Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Brilliant Mining Corp.

Publié le 05 mars 2007

Initial Deacon Resource Exceeds Expectations; 1,325,000 Tonnes at 2.83% Ni as an Indicated Resource

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Nickel |
Brilliant Mining Corp. Suite 1440, 625 Howe St.
Vancouver BC, V6C 2T6

Toll Free: 1-888-331-2269

BMC: TSX-V

Initial Deacon Resource Exceeds Expectations;
1,325,000 Tonnes at 2.83% Ni as an Indicated Resource

March 5, 2007

Vancouver, B.C. - Brilliant Mining Corp. (BMC:TSXV) ("Brilliant" or the "Company") today announced an initial mineral resource estimate (See Table 1), for the Deacon Zone at the Lanfranchi Nickel Mine, located in the Kambalda District of Western Australia.  Since the Company's February 12, 2007 news release, results have also been received from an additional 7 drill holes.

Key Point Summary:

  • Indicated Resource: 1,325,000t at 2.83% Ni for 37,540t contained nickel metal
  • Inferred Resource: 101,000t at 4.59% Ni for 4,650t contained nickel metal
  • Deacon increases Indicated Resource by 70% at the Lanfranchi Mine(1)
  • The Deacon Resource remains open both up and down plunge
  • The resource estimate is based only on a portion of the Deacon channel structure over a 385m strike length
  • Mine planning is being fast-tracked based on the size and grade of the Deacon Resource
  • Extensive 92.7m intersection grading 2.24% (28.0m true thickness) on lowermost drill section

"The Deacon Resource is already close to twice the size of the Helmut South resource, which underpinned the original purchase of the Lanfranchi mine, and remains open both up and down plunge." stated John Williamson, CEO, Brilliant Mining Corp. "With the current record breaking nickel prices, the accelerated incorporation of the Deacon Resource into the active mine plan is a high priority for the Lanfranchi JV and will provide a remarkably positive impact on the economics of the operation."

The Deacon Resource estimate of 37,540t Ni has significantly increased the overall Lanfranchi nickel resource inventory and is almost double the Helmut South resource of 729,000 tonnes at 2.9% Ni(1) which was the foundation for the original purchase of the Lanfranchi Nickel Mine by the Lanfranchi Joint Venture.  More importantly, the Deacon Resource remains open both up and down plunge.

Drilling is ongoing with the short term focus being twofold. Firstly, several infill holes are planned within the current resource area to confirm continuity between several areas of massive sulphide mineralization. These holes will enable the current Inferred Resource Category to be converted to Indicated and also have the potential to push the overall resource grade above 3.0% Ni by demonstrating continuity of several areas of massive sulphide mineralization between existing drill sections. Secondly, the drilling focus will be to extend the Deacon resource up and down plunge. The priority target area, which will require an additional hanging wall drill platform, is up-plunge between Deacon and Helmut (Figure 1). The Deacon/Helmut channel structure is clearly evident in this gap and has not previously been tested by drilling.

Work has commenced on a detailed mine plan, ore reserve estimate and project financial analysis.  It is anticipated that this work will be completed during Q2 2007 and if the outcome is positive, could result in development of the Deacon orebody commencing as early as Q3 2007, subject to the Lanfranchi Joint Venture making a decision to proceed.

"Since its discovery in October 2006 the Deacon zone has grown into one of the most significant nickel discoveries found anywhere in the world over the last few years." stated John Robins, Chairman, Brilliant Mining Corp. "The Deacon discovery presents compelling evidence of the future exploration potential within our land package."

Drilling is ongoing with a total of 33 underground diamond drill holes, comprising 5,150 drill metres completed to date from the Deacon hanging wall drill drive.  The holes completed define the current shape of the Deacon mineralization and form the basis of this initial resource estimate.

Table 1: Deacon - February 2007 Mineral Resource Estimate(2)

Category

Tonnes

Ni %

Ni Tonnes

Cu %

Cu Tonnes

Indicated Resources

1,325,000

2.83

37,540

0.26

3,470

Inferred Resources

101,000

4.59

4,650

0.20

380

Deacon is a coherent zone of disseminated and matrix style mineralization containing significant zones of high grade massive sulphide mineralization. The mineralization occurs within a well defined "channel" structure located immediately to the west of Helmut South (Figure 1).  The channel appears to be oriented sub-parallel to the Helmut South orebody with mineralization outlined so far over a strike length of 385m and is still open both up and down plunge .. This initial resource estimate is for the Deacon mineralization contained within the channel structure between Lanfranchi mine grid northing's 513600mN and 513985mN (Figure 2)

Latest Drill Results

The drill results for seven recent drill holes not previously reported by Brilliant are reported here in Table 2 and their respective spatial positions are shown in Figure 2.

Table 2 - Deacon Resource - Latest Drill Results

Drill Hole

Pierce Point

Pierce Point

Pierce Point
RL

From (m)

To (m)

Interval (m)

True Width

Ni%

North

East

(m)

HS250

513907

391582

-580

136.00

168.20

32.2

16.00

3.50

 

Including massive sulphide

160.60

163.40

2.80

1.40

7.89

HS264

513660

391642

-710

178.10

204.20

26.10

11.00

2.15

HS265

513624

391585

-751

180.00

272.70

92.70

28.00

2.24

 

Including

211.00

272.70

61.70

23.00

2.50

HS266

513703

391681

-672

121.80

145.82

24.02

12.50

2.35

HS267

 

NSR

           

HS269A

513883

391657

-590

90.00

115.20

25.20

16.00

2.39

HS270

513914

391552

-540

168.60

184.00

15.40

10.00

1.75

Deacon Resource Discussion/Analysis

  1. The resources at the Lanfranchi Nickel Mine as outlined in National Instrument 43-101 compliant technical report dated March 17, 2006 prepared by Golder Associates Pty. Ltd. of Perth, Western Australia, entitled "Lanfranchi Nickel Project, Western Australia" includes an Indicated Mineral Resource of 2.43 million tonnes at 2.2% Ni (54,127 tonnes of nickel metal) and an Inferred Mineral Resource of 1.24 million tonnes at 1.6% Ni (19,370 tonnes of nickel metal).  The Technical Report can be viewed at www.sedar.com

    Since production re-commenced in late 2005 through to December 2006, approximately 225,000 tonnes with an average grade of 2.4% Ni has been extracted from the Lanfranchi Mine.
     
  2. The Deacon resource estimate is based on a 3D Surpac block model utilizing a block size of 10m NS x 10m EW x 2m vertical with 5.0m x 5.0m x 1.0m sub-cells. The model contains 42 underground diamond holes, comprising a total of 6,320m of drilling. All holes have been accurately located using Leica survey instruments and down-hole Eastman survey cameras. Grade interpolation is by inverse Distance techniques using an oriented search ellipse based on the geometry of the mineralization.

    The Mineral Resource is largely classified as Indicated due to the good continuity of the mineralization, the adequate drill hole spacing and the confidence gained from QA/QC checks and data validation.  A small zone of mineralization at the extremities of the resource has been classified as Inferred due to the lack of sample support and poor continuity of grade and lithological controls.

    The tonnes and grade of the mineral resource estimate is the material constrained within the interpreted mineralization wireframes which were constructed on sectional interpretations at 50m centres to a 1.0% Ni cut-off grade. When present, high grade massive nickel sulphide mineralization was domained separately on each wireframe. The mineral resource estimate, which is JORC-compliant, has been prepared by BM Geological Services Pty Ltd and Lanfranchi Nickel Mine's personnel; and has been reconciled to the mineral resource and mineral reserve categories as set out by and adopted by the CIM Council.


 

Figure 1:  Three dimensional model of Deacon mineralisation shell (indicative shape only) relative to the currently active Helmut South mining area and the past producing Helmut Orebody.


 

Figure 2: Deacon drill plan showing pierce point locations and drill hole intercepts
with grade x true thickness contours

Lanfranchi Joint Venture

Brilliant Mining Corp. holds a 25% interest in the Lanfranchi Joint Venture ("Lanfranchi JV"), which owns the Lanfranchi Nickel Mine together with associated infrastructure, mining leases and mineral claims.  The remaining 75% interest in the Lanfranchi JV is owned by Sally Malay Mining Limited.

The project is supervised by John Williamson, PGeol, of Edmonton, Alberta, CEO and a Director of Brilliant, and is the qualified person as defined in National Instrument 43-101.

About Brilliant Mining Brilliant Mining Corp. (BMC: TSXV) is focused on the production, development and exploration of nickel opportunities world wide. The Company currently has a 25% interest in the producing Lanfranchi Nickel Mine in Western Australia and has three active nickel projects in Canada, including the Michikamau property in central Labrador. 

On behalf of the Board of Directors

"Mike Sieb
Mike Sieb, B.Sc., MBA
President
Brilliant Mining Corp.

For further information about Brilliant Mining Corporation, or this news release, please visit our website at www.brilliantmining.com , or contact:

Mike Sieb
President 
604-646-4525

mikes@brilliantmining.com  
Derek Iwanaka
Investor Relations
604-646-4527

info@brilliantmining.com

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

Certain disclosures in this release, including management's assessment of Brilliant's plans and projects, constitute forward-looking statements that are subject to numerous risks, uncertainties and other factors relating to Brilliant's operation as a mineral exploration company that may cause future results to differ materially from those expressed or implied in such forward-looking statements. Readers are cautioned not to place undue reliance on forward-looking statements. Brilliant expressly disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise.

- -
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Brilliant Mining Corp.

EXPLORATEUR
CODE : BLT.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Brilliant Mining est une société d’exploration minière de nickel basée au Canada.

Brilliant Mining détient divers projets d'exploration au Canada.

Son principal projet en exploration est MISCHIKAMAU au Canada.

Brilliant Mining est cotée au Canada. Sa capitalisation boursière aujourd'hui est 38,1 millions CA$ (30,9 millions US$, 27,7 millions €).

La valeur de son action a atteint son plus haut niveau récent le 16 janvier 2009 à 0,56 CA$, et son plus bas niveau récent le 19 avril 2013 à 0,03 CA$.

Brilliant Mining possède 149 450 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Brilliant Mining Corp.
2008 Annual Report
2007 Annual report
Financements de Brilliant Mining Corp.
18/04/2006Revises private placement terms
Projets de Brilliant Mining Corp.
08/10/2014Montana Exploration Corp. announces agreement to acquire Bri...
29/01/2009(Lanfranchi)Record Nickel Metal Production for December 2008 Quarter Lan...
14/01/2009(Lanfranchi)39% Increase of Deacon Indicated Mineral Resource to 157.4 M...
19/09/2008(Lanfranchi)Contained Nickel Reserves Increase to 146 million pounds and...
04/09/2008(Lanfranchi)450,000 Tonnes of Ore Approved for Delivery Lanfranchi Nicke...
01/08/2008(Kambalda)June Quarterly Production Update Lanfranchi Nickel Mine, Kam...
01/08/2008(Kambalda)Resource and Exploration Update Lanfranchi Nickel Mine, Kamb...
17/07/2008(Kambalda)Strong Production Growth Forecast - Lanfranchi Nickel Mine K...
23/04/2008(Lanfranchi)Record Quarterly Production – 49% Increase over December 200...
23/04/2008(Lanfranchi)7.0% Ni over 1.22m from First Hole on Northern Tramways Dome...
31/03/2008(Lanfranchi)Production Commences 18 Months After Discovery at High-Grade...
13/03/2008(Lanfranchi) Drill Program to Commence Lanfranchi Nickel Mine, Kambalda ...
31/01/2008(Lanfranchi)Record Quarterly Production?47% Increase over September Quar...
30/01/2008(Lanfranchi)Significant Conductor Identified on Northern Overturned Tram...
29/11/2007(Kambalda)5.4% Ni Delivered from Winner during First Month Production ...
30/10/2007(Kambalda)Winner Production Commenced Oct. 14?First Month Ore Deliveri...
29/10/2007(Lanfranchi)High Grade Massive Ni Sulphide Intersected on Overturned Nor...
04/10/2007Intersects Nickel Sulphide Mineralization at Michikamau Proj...
13/09/2007(Lanfranchi)High Grade Massive Ni Sulphide Zone Delineated, Lanfranchi O...
10/08/2007(Lanfranchi)Deacon Ore Reserve Economic Input Summary; Lanfranchi Nickel...
31/07/2007(Lanfranchi)June 2007 Quarterly Update
10/07/2007(Kambalda)Drilling Validates Tramways Dome Theory; 3.4% Ni over 1 Metr...
03/07/2007(Kambalda)Resource Delineation Drill Program Underway on Lanfranchi Ex...
25/06/2007(Mischikamau)Commences Exploration Program at Michikamau Ni-Cu-Co-PGE Pro...
29/05/2007(Kambalda)21,000 Tonnes (46.8 Million Lbs) Ni Metal Production Target ...
Communiqués de Presse de Brilliant Mining Corp.
20/04/2015Brilliant Announces Proposed Investment in Ram Power
15/04/2015Brilliant Announces Appointment of CFO and New Head Office
10/04/2015IIROC Trading Resumption - BLT
10/04/2015Announces Plans for A Return of Capital; Change of Business ...
10/04/2015Brilliant Announces Plans for A Return of Capital; Change of...
10/04/2015IIROC Trading Halt - BLT
09/04/2015Brilliant Receives Final Payment from Government of Equatori...
24/03/2015Brilliant Receives Third Payment from Government of Equatori...
26/02/2015IIROC Trading Resumption - BLT
26/02/2015IIROC Trading Halt - BLT
26/02/2015Brilliant Receives Second Payment from Government of Equator...
11/02/2015Brilliant Announces Cancellation of Shares
11/02/2015IIROC Trading Resumption - BLT
11/02/2015IIROC Trading Halt - BLT
11/02/2015Brilliant Provides Update on Payment From Government of Equa...
30/01/2015Brilliant Provides Update on Agreement With Government of Eq...
22/01/2015IIROC Trading Resumption - MPL; BLT
22/01/2015Brilliant Announces Agreement with the Government of Equator...
22/01/2015IIROC Trading Halt - BLT
25/11/2014Brilliant Resources and Montana Exploration Announce Termina...
08/10/2014Brilliant Announces Letter Agreement Setting Out Terms of Ac...
12/06/2014Brilliant Proceeds to Arbitration Against the Government of ...
19/11/2008Will Be Exhibiting at the San Francisco Hard Assets Conferen...
26/09/2008Will Be Exhibiting at the Toronto Resource Investment Confer...
23/06/2008TSX Venture 50 Ranks Brilliant Mining In Top 10 Mining Compa...
16/06/2008Ore Deliveries Unaffected - Lanfranchi Nickel Mine, Kambalda...
29/05/2008Retires $5 Million Convertible Debenture with Cash Payment
15/05/2008Cash Position Increases Receives $3.4 Million from Warrant E...
16/04/2008Visits Kamloops, White Rock and Victoria
29/01/2008Presents at 2008 World Outlook Financial Conference
15/01/2008Chairman s Message - Brilliant Mining 2007 Year in Review
01/11/2007Strong Conductor Down-Plunge of Deacon?Surface Drill Program...
24/09/2007Reports Significant Increase to Nickel Reserves and Resource...
07/08/2007Deacon Ore Reserve Exceeds 43,000 Tonnes of Nickel Metal; Tr...
01/08/2007Brilliant Nickel Production Un-hedged, Lanfranchi Nickel Min...
17/07/2007Quarterly Nickel Ore Deliveries Lanfranchi Nickel Mine, Kamb...
16/07/2007Commences Drilling at Michikamau Ni-Cu-Co-PGE Project: Labra...
20/06/2007Recognized as Top 10 Mining Company For 2007 TSX Venture 50 ...
05/03/2007Initial Deacon Resource Exceeds Expectations; 1,325,000 Tonn...
26/05/2006closes acquisition of Donegal Resources Pty Ltd.;…
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (BLT.V)
0,255+0.00%
TSX-V
CA$ 0,255
26/06 15:59 -
0%
Cours préc. Ouverture
0,255 0,255
Bas haut
0,250 0,255
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,255 -1,92%
Volume var. 1 mois
114 001 -1,92%
24hGold TrendPower© : -6
Produit
Développe
Recherche Cobalt - Copper - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 23/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,69 AU$+0,39%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,22 US$-0,33%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,52 GBX-0,76%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$+0,00%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,48 CA$+1,54%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,26 CA$+4,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,23 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,06%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
53,08 US$+0,70%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :