Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Belvedere Resources Ltd.

Publié le 24 avril 2012

High Grade Gold Discovery at Osikonmaki Prospect Confirmed and Extended

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Cobalt | Copper | Nickel | Report |

Belvedere Resources Ltd.: High Grade Gold Discovery at Osikonmaki Prospect Confirmed and Extended

Belvedere Resources Limited (TSX VENTURE:BEL) ("The Company") is pleased to announce final results from the recently completed drill program at the Osikonmäki East prospect on the Rantasalmi gold property. The most significant hole since the last new release, BELOSI 081, continues to develop and extend the Upper East HW Zone discovered in the 2011 drilling campaign. BELOSI 81 was mineralised almost its entire 205m length with the most significant intercept of 18m averaging 5.7g/t gold within a 35m zone averaging 3.2g/t. This zone has now been intersected by four drill holes whose results are tabulated below, and represents a significant new discovery. The zone, though still requiring further delineation, appears to be steeply dipping to the south and occurs from bedrock surface. The zone has a true thickness of at least 12 metres, a strike of at least 100 m and remains open at depth and along strike. Adjacent to the high grade zone in the hanging wall of the main shear there appears to be a zone of lower grade mineralisation, representing potential for a bulk tonnage target.

Hole_ID From To Interval Au (g/t) Au gram metres
BELOSI044* 4.31 27.35 23.04 5.8 133.6
including 7.53 21.71 14.18 9.14 129.6
BELOSI077* 26.4 42.05 15.65 9.96 155.9
BELOSI078* 46.04 100.3 54.26 2.91 157.9
including 46.04 65.9 19.86 6.32 125.6
BELOSI081 55.23 90.81 35.58 3.2 113.9
including 58.72 77.05 18.33 5.69 104.4
* Previously announced in a news release May 17, 2011, Sept 14, 2011 and Feb 28, 2012

Table 1: All intersections into Upper East HW zone. Intersections are based on a 0.3 g/t Au cut-off (higher grade intervals at 1.0 g/t Au cut-off) with a grade thickness greater than 2 gram metres. No top cut is applied. Maximum grade is 69.6 g/t Au over 0.67 metres (BELOSI081), one of 20 individual samples over 10 g/t Au (0.32 oz/t). Intersections are estimated to be 70-90% of true width.

David Pym CEO of Belvedere and Mark Burridge, Chairman of the JV partner REBgold comment "With every intersection into the new discovery yielding greater than 100 gram metres of gold the new zone confirms the potential to rapidly build on the current resource at Osikonmäki East. It's position in the hanging wall to the main shear zone, which hosts the bulk of the mineralisation at Osikonmäki East adds substantially to the potential on the prospect. While the Osikonmäki East prospect continues to grow, the company remains excited about the overall potential of the Rantasalmi Property. Other prospects such as Osikonmäki West and Pirilä areas have not been re-evaluated since their discovery in the late 1980's and the exploration potential for further discoveries appears significant with several gold mineralised boulder trains yet to be traced to source on the property.

Additional drill hole results not previously announced are published below.

Hole_ID From To Interval Au (g/t) Au gram metres
BELOSI081 17.16 20.15 2.99 1.15 3.4
BELOSI081 55.23 90.81 35.58 3.2 113.9
BELOSI081 96.33 130.88 34.55 0.69 23.7
BELOSI081 160.38 165.7 5.32 1.65 8.8
BELOSI081 178.93 188.12 9.19 0.36 3.3
BELOSI082 189.8 193.97 4.17 0.51 2.1
BELOSI084 125.24 131.23 5.99 1.49 8.9
BELOSI084 163.11 172.93 9.82 0.93 9.1
BELOSI086 96.33 97.25 0.92 2.52 2.3
BELOSI086 110.06 118.14 8.08 0.43 3.4
BELOSI090 9.09 18.04 8.95 0.65 5.8
BELOSI091 68.62 73.64 5.02 0.49 2.5

Table 2: Intersections are based on a 0.3 g/t Au cut-off with a grade thickness greater than 2 gram metres. No top cut is applied. Intersections are estimated to be 70-90% of true width.

Other drill holes confirmed the depth and Western strike potential of the systems. BELOSI 84 was drilled to target the main shear zone at depth on the eastern portion of the shear zone. The hole intersected 9.8m at 0.9g/t and identified additional mineralisation in the hanging wall, including 6m at 1.5 g/t.

BELOSI 82 was drilled to test the depth extension of the main shear zone 700 m further to the west, and it confirmed the extension of the shear zone at depth but assay results were modest, at around 0.5g/t. The hole appears to have intersected the low grade zone in-between the higher grade chutes identified in previous holes.

BELOSI 83 and BELOSI 85-91 were shallow exploratory holes drilled to test the shear zone as it continues westwards towards the Osikonmäki West mineralisation. The main shear was intersected in all holes but from the limited drilling undertaken, grades appear generally lower in this portion of the shear zone, with individual samples up to 2.5 g/t gold recorded.

Other ongoing work related to the project include: the surveying and QA/QC assaying of historic holes not used in the previous resource estimates. These, combined with the results from this year's drilling program, will form the basis for updating the mineral resource estimate.

Osikonmäki Geology: The Osikonmäki project occurs in a three kilometer long shear complex, hosted by a Proterozoic aged Tonalitic Intrusion. Most of the drilling to date has focused on the Eastern 800m of the shear where the mineralisation is primarily associated with a 45 °south dipping shear zone between 4 and 30 m thick. A series of higher grade chutes pitch at shallow angles across the plane of the main shear, plunging 20°to the ESE contain the better part of the mineralisation and extend for at least 600 m down plunge. These chutes have been grouped into three principle lode systems the S, T and U lode systems. The following resources have been outlined on the Rantasalmi Property to date:

Property Prospect Resource
Category
Tonnes Au g/t Contained Oz's
Rantasalmi Osikonmäki East Indicated 1,296,000 1.7 68,000
Rantasalmi Osikonmäki East Inferred 3,542,000 2.09 244,000
Rantasalmi Osikonmäki West Historical 90,000 4.86 14,000
Rantasalmi Pirilä Historical 150,000 8.9 43,000

Table 3:Mineral Resources at Rantasalmi.

The drilling was undertaken by Drillcon SMOY of Finland, providing 42 mm diameter core. Samples are comprised of half diamond core. Intersections are estimated to be 70-90% of true width. No top cuts are applied with the highest individual assay being 47.8 g/t gold over 0.46 metres. Core samples are sawn in half on site, prepped and assayed by 30g fire assay with an AAS finish at the internationally accredited laboratories of ALS Chemex in Finland. The quality assurance-quality control (QAQC) program of Belvedere consists of the insertion of certified standards of known gold content every 20 samples, with blanks at the beginning of each batch. In addition, ALS Chemex inserts a number of blanks and standards into the analytical process. Standards, blanks and duplicates make up approximately 15% of the samples assayed. The remaining half core is retained on site for verification and reference purposes.

hole_id x y z max_depth Azimuth Dip
BELOSI078 3564360 6883202 117.8 101.50 180 45
BELOSI079 3564400 6883138 117.3 80.50 0 45
BELOSI080 3564440 6883126 117.4 101.55 0 60
BELOSI081 3564400 6883195 120.0 205.30 180 65
BELOSI082 3563760 6882865 102.7 221.40 0 60
BELOSI083A 3563600 6882890 105.3 56.50 0 60
BELOSI083 3563600 6882888 105.3 156.85 0 60
BELOSI084 3564400 6883080 114.1 200.15 0 65
BELOSI085 3563440 6883015 105.5 57.90 0 45
BELOSI086 3563600 6882935 105.6 131.70 0 60
BELOSI087 3563440 6882970 110.0 71.40 0 60
BELOSI088 3563240 6883040 115.7 68.20 0 45
BELOSI089 3563240 6882995 115.3 89.15 0 45
BELOSI090 3563320 6883050 114.3 49.53 0 45
BELOSI091 3563315 6883005 114.8 79.95 0 45

Table 4: Details of drillhole locations.

The resources were previously announced in a press release on 11th October, 2011. An NI 43-101 compliant Technical Report "Mineral Resource Estimate of the Rantasalmi Gold Project in Finland" filed on SEDAR October 19th, 2011. The mineral resource estimate for Osikonmäki East was prepared by Golder Associates (UK) Ltd under the supervision of Alexandra Akyurek (CSci, MSc MIMMM), acting as an independent "Qualified Person" as defined by National Instrument 43-101. Mrs Akyurek is a member of the Institute of Materials, Minerals and Mining (Member #447670). The Qualified Person has not done sufficient work to classify the historical estimates at Osikonmäki West and Pirilä as current resources under NI 43-101, and suggests that the historical estimates should be considered an historical reference of tonnes and grade, and not resources. These historical estimates have not been validated by Golder and no reliance should be placed on these figures.

About the Joint Venture with REBgold (TSX VENTURE:RBG)

REBgold Corporation has the right to earn up to a 50% interest in a special purpose joint venture company which holds the Kiimala and Rantasalmi projects by contributing expenditures of C$6 million over a 4 year period. If REBgold proceeds with and completes the feasibility study it will increase its stake in the projects to between 55% and 75% depending on the level of Belvedere's contribution to the study. A further 5% can be earned if REBgold's bioleaching technology can lead to a material improvement in the project economics.

Forward Looking Statement: Some of the statements contained herein may be forward-looking statements, which involve known and unknown risks and uncertainties. Without limitation, statements regarding future plans and objectives of the Company (including statements relating to future drill results) are forward- looking statements that involve various degrees of risk. It is important to note that the Company's actual results could differ materially from those in such forward-looking statements.

Qualified Person: The technical aspects of this news release have been prepared by Dr Toby Strauss (CGeol), who is acting as Qualified Person in compliance with National Instrument 43-101 with respect to this release. Toby Strauss is Chief Operating Officer of Belvedere Resources Ltd. The data supporting this news release has been provided in a Surpac database and has been verified against the original laboratory assay certificates. The Qualified Person has not undertaken any independent sampling of the drill core, but has reviewed the QA/QC procedures, and considers the results to be within expected margins of error.

About Belvedere: Belvedere Resources Limited is a mining company incorporated in British Columbia with a primary focus on nickel, gold, cobalt and copper in Finland. The Company currently produces 2500t of nickel in concentrate/year from the Hitura nickel mine in Central Finland. The Company has a number of advanced gold projects in close proximity to the Hitura mine.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of the contents of this release.

Contact Information



This message was sent to .com from:

Belvedere Resources | Suite #404, Vancouver World Trade Centre, 999 Canada Place | Vancouver, BC V6C 3E2, Canada

Email Marketing by iContact - Try It Free!

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Belvedere Resources Ltd.

EN DÉVELOPPEMENT
CODE : BEL.V
ISIN : CA0809031077
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Belvedere Res. est une société d’exploration minière de nickel et de cuivre basée au Canada.

Belvedere Res. est en développement de projets de nickel, de cuivre et de cobalt en Finlande, et détient divers projets d'exploration en Finlande.

Ses principaux projets en développement sont HAUTALAMPI et HITURA en Finlande et ses principaux projets en exploration sont LUIKONLAHTI MILL, HIRSIKANGAS, HAARAKUMPU, KIIMALA, VALKEISENRANTA, SAHAKOSKI, OSIKONMÄKI, SARKINIEMI, RANTASALMI et MÄNTYMÄKI en Finlande.

Belvedere Res. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 60,6 millions CA$ (46,7 millions US$, 39,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 juin 1997 à 9,99 CA$, et son plus bas niveau récent le 01 janvier 2016 à 0,01 CA$.

Belvedere Res. possède 73 904 013 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Belvedere Resources Ltd.
24/12/2013=3A Proposed Private Placement and Share Consolidation
15/02/2011Belvedere Issues 19,094,286 Shares Under Convertible Loan
01/02/2011Belvedere Completes 3,000,000 Private Placement
12/01/2011Private Placement to raise up to CAD $2.5 million
Rapports Financiers de Belvedere Resources Ltd.
30/08/2013Reports Financial and Operating Results for Second Quarter o...
30/05/2013Reports Financial and Operating Results for First Quarter of...
09/07/2011Reports Financial and Operating Results for Q1 2011 -Correct...
Projets de Belvedere Resources Ltd.
14/08/2013(Hitura)Hitura Tailings Expansion Selected as Test Bed for EU Life T...
20/07/2013(Hitura)Provides Status Update on Hitura Nickel Mine and Kopsa Gold ...
23/05/2013(Hitura)to Suspend Nickel Mining Operations at Hitura Nickel Mine
28/01/2013(Hitura): Hitura Mine Operational Update
09/01/2013Belvedere Commences Follow-Up Drilling on Their Antikanper
24/04/2012High Grade Gold Discovery at Osikonmaki Prospect Confirmed a...
29/02/2012Osikonmaki Yields Intersection of 9.6 Metres Averaging 10.0 ...
18/01/2012Reports Further High Grade Gold Drill Results at Kopsa
05/12/2011Ltd: Gold Results From Drilling at Kopsa
11/10/2011Belvedere Significantly Increases Gold Resources on Their Os...
30/06/2011(Rantasalmi)Drilling Continues to Grow Belvedere's Osikonmaki Gold Prosp...
18/05/2011Osikonm=E4ki Prospect delivers further high-grade gold inter...
30/03/2011(Osikonmäki)drills high-grade gold at their Osikonm=E4ki Prospect in Fin...
24/03/2011(Kiimala)Signs LOI With REBgold on the Kiimala and Rantasalmi Gold Pr...
24/03/2011(Rantasalmi)Signs LOI With REBgold on the Kiimala and Rantasalmi Gold Pr...
23/02/2011(Hitura)Commences Open-Pit Expansion Studies at the Hitura Nickel Mi...
01/02/2011(Osikonmäki)commences drilling on their Rantasalmi Gold Property
29/07/2010(Hitura)Restarts production ahead of schedule
17/06/2010(Hitura)On track for the restart
02/06/2010(Kiimala)Indicated Resource Estimate for the K1(Ängesneva) occurrence
07/05/2010Intersects 92 metres averaging 3.2 g/t gold at Kopsa
08/04/2010(Hitura)Plans to Restart the Mine and the Signing of an Offtake Agre...
23/03/2010(Hitura)Evaluates Potential For The Restart & Commences Drilling on ...
15/02/2010(Hitura)Belvedere Re-Acquires Hitura Nickel Mine from Administrators
02/12/2009(Hirsikangas)Maiden Resource Estimate For Hirsikangas
07/10/2009(Kiimala)commences drilling on their Kiimala Gold Property
Communiqués de Presse de Belvedere Resources Ltd.
23/12/2015Belvedere Mining Oy Initiates Voluntary Bankruptcy Proceedin...
04/03/2015Belvedere-Corporate Update
27/01/2015Belvedere Closes Private Placement
26/12/2014Belvedere Resources Ltd.: Correction to December 24, 2014 Ne...
24/12/2014Belvedere Resources Limited: First Tranche of Private Placem...
28/11/2014Belvedere Reports Third Quarter 2014 Financial and Operating...
27/11/2014Belvedere Resources Ltd.: Private Placement
20/11/2014Belvedere Resources Ltd.: Private Placement
15/10/2014Belvedere Resources Ltd: Private Placement and Loan
29/08/2014Belvedere Reports Second Quarter 2014 Financial and Operatin...
29/07/2014Belvedere Closes Non-Brokered Private Placement (Revised)
04/07/2014Belvedere Resources Limited: Proposed Private Placement
30/05/2014Belvedere Reports First Quarter 2014 Financial and Operating...
14/05/2014Belvedere Starts Further Tests on Open-Pit Nickel Ore for Pr...
01/05/2014Belvedere Reports Annual and Fourth Quarter Financial and Op...
30/04/2014CORRECTION FROM SOURCE: Belvedere Closes Non-Brokered Privat...
30/04/2014Belvedere Closes Non-Brokered Private Placement
16/04/2014Belvedere Resources Ltd.: Proposed Non-Brokered Private Plac...
29/11/2013Financial and Operating Results Q3 2013
02/10/2013News Release
02/10/2013Announces Positive PEA on Their Kopsa Gold Copper Project
24/08/2013Announces Agreement With Jinchuan to Defer Preference Shares...
01/05/2013Reports Financial and Operating Results for 2012
19/03/2013Belvedere Confirms Gold Mineralisation Along 2.5 KM Strike a...
19/03/2013Confirms Gold Mineralisation Along 2.5 KM Strike at Antikanp...
08/02/2013: Disclosure Clarification
18/01/2013Booth 1043 Vancouver Resource Investment Conference
09/01/2013Commences Follow-Up Drilling on Their Antikanperä Gold Disco...
29/10/2012Belvedere Announces Mineral Resource Estimate for Kopsa Gold...
29/10/2012Announces Mineral Resource Estimate for Kopsa Gold-Copper Pr...
17/10/2012Belvedere Resources: Osikonm=C3=A4ki East Hanging Wall gold ...
17/10/2012Osikonmaki East Hanging Wall Gold Zone Extended to 200m Down...
19/09/2012: Significant New Gold Discovery on Antikanperä Property
30/08/2012Reports Financial and Operating Results for Second Quarter o...
13/08/2012Belvedere Resources Ltd. Recent Drilling Confirms Potential ...
15/06/2012Belvedere Welcomes New Director
31/05/2012Reports Financial and Operating Results for First Quarter of...
30/04/2012Financial and Operating Results for 2011
19/04/2012Belvedere converts Open Pit Resources to Reserves at Hitura ...
01/03/2012Belvedere Substantially Increases Resources at Hitura Nickel...
09/01/2012(Hitura)Renews Offtake Agreement for Hitura Mine Concentrate
29/11/2011Reports Financial and Operating Results for Q3 2011
29/08/2011Reports Financial and Operating Results for Q2 2011
16/08/2011Engages Investor Relations Firm
21/07/2011REBgold and Belvedere move forward with Finnish JV
06/07/2011Reports Financial and Operating Results for Q1 2011
16/06/2011Kopsa Project Generates +90% Gold and Copper Recoveries Into...
03/05/2011Reports Financial and Operating Results for 2010
20/04/2011Announces Amendment to Agreement With Jinchuan
25/03/2011REBgold Signs LOI with Belvedere on the Kiimala and Rantasal...
19/08/2010Closes Convertible Loan Facility
17/11/2009Announces Material Change
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BEL.V)
0,820+0.00%
TSX-V
CA$ 0,820
11/06 16:59 -
0%
Cours préc. Ouverture
0,820 0,830
Bas haut
0,820 0,850
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,820 -%
Volume var. 1 mois
20 800 -%
24hGold TrendPower© : 4
Produit
Développe Cobalt - Copper - Nickel
Recherche Cobalt - Copper - Gold - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 08/10/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2018168,85%0,930,20
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,45 AU$+0,68%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
5,34 US$-4,81%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,84 GBX-1,18%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,09 CA$+5,88%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
1,96 CA$-10,50%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
8,16 CA$-0,85%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,20 CA$+8,33%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,33 AU$-2,94%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
2,41 CA$+2,99%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
68,30 US$+0,74%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :