Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Gold One International Ltd

Publié le 10 février 2012

Initial Pilot Gold drilling returns 5.91 g/t gold over 18.4 metres at Kinsley Mountain

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter

If you are having trouble viewing this email properly, please click here:
http://www.industrymailout.com/Industry/View.aspx?id=340977&q=419755972&qz=4c233e

Our Story    Our Projects    Our Team    News    Investors    Contact Us

Initial Pilot Gold drilling returns 5.91 g/t gold over 18.4 metres at Kinsley Mountain

February 10, 2012 12-02

Pilot Gold Inc. (PLG - TSX) reports that our initial drilling has returned impressive intervals of gold mineralization at Kinsley Mountain, a system we believe is strongly analogous to the nearby Long Canyon gold deposit in northeastern Nevada.

Kinsley Mountain shares the same unique combination of stratigraphy, structure and mineralization as Long Canyon, a deposit our technical team defined and advanced to a multi-million-ounce resource prior to its acquisition by Newmont Mining Corp. in April last year. Kinsley Mountain is located approximately 90 kilometres to the southeast of Long Canyon. Pilot Gold has an option to earn up to a 65% interest on the Kinsley Mountain project (See Sept. 21, 2011 press release).

Our first work-program included 1,250 metres (six holes) of diamond-core drilling designed to confirm mineralization in historic reverse circulation holes near the margins of open pits at the past-producing Kinsley Mountain Mine. Many of the historic drill holes, averaging 65 metres in depth, stopped short of potentially mineralized zones. Approximately 138,000 oxide ounces were mined from seven pits by Alta Gold, which ceased operations in the late 1990s due to financial difficulties and low gold prices.

Our first six holes are near-twins of existing holes in two locations, one to the north of the main pit and one located between two satellite pits to the southeast. These drill results highlight the exceptional, untapped potential of this system.

Drill highlights from the 2011 program include (full table at bottom of release):

  • 5.91 g/t gold over 18.4 metres, including 11.93 g/t gold over 7.8 metres in hole PK-04;
  •  6.75 g/t gold over 7.5 metres, including 13.52 g/t gold over 3.2 metres in PK-03;
  • 6.23 g/t gold over 8.7 metres, including 12.05 g/t gold over 3.0 metres in hole PK-02.

Primary drill composites were calculated using a cut-off of 0.30 g/t, with variably higher cut-offs for the sub-intervals. Drill intersections are reported as drilled thicknesses. True widths of the mineralized intervals are interpreted to be between 60-100% of the reported lengths.

"Our technical team carries forward Fronteer Gold's in-depth, working knowledge of Long Canyon and our strategy in Nevada was to identify a project with the same attributes and exploration potential as Long Canyon," says Dr. Moira Smith, Pilot Gold's Chief Geologist and previously Fronteer Gold's Chief Geologist for Nevada. "I believe Kinsley Mountain has the framework for discovery and a clear path to building a significant, high-quality deposit in the near-term."

2012 WORK PROGRAM

Kinsley Mountain is one of Pilot Gold's three priority assets to be advanced in 2012. We plan on advancing Kinsley Mountain through detailed geological analysis, aggressive drilling and deposit modeling. The Kinsley Mountain project is under a joint venture option agreement with Nevada Sunrise Gold Corp. We anticipate earning an initial 51% interest in the project by Q2 2012. Our planned 2012 work-program includes:

  • Deposit modelling: Extensive historic databases were compiled and merged with new surface mapping and sampling. These data are being used to create a three-dimensional model of geology and mineralization to aid in selection of new drill targets. 
  • Drilling: 12,000 metres of infill and step-out drilling on mineralized zones identified in historic drill programs. In addition to near-mine and resource definition drilling, a comprehensive effort to identify new targets will be undertaken, encompassing both the original 141 claims as well as 128 claims staked by Pilot Gold to the north, a largely unexplored area.
  • Resource estimation: Anticipated completion of a project-first resource by year-end.
  • Development activities: Preliminary metallurgical work, hydrological, environmental and baseline studies; and, submission of a Plan of Operation to the U.S. federal government to allow for property-wide drilling.    

 FOR DOWNLOAD

2011 DRILL RESULTS

Hole                    ID

From                   (metres)

To              (metres)

Interval            (metres)

Gold             g/t

Silver              g/t

PK001C

88.5

105.3

16.8

1.64

3.3

 


 

 

 

 

PK002C

111.7

120.4

8.7

6.23

2.1

incl

117.3

120.4

3.0

12.05

3.5

and

131.7

135.0

3.4

0.33

1.9

 


 

 

 

 

PK003C

102.7

110.2

7.5

6.75

1.4

incl

107.0

110.2

3.2

13.52

2.3

 


 

 

 

 

PK004C

42.7

61.1

18.4

5.91

2.5

incl.

45.7

53.5

7.8

11.93

4.2

and

148.0

152.1

4.1

0.54

2.1

 


 

 

 

 

PK005C

36.9

39.6

2.7

0.65

0.2

and

159.6

165.0

5.5

0.58

1.6

 

166.7

167.6

0.9

0.06

2790.0

 


 

 

 

 

PK006C

53.0

63.4

10.4

0.95

2.8

Moira Smith, P. Geo., Pilot Gold Chief Geologist, is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the information contained in the release is accurate.  Drill composites were calculated using a cut-off of 0.30 g/t. Drill intersections are reported as drilled thicknesses. True widths of the mineralized intervals are interpreted to be between 60-100% of the reported lengths. Drill samples were assayed by ALS Chemex (ISO9001:2000) in Reno, Nevada for gold by Fire Assay of a 30 gram (1 assay ton) charge with an AA finish, or if over 5.0 g/t were re-assayed and completed with a gravimetric finish. For these samples, the gravimetric data were utilized in calculating gold intersections. QA/QC included the insertion and continual monitoring of numerous standards and blanks into the sample stream, and the collection of duplicate samples at random intervals within each batch. Selected holes are also analyzed for a 72-element geochemical suite by ICP-MS. Data citing ounces mined from historical production is attributed to www.metalseconomics.com

ABOUT PILOT GOLD                                                                      

Pilot Gold is a gold exploration company led by a proven technical team that continues to discover and define high-quality projects featuring strong grades, meaningful size and mining-friendly addresses. Our three key assets include interests in the Halilaga and TV Tower projects in Turkey, each of which alone has the ability to drive the company forward, and the Kinsley Mountain project in Nevada, a gold system analogous to Long Canyon. We also have a pipeline of projects, characterized by large land positions and district-wide potential, that can meet our growth needs for years to come. For more information, visit www.pilotgold.com or contact:

Matt Lennox-King, President & CEO
Patrick Reid, VP Corporate Affairs
Phone 604-632-4677 or Toll Free 1-877-632-4677
info@pilotgold.com

All statements in this release, other than statements of historical fact, are "forward-looking information" with respect to Pilot Gold Inc. ("Pilot Gold") within the meaning of applicable Canadian securities laws, including statements that address future mineral production, reserve potential, exploration drilling, the future price of gold, potential quantity and/or grade of minerals, potential size of a mineralized zone, potential expansion of mineralization, the timing and results of future resource estimates, or other study, proposed exploration and development of our exploration properties and the estimation of mineral resources. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. These statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievement of Pilot Gold to differ materially from those anticipated in such forward-looking information.  Such forward-looking information, including, but not limited to, completion of expenditure obligations under the Kinsley Mountain Option Agreement, proposed exploration and development of the Kinsley Mountain property, future issuances of Common Shares to acquire the Kinsley Mountain Option Agreement from Animas Resources Ltd.; estimated future working capital, funds available, uses of funds, future capital expenditures, exploration expenditures and other expenses for specific operations; information with respect to exploration results, the timing and success of exploration activities generally, and other factors which may cause the actual results, performance or achievement of Pilot Gold to be materially different from any future results, performance or achievements expressed or implied by such forward looking information.

Such factors include, among others, risks related to the interpretation and actual results of historical production at Kinsley Mountain, reliance on technical information provided by third parties on any of our exploration properties, including access to historical information on the Kinsley Mountain property as well as specific historic data associated with and drill results from the property, information from Nevada Sunrise LLC and Nevada Sunrise Gold Corporation, the license and lease owners respectively on the Kinsley Mountain property, current exploration and development activities; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Amended Annual Information Form for the year ended December 31, 2010 dated May 12, 2011 (amended June 7, 2011), which is available under Pilot Gold's SEDAR profile at www.sedar.com.

Although Pilot Gold has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Pilot Gold disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.

Forward-looking statements are made as of the date hereof and accordingly are subject to change after such date. Except as otherwise indicated by Pilot Gold, these statements do not reflect the potential impact of any non-recurring or other special items or of any dispositions, monetizations, mergers, acquisitions, other business combinations or other transactions that may be announced or that may occur after the date hereof. Forward-looking statements are provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of our operating environment. Pilot Gold does not undertake to update any forward-looking statements that are included in this document, except in accordance with applicable securities laws.

�2012 Pilot Gold Inc.  |  pilotgold.com
Subscribe  |  
Suite 1650, 1055 West Hastings, Vancouver, BC V6E 2E9

Gold One International Ltd

PRODUCTEUR
CODE : GDO.AX
ISIN : AU000000GDO5
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Gold One est une société développant des projet miniers d'or basée en Afrique Du Sud.

Ses principaux projets en production sont SUB NIGEL & SPAARWATER et MODDER EAST en Afrique Du Sud et ses principaux projets en exploration sont NEW KLEINFONTEIN & TURNBRIDGE, HOLFONTEIN et VENTERSBURG en Afrique Du Sud et ETENDEKA en Namibie.

Gold One est cotée aux Etats-Unis D'Amerique, en Australie, en Afrique Du Sud et en Allemagne. Sa capitalisation boursière aujourd'hui est 242,1 millions AU$ (213,2 millions US$, 156,2 millions €).

La valeur de son action a atteint son plus bas niveau récent le 03 avril 2009 à 0,01 AU$, et son plus haut niveau récent le 15 mai 2009 à 12,00 AU$.

Gold One possède 807 080 905 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Gold One International Ltd
2007 Annual report
Nominations de Gold One International Ltd
03/11/2008 appoints Macquarie First South Advisors
Rapports Financiers de Gold One International Ltd
29/10/2015Third quarter update on gold operations at Palito and Sao Ch...
28/07/2015Serabi Gold plc : Second quarter update on gold operations a...
16/04/2015Serabi Gold plc : First quarter update on Serabi's Tapajos g...
Projets de Gold One International Ltd
27/02/2014Pilot Gold reports 6.85 g/t gold over 41.7 metres at Western...
18/02/2014Melkior intersects 6.20 g/t Gold over 10.5 metre=?utf-8?Q?s_...
13/01/2014Beaufield Intersect 3=2E92 g/t Gold Over 13=2E40 Metres Near...
09/01/2014Pilot Gold reports 2.00 g/t oxide gold over 35.0 metres at K...
18/11/2013Pilot Gold reports 8.53 g/t gold over 36.6 metres at Kinsley...
01/11/2013Pilot Gold reports 0.60 g/t oxide gold over 81.0 metres at K...
01/10/2013ROBEX/Exploration Permit Moussala: RC Drilling Up to 18=2E56...
23/07/201315.3 g/t gold over 45.2 metres at KCD target, TV Tower
19/03/2013Pilot Gold drills 25.7 g/t gold over 16.5 metres, further de...
22/01/2013Pilot Gold reports 227 g/t gold over 12=2E0 metres from meta...
15/01/2013Tembo Gold Report First Deep Diamond Drill Hole of 22.81 g/t...
09/01/2013Pilot Gold reports 14.9 g/t gold over 14.1 metres from 50-me...
14/11/2012Pilot Gold reports 11.63 g/t gold over 32.5 metres at TV Tow...
05/09/2012Pilot Gold reports 13.7 metres of 6.03 g/t gold on west side...
08/08/2012El Gallo Phase 1 Production Area DrillingEncounters More Gol...
05/10/201110 g/t Gold over 13 Metres Intersected on Upper Montrose Zon...
10/08/2011Pilot Gold intersects 1=2E87 g/t gold over 48=2E0 metres in ...
10/02/2009(Modder East)Modder East intersects first reef
28/01/2009(Sub Nigel & Spaarwater)hoists first ore at recommissioned Sub-Nigel
21/01/2009(Modder East)Shareholders give thumbs up to Aflease/BMA union
Communiqués de Presse de Gold One International Ltd
13/01/2014Melkior and Beaufield intersect 3.92 g/t gold over 13.40 met...
03/09/2013Western Pacific Reports Sampling of up to 20.9 g/t Gold Over...
21/03/2013Red Cloud Congratulates Tyhee Gold on Nomination of Richard...
30/01/2013Tembo Gold Reports Drill Hole TRC0003 at Ngula 1 With 4.73 g...
29/01/2013Pilot Gold reports 2.33 g/t gold over 93.5 metres in step-ou...
05/09/2012Tembo Gold Drills 10.17g/t of Gold Over 6m Including 19.1g/t...
04/09/2012Comstock samples 3.31 g/t Gold over 95 m at VG Zone on QV Pr...
04/09/2012Tucano Gold Ore Resource and Reserve Update
21/08/2012Taku Drills 0.95gpt Gold Over 23.4m at Rosebute in White Gol...
16/07/2012Pilot Gold reports 5.48 g/t gold over 20.4 metres from core ...
10/05/2012Bonterra Assays 73.82 G/T Gold Over 3.0 Metres At The New Ri...
12/04/2012Marathon - Marathon Gold Hits 12.4 g/t Gold Over 5.2 Meters ...
10/04/2012Drilling Intersects 78 Grams per Tonne Gold on Destiny Gold ...
13/03/2012Tembo Gold Reports 16.10 g/t Au Over 3.00 Meters and 3.13 g/...
27/02/2012Marathon - Marathon Gold Hits 2.20 g/t Gold Over 26.2 Meters...
10/02/2012Initial Pilot Gold drilling returns 5.91 g/t gold over 18.4 ...
09/02/2012Assays for Upper Montrose Zone in DDH-MON-11-28 have 7.91g/t...
31/01/2012BONTERRA CONTINUES DISCOVERING HIGH GRADE GOLD ON ITS EASTER...
10/01/2012Marathon - Marathon Gold Intersects 1.48 g/t Gold Over 42.5 ...
09/12/2011Taku Intersects 2.3 Grams per Tonne Gold Over 1.0m at Portla...
05/12/2011Marathon - Marathon Gold Intersects 4.59 g/t Gold Over 18.1 ...
26/10/2011Marathon - Marathon Gold Intersects 2.05 g/t Gold Over 30.8 ...
11/10/201143.7 Grams/Tonne Gold Over 7.4 Metres Intersected on Southwe...
07/09/2011BonTerra Drills 14.85 g/t Gold over 15.3 Metres at Eastern E...
07/09/2011Marathon - Marathon Intersects 5.15 g/t Gold Over 29.2 Meter...
10/08/2011Marathon - Marathon Gold Intersects 8.26 g/t Gold over 5.5m ...
09/08/2011Marathon - Marathon Expands It's "Heart of Gold" with 16.15g...
27/07/2011Marathon - Marathon Continues Successful Results at Leprecha...
24/03/2011Auriga Gold's Drilling at Maverick Gold Project, Manitoba, I...
06/02/2009High court sanctions scheme of arrangement
02/02/2009Strategic and operation update
29/01/2009COMPETITION COMMISSION AND FOREIGN INVESTMENT
13/01/2009secures additional funding for Modder East completion
19/12/2008Scheme of arrangement update
15/12/2008Dealing in securities by directors
12/12/2008Change to the board of directors
10/12/2008Withdrawal of cautionary announcement
02/12/2008acquires prospective Mozambique concession
26/11/2008TRADING STATEMENT, ACQUISITION ISSUE, FINANCIAL EFFECTS...
20/11/2008BMA Gold deal creates new international gold company
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (GDO.AX)JSE (GDO.JSE)
0,300+0.00%285,00+0.00%
AUSTRALIA
AU$ 0,300
29/01 13:54 -
0%
Cours préc. Ouverture
0,300 0,295
Bas haut
0,295 0,300
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,300 -%
Volume var. 1 mois
245 319 -%
24hGold TrendPower© : 34
Produit Gold
Développe
Recherche Copper - Gold - Iron
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 12/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,64 AU$-0,97%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,21 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :