In-Fill Diamond Drilling Confirms Continuity of High Grade Gold Zones at the SREP Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

                                                                RUSORO MINING LTD.

                               355 Burrard Street, Suite 830     Vancouver, BC  V6C 2G8

                                            Tel:  604-682-1545    Fax:  604-682-1514

 

            In-Fill Diamond Drilling Confirms Continuity of

               High Grade Gold Zones at the SREP Project

 

April 30, 2007                                                                                             Trading Symbol (TSX-V):RML

 

Vancouver, Canada – The Company is very pleased to report that results for 32 holes of a 40 hole, 10,000 m

diamond drill program at the San Rafael/El Placer Project (SREP) in southeastern Venezuela have been received.  

This drilling was part of an in-fill program designed by the Company’s engineering consultants, Micon International,

to further test the continuity of the main gold mineralized blocks.

 

Highlights:

Ø    In-fill drilling program has confirmed the existing interpretation with grades consistent to previous drilling

           (averaging 16 to 20 g/t Au), being encountered in all holes targeted at the central portions of the interpreted ore blocks.

Ø    Drilling outlined a significant new gold mineralized structure 20 to 40 metres north of the targeted blocks. 

      The Company will immediately design a drill program to define the limits of this new zone both in strike and to depth. 

Ø    Based on the highly positive nature of the in-fill drilling the Company plans to complete a 1.8 kilometre ramp which

            will provide access to the main ore bodies 180 metres below surface.  The ramp will provide all of the necessary access

            for future mining operations. 

 

Detailed drilling and underground sampling will continue to evaluate the potential economics of the SREP zones.  Preliminary

engineering including the location, orientation, and angle of the ramp has been completed by Rusoro staff.  A mining contractor

has been hired who has completed initial site visits and a review of the existing layout.  Equipment requirements have been

determined and their purchase is underway. 

 

The Company’s main goal is to concurrently build this ramp and complete the underground development at SREP, while continuing

the comprehensive expansion and upgrade of the Company’s centrally located Emilia mill facility.  The Emilia Mill Facility project

is on schedule for completion in Q4 2007 with the Company aiming to start commercial production in early 2008. 

 

Diamond drilling was conducted by Major Drilling of Moncton, New Brunswick, Canada.  All drilling and drill sampling have

been completed using industry standard practices.  All drill core is described in detail and photographed and one half of the core

remains for inspection and reference.

 

Sample analyses have been conducted at SGS labs and Triad Labs located in El Dorado and El Callao, Venezuela.  All sample analyses

were completed using industry standard practices and standard samples, blanks and duplicate check samples were randomly inserted

into the sample stream to ensure quality control.  A review of the QA/QC results shows no significant bias and all results are considered

highly reliable.  Sample rejects for all drill samples are stored in Rusoro’s secure facilities in Tumeremo, Venezuela, and will continue to

be available for any further testing which may be required.  All QA/QC is completed under the direction of G.F. Smith, P.Geo.

 


Qualified Person:  Mr. Gregory Smith, P.Geo, the Vice-President Exploration of the Company, is the Qualified Person as defined by

National Instrument 43-101, and is responsible for the accuracy of this news release.

 

ON BEHALF OF THE BOARD

    “Mario Szotlender”

Mario Szotlender, President

                             

          The TSX Venture Exchange has not reviewed and does not take responsibility for the adequacy or accuracy of this release.

 

CONTACT INFORMATION :

 

Tel: 604-682-1545           Fax: 604-682-1514

Toll Free:  1-800-668-0091

Symbol: TSX-V:RML     Email: info@rusoro.com

Website:  www.rusuro.com

 

 

 

Weighted

 Average

 

 

Drill Hole

Au (g/t)

sample (m)

From (m)

To (m)

ED-07-540

4.44

1.0

174.0

175.0

ED-07-541

23.89

1.0

158.0

159.0

ED-07-542

9.25

2.0

107.0

109.0

ED-07-544

12.37

3.0

165.0

168.0

ED-07-545

4.36

3.0

276.0

279.0

ED-07-547

3.45

1.0

149.0

150.0

ED-07-548

3.04

3.0

217.0

220.0

and

7.67

1.0

247.0

248.0

ED-07-549

2.23

2.0

233.0

235.0

ED-07-550

11.44

3.0

340.0

343.0

ED-07-551

6.94

5.5

389.5

395.0

ED-07-552

12.40

2.0

364.4

366.4

ED-07-553

0.65

2.0

186.0

188.0

ED-07-554

7.12

2.0

225.0

227.0

ED-07-556

8.17

2.0

207.0

209.0

ED-07-557

0.73

3.0

334.0

337.0

ED-07-558

1.01

3.0

377.0

380.0

ED-07-559

1.16

5.0

421.0

426.0

ED-07-560

3.51

5.0

268.0

273.0

ED-07-650

3.08

2.0

143.0

145.0

ED-07-651

51.93

2.0

295.0

297.0

and

47.24

2.0

312.0

314.0

ED-07-652

3.78

2.0

109.0

111.0

ED-07-653

12.34

1.0

348.0

349.0

ED-07-657

7.53

1.0

228.0

229.0

ED-07-658

0.86

1.0

137.0

138.0

ED-07-661

1.56

6.0

405.0

411.0

ED-07-662

6.01

1.0

208.0

209.0

ED-07-665

3.78

2.0

150.0

152.0

ED-07-666

71.25

3.0

541.0

544.0

ED-07-667

0.78

2.0

154.0

156.0

ED-07-669

16.23

2.0

291.0

293.0

ED-07-670

12.33

3.0

312.0

315.0

ED-07-671

1.66

2.0

322.0

324.0

NOTES:          1) All thicknesses are core widths / true widths estimated at 70-80%.

                                        2) All weighted averages calculated using uncut assays.

 

Rusoro Mining

PRODUCTEUR
CODE : RML.V
ISIN : CA7822271028
CUSIP : 782227 10 2
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Rusoro Mining est une société de production minière d'or basée au Canada.

Ses principaux projets en production sont LA CAMORRA MILL, CHOCO 10 MINE et BLOCK B (ISIDORA ET AL) au Venezuela, ses principaux projets en développement sont ISIDORA, SAN RAFAEL/EL PLACER et INCREDIBLE 6 au Venezuela et ses principaux projets en exploration sont TRINIDAD, YURUAN, TWIN SHEAR, EMILIA MILL, CEIBA et VALLE HONDO au Venezuela.

Rusoro Mining est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 681,0 millions CA$ (498,3 millions US$, 465,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 01 décembre 2006 à 4,19 CA$, et son plus bas niveau récent le 28 novembre 2014 à 0,01 CA$.

Rusoro Mining possède 544 770 048 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Rusoro Mining
09/01/2009featured in National Post and Reuters articles
27/06/2000Hecla's La Camorra Mine Producing At Record Rates
Nominations de Rusoro Mining
15/05/2008Appointments
08/01/2008Appoints new COO
27/09/2007Appoints Omar Salas as CFO
04/09/2007Appoints George Salamis as President
Rapports Financiers de Rusoro Mining
30/06/2011Reports Q1 2011 Financial Results
29/08/2008Reports Q2 2008 Financial Results
Projets de Rusoro Mining
06/07/2010(Choco 10 Mine)Announces Updated Resource Estimate for the Choco 10 Deposit...
20/07/2009(Choco 10 Mine)Rusoro Mining Initiates Major Engineering Studies
14/01/2009(Choco 10 Mine)Reports Record Gold Production and Record Low Cash Costs fo...
19/12/2008(Choco 10 Mine)Reports Record Gold Production and Record Low Cash Costs at ...
06/09/2008(Isidora)Completes Landmark Agreements with Venezuelan Government to ...
07/08/2008(Isidora) Report Filed for Isidora and Twin Shear Projects Acquired F...
09/05/2008(Choco 10 Mine)Scoping/Feasibility Studies Awarded
23/01/2008Choco 10 Production/Permitting Update
10/12/2007(Choco 10 Mine)News Release - Choco 10 update
29/11/2007UPDATED 43-101 ACCEPTED FOR FILING RUSORO DRILLS 21m of 8.44...
21/11/2007(Choco 10 Mine)2007 Technical report
11/06/2007Intersects 37m of 9.34g/t Au and 21m of 4.72g/t Au in Separ...
23/05/2007Numerous High Grade Intercepts
30/04/2007In-Fill Diamond Drilling Confirms Continuity of High Grade G...
Communiqués de Presse de Rusoro Mining
25/06/2015Rusoro Provides Update On Status Of International Arbitratio...
23/01/2014Adopts Advance Notice Policy
23/01/2014Adopts Advance Notice Policy
22/09/2011NR - Gold Law Update
16/06/2011NR
14/06/2011Reports on its Loan Repayment Status
22/06/2010Makes Second Payment of Restructured Secured Exchangeable Lo...
11/06/2010Loan Restructuring Closes
15/04/2010SREP Results
12/01/2010Positive Change in Exchange Rate Policy
19/11/2009Purchases Portion of loan
25/09/2009Aims to be Producing 540,000 Ounces of Gold Per Year By 2012
25/08/2009Q2 Record Production and Low Cash Costs
20/07/2009Initiates Major Engineering Studies at Choco 10 and San Rafa...
02/06/2009reports net income of $0.5 million for Q1 2009 and record pr...
01/06/2009Reports Positive Q1 and Record Production
19/05/2009Preliminary Assessment for Choco 10 Expansion
19/05/2009Reinhard Updates Rusoro Mining
19/05/2009Preliminary Assessment: Production Expansion of Choco 10
02/03/2009Midas Letter interviews Rusoro President George Salamis
25/02/2009Winston highlights Rusoro's rapid growth and low cash costs
24/02/2009Reports Record Gold Production and Cash Costs for January 20...
10/02/2009Withdraws Offer for Gold ReserveThread-Topic: Rusoro Withdra...
09/02/2009OSC SETS HEARING DATE TO CONSIDER CEASE TRADE OF GOLD RESERV...
28/01/2009insiders buying, growing production & positive cash flow
02/02/2009 Applies to Terminate GRZ Poison PillThread-Topic: Ruoro NR ...
21/01/2009featured in 'Business in Vancouver' magazine
20/01/2009Extends Expiry Date of Gold Reserve takeover BidThread-Topic...
14/01/2009Record Production/Cash Costs Q4 2008Thread-Topic: Rusoro NR ...
15/01/2009Reuters covers Rusoro Mining
13/01/2009Blogger interviews George Salamis, President of Rusoro Minin...
09/01/2009Reinhard reviews Rusoro’s takeover bid for Gold Reserve
05/01/2009Responds to Gold Reserve's Directors' Circular.Thread-Topic:...
05/01/2009Responds to Gold Reserve=E2??s Directors=E2?? Circular and O...
30/12/2008Entrenched Gold Reserve Management Continues to Attempt to D...
22/12/2008Mails Bid Documents to Gold Reserve Shareholders; Amends Fil...
19/12/2008Two Rusoro Mining clips from today's BNN Commodities Report
19/12/2008to Defend Against GRZ Attempt to Disenfranchise Own Sharehol...
19/12/2008TO DEFEND AGAINST GOLD RESERVE?S ATTEMPTS TO DISENFRANCHISE ...
15/12/2008LAUNCHES TAKE-OVER BID FOR GOLD RESERVEThread-Topic: RUSORO ...
17/12/2008The Offer From Rusoro Could Be The Best Christmas Present Sh...
16/12/2008FULLY COMMITTED TO BID FOR GOLD RESERVEThread-Topic: RUSORO ...
03/11/2008Expands Resources and Increases Grade at SREPThread-Topic: R...
16/09/2008? Annual General Meeting Results
09/09/2008advances in Venezuela says MineWeb.com
05/09/2008Signs Landmark Agreements with GovernmentThread-Topic: Rusor...
28/08/2008Responds to Gold Reserve News Release
10/07/2008Partners With Venezuelan Govt. - Hecla Assets Acquisition Cl...
09/07/2008drills 39.1 g/t Au over 5.7 m at Yuruan projectThread-Topic:...
20/06/2008NR - Hecla Venezuelan Assets AcquisitionThread-Topic: Rusoro...
01/05/2008CONFIRMS GOOD STANDING WITH GOVERNMENT AGENCIES IN VENEZUELA
23/04/2008Positive Meetings With Mines Minister
03/12/2007Choco 10 Acquisition Closes
26/11/2007 Drilling Starts at Valle Hondo
15/11/2007DRILLS 37m of 9.34g/t Au AT INCREIBLE 6 ALL MAIN GOLD ZONES ...
12/10/2007RAISES $210 MILLION FOR ACQUISITION OF GOLD FIELDS VENEZUELA...
12/10/2007to Acquire Gold Fields’ Venezuelan Assets to become Immediat...
11/09/2007Management Additions at AGM
19/04/2007Positive Results Continue at Increible 6 Gold Project, Boliv...
22/03/2007News reslease
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (RML.V)FRANKFURT (PKJ2.F)
1,25+0.00%0,842+1.69%
TSX-V
CA$ 1,25
26/04 16:59 -
0%
Cours préc. Ouverture
1,25 1,26
Bas haut
1,24 1,27
Année b/h Var. YTD
0,570 -  1,29 108,33%
52 sem. b/h var. 52 sem.
0,075 -  1,29 1 462,50%
Volume var. 1 mois
347 799 7,76%
24hGold TrendPower© : -38
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 18/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024216,46%
2023690,00%0,520,05
20220,00%0,100,04
202142,86%0,140,04
2020-41,67%0,080,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :