Infill Drilling Program Completed At Joanna 116 Grams Of Gold Per Tonne Over 2.7 Metres Intersected

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
                 


  December 11, 2008
INFILL DRILLING COMPLETED AT JOANNA - 116 GRAMS OF GOLD PER TONNE OVER 2.7 METRES INTERSECTED

 
Aurizon Mines Ltd. (TSX: ARZ; NYSE Alternext U.S.: AZK) is pleased to announce the completion of an important infill drill program at its Joanna project, located 20 kilometres from Rouyn-Noranda, in
north-western, Quebec.

Four hundred sixty-three (463) holes totalling 134,489 metres have been completed by Aurizon at Joanna, with the objective of confirming results from previous drilling and to extend the mineralized zones. Results from three hundred nineteen (319) holes have been previously released, and results from seventy (70) holes are included in this release. Results are currently pending for seventy-four (74) holes. All results are expected to be received before year end.

Drilling intersected one to four mineralized intersections along the main zones on the East block (formerly Hosco) corresponding to a geological continuity along the strike of 1.1 kilometres with combined thickness variations between 20 and 100 metres. New results for individual mineralized intervals such as 2.4 grams of gold per tonne over 35.6 meters in hole JA-08-404, 2.0 grams of gold per tonne over 24 meters in hole JA-08-397 and 2.1 grams of gold per tonne over 26.4 metres in hole JA-08-330, indicate consistency of the mineralized system at the limit of the proposed pit outline (BBA Preliminary Assessment Report, see news release dated May 12, 2008 and report filed on under the Company's profile at www.sedar.com "BBA Preliminary Assessment").

In addition, an exceptional result of 116 grams of gold per tonne over 2.7 metres (true thickness) in hole
JA-08-329 has been intercepted 50 metres above historical underground development in a vein system inside the disseminated mineralized body.

"We are pleased to conclude this major drill program which has confirmed the consistency of thickness, continuity and grade mineralization. We would like to thank our staff for completing the infill drilling program on budget and schedule." said Michel Gilbert, Vice-President of Aurizon.

The best results reported are as follows:

 

 

 Mineralized Intersections

Hole

East

From

To

Gold grade

True width

 

(metres)

(metres)

(metres)

(grams/tonne)

(metres)

JA-08-329

8525

72.0

82.5

3.6

9.5

 

 

100.5

103.5

116.0

2.7

JA-08-330

9101

121.5

142.5

1.1

20.7

 

 

169.5

196.5

2.1

26.4

JA-08-404

8200

 

24.0

64.5

2.4

35.6



Results of fifty seven (57) holes representing one or more individual mineralized intersections with grades over 1 gram of gold per tonne over more than 5 metres are indicated on detailed tables attached to this news release. An additional table indicates distinct or included 1.2 to 2.7 metres intervals of more than 10 grams of gold per tonne.

The details of thirteen (13) holes with grades below 1.0 gram of gold per tonne are not included in the table.

A sketch showing the holes location with intersections greater than 23 metres is attached to this release.

East Block (Hosco)
Infill drilling is performed on a 25 metre by 25 metre spacing within the core of the areas previously known as the Hosco Zone as defined by BBA in their Report. In this area, gold mineralization is located within different lenses located on both sides of the Cadillac break both dipping 55 degrees to the North. The South Zone, extending for more than 800 metres, corresponds to the entire length of the deposit. The North Zone is restricted to an extension of 400 metres. To date, 333 holes of 338 holes drilled on the East Block, successfully intersected mineralization above the cut off grade of 0.5 grams of gold per tonne as defined by the Preliminary Assessment report.

Preliminary Assessment Report
The BBA Preliminary Assessment concluded that based upon the September 2007 mineral resources estimate for the East block (Hosco) above the 200 metre level, the Joanna project is potentially feasible as a stand alone open-pit mine operation and recommended that additional work be undertaken to advance the project to the pre-feasibility stage. In addition, the report provided guidelines on the environmental risks.

Based on the preliminary pit optimization studies and mine design in the BBA report, the estimated diluted in pit resources contained in the detailed pit design are 9.08 million tonnes in the indicated mineral resource category and 9.07 million tonnes in the inferred mineral resource category at a combined average grade of 1.5 grams of gold per tonne, based on a cut-off grade of 0.5 grams of gold per tonne. The overall life of mine stripping ratio was estimated at 3.4 tonnes of waste per tonne of ore, with an inter-ramp pit slope of 55 degrees. Total metal recovered was estimated at 653,000 ounces of gold assuming a mill recovery of 77%.

The BBA Preliminary Assessment is preliminary in nature, includes inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. There is no certainty that the preliminary assessment will be realized.

Outlook

With the infill program now completed, Aurizon expects to receive an updated resource estimate early in 2009, and has appointed BBA to prepare the pre-feasibility study upon completion of the updated resource estimate. Contracts have been awarded to the following companies: Roche Ltd., to complete the required environmental studies, Golder Associates, the rock mechanic evaluation of the pit design, and SGS Lakefield Research Limited, the metallurgy processes. The pre-feasibility study will include the results of the expanded drill program, resource modelling and the metallurgical testwork that is presently in progress.

Following the infill drill program, Aurizon intends to resume its exploration drilling activities, testing high grade potential along the dip extension below 700 metres, and geophysical and geochemical targets outside of the main orebody, including the recently optioned Alexandria property located along the eastern extension of the Joanna deposit.

Quality Control

Core assays are performed on core sawed in half, with standard fire assay procedures and atomic absorption finition. Certified reference material, duplicate and blanks are inserted in the sample sequence for quality control. Assay checking on pulp and coarse reject are carried out on approximately 10% of samples. For additional information on Quality Assurance and Quality control ("QA/QC"), refer to the previously mentioned BBA Preliminary Assessment Report. Exploration primary assaying was performed at ALS Chemex of Val d'Or and check assays were carried out by Laboratoire d'Analyse Bourlamaque of Val d'Or. ALS Chemex is a fully accredited laboratory under ISO 9001-2000 standards, and Laboratoire d'Analyse Bourlamaque is in the process of obtaining ISO-9001-2000 certification.

Drill hole planning, implementation and the quality control program is supervised by Martin Demers P.Geo., Exploration manager, an appropriately qualified person as defined by National Instrument 43-101. Mr. Demers is also responsible for the scientific and technical information in this news release.

Additional Information

One sketch is attached showing the Joanna area. Detailed results from the additional holes drilled are reported in separate tables. All other information previously released on the Joanna Project is also available on the Aurizon website.

About Aurizon

Aurizon is a gold producer with a growth strategy focused on developing its existing projects in the Abitibi region of north-western Quebec, one of the world's most favourable mining jurisdictions and prolific gold and base metal regions, and by increasing its asset base through accretive transactions. Aurizon shares trade on the Toronto Stock Exchange under the symbol "ARZ" and on the NYSE Alternext (formerly the American Stock Exchange) under the symbol "AZK". Additional information on Aurizon and its properties is available on Aurizon's website at www.aurizon.com.

For further information, contact



AURIZON MINES LTD.

David Hall, President and C.E.O.
Telephone: 604-687-6600
Toll Free: 1-888-411-GOLD
Fax: 604-687-3932
Michel Gilbert, Vice President
Telephone: 819-874-4511
Fax: 819-874-3391

Web Site: www.aurizon.com; Email: info@aurizon.com




or

Renmark Financial Communications Inc.
2080 Rene-Levesque Blvd. West
Montreal, QC
H3H 1R6
Barry Mire: bmire@renmarkfinancial.com
Jen Power: jpower@renmarkfinancial.com
Media: Vanessa Napoli: vnapoli@renmarkfinancial.com
Tel: (514) 939-3989 Fax: (514) 939-3717



FORWARD-LOOKING STATEMENTS
This News Release contains "forward-looking statements". These forward-looking statements include, but are not limited to, statements regarding estimated mineral resources, anticipated effect of the completed drill results on the Joanna project, a preliminary assessment, timing of an updated mineral resource estimate and a pre-feasibility study, and timing and expectations or future work programs. Forward-looking statements express, as at the date of this News Release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and the Company does not intend, and does not assume any obligation to update these forward-looking statements. Forward-looking statements are based on certain assumptions, including, with respect to mineral resource estimates, the key assumptions and parameters on which such estimates are based, as set out in the technical report for the property, and involve risks and uncertainties, and there can be no assurance that such statements will prove to be accurate. Therefore, actual results and future events could differ materially from those anticipated in such statements. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of gold; possible variations in ore reserves, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; and other risks more fully described in Aurizon's Annual Information Form filed with the Securities Commissions of the provinces of British Columbia, Alberta, Manitoba, Ontario and Quebec, and in Aurizon's Annual Report on Form 40-F filed with the United States Securities and Exchange Commission. These documents are available on Sedar at www.sedar.com and on Edgar at www.sec.gov.

CAUTIONARY NOTE TO US READERS
As a British Columbia corporation, the Company is subject to certain rules and regulations issued by the British Columbia Securities Commission ("BC Securities Commission"). The Company is required to provide detailed information regarding its properties including mineralization, drilling, sampling and analysis, security of samples and mineral resource and mineral reserve estimates. Further, the Company describes mineral resources associated with its properties utilizing terminology such as "indicated" or "inferred" which terms are recognized by Canadian regulations but are not recognized by the United States Securities and Exchange Commission ("SEC").

Cautionary Note to U.S. Investors Regarding Mineral Resources

The SEC allows mining companies, in their filings with the SEC, to disclose only those mineral deposits they can economically and legally extract or produce. The Company may use certain terms in this document, such as "mineral resources", "indicated mineral resources" and "inferred resources" that are recognized and mandated by Canadian securities regulators but are not recognized by the SEC.

This News Release may use the term "indicated" resources. U.S. readers are cautioned that while that term is recognized and required by Canadian regulations, the SEC does not recognize it. U.S. investors are cautioned not to assume that any part or all of mineral deposits in this category will ever be converted into mineral reserves.

This News Release may also use the term "inferred" resources. U.S. readers are cautioned that while this term is recognized and required by Canadian regulations, the SEC does not recognize it. "Inferred resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies, except in rare cases. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable.


High grade

 

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metres)

(grams/tonne)

(metres)

(metres)

 

JA-08-312

8426

156.0

157.5

10.0

1.5

1.4

S

JA-08-313

8426

147.0

148.5

19.9

1.5

1.3

S

JA-08-324

8475

60.0

61.5

23.9

1.5

1.3

S

JA-08-326

8475

66.0

67.5

13.9

1.5

1.2

S

JA-08-329

8525

75.0

76.5

14.3

1.5

1.4

S

 

 

100.5

103.5

116.0

3.0

2.7

S

JA-08-330

9101

181.5

183.0

14.2

1.5

1.5

S

JA-08-358

8450

163.5

165.0

20.7

1.5

1.5

S

JA-08-368

8425

144.0

145.5

10.3

1.5

1.3

S

JA-08-378

8400

181.5

183.0

113.0

1.5

1.4

S

JA-08-397

8350

214.5

216.0

15.2

1.5

1.4

S

JA-08-404

8200

33.0

34.5

12.0

1.5

1.3

S



Infill North Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metres)

(grams/tonne)

(metres)

(metres)

 

JA-08-312

8426

33.6

39.0

1.3

5.4

5.0

N

JA-08-330

9101

82.5

87.6

1.4

5.1

5.0

N

JA-08-351

8651

43.5

57.0

1.3

13.5

13.2

N

JA-08-352

8575

52.5

67.5

1.3

15.0

13.3

N

JA-08-358

8450

42.0

49.5

1.1

7.5

7.1

N

 

 

63.0

79.5

1.2

16.5

15.6

N

JA-08-359

8450

45.0

50.6

1.4

5.6

5.0

N

 

 

66.0

91.3

1.1

25.3

22.6

N

JA-08-366

8425

78.0

94.5

1.3

16.5

16.1

N

JA-08-367

Assay pending

 

 

 

 

 

 

JA-08-368

8425

84.0

109.5

1.1

25.5

22.4

JA-08-371

Assay pending

 

 

 

 

 

 

JA-08-375

Assay pending

 

 

 

 

 

 

JA-08-376

8725

208.5

213.9

1.5

5.4

5.0

JA-08-378

8400

63.0

82.5

1.0

19.5

17.6

N

 

 

90.0

99.0

1.2

9.0

8.2

N

JA-08-379

Assay pending

 

 

 

 

 

 

JA-08-381

8700

172.5

178.5

1.2

6.0

5.9

N

JA-08-385

Assay pending

 

 

 

 

 

 

JA-08-386

8375

73.5

85.5

1.1

12.0

11.2

N

JA-08-387

Assay pending

 

 

 

 

 

 



Infill North Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metres)

(grams/tonne)

(metres)

(metres)

 

JA-08-388

8375

75.0

93.0

1.0

18.0

14.4

N

 

 

100.5

108.0

1.1

7.5

6.1

N

 

 

115.5

123.0

1.1

7.5

6.1

N

JA-08-391

8700

106.5

117.0

1.0

10.5

10.2

N

JA-08-392

Assay pending

 

 

 

 

 

 

JA-08-393

8675

159.0

171.0

1.1

12.0

11.8

N

JA-08-394

Assay pending

 

 

 

 

 

 

JA-08-395

Assay pending

 

 

 

 

 

 

JA-08-396

8575

121.5

157.5

1.2

36.0

30.1

N

JA-08-397

8350

97.5

103.5

2.1

6.0

5.6

N

JA-08-399

Assay pending

 

 

 

 

 

 

JA-08-400

Assay pending

 

 

 

 

 

 

JA-08-401

Assay pending

 

 

 

 

 

 



Infill South Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metre)

(grams/tonne)

(metres)

(metres)

 

JA-08-304

9275

91.5

106.5

1.1

15.0

12.9

S

 

 

150.0

157.5

1.0

7.5

6.5

 

JA-08-310

Assay pending

 

 

 

 

 

 

JA-08-312

8426 

81.0

102.0

1.4

21.0

19.5

S

JA-08-313

8426

76.5

82.3

1.1

5.8

5.0

S

 

 

90.0

106.5

1.0

16.5

14.2

S

 

 

115.7

121.5

1.4

5.8

5.0

S

JA-08-324

8475

43.5

49.5

3.0

6.0

5.3

S

 

 

69.0

90.0

1.4

21.0

18.7

S

 

 

96.0

112.5

1.0

16.5

14.7

S

 

 

131.6

137.2

1.1

5.6

5.0

S

JA-08-325

8475

31.5

36.6

1.0

5.1

5.0

S

 

 

43.5

48.6

1.4

5.1

5.0

S

JA-08-326

8475

8.4

16.5

1.0

8.1

6.5

S

 

 

33.0

52.5

1.3

19.5

15.7

S

JA-08-327

9099

130.5

139.5

1.2

9.0

8.8

S

JA-08-328

8525

61.5

99.0

1.6

37.5

36.9

S

 

 

105.0

111.0

2.1

6.0

5.9

S



Infill South Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metres)

(grams/tonne)

(metres)

(metres)

 

JA-08-329

8525

72.0

82.5

3.6

10.5

9.5

S

JA-08-330

9101

82.5

87.6

1.4

5.1

5.0

 S

 

 

121.5

142.5

1.1

21.0

20.7

S

 

 

169.5

196.5

2.1

27.0

26.4

S

JA-08-331

8500

40.5

45.6

1.4

5.1

5.0

S

 

 

52.5

57.6

1.3

5.1

5.0

S

JA-08-332

Assay pending 

 

 

 

 

 

 

JA-08-333

9175

40.5

52.5

1.3

12.0

10.7

S

JA-08-334

8550

72.0

85.5

1.6

13.5

13.3

S

JA-08-335

8551

81.0

114.0

1.8

33.0

30.1

S

 

 

120.0

129.0

1.2

9.0

8.3

 S

JA-08-337

8525

18.0

24.1

1.9

6.1

5.0

S

 

 

36.0

54.0

1.3

18.0

14.9

S

 

 

64.5

70.5

1.3

6.0

5.0

JA-08-338

9200

19.5

24.6

1.2

5.1

5.0

S

 

 

34.5

61.5

1.0

27.0

26.5

S

JA-08-339

9200

25.5

34.5

2.4

9.0

7.6

S

JA-08-340

8550

12.0

52.5

1.2

40.5

39.7

S

JA-08-341

8575

45.0

50.1

1.8

5.1

5.0

S

JA-08-342

8650

57.0

63.0

2.1

6.0

5.9

S

 

 

67.5

90.0

1.3

22.5

22.2

S

JA-08-343

8650

61.5

70.5

2.8

9.0

7.8

S

 

 

76.5

82.5

3.5

6.0

5.2

S

 

 

88.5

96.0

1.3

7.5

6.5

S

 

 

102.0

108.0

3.0

6.0

5.2

S

JA-08-344

8600

21.0

27.0

1.4

6.0

5.9

S

 

 

48.0

53.1

3.5

5.1

5.0

S

JA-08-346

8650

15.0

36.0

1.1

21.0

20.6

S

JA-08-347

9226

57.0

62.1

1.3

5.1

5.0

S

JA-08-348

9226

12.9

19.5

1.0

6.6

5.0

S

JA-08-349

8675

12.9

18.0

2.2

5.1

5.0

S

JA-08-350

8675

18.0

31.5

2.4

13.5

11.0

S

JA-08-353

8524

64.5

81.0

1.1

16.5

16.3

S

JA-08-355

8700

8.2

15.0

1.0

6.8

5.0

JA-08-356

9250

21.0

37.5

2.0

16.5

14.2

S

JA-08-357

8475

46.5

57.0

1.5

10.5

10.3

S

JA-08-358

8450

120.0

147.0

1.3

27.0

25.8

S

JA-08-359

8450

132.0

160.5

1.0

28.5

25.8

S

JA-08-360

9276

50.4

55.5

1.6

5.1

5.0

S

JA-08-361

9275

27.0

36.0

1.1

9.0

7.5

 S



Infill South Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metre)

(grams/tonne)

(metres)

(metres)

 

JA-08-362

8726

36.0

41.1

1.9

5.1

5.0

S

 

 

54.0

70.5

1.8

16.5

16.2

S

 

 

76.5

85.5

1.1

9.0

8.8

S

JA-08-363

8875

90.0

99.0

1.4

9.0

8.6

S

 

 

111.0

145.5

1.6

34.5

33.0

S

JA-08-364

9300

13.0

18.1

1.6

5.1

5.0

S

JA-08-365

9300

48.0

53.6

1.1

5.6

5.0

S

 

 

61.5

75.0

1.1

13.5

12.1

S

 

 

130.9

136.5

1.7

5.6

5.0

S

 

 

142.5

148.1

1.5

5.6

5.0

S

JA-08-367

Assay pending  

 

 

 

 

 

 

JA-08-368

8425

165.0

187.5

1.6

22.5

20.0

S

 

 

195.0

216.0

1.3

21.0

18.8

S

JA-08-370

8775

158.5

163.5

1.2

5.0

5.0

S

 

 

186.0

208.5

1.3

22.5

22.4

S

JA-08-371

Assay pending  

 

 

 

 

 

 

JA-08-372

8775

168.0

175.5

1.2

7.5

7.1

S

 

 

187.5

193.5

1.8

6.0

5.7

S

 

 

199.5

232.5

1.0

33.0

31.5

S

 

 

240.0

246.0

1.6

6.0

5.7

S

JA-08-373

8775

177.0

195.0

1.0

18.0

16.1

S

JA-08-378

8400

127.5

141.0

1.4

13.5

12.4

S

 

 

147.0

163.5

1.4

16.5

15.2

S

 

 

172.5

190.5

10.1

18.0

16.7

S

 

 

202.5

216.0

2.1

13.5

12.5

S

 

 

234.0

240.0

1.6

6.0

5.6

S

JA-08-379

Assay pending  

 

 

 

 

 

 

JA-08-385

Assay pending  

 

 

 

 

 

 

JA-08-386

8375

139.5

165.0

1.9

25.5

24.0

S

 

 

185.2

190.5

1.6

5.3

5.0

S

JA-08-387

Assay pending 

 

 

 

 

 

 

JA-08-388

8375

210.0

216.0

1.0

6.0

5.0

S

JA-08-389

8725

162.0

171.0

1.1

9.0

8.6

S

JA-08-391

8700

168.0

180.0

1.0

12.0

11.6

S

 

 

208.5

228.0

1.1

19.5

19.0

S



Infill South Zone

 

 

 

 

 

 

 

 

 

Mineralized Intersections

 

 

Hole

East

From

To

Gold grade

Length along the hole

True width

Zone

 

(metres)

(metres)

(metre)

(grams/tonne)

(metres)

(metres)

 

JA-08-392

Assay pending 

 

 

 

 

 

 

JA-08-394

Assay pending 

 

 

 

 

 

 

JA-08-395

Assay pending 

 

 

 

 

 

 

JA-08-396

8575

229.5

241.5

1.2

12.0

10.3

S

 

 

259.5

265.5

2.1

6.0

5.2

 S

 

 

271.5

277.3

2.7

5.8

5.0

S

JA-08-397

8350 

210.0

235.5

2.0

25.5

24.2

S

JA-08-403

Assay pending 

 

 

 

 

 

 

JA-08-404

8200

24.0

64.5

2.4

40.5

35.6

S

 

 

136.5

142.1

1.2

5.6

5.0

S




Click to Enlarge

 


Aurizon Mines Ltd

PRODUCTEUR
CODE : ARZ.TO
ISIN : CA05155P1062
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Aurizon Mines est une société de production minière d'or basée au Canada.

Aurizon Mines détient divers projets d'exploration au Canada.

Son principal projet en production est CASA BERARDI au Canada, son principal projet en développement est JOANNA au Canada et ses principaux projets en exploration sont DUVERNY, PATRIS, OPINACA, REX SOUTH, MARBAN MINE, KIPAWA, FAYOLLE et JOANNES au Canada.

Aurizon Mines est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 27,5 millions CA$ (21,1 millions US$, 18,3 millions €).

La valeur de son action a atteint son plus bas niveau récent le 31 décembre 2001 à 0,21 CA$, et son plus haut niveau récent le 16 septembre 2016 à 8,75 CA$.

Aurizon Mines possède 63 960 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Aurizon Mines Ltd
2008 Annual Report
2007 Annual Report
2005 Annual report
Financements de Aurizon Mines Ltd
02/02/2011AURIZON ANNOUNCES US$50 MILLION REVOLVING CREDIT FACILITY
Attributions d'options de Aurizon Mines Ltd
15/08/2011Grant of 600,000 options at 6,38
Nominations de Aurizon Mines Ltd
18/01/2013Aurizon Appoints a Special Committee to Evaluate Offer
26/08/2011Announces Vice President, Corporate Development Resignation
15/08/2011George Paspalas Joins Aurizon as Chief Executive Officer; Da...
27/06/2011Aurizon Announces Appointment of George Paspalas as Chief Ex...
Rapports Financiers de Aurizon Mines Ltd
15/05/2013Aurizon Reports First Quarter 2013 Financial Results
14/03/2013Aurizon Reports 2012 Financial Results
08/11/2012Aurizon Reports Third Quarter 2012 Financial Results
09/08/2012Aurizon Reports Second Quarter 2012 Financial Results
10/05/2012Aurizon Reports First Quarter 2012 Financial Results
15/03/2012Aurizon Reports 2011 Financial Results
11/08/2011Aurizon Reports Second Quarter 2011 Results
16/05/2011AURIZON REPORTS FIRST QUARTER 2011 RESULTS
14/08/2009reports record revenues and cash flow in second quarter 2009
13/05/2009Reports Highlights Of First Quarter 2009 Results
11/03/2009Reports 2008 Financial Results
06/11/2008Third Quarter 2008 Results
06/11/2008Reports Highlights Of Third Quarter 2008 Results
08/08/2008Reports Highlights Of Second Quarter 2008 Results
07/05/2008Reports Highlights Of First Quarter 2008 Results
19/03/2008 Reports 2007 Financial Results
Projets de Aurizon Mines Ltd
03/05/2013(Casa Berardi)Aurizon Reports Status Update on Minor Discharge at Tailings...
02/05/2013(Casa Berardi)Aurizon Reports Minor Discharge at Tailings Facility at Casa...
25/03/2013(Casa Berardi)Aurizon Reports Accident at Casa Berardi Mine
15/02/2013(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
12/12/2012New Discovery at Aurizon's Heva West Area Returns 1.7 Grams ...
06/09/2012Aurizon Mines Ltd.: New Drill Results Confirm High Grade Pot...
06/09/2012(Fayolle)Aurizon Announces an Updated Mineral Resource Estimate for F...
16/08/2012(Marban Mine)Aurizon Announces the Completion of the Marban Block Phase T...
30/07/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Confirm Continuity and...
20/07/2012(Joanna)Aurizon Files Feasibility Study of the Hosco Deposit
09/07/2012(Joanna)Aurizon Mines Ltd.: New Drill Results Expand the Heva Area a...
12/06/2012Aurizon Mines Ltd.: Marban's Phase Two Drill Program Results...
11/06/2012Aurizon Acquires Common Shares of Typhoon Exploration Inc.
06/06/2012(Joanna)Aurizon Receives Results of Feasibility Study for Joanna's H...
15/05/2012(Casa Berardi)Aurizon Mines Ltd.: New Drill Results Highlight the Potentia...
26/04/2012(Marban Mine)Aurizon Mines Ltd.: New Results at Marban Highlight Potentia...
20/04/2012(Joanna).: Higher Grade Mineralization Discovered on the Heva and Ho...
04/04/2012(Rex South)Aurizon Announces Results from the 2011 Exploration Program ...
01/03/2012(Marban Mine)Aurizon Mines Ltd.: Marban Eastern Down Dip Zone Returns 6.4...
01/03/2012(Casa Berardi)Reports Mineral Reserve Replenishment and Mineral Resource U...
22/09/2011(Marban Mine) Two New High Grade Gold Zones Discovered at Marban
09/09/2011(Casa Berardi)Aurizon Mines Ltd.: Drilling Confirms the Continuity and the...
31/08/2011(Fayolle)Aurizon Reports New High Grade Values at Fayolle
11/08/2011(Joanna)Aurizon Reports Joanna Feasibility Study Delayed, However Dr...
09/08/2011(Fayolle)Aurizon Reports Discovery of New Gold Bearing Trends Outside...
22/06/2011(Marban Mine) Deeper Drilling at Marban Reveals Added Upside With 5
13/06/2011(Joanna)Aurizon Increases the Hosco In-Pit Measured and Indicated Mi...
25/05/2011(Marban Mine)AURIZON REPORTS FURTHER RESULTS FROM MARBAN BLOCK
14/04/2011(Marban Mine)AURIZON REPORTS FURTHER DRILL RESULTS FROM MARBAN
13/03/2011(Casa Berardi)AURIZON REPORTS A 44% INCREASE IN MINERAL RESERVES FOR THE C...
15/02/2011(Rex South)AURIZON AND AZIMUT RE-EVALUATE TUNGSTEN VALUES ON THE COPPER...
21/01/2011(Marban Mine)AURIZON ANNOUNCES 9=2E06 GRAMS OF GOLD PER TONNE OVER 7=2E3 ...
11/01/2011AURIZON ANNOUNCES 2010 PRODUCTION RESULTS AND 2011 PLANS
01/09/2009Aurizon Intersects 18.9 Grams of Gold per Tonne Over 4.0 Met...
11/03/2009(Joanna) Infill Drilling Increases Mineral Resources at Joanna
20/02/2009(Casa Berardi)Reports Mineral Reserve Renewal And Mineral Resource Update ...
26/01/2009(Joanna): Grade and Thickness Confirmed Along the North Zone at Joan...
11/12/2008(Joanna)Infill Drilling Program Completed At Joanna 116 Grams Of Gol...
13/06/2008(Kipawa)Reports Additional Rare Earth And Uranium Results At Kipawa ...
12/05/2008(Joanna) Commissions Pre-Feasibility Study At Joanna
23/04/2008(Joanna) Reports Further Results From Its Joanna Property Including ...
02/04/2008(Casa Berardi)Provides Mineral Reserves And Resources Update
Communiqués de Presse de Aurizon Mines Ltd
30/05/2013Aurizon Announces Results of Hecla Arrangement Consideration...
28/05/2013Aurizon Announces Receipt of Investment Canada Act Approval
22/05/2013Aurizon Announces Change to Election Deadline to May 29, 201...
21/05/2013Aurizon Announces Extension of Election Deadline
10/05/2013Aurizon Receives Final Court Approval of Plan of Arrangement
09/05/2013Aurizon Securityholders Approve Plan of Arrangement
08/05/2013Aurizon Announces Preliminary Results of Hecla Arrangement C...
06/05/2013Aurizon Reminds Shareholders of Election Deadline
01/05/2013Aurizon Reminds Shareholders of Important Vote Deadline of M...
01/05/2013Reminds Shareholders of Important Vote Deadline of May 7, 20...
24/04/2013Announces That Leading Independent Proxy Advisory Firm Insti...
12/04/2013Aurizon Announces Special Meeting of Securityholders and Mai...
26/03/2013(Casa Berardi)Aurizon Mines Ltd.: Regular Operations Resume at Casa Berard...
20/03/2013Aurizon Comments on Expiry of Alamos Offer
19/03/2013Aurizon Responds to BCSC Decision to Cease Trade New Shareho...
18/03/2013Aurizon Reiterates Rejection of the Financially Inadequate A...
12/03/2013Aurizon Announces Hearing on New Shareholder Rights Plan
11/03/2013Aurizon Takes Steps to Ensure Equal Treatment of All Shareho...
15/02/2013(Casa Berardi)Aurizon Reports Mineral Reserve Replenishment and an Increas...
12/02/2013Aurizon Announces Hearing on Shareholder Rights Plan
08/02/2013Aurizon Mails Shareholder Rights Plan Materials
30/01/2013Aurizon Provides Update on Shareholder Rights Plan
15/01/2013Aurizon Responds to Unsolicited Offer
14/01/2013Alamos Gold Acquires Common Shares of Aurizon Mines
30/10/2012. Announces Third Quarter 2012 Conference Call & Webcast
07/09/2012Aurizon Announces an Updated Mineral Resource Estimate for t...
01/05/2012. Announces First Quarter 2012 Conference Call & Webcast
24/04/2012Aurizon Mines Ltd.: Preliminary Metallurgical Testwork at Ma...
31/03/2012Aurizon Releases Annual Disclosure Documents
09/03/2012. Announces 2011 Financial Results Conference Call & Webcast
11/01/2012Aurizon Announces Record 2011 Gold Production and 2012 Plans
08/12/2011Aurizon Grants Stock Options
08/12/2011Grants Stock Options
02/08/2011. Announces Second Quarter 2011 Conference Call & Webcast
30/11/2010Receives Award From Aemq
26/05/2010Options Azimut's Rex South Property
13/06/2008defines Gold Targets and Commences Exploration Program at Ki...
15/05/2008Andre Falzon Joins Aurizon's Board
15/03/2008deeply regrets
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (ARZ.TO)FRANKFURT (AUE.F)
0,430+10.26%2,95+5.85%
TORONTO
CA$ 0,430
09/08 16:50 0,040
10,26%
Cours préc. Ouverture
0,390 0,395
Bas haut
0,395 0,510
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,430 -%
Volume var. 1 mois
274 400 -%
24hGold TrendPower© : -44
Produit Gold
Développe Gold
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 11/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,22 US$+1,63%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,48 CA$-1,59%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-2,63%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,83 US$+0,78%Trend Power :