Hot Maden – Continues to Deliver Significant Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | K Street | Suriname | Zinc |

Hot Maden – Continues to Deliver Significant Results

Microsoft Word - 2015_07 _27 Hot Maden Drill Update Final.doc

AIM: MARL

27 July 2015

Suite 102, 3 Eden Street

North Sydney, NSW 2060

Australia

Hot Maden, Turkey: Gold Copper Zone Expands and

RungePincockMinarco Engaged for Maiden Mineral Resource Estimation

Mariana Resources Ltd ("Mariana" or the "Company") (AIM:MARL) is pleased to report further high grade gold‐copper (Au‐Cu) intercepts from the ongoing drill program at the Hot Maden Project, eastern Turkey (Figure 1). Assays have now been received for drill holes HTD‐15 through HTD‐17 (Figure 2) confirming continuity and further increasing the size and confidence in the Au‐Cu mineralised zone including the high grade core.

Highlights:

HTD‐15: 117.3m @ 13.9 g/t Au + 2.0% Cu from 216.0m downhole

Including 22m @ 46.2 g/t Au + 3.1% Cu (306.0m - 328.0m) (Figure 4)

HTD‐16: 100.7m @ 2.3 g/t Au + 1.8% Cu from 332.3m downhole

Including 14.7m @ 7.7 g/t Au + 2.0% Cu (333.3m - 348.0m) (Figure 5)

HTD‐17: 83m @ 13.4 g/t Au + 3.9% Cu from 51.3m downhole

Including 16.0m @ 34.5 g/t Au + 2.2% Cu (98.0 - 114.0m) (Figure 3)

HTD‐18: (Assays Pending) Hole HTD‐18 was drilled as the "step back" to HTD‐15 and intersected the main mineralised zone over 93m from 313m downhole (figure 4)

The significant Au‐Cu intercept from hole HTD‐15 confirms the vertical continuity of the mineralised zone previously intersected in HTD‐10, and similarly, the results from drill hole HTD‐16 extend the Au‐Cu mineralization previously intersected in holes HTD‐5 and HTD‐13 a further 50m down dip. Massive sulphide mineralisation was also intersected in HTD‐17, the scissor hole to our original discovery hole HTD‐04, and confirms a minimum true width of at least 50m for the main mineralized zone.
Based on the overall excellent results at Hot Maden to date Mariana has independently engaged RungePincockMinarco ("RPM"), a global leader in mining advisory and consulting services, to commence work on the preparation of a National Instrument 43‐101 ("NI 43‐101") compliant mineral resource estimate for the Hot Maden gold‐copper project. RPM's will carry out an initial data validation phase and site visit, before progressing on to the mineral resource estimation phase. The mineral resource estimate for Hot Maden is expected to be completed by early Q4, 2015.
Chief Executive Officer Glen Parsons today commented:
"Our confidence in Hot Maden and the mineralised Au‐Cu body has rapidly reached a critical stage for Mariana as drilling continues to deliver exceptional results.
"Based on the overall confidence in the quality of all results to date, and specifically the continuity of mineralisation and grade, we have appointed the resource specialists RungePincockMinarco to initiate an independent resource estimate. This report will provide an independent assessment of what Hot Maden has delivered to date and will certainly be able to assist in quantifying and underpinning a market related valuation for Mariana's stake in the project.
"In line with Mariana's disciplined portfolio strategy and following initial exploration work on Rurimarac in Peru, we have taken the decision to terminate the option with Tinka Resources Limited over the properties.
"Hot Maden has progressed significantly up Mariana's delivery curve and continues to do so with around 4,000m drilled to date in this 10,000m program. I look forward to updating the market on the further anticipated drilling at Hot Maden, as well as the resource estimate in due course."
Links to Figures: http://marianaresources.com/site/media/July_27_NR_Maps.pdf
Please see link for audio interview with Glen Parsons, CEO:
http://brrmedia.co.uk/event/139720?popup=true

Drill Holes Completed (Assays Pending)

Drill hole HTD‐18 (Figures 2 & 4) is the "step back" hole to HTD‐15, and was successful in intersecting the main mineralised zone (pyrite + chalcopyrite in brecciated andesites and quartz veinlets) between 271m and 406m downhole. However, the greatest sulphide content and jasperoid + hematite alteration in HTD‐18 is observed over 93m between 313m and 406m downhole. The mineralised zone in HTD‐18 is interpreted to represent the down‐ dip continuation of the Au‐Cu mineralised zone in HTD‐15.

Drill Holes in Progress

The drilling of diamond drill holes HTD‐19 and HTD‐20 is currently in progress.
Drill hole HTD‐19 (Figure 2) is a scout drill hole which was collared approximately 320m S of the southernmost cross section (4,542,100N, and which contains drill holes HTD‐11 and HTD‐
12). This hole was designed to commence exploring for large scale extensions to the broadly N‐S trending Au‐Cu mineralised zone at Hot Maden. Currently, HTD‐19 is at a downhole depth of 354m and has successfully intersected: i) spotty Cu +/‐ Zn mineralisation in the upper portions of the drill hole ii) three silicified/veinlet zones (203m‐221m, 245m‐250m, and 266m‐283m) with Cu +/‐ Zn‐Pb mineralisation and iii) three semi‐massive sulphide zones (297.6m‐305m, 309m‐322.3m, and 332m‐337m) with Cu‐Zn‐Pb mineralisation.
Drill hole HTD‐20 (Figures 2) was designed to test the northern, near‐surface extension of the massive sulphide mineralisation intersected in both holes HTD‐04 and ‐17. HTD‐20 has passed through a mixed "slag" / void zone between 15m and 25m followed by a zone of faulting, with the hole ultimately being lost in a fault zone at 54.5m.

Table 1: Summary of significant intercepts in drill holes HTD‐15, HTD‐16, and HTD‐17

Drill Hole

From (m)

To (m)

Intercept (m)

Au g/t

Cu

%

Zn

%

Zone

HTD‐15

157.0

161.0

4.0

1.02

Zinc

Zone

216.0

333.3

117.3

13.9

2.04

Au‐Cu

Zone

Including

277.0

285.0

8.0

15.1

1.46

Au‐Cu

Zone

306.0

328.0

22.0

46.2

3.06

Au‐Cu

Zone

HTD‐16

150.0

158.0

8.0

1.18

Zinc

Zone

163.4

164.1

0.7

1.54

Zinc

Zone

183.0

185.6

2.6

1.51

Zinc

Zone

222.5

224.5

2.0

1.23

1.34

Zinc

Zone

234.2

235.5

1.3

1.76

Zinc

Zone

233.8

234.2

0.4

11.90

Zinc

Zone

245.0

247.0

2.0

2.15

Zinc

Zone

270.0

273.6

3.6

1.20

Zinc

Zone

274.6

275.6

1.0

3.19

Zinc

Zone

278.1

279.1

1.0

1.89

Zinc

Zone

284.7

290.0

5.3

1.43

Zinc

Zone

307.0

308.0

1.0

1.95

Zinc

Zone

332.3

433.0

100.7

2.3

1.84

Au‐Cu

Zone

Including

333.3

348.0

14.7

7.7

1.98

Au‐Cu

Zone

399.0

405.0

6.0

7.9

1.36

Au‐Cu

Zone

439.0

451.0

12.0

0.14

0.58

Au‐Cu

Zone

467.0

477.0

10.0

0.05

0.72

Au‐Cu

Zone

482.0

484.0

2.0

0.05

1.17

Au‐Cu

Zone

HTD‐17

51.3

134.3

83.0

13.4

3.88

Au‐Cu

Zone

Including

58.0

69.9

11.9

16.4

5.27

Au‐Cu

Zone

83.0

89.0

6.0

13.8

5.62

Au‐Cu

Zone

98.0

114.0

16.0

34.5

2.22

Au‐Cu

Zone

159.8

171.0

11.3

1.05

Zn

Zone

171.0

189.5

18.5

0.24

0.71

Au‐Zn

Zone

Hot Maden Definitive Agreement

Aegean Metals Group Inc. signed a Definitive Agreement with Lidya Madencilik Sanayi ve Ticaret A.S. ("Lidya") on 24 June 2014, through which Lidya retains the exclusive right to earn‐in to a 70% interest in the Hot Maden Project by incurring a total of USD 2.5 million of combined exploration expenditures and USD 0.5 million cash payments within a 48 month period. Prior to the commencement of the Phase II drill program, Lidya had invested approximately USD 700,000 on exploration at Hot Maden.

Quality Control and Assurance

Mineralised intervals presented in Table 1 are drill intersection widths and may not represent true widths of mineralisation. Drill core obtained from the diamond drill program was dominantly HQ‐ sized core with the remainder being PQ‐sized core. All drill core was photographed and quick logged prior to sampling. Standard sampling protocol involved the halving of all drill core and sampling over generally 1 m intervals (in clearly mineralised sections) or 2 m intervals (elsewhere), with one half of the core being placed in a sealed sample bag and dispatched to the analytical laboratory for analysis.
Samples from the Phase II drill program are being analysed at ALS Laboratories' facility in Izmir, western Turkey. All samples are analysed for gold using a 30g Fire Assay with AAS finish, in addition to a 32 element ICP‐AES analysis of an aqua regia digest. Samples in which ICP analyses returned greater than the maximum detection limit for the elements Ag (10 ppm), Cu (10,000 ppm), Fe (15%), Pb (10,000 ppm), and Zn (10,000 ppm) were reanalysed using the AAS analytical technique. Standards and blanks were inserted in to the analytical sequence on the basis of one standard for every 20 samples, 2 blanks in every batch, and one duplicate every 40 samples.

Health, Safety, and Environment (HSE)

No HSE incidents have been reported during the current diamond drill program.

Hot Maden drill holes - technical data

Technical data relating to the Hot Maden drill holes are given in the following table:

Hole ID

Easting

Northing

Elevation

(m)

Azimuth

Dip

(degrees)

Depth

(m)

Assays

Phase I

HTD‐01

740,503.26

4,541,740.88

902.58

245

‐60

223

Complete

HTD‐02

740,602.64

4,542,143.24

877.77

222

‐60

286

Complete

HTD‐03

740,514.81

4,541,793.26

910.87

270

‐60

150

Complete

HTD‐04

740,609.82

4,542,260.07

893.42

090

‐60

185

Complete

HTD‐05

740,730.37

4,542,159.99

883.87

270

‐60

291

Complete

HTD‐06

740,652.94

4,542,368.64

914.58

105

‐60

215

Complete

HTD‐07

740,550.03

4,541,765.20

915.43

245

‐60

240

Complete

Phase II

HTD‐08

740,581.58

4,542,298.29

877.81

090

‐60

274

Complete

HTD‐09

740,562.94

4,542,255.00

873.02

090

‐60

361

Complete

HTD‐10

740,578.92

4,542,201.35

862.08

090

‐60

245

Complete

HTD‐11

740,776.46

4,542,099.01

866.72

270

‐60

450

Complete

HTD‐12

740,774.00

4,542,098.00

867.00

270

‐50

360

Complete

HTD‐13

740,795.00

4,542,160.00

873.00

270

‐60

369

Complete

HTD‐14

740,692.55

4,542,144.26

868.22

270

‐54

234

Complete

HTD‐15

740,493.85

4,542,204.22

855.12

090

‐54

375

Complete

HTD‐16

740,852.90

4,542,141.94

872.24

270

‐59

498.5

Complete

HTD‐17

740,721.82

4,542,245.80

873.53

270

‐50

261

Complete

HTD‐18

740,461.99

4,542,208.64

853.30

090

‐57

425

Pending

HTD‐19

740,503.36

4,541,790.50

888.41

090

‐60

In progress

Pending

HTD‐20

740,639.37

4,542,285.54

874.16

080

‐60

In progress

Pending

Peru Update

Mariana has terminated the option agreement with Tinka Resources Limited ("Tinka") (TSXV:TK) over the Rurimarac Properties which are located 4km to the west of Mariana's recently drilled and strongly mineralised copper‐gold Soledad project.

**ENDS**

Qualified Person

The information in this release has been reviewed by Eric Roth, Chief Operating Officer and Executive Director of Mariana Resources. Mr Roth holds a Ph.D. in Economic Geology from the University of Western Australia, is a Fellow of the Australian Institute of Mining and Metallurgy (AusIMM), and is a Fellow of the Society of Economic Geologists (SEG). Mr Roth has 25 years of experience in international minerals exploration and mining project evaluation.

For further information please visit website at www.marianaresources.com or contact the following. In Australia:

Glen Parsons (CEO)

Mariana Resources Ltd

+61 2 9437 4588

Eric Roth (COO)

Mariana Resources Ltd

+56 9 8818 1243

Rob Adamson

RFC Ambrian Limited (Nomad)

+61 2 9250 0041

Will Souter

RFC Ambrian Limited (Nomad)

+61 2 9250 0050

In U.K.

Claire Louise Noyce

Hybridan LLP (UK Broker)

+44 20 3764 2341

Niall Pearson

Hybridan LLP (UK Broker)

+44 20 3764 2342

Oliver Stansfield

Brandon Hill Capital (UK Broker)

+44 20 3463 5061

Jonathan Evans

Brandon Hill Capital (UK Broker)

+44 20 3463 5016

Tim Blythe

Blytheweigh (Financial PR)

+44 20 7138 3205

Megan Ray

Blytheweigh (Financial PR)

+44 20 7138 3203

About Mariana Resources

Mariana Resources Ltd is an AIM quoted exploration and development company with an extensive portfolio of gold, silver and copper projects in South America and Turkey. In Peru, Mariana holds options to earn up to 70% interests in the highly prospective Soledad Cu‐Au‐Ag and Rurimarac Au‐Ag prospects in Central Peru. In Suriname, Mariana has an option to earn up to a 50.01% interest in Nassau Gold Limited, a JV company between Mariana and Sumin Resources Limited ("Sumin") which in turn holds an option to earn up to 80% of the Nassau Gold Project. The Nassau Gold Project is a 28,000 Ha exploration concession located approximately

125 km SE of the capital Paramaribo and immediately adjacent to Newmont Mining's 4.2Moz Au Merian project. In southern Argentina, the Company's core gold‐silver projects are Las Calandrias (100%), Sierra Blanca (100%), Los Cisnes (100%), Bozal (100%). These projects are part of a 200,000+ Ha land package in the Deseado Massif epithermal gold‐silver district in mining‐friendly Santa Cruz Province. On January 16, 2015, Mariana completed the acquisition of TSX.V‐listed Aegean Metals Group Inc. ("Aegean"), which holds 100% interests in the Hot Maden Au‐Cu and Ergama Au‐Ag prospects in Turkey. Hot Maden is currently being advanced by Lidya our Turkish JV partner earning 70%. In addition, Mariana also acquired 100% interests in the Doña Ines Au‐Ag and Exploradora East Cu prospects in northern Chile through the Aegean transaction with Mariana exploration being funded by Asset Chile by providing $1.65m for a total 50% interest.

About Lidya Madencilik Sanayi ve Ticaret A.S.

Lidya is a metal mining exploration company that has been operating in Turkey since 2009. Lidya is part of the Ҫalik Group, one of Turkey's largest private conglomerates with activities in the areas of mining, energy, finance, construction, textiles, telecom and media. Lidya established a strategic partnership with Canadian TSX listed mining company Alacer Gold Corp in August 2009. This was the first major international partnership in the Turkish mining sector with the primary goal of discovering and developing new gold and copper mines throughout Turkey. Alacer and Lidya are 80:20 Joint Venture partners at the Ҫöpler Gold Mine in central‐ eastern Turkey, which produced 227,000 ounces of gold during 2014 at all‐in cash costs of USD 695/oz.

Safe Harbour

This press release contains certain statements which may be deemed to be forward‐looking statements. These forward‐looking statements are made as at the date of this press release and include, without limitation, statements regarding discussions of future plans, the realization, cost, timing and extent of mineral resource estimates, estimated future exploration expenditures, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, and requirements for additional capital. The words "plans", "expects", "budget", "scheduled", "estimate", "forecasts", "intend", "anticipate", "believe", "may", "will", or similar expressions or variations of such words are intended to identify forward‐looking statements. Forward‐looking statements are subject to known and unknown risks, uncertainties, assumptions and other factors that may cause actual results to vary materially from those expressed or implied by such forward‐ looking statements, including, but not limited to: the effects of general economic conditions; the price of gold, silver and copper; misjudgements in the course of preparing forward‐looking statements; risks associated with international operations; the need for additional financing; risks inherent in exploration results; conclusions of economic evaluations; changes in project parameters; currency and commodity price fluctuations; title matters; environmental liability claims; unanticipated operational risks; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or in the completion of development or construction activities; political risk; and other risks and uncertainties described in the Company's annual financial statements for the most recently completed financial year which is available on the Company's website at www.marianaresources.com . Although we believe that the expectations reflected in such forward‐ looking statements are based upon reasonable assumptions and have attempted to identify important factors that could cause actual results to differ materially from those contained in forward‐looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such forward‐looking statements. Accordingly, readers are cautioned not to place undue reliance on forward‐looking statements. We do not undertake to update any forward‐looking statements, except in accordance with applicable securities laws.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Suriname | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Suriname | Tous

Tinka Resources Ltd

EXPLORATEUR
CODE : TK.V
ISIN : CA8875221001
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tinka Resources est une société d’exploration minière d'argent et de zinc basée au Canada.

Tinka Resources détient divers projets d'exploration au Perou.

Ses principaux projets en exploration sont COLQUIPUCRO et TIBILLOS au Perou.

Tinka Resources est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,9 millions CA$ (20,4 millions US$, 19,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 09 janvier 2009 à 0,03 CA$, et son plus haut niveau récent le 22 mars 2013 à 1,25 CA$.

Tinka Resources possède 206 720 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Tinka Resources Ltd
Annual Report 2008
Financements de Tinka Resources Ltd
08/11/2013Provides Update on Private Placement Financing
08/10/2013Announces First Tranche Non-Brokered Private Placement Closi...
23/09/2013Announces Non-Brokered Private Placement Financing
14/05/2013Closes Private Placement Financing
11/12/2012Tinka Announces Non-Brokered Private Placement Financing
11/12/2012Announces Non-Brokered Private Placement Financing
22/06/2011TINKA AMENDS TERMS OF PRIVATE PLACEMENT
02/06/2011TINKA ANNOUNCES $5 MILLION FINANCING
Nominations de Tinka Resources Ltd
07/02/2013Tinka Announces Appointment of Mr. Allen Morton to its Advis...
02/02/2013Tinka Announces Appointment of New Investor Relations Consul...
Projets de Tinka Resources Ltd
29/09/2015Tinka extends zinc, tin, copper mineralization at Ayawilca
23/02/2015Tinka confirms indium with zinc mineralization at Ayawilca, ...
10/02/2015Tinka expands zinc, tin, copper mineralization at Ayawilca, ...
15/01/2015(Colquipucro)announces results of 1,600 metre ten-hole drill program at C...
18/02/2014Drills 36 Metres of 5.93% Zinc and 22.8 Metres of 5.80% Zinc...
15/01/2014Drills 24 Metres of 2.8% Zinc and 6.3 Metres of 6.19% Zinc a...
25/09/2013Mobilizes Drill Rig to Ayawilca Project, Peru
10/09/2013Resumes Work at Ayawilca Project in Preparation for Drilling
11/06/2013Tinka Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% ...
11/06/2013Drills 24 Metres of 4.79% Zinc and 10 Metres of 7.85% Zinc ...
22/05/2013Tinka Drills 60 Metres of 7.75% Zinc (Including 24 Metres of...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc (Including 8 Metres of ...
26/03/2013Tinka Drills 18.7 Metres of 165 g/t Ag
13/02/2013Tinka Resources Named to TSX Venture Top 50
29/01/2013Tinka Commences Third IP Survey At Ayawilca Project And Init...
10/01/2013Tinka Resumes Drilling at Colquipucro and Ayawilca Projects,...
10/01/2013(Colquipucro)Resumes Drilling at Colquipucro and Ayawilca Projects, Peru
15/10/2012Tinka Increases Inferred Silver Resource To 32.7 Million Oun...
02/10/2012Tinka Resumes Exploration At The Chaucha Zone, Colquipucro, ...
02/10/2012(Colquipucro)Resumes Exploration At The Chaucha Zone, Colquipucro, Peru
17/09/2012Tinka Identifies Further Surface Mineralization At Zone 1, C...
10/09/2012Tinka Resumes Drilling At The Ayawilca Zone,
10/09/2012(Colquipucro)Resumes Drilling At The Ayawilca Zone, Colquipucro, Peru
01/05/2012Tinka Drills 20 m of 85.9 g/t Silver At
13/03/2012Tinka Drills 92.7 m of 92 g/t Silver,
21/02/2012Tinka drills 42 m of 165 g/t silver
27/05/2011(Colquipucro)DRILLING COMMENCES AT TINKA'S COLQUIPUCRO SILVER PROJECT, PE...
24/05/2011DRILLING COMMENCES AT TINKA'S COLQUIPUCRO
07/03/2011(Colquipucro)SIGNS DIAMOND DRILL CONTRACT FOR COLQUIPUCRO SILVER PROJECT,...
24/01/2011(Tibillos)IDENTIFIES DRILL TARGETS AT TIBILLOS COPPER PORPHYRY PROJECT...
28/08/2007(Colquipucro)Announces Positive Silver Results, Colquipucro Silver-Zinc P...
15/08/2007(Colquipucro)Update on Drill Program at Colquipucro Silver-Zinc Project, ...
15/05/2007(Colquipucro)Starts Drilling Colquipucro Silver Project, Peru
Communiqués de Presse de Tinka Resources Ltd
25/07/2016Tinka Appoints Investor Relations Consultant
29/06/2016Tinka Announces Filing Of NI 43-101 Technical Report On The ...
27/06/2016Tinka Commences Property-Wide Airborne Geophysics At Ayawilc...
21/04/2016Tinka Announces AGM Results
04/04/2016Tinka Announces Grant Of Stock Options
23/03/2016Tinka Resources Appoints Mary L. Little To Board Of Director...
21/03/2016Tinka Announces Passing Of Director William Lee
20/01/2016Tinka Continues to Expand Zinc and Tin Footprint at Ayawilca
28/10/2015Tinka Drills 14.9 Metres at 1.1% Tin & 0.36% Copper at Ayawi...
13/10/2015Tinka Drills 50.5 Metres at 1.23% Tin & 0.16% Copper at Ayaw...
28/07/2015commences 10,000 metre drill program at Ayawilca zinc projec...
27/07/2015Hot Maden – Continues to Deliver Significant Results
20/04/2015announces appointment of new Vice President Exploration
20/04/2015announces appointment of new Vice President Exploration
20/04/2015Tinka announces appointment of new Vice President Exploratio...
13/04/2015Tinka Announces C$7.0 Million Private Placement Financing wi...
27/03/2015Tinka Announces Filing of NI 43-101 Technical Report on the ...
27/02/2015Tinka Announces AGM Results
27/02/2015IIROC Trading Resumption - TK
26/02/2015Tinka Announces Initial Inferred Zinc Resource of 13.3 Milli...
26/02/2015IIROC Trading Halt - TK
15/01/2015Tinka announces results of 1,600 metre ten-hole drill progra...
18/12/2014(Colquipucro)provides update on drill programs at Ayawilca-Colquipucro, P...
18/12/2014Tinka provides update on drill programs at Ayawilca-Colquipu...
11/12/2014Tinka announces release from escrow following Tier 1 graduat...
25/11/2014Discovers Tin - Copper Mineralization Beneath High-Grade Zin...
25/11/2014Tinka Discovers Tin - Copper Mineralization Beneath High-Gra...
13/11/2014Tinka announces graduation to Tier 1 on the TSX Venture Exch...
12/11/2014Intersects Thick High-grade Zinc Mineralization in Four Dril...
12/11/2014Tinka Intersects Thick High-grade Zinc Mineralization in Fou...
22/09/2014Tinka Starts Drilling With Third Rig at Colquipucro-Ayawilca...
11/09/2014Tinka Announces Start of Drilling at Colquipucro, Peru
08/09/2014Tinka Starts Drilling at Ayawilca; Farms Out Rurimarac Gold ...
26/08/2014Tinka Mobilizes First of Three Drill Rigs to Ayawilca-Colqui...
06/08/2014Tinka Provides Exploration Update; Grants Stock Options; Ret...
21/05/2014Tinka to Commence Geophysical Surveying to Cover 26 km2 at A...
18/12/2013Drills 12 Metres of 4.22% Zinc and Intercepts Mineralization...
16/12/2013Adopts Advance Notice Policy for Director Nominations
30/11/2013Announces Appointment of Corporate Development - Investor Re...
24/10/2013Resumes Drilling at Ayawilca Project, Peru
03/09/2013(Colquipucro)Receives Return to Work Permit for Ayawilca Project and Dril...
23/07/2013Tinka Announces the Approval of Its Environmental Impact Ass...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/07/2013Announces the Approval of Its Environmental Impact Assessmen...
23/05/2013Tinka Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/...
23/05/2013(Colquipucro)Drills 60 Metres of 109 g/t Ag and 10 Metres of 232 g/t Ag a...
22/05/2013Drills 60 Metres of 7.75% Zinc (Including 24 Metres of 13.85...
10/05/2013Announces Oversubscription in Private Placement Financing
23/04/2013Tinka Identifies 1.7 Km Anomalous Geophysical Strike Length ...
23/04/2013Identifies 1.7 Km Anomalous Geophysical Strike Length At Aya...
02/04/2013Tinka Drills 16 Metres of 4.62% Zinc
02/04/2013Drills 16 Metres of 4.62% Zinc (Including 8 Metres of 6.62% ...
26/03/2013Drills 18.7 Metres of 165 g/t Ag (Including 8 Metres of 298 ...
21/03/2013Tinka Announces Results of AGM
12/03/2013Tinka Drills 12 Metres of 5.84% Zinc
13/02/2013Named to TSX Venture Top 50
08/01/2013Tinka Drills 70 metres of 4.8% Zinc (Including 19 metres of ...
08/11/2012Tinka Drills 20 m of 7.1% Zinc Including 14 m of 9.6% Zinc a...
18/10/2012Tinka Releases Independent NI 43-101 Report for the Colquipu...
15/10/2012(Colquipucro)Increases Inferred Silver Resource To 32.7 Million Ounces At...
02/08/2012Tinka Secures Surface Agreement With
05/03/2012Tinka Extends IP Anomaly at Ayawilca Zone to
23/02/2012Tinka Drills 10.4 metres of 7% Zn at
07/02/2012Tinka commences second IP survey at Ayawilca
04/08/2011Tinka Resources drilling update
01/06/2011ANNOUNCES $5 MILLION FINANCING
19/05/2011DRILL RIG MOBILIZED TO TINKA'S COLQUIPUCRO
19/05/2011GUYANA PRECIOUS METALS ANNOUNCES TAKARA RESOURCES PROVIDES ...
07/03/2011TINKA SIGNS DIAMOND DRILL CONTRACT FOR
03/10/2007Drills 66m Grading 83 g/t Silver from Surface at Colquipucro...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TK.V)Other OTC (TKRFF)
0,135+3.85%0,100+3.09%
TSX-V
CA$ 0,135
24/04 16:11 0,010
3,85%
Cours préc. Ouverture
0,130 0,135
Bas haut
0,135 0,135
Année b/h Var. YTD
0,100 -  0,140 12,50%
52 sem. b/h var. 52 sem.
0,100 -  0,180 3,85%
Volume var. 1 mois
11 000 12,50%
24hGold TrendPower© : 44
Produit
Développe
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 24/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20248,00%
2023-7,41%0,170,11
2022-15,63%0,220,12
2021-28,89%0,300,16
202015,38%0,250,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :