)Delivers Maiden $1.8M Net Profit Underpinned by Strong Produ...
08/09/2008(Que River Mine)Hellyer & Que River Mine Update
19/08/2008Further Progress on High-Grade Polymetallic Mineralisation a...
01/07/2008(Hellyer Mine)High grade drill intercepts at Fossey Zone
23/06/2008(Que River Mine)Que River Mine Operations Update
02/05/2008 Fossey Zone - High Grade Drill Intercept
17/04/2008(Hellyer Mine)Hellyer Mine Project- High Grade Drill Intercept
10/03/2008Bass Metals: Fossey Zone, Hellyer - Further High Grade Assay...
27/02/200819 Metre High Grade Intersection at Fossey Zone, Hellyer
12/02/2008 Further High Grade Base Metal Intersections at Fossey Zone
Communiqués de Presse de Bass Metals Ltd
27/05/2016Bass Transaction Update
04/12/2015Bass Transaction Update 4 December 2015
18/09/2015Bass Metals Ltd Investment Update
29/12/201330.12.2013 Quarterly Activities Report
25/10/2011MD Interview =e2?? Quarterly and Capital Raising
25/10/2011September Quarterly Report - A Strong Recovery
13/10/2011Open Investor Forums - Brisbane, Sydney, Melbourne, Perth an...
15/09/2011Prospectus and Update Interview
20/07/2011Rebuilding Lost Value
15/06/2010European Investor Roadshow
11/06/2010New Broker Research from Intersuisse
29/01/2010December 2009 Quarterly Report Of Activities & Cashflow
05/10/2009Hellyer Toll Treatment Letter of Intent
28/09/2009Bass poised for strong growth after sharp increase in profit
14/09/2009Reaches Agreement to Extend Que River Ore Sales
30/07/2009June 2009 Quarterly Report
11/03/2009Delivers $4.5M First Half Profit on Strong Que River Perform...
24/12/2008Drilling Update
20/08/2008Iron, Tin & Tungsten - new Joint Venture
30/07/2008June 2008 Quarterly Activities Report
17/07/2008Metal - Hellyer Project Drilling Update - Fossey Zone Strike...
15/05/2008Exploration & Development Update
24/04/2008Stong March Qtly Report
24/04/2008Quarterly Activities Report - March 2008
31/01/2008December 2007 Quarterly Activities Report
21/12/2007Final Update for 2007
21/11/2007Patersons Research Report
26/06/2007Signs Key Que River Off-take Agreement with Zinifex
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (BSM.AX)
0,305-1.61%
AUSTRALIA
AU$ 0,305
29/09 11:00 -0,010
-1,61%
Cours préc. Ouverture
0,310 0,310
Bas haut
0,305 0,315
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,305 -%
Volume var. 1 mois
71 745 -%
24hGold TrendPower© : -37
Produit Copper - Gold - Lead - Silver - Zinc
Développe Copper - Gold - Lead - Silver - Zinc
Recherche Barite - Copper - Gold - Iron - Lead - Nickel - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20217525,00%0,380,00
2020-33,33%0,010,00
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :