Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Dans la même rubrique

Castle Gold Corporation

Publié le 23 janvier 2009

Increase in Fourth Quarter 2008 Production

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Fortuna | G Mexico | Guatemala |

Marketwire

 
 
Castle Gold Corporation
TSX VENTURE: CSG
Other Recent News

January 23, 2009
Castle Gold Reports Increase in Fourth Quarter 2008 Production to 6,928 Ounces Gold, Provides Update on Operating Performance Expectations for 2009
TORONTO, ONTARIO--(Marketwire - Jan. 23, 2009) - CASTLE GOLD CORPORATION (Castle Gold, the Company) (TSX VENTURE:CSG) is pleased to report on its fourth quarter 2008 operating performance from its 100% owned El Castillo Gold Mine located in Durango, Mexico and its 50% owned El Sastre Gold Mine located in Guatemala. Production for the fourth quarter 2008 totalled 6,928 ounces, including 5,386 ounces of gold from El Castillo and 1,542 ounces of gold from El Sastre (Castle Gold's 50% share).

Gold production from El Castillo during the fourth quarter increased 16% to 5,386 ounces, compared to the third quarter 2008 period (4,629 ounces of gold reported in Q3-2008) as the Company continues to ramp-up gold production levels according to plan. During the month of December 2008 El Castillo produced 2,034 ounces of gold, or an annualized rate of 24,400 ounces of gold. The Company also achieved a new monthly record with 523,205 tonnes of material mined. Average grade of ore material mined during the fourth quarter was 0.53 grams per tonne gold. The waste to ore ratio ("strip ratio") for the quarter averaged 1.47 to 1.0, including a waste to ore ratio of 1.7 to 1.0 during December.

Gold production from El Sastre during the fourth quarter decreased 19% to 1,542 ounces (Castle Gold's 50% share), compared to the third quarter 2008 period (1,913 ounces of gold reported in Q3-2008) due to generally lower tonnages mined and a small increase in the waste to ore ratio. Grade mined during the fourth quarter was higher at 2.84 grams per tonne compared to an average grade of 2.55 grams per tonne in the third quarter 2008 which partially offset the lower tonnages mined.

Thomas Atkins, President and CEO of Castle Gold commented on the fourth quarter operating performance stating: "The El Castillo operating team performed well during the quarter with production rebounding in the latter half of the period as the rainy season ended. This permitted a return to more normal production levels. For the quarter, El Castillo achieved record levels of material mined and gold production. Quarterly gold production numbers were that much more significant given that the operation continued to mine high levels of waste. The stripping ratio, the ratio of waste to ore, is expected to average approximately 1.2 to 1.0 during 2009, a 20% reduction from levels mined in the third and fourth quarter of 2008. Beyond 2009, waste to ore ratios will decline to approximate life-of-mine ratios of 0.6 to 1.0. The reduction in the strip ratio enables the mining of higher quantities of gold ore with the same equipment, resulting in greater gold production and reduced costs per ounce of gold produced. We also expect that as the strip ratio declines we should begin to gain exposure to some higher grade portions of the mine. Additional ore at higher grades has the potential to further boost the economics of the mine in the coming quarters."

Outlook for 2009

El Castillo

Expanded Production

During the fourth quarter 2008, the Company has been pursuing quotes from contractors on competitive terms for the utilization of larger and higher capacity mining equipment. Larger and more efficient equipment is key to the ramp-up in production to in excess of 50,000 ounces gold per annum. To this end the Company has been in contact with 13 contractors soliciting competitive quotes for the mining of the objective quantity of material. Of these 13 contractors the Company has received bids from 11 contactors for this work. Over the coming weeks the Company expects to narrow the selection of these bids down to a single contractor offering a combination of the most cost competitive terms and best service.

The larger equipment will be employed in the ramp-up of production from a current rate of approximately 520,000 tonnes mined monthly to in excess of 800,000 tonnes mined monthly. At the planned mining rate of 800,000 tonnes per month, and taking into account the reduction of the waste to ore ratio from the average of approximately 1.6 to 1.0 during 2008 to 1.2 to 1.0 in 2009, the Company expects to see an increase in gold production to in excess of 50,000 ounces per year in the second half of 2009. Beyond 2009 the waste to ore ratio will decline to approximately 0.6 to 1.0 under the current phase of planned mine expansion.

In addition to the pursuit of a new mining contract, the Company is also pursuing the purchase of used equipment to supplement contractor equipment. This equipment has the potential of supplementing the new equipment provided by the contractor, possibly enabling the enhancement of production beyond currently designed levels and could also act as spare equipment in the event of unscheduled maintenance of contractor equipment. The operation of such equipment by Company employees has the potential to further reduce per tonne mining costs beyond efficiencies currently being sought in the new mining contract. Once terms have been negotiated under the new contract, timing of equipment, mobilization and the timing of the ramp-up of production will be more clearly understood. It is expected that the impact of mining higher volumes of material should begin to be reflected in higher volumes of gold production in the third and fourth quarters 2009 and beyond.

Resource Expansion Drilling

The Company is preparing for the commencement of its first drill program at El Castillo to explore the potential to enhance the gold resources. During the fourth quarter 2008 a combination of in-pit geological and structural mapping, historic, widely-spaced drill data and the evaluation of historical geochemical survey results has identified compelling targets for an initial, first phase 14-hole reverse circulation drill program to explore resource extension opportunities to the south, southeast and east of the current pit. This program is expected to commence in the coming weeks and is expected to require approximately one month to complete. Assay results are expected to take approximately six weeks from completion of the drill program. As the timing of commencement of this program becomes more evident, the Company intends to issue a press release detailing the location and objectives of the program.

Sulphide Resources

The Company is studying the quantity and recovery of sulphide resources that exist below the limits of the current open pit resources at El Castillo, resources and reserves which only take into account oxidized material. A resource study is underway and is expected to identify gold resources at varying gold cut-off grades. A historic resource completed under non-43-101 standards identified approximately 300,000 ounces of sulphide resources. The Company has also completed the selection of quantities of available drill core from the sulphide zone for metallurgical testing. This metallurgical program is expected to determine the means and extent to which gold may be recovered from this sulphide material. The new resource study is expected to be completed prior to the end of the first quarter 2009. Results from the metallurgical test program on the sulphide material are expected early in the second quarter 2009.

La Fortuna Property

At the Company's La Fortuna gold-silver-copper advanced-stage exploration project the Company is mobilizing personnel and setting-up a camp to initiate its concession-wide mapping and sampling program and its geochemical program and geophysical program aimed at calibrating these exploration tools over known mineralized gold-silver-copper bearing structures and testing extensions to these structures beyond the currently known 309,000 ounce gold resource identified in the recent NI 43-101 study (refer to press release dated November 12, 2008). Following this work the Company hopes to initiate an exploration drill program testing attractive areas to host extensions to known mineralization at the La Fortuna mine site and depending on results, additional attractive prospects for gold mineralization on the Company's approximate 10,000 hectare land position. Within the 10,000 hectare land position a number of historical workings are know to exist that host potentially economic intersections of gold mineralization. Based on the results of this surface work, the first phase drill program could begin in the second half 2009.

About Castle Gold

Castle Gold Corporation is a growth oriented gold producer with projects focused in the America's. The Company owns a 100% interest in the El Castillo gold mine in Mexico and a 50% interest in the El Sastre gold mine in Guatemala. Castle Gold is also advancing exploration and development work at its La Fortuna gold-silver-copper project in Mexico.

Total Shares Outstanding:          75.3MM
Fully Diluted:                     88.9MM
52-Week Trading Range:     C$0.15 - $0.64
 



The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this news release.

CONTACT INFORMATION:

Castle Gold Corporation
Thomas Atkins
President and CEO
(416) 214-4809 or Toll Free: 1-866-646-3274
Fax: (416) 366-7421

or

Castle Gold Corporation
Rory Quinn
Manager Investor and Public Relations
(416) 214-4809 or Toll Free: 1-866-646-3274
Fax: (416) 366-7421
Email: info@castlegoldcorp.com
Website: www.castlegoldcorp.com

INDUSTRY: Manufacturing and Production - Mining and Metals

Footer


If you no longer want to receive announcements from us, please do not reply to this e-mail. Instead simply click . . <
Données et statistiques pour les pays mentionnés : Guatemala | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Guatemala | Tous

Castle Gold Corporation

PRODUCTEUR
CODE : CSG.V
ISIN : CA22122T1030
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Castle Gold Corp. est une société de production minière d'or basée au Canada.

Castle Gold Corp. est productrice d'or, d'argent au Guatemala et au Mexique.

Ses principaux projets en production sont EL SASTRE GOLD MINE, EL SASTRE, EL SASTRE - EL ARENAL, EL SASTRE BRIDGE ZONE et EL SASTRE - LUPITA ZONE au Guatemala et EL CASTILLO MINE au Mexique et son principal projet en exploration est LA FORTUNA DURANGO au Mexique.

Castle Gold Corp. est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 776 300 CA$ (596 819 US$, 545 553 €).

La valeur de son action a atteint son plus haut niveau récent le 18 janvier 2008 à 0,75 CA$, et son plus bas niveau récent le 30 juillet 2015 à 0,01 CA$.

Castle Gold Corp. possède 77 630 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Castle Gold Corporation
Annual Report 2007
Financements de Castle Gold Corporation
25/06/2014Cosigo announces non-brokered private placement
Nominations de Castle Gold Corporation
24/11/2014Cosigo announces resignation of two directors
02/07/2008Appoints New Chief Financial Officer and Manager of Investor...
Rapports Financiers de Castle Gold Corporation
25/11/2009Reports Third Quarter 2009 Operating and Financial Results
26/08/2009Reports Second Quarter 2009 Operating and Financial Results
23/01/2009(El Castillo Mine)Increase in Fourth Quarter 2008 Production
27/11/2008Third Quarter Financial Results
20/06/2008Files Q1-2008 Financial Statements Indicating First Quarter ...
13/06/2008Filing Of First Quarter Financial Statements Delayed Cease T...
07/09/2007Records Strong Second Quarter Results: Cash Costs Fall To $1...
Projets de Castle Gold Corporation
09/11/2009(La Fortuna Durango)Reports Up to 39 Grams Per Tonne Gold and Up to 1,500 Grams ...
21/10/2009(El Castillo Mine)Q3-2009 Operating Performance-El Castillo Gold Production In...
21/07/2009(El Castillo Mine)Operation of Remaining New Equipment Fleet at El Castillo Mi...
09/06/2009(El Castillo Mine)Intersects 42,7 Metres Grading 0,7 Grams Per Tonne Gold as P...
21/05/2009(El Castillo Mine)Intersects 109.7 Metres Grading 0.7 Grams Per Tonne Gold
02/03/2009(El Castillo Mine)Commences Drill Program to Test Gold Resource Expansion Pote...
24/02/2009(El Castillo Mine)625,000 Ounce Transition/Sulphide Zone Gold Resource Below E...
02/12/2008(La Fortuna Durango)Completes Phase 1 of Metallurgical Studies for La Fortuna Pr...
12/11/2008(La Fortuna Durango)43-101 Technical Report
20/08/2008(El Castillo Mine)Reports Enhanced Resources And Reserves And Resulting Increa...
11/08/2008(El Castillo Mine)Attains Commercial Production At Its El Castillo Gold Mine...
16/01/2008(La Fortuna Durango)Commences Drilling at La Fortuna Gold Project
10/01/2008(El Castillo Mine)Updates Progress at Castillo Mine
Communiqués de Presse de Castle Gold Corporation
03/08/2015Cosigo Requests NEX Listing
06/07/2015Cosigo Appoints Officers
11/05/2015IIROC Trading Halt - CSG
29/04/2015IIROC Trading Resumption - CSG
27/04/2015Cosigo Board Structures Acting Positions
07/03/2015Cosigo Board Appoints Two New Members
23/02/2015Cosigo Board and Management Resign
18/02/2015IIROC Trading Halt - CSG
26/11/2014Cosigo Engages Financial Advisory Services
15/10/2014Cosigo announces formation of strategic committee; Provides ...
31/07/2014Cosigo Resources Ltd. - President's Update
04/02/2014Cosigo reports further gold-bearing intercepts at Machado
20/12/2013Cosigo intersects gold in initial two drill holes at Machado
09/12/2013Cosigo adds Romero as Colombia Business Advisor
18/06/2013Cosigo Resources Ltd. Closes $1,113,775 Private Placement
21/05/2013Cosigo Resources announces non-brokered private placement
30/12/2009Over 90% of Castle Gold Shares Tenderedto Argonaut Offer-Arg...
15/12/2009Reminds Shareholders to Tender to Argonaut Gold Cash Offer
24/11/2009Provides an Update on Argonaut Gold Cash Offer
18/11/2009Closes Financing & Provides Up
30/10/2009 Management Change
28/10/2009Argonaut Gold Seeks to Acquire Castle Gold for a Minimum of ...
16/07/2009Provides Update on Strategic Alternative Review Process
18/06/2009Provides Update on Strategic Alternative Review Process
28/05/2009Reports Record Quarterly Gold Production and $0=2E01 Per Sha...
02/03/2009Committee Update and Shareholder Rights Plan
05/11/2008Announces Stock Repurchase Program
30/09/2008(CSG) at Toronto Cambridge Resource Investor Conference Oct...
26/09/2008Provides Update on Corporate Restructuring Initiatives
10/09/2008Announces Change to Its Board of Directors
04/07/2008Announces Results of Annual General Meeting
27/09/2007Sells First El Castillo Gold At Us $715 Per Ounce
17/09/2007Announces Early Exercise Warrant Incentive Amendment
11/09/2007 presenting at the 2007 Annual Resource Investors Forum in S...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CSG.V)OTHER OTC (CSGLF)
0,010+0.00%0,020+0.00%
TSX-V
CA$ 0,010
30/07 15:44 -
0%
Cours préc. Ouverture
0,010 0,010
Bas haut
0,010 0,020
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,010 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -31
Produit Gold
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 09/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,26 US$-0,53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,58 GBX-0,35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,49 CA$-0,40%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,41 CA$-1,34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,72 CA$-0,86%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,68 US$-1,39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :