Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Osisko Increases Gold Reserve at Canadian Malartic to 10.7 Million Ounces
Published : March 31, 2011

Total reserves up 19 percent

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Louis |

MONTREAL, QUEBEC--(Marketwire - March 31, 2011) - Osisko Mining Corporation (News - Market indicators)(FRANKFURT:EWX) is pleased to provide an updated reserve and resource estimate for its 100%-owned Canadian Malartic project. This new estimate, calculated at US$1000 gold, combines the previously-reported US$825 reserves and resources of the Canadian Malartic (CM) and South Barnat deposits (see February 10 2010 press release) with new resources defined from the ongoing drill program, including the Barnat Extension and Gouldie Zones.

Belzile Solutions Inc. of Rouyn-Noranda, Québec ("BSI") and G Mining Services of Montreal, the independent resource/reserve estimate consultants for Osisko, have authorized the release of the following estimates. Highlights include:

  • The open pit Proven & Probable reserve has increased to 10.71 million (M) ounces gold at a fully diluted average grade of 0.97 g/t, a 1.74 million ounce or 19.3 percent increase relative to the previously-published estimate of 8.97 million ounces (see February 10, 2010 press release);

  • Global Measured and Indicated (M&I) resources above a cut-off grade of 0.30 g/t Au have increased to 11.80 M ounces gold, a 600,000 ounce or 5.4 percent increase relative to the previously-published estimate of 11.20 M ounces (see December 14, 2009 press release);

  • Global Inferred resources above a cut-off grade of 0.30 g/t Au have increased to 850,000 ounces gold, a 510,000 ounce or 150% percent increase relative to the previously-published estimate of 340,000 ounces (see December 14, 2009 press release);

  • In-pit Inferred resources (not included in reserves) consist of an additional 197,000 oz gold (9.0 M tonnes at 0.68 g/t Au), which was considered as waste and could potentially be converted to reserves with additional drilling.

  • Recoverable gold has increased by 1.47 M ounces to 9.19 M ounces (at 85.8% recovery) from 7.72 M ounces (at 86.1% recovery; see February 10, 2010 press release).

  • 7.21 M ounces of gold in the in-pit M&I resource category, representing 67.3 percent of the reserve, has an average grade of 1.80 g/t using a very conservative cut-off grade of 1 g/t gold.

  • At a gold price of US$1400 per ounce, the in-pit diluted M&I resource increases to 11.80 M ounces of gold at an average grade of 0.84 g/t Au.

  • These reserve/resource estimates were calculated from a robust database comprising 636,200 metres of drilling completed by Osisko since March 2005, as well as 228,500 metres of historical drilling that was tested and validated.

Reserve and resource estimates using base case US$1000 engineered pit design with 0.30 g/t Au (South Barnat) to 0.32 g/t Au (CM) lower cut-off grade

Category Tonnes (M) Grade (g/t) Au (M oz)
Proven Reserves 48.7 0.80 1.26
Probable Reserves 295.0 1.00 9.45
Proven & Probable Reserves 343.7 0.97 10.71
Out-of-pit Indicated Resources 47.6 0.77 1.18
Global Inferred Resources 33.9 0.78 0.85

Sean Roosen, President and CEO, noted: "We are very proud to be able to present our shareholders with these updated reserve and resource estimates. We have increased our reserves by over 19 percent with respect to last year and by over 70 percent with respect to the 2008 Feasibility Study. This is a very significant increase in reserves which will positively impact the mine life and economics of the project. Ongoing drilling continues to define new mineralization in areas such as the Jeffrey and Western Porphyry Zones, which has not been included in this reserve/resource estimate".

"I would also like to add that using a very conservative cut-off grade of 1 g/t gold, the in-pit M&I resource is 7.21 million ounces gold, that is 67 percent of the reserve, at an average undiluted grade of 1.80 g/t Au. Furthermore, at US$1400 per ounce gold, the in-pit M&I resource increases to 11.80 million ounces at an average diluted grade of 0.84 g/t gold, virtually all of which could potentially be converted to reserves, if one assumes a similar conversion factor as in the case of the present estimates."

For the purpose of the reserve estimate, the optimal Whittle pit shell was used as a guideline for the manual design of the engineered pit, and only the in-pit measured and indicated resources were considered. Optimization parameters included a gold price of US$1000 per ounce, processing costs of US$5.66 per tonne, total ore-based costs of US$7.18 per tonne, average metallurgical recovery of 85.8% and inter-ramp pit slope angles between 46 and 55 degrees. The strip ratio is estimated at 2.28 with average diluted grade of 0.97 g/t Au based on a calculated dilution of 8.9%. The quoted mineral reserve is exclusive of estimated historical stope crown pillar losses. The proven & probable reserves lost in crown pillars are estimated at 2.8 M tonnes at an average grade of 1.98 g/t Au for 178,260 ounces gold.

Details on updated costs, mine plan, production schedules and mine life will be provided in Q2 2011. Projected production for 2011 and 2012 may be less than previously projected (see February 10, 2010 press release and subsequent disclosure), due to the increased overall reserve and its effect on the mine plan. The new mine plan will be modified to include new ounces defined in lower grade zones that require incorporation into the 2011 – 2012 mining schedule, to accommodate required waste dumps over these newly identified mineralized deposits. For example, modifications to the mine plan now include earlier mining of the Gouldie zone (reserves of approximately 185,652 ounces at a diluted grade of 0.91 g/t Au) which requires early extraction because of its location. Furthermore, noise levels imposed on operations currently restrain ramping up to full production capacity of 55,000 tpd. Osisko continues to implement noise reduction measures and is working to resolve noise level issues with the Quebec government to allow production ramp-up to full capacity for Q3 2011.

Updated Resource Estimates

BSI, in collaboration with G Mining Services Inc. of Montreal, estimated an in-pit M&I resource within a single Whittle-optimized pit shell using a base case gold price of US$1000 per ounce. The total in-pit M&I resource for the Canadian Malartic Project is 10.63 million ounces of gold at an average undiluted grade of 1.08 g/t Au, with an additional 0.20 million ounces gold at an average grade of 0.68 g/t Au in the inferred category, based on a derived lower cut-off grade of 0.32 g/t Au for the Canadian Malartic portion of the pit and a derived lower cut-off grade of 0.30 g/t Au for the South Barnat portion of the pit. The tables below summarize the in-pit estimates using variable lower cut-off grades:

Canadian Malartic Undiluted Resource Estimates within US$1000 Whittle Pit Shell

Measured Indicated   Total M&I
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Cut-off
(g/t)
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
1.00 37.4 1.20 1.10 267.7 9.43 0.30-0.32* 1.08 305.1 10.63
1.07 33.8 1.16 1.19 237.2 9.08 0.40 1.17 271.0 10.24
1.17 28.7 1.09 1.30 205.9 8.63 0.50 1.29 234.6 9.71
1.30 24.0 1.00 1.42 178.8 8.15 0.60 1.40 202.8 9.15
1.43 20.0 0.92 1.52 156.9 7.69 0.70 1.51 176.9 8.61
1.56 16.8 0.84 1.62 139.7 7.28 0.80 1.61 156.5 8.12
1.68 14.4 0.78 1.71 125.2 6.88 0.90 1.71 139.5 7.66
1.81 12.2 0.71 1.80 112.6 6.50 1.00 1.80 124.8 7.21
Inferred  
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Cut-off
(g/t)
0.68 9.0 0.20 0.30-0.32*
0.79 6.8 0.17 0.40
0.89 5.2 0.15 0.50
1.00 4.0 0.13 0.60
1.13 2.9 0.11 0.70
1.25 2.2 0.09 0.80
1.35 1.8 0.08 0.90
1.47 1.4 0.06 1.00
* Cut-off of 0.30 g/t Au for Barnat and 0.32 g/t Au for Canadian Malartic.

Sensitivity of the in-pit diluted M&I resource to gold price is as follows (inferred resources excluded):

Gold Price (US$) Grade (g/t) Tonnes (M) Oz (M) Strip Ratio (Waste/Ore)
$800 1.05 300.1 10.15 2.01
$900 1.01 328.0 10.60 2.00
$1000 0.96 353.7 10.95 1.96
$1100 0.93 376.1 11.20 1.89
$1200 0.90 395.9 11.41 1.84
$1300 0.86 419.6 11.65 1.80
$1400 0.84 437.0 11.80 1.76
$1500 0.82 452.0 11.91 1.71
$1600 0.80 466.0 12.01 1.66

The global Measured and Indicated ("M&I") resource is 11.80 million ounces of gold at an average undiluted grade of 1.04 g/t Au, with an additional 0.85 million ounces gold at an average grade of 0.78 g/t Au in the Inferred category, based on a lower cut-off grade of 0.30 g/t Au at US$1000 per ounce gold. The tables below summarize the BSI estimates using variable lower cut-off grades:

Canadian Malartic Updated Global Resource Estimates

Measured Indicated   Total M&I
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Cut-off
(g/t)
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
0.98 40.7 1.28 1.05 312.0 10.52 0.30-0.32* 1.04 352.7 11.80
1.05 36.5 1.23 1.15 271.5 10.06 0.40 1.14 308.0 11.29
1.16 30.8 1.15 1.27 231.5 9.49 0.50 1.26 262.3 10.63
1.28 25.6 1.06 1.40 198.3 8.90 0.60 1.38 224.0 9.96
1.41 21.3 0.97 1.51 172.3 8.36 0.70 1.50 193.6 9.32
1.55 17.8 0.88 1.61 152.3 7.88 0.80 1.60 170.0 8.76
1.67 15.1 0.81 1.70 135.5 7.42 0.90 1.70 150.6 8.23
1.80 12.9 0.74 1.79 121.4 6.99 1.00 1.79 134.2 7.73
Inferred  
Grade
(g/t)
Tonnes
(M)
Au
(M oz)
Cut-off
(g/t)
0.78 33.9 0.85 0.30-0.32*
0.91 25.9 0.75 0.40
1.06 19.3 0.66 0.50
1.20 15.1 0.59 0.60
1.37 11.7 0.51 0.70
1.52 9.4 0.46 0.80
1.64 8.0 0.42 0.90
1.74 7.0 0.39 1.00

Details on the parameters of the resource estimates are as follows:

  • The database comprised a total of 228,500 metres of drilling validated from a larger database of historical drilling (Canadian Malartic Mines and Lac Minerals) and from approximately 636,200 metres of drilling completed and assayed by Osisko as of the end of January 2011 on a maximum 25 m x 25 metre grid. (All NQ or HQ core assays reported by Osisko were obtained by standard 50 g fire assaying-AA finish or gravimetric finish at ALS Chemex laboratories in Val d'Or, Quebec.)

  • The database also comprised a total of 572,280 assays with an average of 1.39 metre per sample for a total of 793,939 assayed metres.

  • The estimates were done using Ordinary Kriging (OK) as the geostatistical interpolation method based on 5.0 metre analytical composites. Resources were also estimated using Inverse Distance Squared (ID2) interpolation for testing and comparative purposes, which produced similar results, i.e. less than 2 percent difference in total ounces at all cut-offs.

  • Calculations were based on original samples cut to a maximum of 10 g/t to 70 g/t Au depending on the domain. The apparent reduction in the gold content varies from 0 to 14.5% depending of the domains. All five metre composites were calculated based on cut original data.

  • All estimates were based on a Parent Cell dimension of 20 metres E, 10 metres N and 10 metres height with estimation parameters determined by variography.

  • Geological interpretation identified thirty-seven different domains (sixteen in Canadian Malartic, thirteen in South-Barnat and eight in Gouldie).

  • Underground voids were modeled from historical mine plans and adjusted according to positions of drill intersections in stopes and drifts. Void volumes of stopes were increased by one metre along all edges to compensate for uncertainties. The void models were then used to deplete the resource estimate. All samples located within the voids were also removed from the estimate.

  • Tonnage estimates were based on rock densities of 2.69 tonnes/cubic metre for the porphyry, 2.75 for altered sediments and 2.83 for altered ultramafic rocks.

  • The resource estimates using the lower cut-offs of 0.32 g/t Au (CM) to 0.30 g/t Au (Barnat) are emphasized for reporting purposes as this is the in-pit cut-off estimated for the US$1000 Whittle shell.

  • The US$1000 engineered pit has approximate maximum dimensions of 3,485 metres in length, 1,265 metres in width and a vertical depth of 400 metres. 

Mr. Elzéar Belzile, P. Eng. of BSI, Mr. Louis-Pierre Gignac, P. Eng. of G Mining Services Inc. and Mr. Robert Wares, P. Geo. and Executive Vice-President of Osisko, are the Qualified Persons who have reviewed this news release and are responsible for the technical information reported herein, including verification of the data disclosed. A NI 43-101 compliant report on these updated resource and reserves estimates will be filed on SEDAR within 45 days of the date of this press release.

Cautionary Notes Concerning Estimates of Mineral Resources

This news release uses the terms measured, indicated and inferred resources as a relative measure of the level of confidence in the resource estimate. Readers are cautioned that mineral resources are not economic mineral reserves and that the economic viability of resources that are not mineral reserves has not been demonstrated. In addition, inferred resources are considered too geologically speculative to have any economic considerations applied to them. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or pre-feasibility studies or economic studies except for Preliminary Assessment as defined under NI 43-101. Readers are cautioned not to assume that that further work on the stated resources will lead to mineral reserves that can be mined economically.

Forward-Looking Statements

Certain statements contained in this press release may be deemed "forward-looking statements". All statements in this release, other than statements of historical fact, that address events or developments that Osisko expects to occur, are forward looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential", "scheduled" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur including, without limitation, the commencement of commercial production. Although Osisko believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, including, without limitation, that all technical, economical and financial conditions will be met in order to warrant further development of the project, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include gold prices, access to skilled consultants, mining development personnel, results of exploration and development activities, Osisko's limited experience with production and development stage mining operations, uninsured risks, regulatory changes, defects in title, availability of personnel, materials and equipment, timeliness of government approvals, actual performance of facilities, equipment and processes relative to specifications and expectations, unanticipated environmental impacts on operations market prices, continued availability of capital and financing and general economic, market or business conditions. These factors are discussed in greater detail in Osisko's most recent Annual Information Form and in the most recent Management Discussion and Analysis filed on SEDAR, which also provide additional general assumptions in connection with these statements. Osisko cautions that the foregoing list of important factors is not exhaustive. Investors and others who base themselves on forward-looking statements should carefully consider the above factors as well as the uncertainties they represent and the risk they entail. Osisko believes that the expectations reflected in those forward-looking statements are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking statements included in this press release should not be unduly relied upon. These statements speak only as of the date of this press release.



Osisko Mining Corporation
John Burzynski
Vice-President Corporate Development
416-363-8653
www.osisko.com
or
Osisko Mining Corporation
Sylvie Prud'homme
Investor Relations
514-735-7131
Toll Free: 1-888-674-7563

Osisko Mining Corp.

PRODUCTEUR
CODE : OSK.TO
ISIN : CA6882781009
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Osisko Mining est une société de production minière d'or basée au Canada.

Osisko Mining détient divers projets d'exploration au Bresil, au Canada et en Argentine.

Son principal projet en production est MALARTIC au Canada et ses principaux projets en exploration sont GOLDBORO, SLEITAT, JC - SMART SKARNS, HAMMOND REEF, MALARTIC CHL GOLD PROPERTY, DUPARQUET et CLEMENT LAKE au Canada, EL POTOSI et SANTA CLARA / CERRO BONITO au Salvador, CERRO CONDORINI et COAL CREEK au Perou, CASTELO DOS SONHOS au Bresil et FAMATINA en Argentine.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Osisko Mining Corp.
20/12/2018Osisko Mining reports 39% higher grade than resource model a...
Rapports annuels de Osisko Mining Corp.
2008 Annual report
Financements de Osisko Mining Corp.
31/08/2011Osisko Announces an Increase in Caterpillar Lease Financing ...
31/08/2011Announces an Increase in Caterpillar Lease Financing Facilit...
18/11/2009Strengthens Balance Sheet With $241 M Proceeds From Exercise...
30/06/2009Closes $10.64 Million Flow-Through Financing
17/04/2006Announces C10$ million "bought deal" financing
Nominations de Osisko Mining Corp.
10/05/2013Anounces Election of Directors
17/04/2012Nominates Michele Darling to Board of Directors
14/03/2012Appoints Gary Sugar to Board of Directors
02/02/2012Board Member Resigns
16/09/2011Osisko Appoints Richard Ross to Board of Directors
15/09/2011Appoints Richard Ross to Board of Directors
22/08/2011Director Resigns
Rapports Financiers de Osisko Mining Corp.
14/02/2014Provides Notice of Fourth Quarter and Year End 2013 Results ...
01/08/2013Reports Second Quarter 2013 Results
15/07/2013Provides Notice of Second Quarter 2013 Operating and Financi...
09/05/2013Reports First Quarter 2013 Results
29/04/2013Provides Notice of First Quarter 2013 Financial Results Rele...
21/02/2013Reports Fourth Quarter and Year-End 2012 Results
13/11/2012Reports Third Quarter 2012 Results
05/07/2012Produces 92,003 Ounces Au in Second Quarter
09/05/2012Provides Notice of First Quarter 2012 Financial Results Rele...
27/02/2012Q4 2011 Net Profit of $37.8 Million
16/01/2012Provides Notice of Fourth Quarter and Year-End 2011 Financia...
11/08/2011Releases Second Quarter 2011 Results
16/05/2011Osisko Releases First Quarter 2011 Results
14/05/2011Osisko Releases First Quarter 2011 Results
28/02/2011Releases Year-End Financial Results and Review of 2010
28/02/2011publie ses résultats financiers de fin d'année
06/11/2009Releases Third Quarter 2009 Results
11/08/2009Releases Second Quarter 2009 Results
Projets de Osisko Mining Corp.
26/07/2017OSK Osisko Mining drills 2.7 m of 57 g/t Au at Windfall
21/02/2014Intersects 2.26 g/t Gold Over 128 Metres at Kirkland Lake
07/02/2014(Malartic)Commences 2014 Canadian Malartic Exploration Program
06/02/2014(Malartic)Reports Record January Production at Canadian Malartic
04/12/2013Intersects 61.6 Metres Averaging 1.44 g/t Au at Bidgood
21/11/2013(Malartic)Canadian Malartic Mine Produces Millionth Ounce
23/10/2013GLOBAL'S NEVADA PROJECTS ATTRACT STRONG THIRD PARTY INTEREST...
10/07/2013(Malartic)Deposits Study Reporting Local and Regional Economic Impact ...
30/01/2013Intersects 5.5 g/t Au Over 54.0 Metres at Upper Beaver
10/12/2012(Malartic)Reports November Production From Canadian Malartic
12/11/2012Announces Friendly Acquisition of Queenston
11/10/2012(Malartic)Canadian Malartic Mine Produces Half Millionth Ounce
10/10/2012(Malartic)Reports Record Quarterly Production from Canadian Malartic
06/09/2012(Malartic)Reports Record Monthly Production from Canadian Malartic
26/07/2012Acquires Common Shares of Bowmore Exploration Ltd=2E
17/05/2012(Malartic)Canadian Malartic Mill Returns to Operation
10/05/2012(Malartic)Reports Fire Damage at Canadian Malartic Mill Limited to Cyc...
30/01/2012(Famatina)s Status of Famatina Exploration Project
22/12/2011and DIOS Discover New Gold Showings on the AU33 WEST Project
28/11/2011TSX.V Company Adjacent to Osisko Property - 3 Minute Video
29/09/2011(Goldboro)Orex to Pursue Exploration Work on Goldboro Gold Project
08/09/2011(Malartic)Intersects 1.23 g/t Au Over 172 Metres at Barnat Extension
31/08/2011Osisko and EMSE Sign Agreement for Development of Famatina P...
31/08/2011(Famatina)and EMSE Sign Agreement for Development of Famatina Project ...
11/08/2011(Goldboro)Goldboro Gold Project Drill Assay Results Identify Extension...
05/08/2011Osisko Buys Back a 1% Royalty Interest on Canadian Malartic ...
05/08/2011(Malartic)Buys Back a 1% Royalty Interest on Canadian Malartic Propert...
21/06/2011Osisko Declares Commercial Production at Canadian Malartic
21/06/2011(Malartic)Declares Commercial Production at Canadian Malartic
17/06/2011Osisko Submits Notice of Termination in Duparquet Project
17/06/2011(Duparquet)Submits Notice of Termination in Duparquet Project
14/06/2011(Malartic)=?ISO-8859-1?Q?Osisko=20recoupe=201,50=20g/t=20Au=20sur=2063...
14/06/2011(Malartic)Intersects 1.50 g/t Au Over 63.6 Metres at Jeffrey Zone
13/06/2011(Duparquet)et Clifton Star annoncent une estimation de ressources pour ...
13/06/2011(Duparquet)and Clifton Star Release Resource Estimate for the Beattie D...
01/06/2011(Malartic)Officially Inaugurates the Canadian Malartic Mine
01/06/2011Osisko Officially Inaugurates the Canadian Malartic Mine
02/05/2011(Malartic)Announces Revised Mine Production Plan at Canadian Malartic
21/04/2011(Goldboro)Orex Exploration Inc.: Drilling Campaign Has Begun at Goldbo...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
20/04/2011Osisko Mining Corporation - Drilling campaign has begun at G...
13/04/2011(Malartic)Pours First Gold at Canadian Malartic Mine
31/03/2011(Malartic)Osisko accroît les réserves aurifères de Canadian Malartic à...
31/03/2011(Malartic)Increases Gold Reserve at Canadian Malartic to 10=2E7 Millio...
29/03/2011(Malartic)Exercises Buy Out Option in Canadian Malartic Net Smelter Ro...
28/02/2011(Malartic) Découverte de minéralisation de type Canadian Malartic
24/02/2011(Hammond Reef)Reports 124 Metres Averaging 0.73 g/t Au in Southeast Extens...
29/01/2011(Malartic)Osisko Reports Significant New Intersections at Barnat Exten...
25/01/2011(Malartic)Reports Significant New Intersections at Barnat Extension, I...
21/12/2009(Malartic)Provides Update on Construction and Development Progress at ...
14/12/2009(Malartic)Releases New Resource Estimate for Canadian Malartic Project
20/10/2009(Malartic) Intersects New Gold Mineralization on the Malartic CHL Prop...
14/09/2009(Malartic)Intersects 1.20 g/t Au Over 86.9 Metres at Jeffrey Zone
01/09/2009(Malartic)Osisko Mining Corporation: Construction Activities at Canadi...
20/08/2009(Malartic)Quebec Government Authorizes Construction of Osisko's Canadi...
26/02/2009(Malartic) Preliminary Metallurgical Results on Barnat
26/01/2009(Malartic)Announces Inferred Resource Estimate for South Barnat Deposi...
03/12/2008(Malartic) Intersects 102 Metres Averaging 3.21 g/t Au at South Barnat
Communiqués de Presse en Français de Osisko Mining Corp.
01/06/2011(Malartic)inaugure officiellement la mine Canadian Malartic
Communiqués de Presse de Osisko Mining Corp.
13/02/2014Mails Letter to Shareholders Regarding Inadequate Goldcorp O...
05/02/2014Provides Corporate Update
29/01/2014Commences Legal Proceeding to Restrain Misuse of Confidentia...
29/01/2014Announces Filing and Mailing of Directors' Circular and Reco...
20/01/2014Reports Preliminary Fourth Quarter 2013 Production
15/01/2014Responds to Unsolicited Proposal From Goldcorp Inc=2E
13/01/2014Responds to Announcement by Goldcorp
16/12/2013Completes Long-Term Debt Renegotiation
24/10/2013Provides Notice of Third Quarter 2013 Operating and Financia...
30/07/2013Enhances Financial Flexibility by Improving Long-Term Debt T...
05/07/2013Intercepts 68 Metres Averaging 1=2E26 =?ISO-8859-1?Q?=20g/t=...
02/07/2013Receives Final $30 Million Payment from Kirkland Lake Gold
29/04/2013Corporate Update
17/04/2013Comments on Trading Activities
09/04/2013(Malartic)Previews Q1 2013 Canadian Malartic Operating Results
21/03/2013Discovers Two New Gold-Copper Zones at Upper Beaver
19/02/2013(Malartic)Receives Modified Operating Parameters at Canadian Malartic
19/02/2013(Malartic)s Reserves at Canadian Malartic
11/02/2013Denis Cimon Receives the 2013 Mineral Processor of the Year
29/01/2013(Hammond Reef)Provides Resource Update for Hammond Reef Project
24/01/2013(Malartic)Previews Q4 2012 Canadian Malartic Operating Results and 201...
12/11/2012(Malartic)Reports Record Monthly Throughput at Canadian Malartic
15/10/2012Founder Retires
09/10/2012Acquires Ground in Emerging Gold Belt in Mexico and Identifi...
03/10/2012Deposits the Second Tranche of itsFinancial Guarantee Coveri...
03/08/2012Secondary Crusher Installation Completed
24/07/2012Acquisition of Subscription Receipts of Druk Capital Partner...
16/05/2012Enhances Credit Agreement With CPPIB
14/05/2012(Malartic)Provides Update on Canadian Malartic
10/05/2012(Malartic)Reports Fire at Canadian Malartic Milling Plant
03/04/2012and Metis Nation of Ontario Sign Memorandum of Understanding
12/03/2012Brings First Half of Secondary Crusher Online
01/03/2012Announces Record Date for Annual Meeting
16/02/2012Canadian gold producer Osisko Mining Corporation joins Globa...
12/01/2012(Malartic)Previews Q4 2011 Canadian Malartic Operating Results
03/01/2012Responds to Below Market Price Offer for 5 Million Shares On...
14/12/2011Osisko Comments on Trading of Common Shares
14/12/2011Comments on Trading of Common Shares
08/10/2011President Sean Roosen Named Ernst & Young 2011 Quebec Entrep...
17/06/2011(Duparquet)met fin =E0 sa participation au projet Duparquet
13/06/2011Osisko and Clifton Star Release Resource Estimate for the Be...
14/05/2011Osisko publie ses r=E9sultats du premier trismestre de 2011
12/05/2011Annual and Special Meeting of Shareholders of Osisko Mining ...
29/04/2011Osisko Announces Revised Mine Production Plan at Canadian Ma...
29/03/2011Osisko Exercises Buy Out Option in Canadian Malartic Net Sme...
09/02/2011Goldcorp Sells Osisko Investment
22/12/2009Donates Shares to McGill University
11/12/2009and Clifton Star Complete Joint Venture Agreement on Duparqu...
13/11/2009Options Goldboro Gold Property From Orex Exploration
28/09/2009 Signs Option Agreement With Claim Post Resources for the Mo...
24/09/2009 Enters Into Financing Agreement With CPPIB Credit Investmen...
11/08/2009Signs Option Agreement With Midland Exploration for the Dunn...
10/07/2009Report on Osisko's Canadian Malartic Bape Hearings is Made P...
03/07/2009Osisko Mining Corporation Completes Strategic Investment
18/06/2009Comments on Trading of Common Shares
21/05/2009Discovers New Mineralized Zone Adjacent to South Barnat
19/05/2009Makes Strategic Investment
13/01/2009 Extends South Barnat to 1200 Metres Length
04/12/2008 Recognized for Strong Sustainability Performance
07/04/2006(Castelo Dos Sonhos)Résultats positifs sur le projet diamantifère Pontax
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (OSK.TO)FRANKFURT (EWX.F)
3,11+0.32%2,43-1.62%
TORONTO
CA$ 3,11
26/04 10:40 0,010
0,32%
Cours préc. Ouverture
3,10 3,14
Bas haut
3,11 3,15
Année b/h Var. YTD
2,42 -  3,21 12,68%
52 sem. b/h var. 52 sem.
2,36 -  3,87 -19,22%
Volume var. 1 mois
34 567 18,25%
Produit Gold
Développe
Recherche Gold - Lead - Silver - Tin - Tungsten - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202413,92%
2023-22,00%4,532,64
2022-6,17%5,022,36
20210,81%3,972,33
2020-4,88%4,851,67
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,24%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,56 CA$-4,83%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,88 CA$+1,79%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :