Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
Cours Or & Argent

Klondex Mines Ltd

Publié le 19 décembre 2013

Intercepts New Areas of Gold Mineralization at its Fire Creek Project

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |
KDX Logo Header
Klondex Mines Intercepts New Areas of Gold Mineralization at its Fire Creek Project

Reno, NV & Vancouver, BC - December 19, 2013 - Klondex Mines Ltd. (TSX: KDX; OTCQX: KLNDF), a Nevada gold exploration and development company, today reports gold assays at its Fire Creek gold Project in Nevada, from surface drilling. The drilling suggests possible extensions of the current mineral resource model.

 

Four reverse circulation (RC) holes were drilled as part of the Fire Creek hydrology study (see FIGURE 1). RC chips were logged, and samples collected on 5 ft intervals for assaying. Three of the four holes intercepted mineralization outside of the current mineral resource model that are in line with the underground workings. Grades from the surface drilling range from 16.3 g/t (0.47 opt) Au to 5.1 g/t (0.15 opt) Au. See Tables 2 and 3 below, for detailed sample results. Table 1 details significant assays and locations in relation to the mineral resource model at Fire Creek.

 

Drill Hole

Intercept

Location

FC-13-27S

13.0 g/t (0.38 opt) Au over 10.7m (35 ft)

250 ft north of the known Joyce structure block model, and 1070 ft north of the last blasted Joyce face round.

FC-13-26S

9.2 g/t (0.27 opt) Au over 4.6m (15 ft)

480 ft south of the closest modeled vein and west of the main ramp

FC-13-25S

10.4 g/t (0.30 opt) Au over 1.5m (5 ft)

250 ft south of the resource model

Table 1: RC drilling during the hydrology study




 

 

 Mike Doolin, Klondex General Manager stated, "These intercepts continue to support our view that the Fire Creek project is significantly underexplored. The 2014 drill program is designed to follow up on new discoveries as well as extend the strike length and vertical extent of the current known mineralization, as we continue to unlock value at Fire Creek. Based on my personal experience, in these styles of mineral deposits, RC drill holes dilute and underestimate the grades. We expect that additional core drilling in these areas will clarify grades and widths."

 

The technical information contained in this press release has been reviewed and approved by Steven L. McMillin, CPG-11031 (American Inst. of Prof. Geol.), Chief Geologist for Klondex Mines Ltd., as a non-independent Qualified Person for the purposes of National Instrument 43-101.

 

RC sample size was monitored during drilling and kept to approximately 10-15kg.  Reference chips were collected in standard chip trays for logging. Assays were performed by ALS Minerals in Reno, Nevada (an independent laboratory), under the supervision of Klondex staff. Fire Creek QA/QC protocols include insertion of standards, blanks and duplicates approximately every 20 samples. Standard and blank samples use accredited reference material. Gold analyses were obtained via industry standard fire assay with atomic absorption finish. For samples returning greater than 10.00 g/t Au, a follow-up fire assay analysis with a gravimetric finish was performed.  

 

About Klondex Mines Ltd. (www.klondexmines.com)

Klondex Mines is focused on the exploration and development of its high-grade Fire Creek gold deposit in north central Nevada. Fire Creek is a compelling gold project located in a mining-friendly jurisdiction, near major producers, power, transportation, mining infrastructure and milling facilities. As at December 19,2013, the Company had 79.2 million shares issued and outstanding and 97.2 million shares fully diluted.

 

Contact:                                                                                                                                                

Paul Huet                                                     Alison Tullis                                             Toni Trigiani

President & CEO                                        Manager, Investor Relations               Investor Relations

Klondex Mines Ltd.                                Klondex Mines Ltd.                             Catalyst Global LLC

1-775-284-5757                                        1-647-233-4348                                    1-212-924-9800

investors@klondexmines.com              atullis@klondexmines.com                kdx@catalyst-ir.com

 

 

Hole No.

AZI

DIP

Depth

Depth

 

 

 

(m)

(ft)

FC-13-24S

227

-60

452.7

1500

FC-13-25S

66

-60

403.9

1325

FC-13-26S

248

-60

518.2

1700

FC-13-27S

60

-60

518.2

1700

Table 2: RC drilling azimuth, dip and depth

 

Hole No.

From

To

Length

From

To

Length

Grade

Grade

 

(m)

(m)

(m)

(ft)

(ft)

(ft)

(g/t Au)

(opt Au)

FC-13-24S

No Significant Intercept

 

 

 

 

 

 

 

 

 

FC-13-25S

126.5

131.1

4.57

415

430

15

8.49

0.248

including

128.0

129.5

1.52

420

425

5

6.59

0.192

including

129.5

131.1

1.52

425

430

5

10.40

0.303

 

 

 

 

 

 

 

 

 

FC-13-26S

161.5

164.6

3.05

530

540

10

6.16

0.180

including

161.5

163.1

1.52

530

535

5

8.17

0.238

and

233.2

234.7

1.52

765

770

5

6.59

0.192

and

239.3

242.3

3.05

785

795

10

7.18

0.209

including

239.3

240.8

1.52

785

790

5

5.13

0.149

including

240.8

242.3

1.52

790

795

5

9.24

0.269

and

256.0

257.6

1.52

840

845

5

7.02

0.205

and

297.2

304.8

7.62

975

1000

25

9.21

0.269

including

297.2

298.7

1.52

975

980

5

12.50

0.365

including

298.7

300.2

1.52

980

985

5

8.01

0.234

including

300.2

301.8

1.52

985

990

5

7.11

0.207

and

373.4

391.7

18.29

1225

1285

60

5.12

0.149

including

374.9

376.4

1.52

1230

1235

5

5.09

0.148

including

376.4

378.0

1.52

1235

1240

5

7.23

0.211

including

378.0

379.5

1.52

1240

1245

5

7.91

0.231

including

379.5

381.0

1.52

1245

1250

5

5.65

0.165

including

384.0

385.6

1.52

1260

1265

5

5.97

0.174

including

387.1

388.6

1.52

1270

1275

5

6.64

0.194

 

 

 

 

 

 

 

 

 

FC-13-27S

342.9

365.8

22.86

1125

1200

75

8.36

0.244

including

344.4

345.9

1.52

1130

1135

5

5.94

0.173

including

349.0

350.5

1.52

1145

1150

5

5.40

0.157

including

353.6

355.1

1.52

1160

1165

5

11.65

0.340

including

355.1

356.6

1.52

1165

1170

5

13.85

0.404

including

356.6

358.1

1.52

1170

1175

5

14.95

0.436

including

358.1

359.7

1.52

1175

1180

5

16.25

0.474

including

359.7

361.2

1.52

1180

1185

5

10.90

0.318

including

361.2

362.7

1.52

1185

1190

5

12.15

0.354

including

362.7

364.2

1.52

1190

1195

5

10.30

0.300

and

449.6

451.1

1.52

1475

1480

5

5.56

0.162

Table 3: RC drilling widths and grades, true widths are unknown.

 

 

This news release contains certain information that may constitute forward-looking information under applicable Canadian securities legislation, including information about the magnitude and quality of the Fire Creek Project the results of exploration and assay sampling at the Fire Creek Project, the Company's intention and ability to monetize mineralized material, timing of the updated mineral resource estimate at the Fire Creek Project and the bulk sampling program. This forward-looking information entails various risks and uncertainties are based on current expectations, and actual results may differ materially from those contained in such information. These risks and uncertainties include, but are not limited to the risks and hazards associated with environmental compliance and permitting for its underground operations, the strength of the global economy; the price of gold; operational, funding and liquidity risks; the degree to which mineral resource estimates are reflective of actual mineral resources; the degree to which factors which would make a mineral deposit commercially viable are present. Risks and uncertainties about the Company's business are more fully discussed in the Company's disclosure materials filed with the securities regulatory authorities in Canada and available at www.sedar.com. Readers are urged to read these materials. Klondex assumes no obligation to update any forward-looking information or to update the reasons why actual results could differ from such information unless required by law.

 

This email was sent to .com by investors@klondexmines.com |  
Update Profile/Email Address | Instant removal with � | Privacy Policy.
Catalyst Global LLC | 104 Fifth Avenue | 6th Floor | New York | NY | 10011
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Klondex Mines Ltd

EN DÉVELOPPEMENT
CODE : KDX.TO
ISIN : CA4986961031
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Klondex Mines est une société développant des projet miniers d'or et d'argent basée au Canada.

Klondex Mines détient divers projets d'exploration en USA.

Son principal projet en développement est FIRE CREEK en USA et ses principaux projets en exploration sont MAGGIE CREEK, REEF, HOT SPRINGS POINT, CORRAL CANYON et SWALES MOUNTAIN en USA.

Klondex Mines est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 543,8 millions CA$ (414,3 millions US$, 344,7 millions €).

La valeur de son action a atteint son plus bas niveau récent le 08 décembre 2000 à 0,06 CA$, et son plus haut niveau récent le 04 novembre 2016 à 7,95 CA$.

Klondex Mines possède 177 130 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Klondex Mines Ltd
06/05/2008to Highlight New Gold Intercepts from its Nevada Exploration...
Rapports annuels de Klondex Mines Ltd
2007 Annual report
Financements de Klondex Mines Ltd
09/12/2013Klondex Updates Proposed Financing with Franco-Nevada
02/11/2012Announces $20 Million Equity Financing and US$7 Million Debt...
22/07/2011Announces Repricing of Lender Warrants to Purchase 1.4 Milli...
21/08/2008Completes CDN $1.75 Million Private Placement
01/08/2008Arranges Non-Brokered Private Placement
16/09/2007to Extend the Expiration Date and Reduce Exercise Price of W...
Nominations de Klondex Mines Ltd
15/11/2013Appoints Barry Dahl as Chief Financial Officer
14/09/2013Appoints Ritch Hall as Special Advisor to the Board
29/06/2012=2DKlondex Mines Announces Independent Board of Directors El...
13/07/2011Confirms Seven-Member Board with Substantial Nevada Gold Min...
12/10/2009Appoints Dr. W. Lang to its Board of Directors
22/06/2009(Fire Creek)Appoints Special Committee to Review Silvercorp Takeover Off...
22/05/2007Expands Board with Appointment of Mining Industry Executive,...
Projets de Klondex Mines Ltd
17/03/2015(Fire Creek)Files Pre-Feasibility Study Technical Report in Relation to ...
13/02/2014(Fire Creek)Infill Drilling Extends Joyce and Vonnie Veins at Fire Creek
11/02/2014Klondex Completes Acquisition of the Midas Mine and Mill Com...
20/01/2014Drilling Details Three Mineralized Structures in the West Zo...
14/01/2014continues to Strengthen Nevada Operations Team; Klondex to E...
19/12/2013(Fire Creek)Intercepts New Areas of Gold Mineralization at its Fire Cree...
04/12/2013Enters into Definitive Agreement with Newmont to Acquire the...
01/11/2013(Fire Creek)Files Technical Report in Connection with Fire Creek Project
31/10/2013Klondex to Begin Drilling West Zone
16/09/2013Reports Updated Resource Estimate
13/05/2013Visible Gold from Exploration
02/04/2013Klondex Secures Toll Milling Agreement w/ Veris Gold for Fir...
22/01/2013Klondex Discovers a New "West Zone" With Significant Visible...
24/09/2012(Fire Creek)Drills 2=2C910 g=2Ft (85 oz=2Fton) Gold over 1.5 Meters at t...
11/08/2012Veteran Mine Engineer=2C Rodney Cooper=2C Named To Board of ...
13/04/2012(Fire Creek)Underground In-Fill Drilling Continues to Intersect Gold Min...
10/01/2012Nevada Gold Explorer Klondex Mines Presents Sunday=2C Jan. 2...
05/10/2011(Fire Creek)Draws U.S. $5 Million from Gold Loan to Fund Continued Devel...
26/07/2011(Fire Creek)Reports Solid Progress at Fire Creek Nevada Gold Deposit
15/02/2011(Fire Creek)Discovers High-Grade Gold Vein in Nevada with 0.31 oz/ton Go...
15/02/2011Klondex Discovers High-Grade Gold Vein in Nevada with 0.31 o...
07/01/2010(Fire Creek)to Review High-Grade Nevada Gold Exploration Program at Vanc...
17/12/2009(Fire Creek)Secures BLM Permits for Confirmation Program at Fire Creek
09/07/2009(Fire Creek)Resumes Drilling Of High-Grade Gold Zones At Fire Creek As I...
29/05/2009(Fire Creek)to Highlight 1.6 mm Oz. Indicated Gold Resource (and 0.5 mm ...
02/03/2009(Fire Creek)Releases Final Gold Assays From 2008 Fire Creek Drill Progra...
12/12/2008Initiates High-Grade Gold Resource Update to Include Two Yea...
19/03/2008(Fire Creek) Confirms Gold Intercept of 0.37 oz/ton (12.7 g/t) over 25 f...
17/01/2008(Fire Creek)'s Drills Gold Intercepts of 67.2 gpt over 1.5 meters
26/11/2007 Reports New High-Grade Gold Intercept 18.0 gpt over 9.1 met...
22/10/2007(Fire Creek)Hits New High-Grade Intercept (41.55 gpt/1.21 oz/ton over 4....
14/09/2007(Fire Creek)Drilling Results Increase Klondex's Gold Resource By Extendi...
05/07/2007(Fire Creek)Records Drill Intercept of 8.32 oz/ton Gold over 2.6 Feet Fr...
Communiqués de Presse de Klondex Mines Ltd
10/05/2016Klondex Mines reports 1Q loss
01/02/2016Klondex Receives BLM Approval for the Environmental Assessme...
22/01/2016Klondex Completes Acquisition of Rice Lake Mine and Mill Com...
19/01/2016Klondex Announces 2015 Production of ~128,000 GEOs; 2016 Pro...
29/12/2015Klondex Announces Changes to Its Board of Directors
17/12/2015Klondex Announces Acquisition of Rice Lake Mine and Mill Com...
03/12/2015Klondex Increases Total Mineral Reserves by ~19% in 2015
23/10/2015Klondex Announces Sales of 33,846 GEOs in Q3 2015; Increases...
19/10/2015U.S. Global Investors' Frank Holmes and Ralph Aldis Intervie...
08/10/2015Klondex Provides Update on Midas' Exploration Drill Program
06/10/2015Klondex Modifies NYSE MKT Exchange Symbol to "KLDX"
05/10/2015Klondex Approved for Listing on NYSE MKT Exchange Under the ...
10/09/2015Klondex Completes $26,270,000 Bought Deal Public Offering of...
12/08/2015Klondex Reports Second Quarter 2015 Cash Increase of $13.1 m...
06/08/2015Klondex Mines Bolsters Executive Team by Appointing John Sea...
05/08/2015Klondex Mines Schedules 2Q 2015 Conference Call for Thursday...
04/08/2015Klondex Discovers New Veins at Fire Creek; Intercepts 9.1 g/...
22/07/2015Klondex Reports Record Sales of 34,188 GEOs in 2Q2015; Incre...
14/07/2015Klondex Begins Construction of Midas Tailings Expansion
18/06/2015Klondex Receives WPCP Permit from State of Nevada; The Tonna...
14/04/2015Recovers 32,542 GEO in 1Q2015
07/04/2015Releases Midas Phase I Drill Program Results
07/04/2015Klondex Releases Midas Phase I Drill Program Results
01/04/2015Files Pre-Feasibility Study for the Midas Mine
01/04/2015Klondex Files Pre-Feasibility Study for the Midas Mine
25/03/2015Reports Net Income of $18.3 Million or $0.16 per Share in In...
25/03/2015Klondex Reports Net Income of $18.3 Million or $0.16 per Sha...
17/03/2015Klondex Files Pre-Feasibility Study Technical Report in Rela...
09/03/2015Schedules Fourth Quarter 2014 Conference Call for Wednesday,...
09/03/2015Klondex Mines Schedules Fourth Quarter 2014 Conference Call ...
25/02/2015Klondex to Exhibit and Present at the PDAC; Present at Red C...
23/02/2015Klondex Reports Initial Fire Creek and Midas Mineral Reserve...
29/01/2015Klondex Increases Mineral Resource Estimate at Fire Creek
19/01/2015Klondex Recovers 107,860 Au Equivalent Ounces in First Year ...
16/12/2014Klondex Mines Bolsters Executive Team by Appointing Brian Mo...
03/12/2014Klondex Enters Into Toll Milling Agreement With LKA Gold
25/11/2014Klondex Mines Receives $10.3 Million From the Exercise of Wa...
12/11/2014Klondex Reports Q3 Production Cost of US$439 per Ounce Sold ...
28/10/2014Klondex Mines Schedules Third Quarter 2014 Conference Call f...
23/10/2014Klondex Celebrates 2 Years No Lost Time Accidents at Fire Cr...
20/10/2014Klondex Mines Reports Third Quarter 2014 Operations Results
08/10/2014Klondex Releases Fire Creek Drill Program Results
01/10/2014IIROC Trade Resumption - KDX
30/09/2014Klondex Increases Mineral Resource Estimate at Midas
30/09/2014IIROC Trading Halt - KDX (all issues)
18/09/2014Klondex to Trade on S&P/TSX SmallCap Index
15/09/2014Klondex Identifies Another New Structure, the "Honeyrunner"
10/09/2014Klondex Reports on Midas Infill Drilling Program
10/09/2014Klondex Comments on Report
06/12/2013Klondex Announces Acquisition Financing Update
28/10/2013Completes Secondary Egress Excavation-Enters Bulk Sampling P...
22/10/2013Retires Short-Term Debt
16/10/2013Announces Closing of C$19 Million Financing
08/10/2013Announces Further Infill Drilling Results
30/09/2013Announces August Development Results at Fire Creek
23/09/2013Announces Receipt of Proceeds
12/09/2013Announces July Development Results
12/08/2013(Fire Creek)Sends First Shipment to Newmont, Electrifies Fire Creek
29/07/2013Reports Results of June Development Program
26/07/2013Secures Agreement for High-Grade Mineralization
26/07/2013Klondex Announces Bridge Loan
25/07/2013US Global Investors' Ralph Aldis recommends Klondex Mines Lt...
25/07/2013US Global Investors' Ralph Aldis recommends Klondex Mines Lt...
16/07/2013Announces Renaud Adams to Board
16/07/2013Primero - Klondex Names Mining Executive Renaud Adams to the...
10/07/2013Joyce Vein Sampling Averages 132.8g/t (3.87opt) Gold
27/06/2013Samples 22,396 gpt Gold
18/06/2013Announces New Mineralized Structure
13/06/2013AGM Meeting CORRECTION
13/06/2013Annual General Meeting Invitation
12/06/2013Announcement
30/05/2013Drilling Confirms New West Zone Gold Mineralization; All Fiv...
16/05/2013Profiled by Michael Brush - MSN Money
08/05/2013Klondex Presenting at The MoneyShow in Las Vegas - May 14
08/05/2013CEO to Exhibit and Present at the Las Vegas MoneyShow; CEO C...
01/05/2013Completes Relogging Effort
01/05/2013Completes Core Re-Logging
09/04/2013Confirms Zone of Gold Mineralization South of Mineral Resour...
02/04/2013Veris Gold Enters Into A Toll Milling Agreement With Klondex...
02/04/2013Klondex Signs Milling Agreement with Veris Gold
21/03/2013Featured on B-TV Business Television
21/03/2013Klondex Video on BTV
14/03/2013News Release
25/02/2013NAMES LARRY PHILLIPS CHAIRMAN OF THE BOARD
20/02/2013- The Northern Miner
19/02/2013Nevada Gold Explorer Klondex Mines to Present at Red Cloud M...
08/02/2013- The Northern Miner
22/01/2013Discovers a New "West Zone" With Significant Visible Gold Mi...
16/01/2013Press Announcement
08/11/2012. Provides Update on Offering
31/10/2012Encounters Two Gold Veins with 95.5 g=2Ft (2.79 oz=2Fton) Go...
13/09/2012Names Paul Andre Huet=2C Who Led the Midas and Hollister Und...
29/08/2012(Fire Creek)Drills Long Intercepts of Near=2DSurface=2C Oxidized Gold Mi...
16/07/2012(Fire Creek)Nevada Gold Explorer Klondex Mines Announces Interim CEO And...
28/06/2012=2D Klondex Mines Announces Proxies Will be Accepted Up to C...
18/06/2012(Fire Creek)=3A Underground In=2DFill Drilling Continues to Intersect Go...
23/04/2012Nevada Gold Explorer Klondex Mines Begins Trading Today on t...
16/04/2012(Fire Creek)Underground In=2DFill Drilling Continues to Intersect Gold M...
01/03/2012(Fire Creek)Initial Underground Drill Results Show Continuity of Gold Mi...
14/02/20122011 Drill Program Results Press Release
14/02/2012Mid-Day Breaking News From International Enexco, Klondex, Zi...
26/01/2012Nevada Gold Explorer Klondex Mines to Webcast Merriman Capit...
21/12/2011Nevada Gold Explorer=2C Klondex Mines=2C Appoints Veteran Ge...
05/10/2011Mid-Day Breaking News From Lucky Strike, Galore, Indigo, Klo...
30/06/2011Announces Settlement Agreement and New Proposed Board
29/06/2011Waives Deadline for Submitting Proxies
27/06/2011Proposes Veteran Mining Industry Executive Ken Stowe as Addi...
22/06/2011ISS Recommends Klondex Shareholders Vote For Incumbent Klond...
11/05/2011(Fire Creek)Clarifies Technical Disclosure, To Prepare Fire Creek Report
28/04/2011(Fire Creek)Portal Blast Formally Launches Underground Gold Mining at Kl...
18/04/2011(Fire Creek)Announces Expanded 2011 Surface Exploration Program at its H...
06/04/2011Closes U.S. $20 Million Secured Facility to Advance Undergro...
06/04/2011(Fire Creek)BREAKING NEWS: Klondex Secures $20mm Gold-Backed Funding for...
24/02/2011Names Robin Goad, Veteran Geologist and Mining Industry Exec...
22/02/2011(Fire Creek)Receives Nevada State Approval for Fire Creek High-Grade Gol...
06/10/2009to Vigorously Defend Against Baseless Paramount Suit and to ...
25/09/2009Terminates Agreement with Paramount Gold and Silver Corp. Ci...
17/09/2009Reports Proceeds of $2.0 Million from Warrant/Option Exercis...
20/07/2009Business Combination
30/06/2009Rejects Silvercorp's Hostile Takeover Bid
30/06/2009Completes $3.0 Million Financing with China Mineral United t...
26/06/2009Scotia Capital Appointed by Klondex as Financial Advisor to ...
23/06/2009Waives Application of Previous Shareholder Rights Plan and A...
08/06/2009Responds to Unsolicited Acquisition Offer from Silvercorp Me...
18/09/2008Grants Incentive Options
12/08/2008President Exercises Options
09/07/2008Intercept Averaging 0.361 oz/ton Gold over 18 Feet True Widt...
19/06/2008Announces AGM Voting Results
30/04/2008Provides Investor Update
14/01/2008to Highlight New Gold Intercepts from its Nevada Exploration...
27/11/2007 Highlight Nevada Gold Exploration Progress at Academy & Fin...
08/11/2007to Highlight Nevada Gold Exploration Progress at Hard Assets...
11/10/2007Klondex to Highlight Nevada Gold Exploration and Development...
27/06/2007Receives Shareholder Petition
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (KDX.TO)Other OTC (KLNDF)
3,07-5.83%2,47-1.59%
TORONTO
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -100,00%
Volume var. 1 mois
-100,00%
Produit
Développe Gold
Recherche Gold - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 15/07/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
error

 

 

THE REQUESTED URL IS UNCORRECT

Profitez de la hausse des actions aurifères
  • Inscrivez-vous à notre market briefing minier
    hebdomadaire
  • Recevez nos rapports sur les sociétés qui nous semblent
    présenter les meilleurs potentiels
  • Abonnement GRATUIT, aucune sollicitation
  • Offre limitée, inscrivez-vous maintenant !