Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en
Panoro Minerals Intersects 103.6 Meters Grading 0.79 %Cu, 0.58 g/t Au and 5.2 g/t Ag at the Cotabambas Cu/Au/Ag Project, Peru
Published : May 06, 2013
( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Report |

Panoro Minerals Intersects 103.6 Meters Grading 0.79 %Cu, 0.58 g/t Au and 5.2 g/t Ag at the Cotabambas Cu/Au/Ag Project, Peru

VANCOUVER, May 6, 2013 /CNW Telbec/ - Panoro Minerals Ltd. (TSXV: PML) (Lima: PML) (Frankfurt: PZM) ("Panoro", the "Company") Panoro is pleased to report additional assay results from its 100% owned Cotabambas porphyry copper-gold-silver project located in southern Peru. The drill results include infill, step out, and exploration drill holes in Ccalla, Ccalla East and Azulccaca deposits. Some highlights are as follows:

  • Drillhole CB-111 intersected 88.5m of oxide copper mineralization grading 0.93% Cu, 0.10g/t Au and 2.2g/t Ag including 51.5m averaging 1.24%Cu, 0.04g/t Au and 0.9 g/t Ag.

  • Drillhole CB-112 intersected 86.7m of oxide copper mineralization grading 0.43%Cu, 0.31g/t Au, 3.3g/t Ag, including 26.7m averaging 0.73% Cu, 0.35g/t Au, 4.8g/t Ag, underlain by 103.6m of primary copper mineralization grading 0.79% Cu, 0.58g/t Au and 5.2g/t Ag, including 67.9m averaging 1.06% Cu, 0.84 g/t Au and 6.8 g/t Ag.

  • Drillhole CB-115 intersected 119.6m of primary copper mineralization grading 0.61% Cu, 0.25 g/t Au and 4.3 g/t Ag, including 64.3m averaging 0.82% Cu, 0.32 g/t Au and 5.0 g/t Ag.

The following table details the more significant intersections:

Drillhole From (m) To (m) Metres Cu (%) Au (g/t) Ag (g/t) Mo (%) Zone
CB-105 32.5 36.5 4.0 0.17 0.77 1.0 0.0010 Leach
"" 51.3 56.7 5.4 0.12 0.04 1.7 0.0006 Mixed
"" 667.2 957.6 290.4 0.31 0.12 2.7 0.0033 Primary
Including 731.2 803.9 72.7 0.47 0.19 2.8 0.0040 Primary
Including 741.7 782.3 40.6 0.52 0.19 2.9 0.0032 Primary
Including 894.2 944.2 50.0 0.41 0.14 5.2 0.0044 Primary
Including 948.2 957.6 9.4 0.84 0.43 6.1 0.0023 Primary
"" 989.9 998.9 9.0 0.49 0.24 6.1 0.0034 Primary
"" 1012.9 1029.0 16.1 1.00 0.68 10.7 0.0013 Primary
"" 1077.5 1090.5 13.0 0.26 0.10 3.2 0.0010 Primary
CB-109 0.0 146.0 146.0 0.46 0.40 2.0 0.0013 Oxide
Including 26.7 40.7 14.0 0.70 0.35 1.7 0.0020 Oxide
Including 68.7 132.7 64.0 0.53 0.48 2.1 0.0011 Oxide
"" 153.1 214.6 61.5 0.22 0.10 1.4 0.0022 Primary
CB-110 0.0 2.2 2.2 0.35 0.41 2.1 0.0008 Oxide
"" 2.2 53.6 51.5 0.45 0.44 3.5 0.0019 Enrichment
Including 2.2 12.2 10.0 0.91 0.32 4.4 0.0026 Enrichment
"" 132.1 261.8 129.7 0.48 0.37 4.0 0.0010 Primary
Including 132.1 222.0 89.9 0.57 0.48 4.3 0.0010 Primary
CB-111 0.0 88.5 88.5 0.93 0.10 2.2 0.0006 Oxide
Including 22.2 73.7 51.4 1.24 0.04 0.9 0.0006 Oxide
"" 88.5 122.0 33.5 0.26 0.06 1.8 0.0019 Primary
"" 148.8 184.5 35.7 0.23 0.05 2.0 0.0029 Primary
"" 205.5 262.3 56.8 0.19 0.06 1.3 0.0024 Primary
"" 281.5 313.8 32.3 0.28 0.10 1.9 0.0031 Primary
CB-112 0.0 86.7 86.7 0.43 0.31 3.3 0.0010 Oxide
Including 52.0 78.7 26.7 0.73 0.35 4.8 0.0010 Oxide
"" 86.7 190.3 103.6 0.79 0.58 5.2 0.0018 Primary
Including 122.4 190.3 67.9 1.06 0.84 6.8 0.0018 Primary
"" 237.7 248.7 11.0 0.82 0.71 4.2 0.0010 Primary
CB-113 no significant values
CB-114 56.0 92.2 36.2 0.56 0.04 1.0 0.0001 Oxide
Including 69.1 84.2 15.1 0.80 0.06 0.7 0.0001 Oxide
"" 178.5 253.3 74.8 0.20 0.08 1.0 0.0016 Primary
"" 284.2 299.8 15.6 0.14 0.03 1.0 0.0046 Primary
CB-115 0.0 4.2 4.2 0.10 0.56 18.9 0.0015 Leach
"" 4.2 118.7 114.5 0.36 0.18 2.0 0.0023 Oxide
Including 60.5 70.5 10.0 0.93 0.31 2.4 0.0030 Oxide
CB-115 118.7 164.7 46.1 0.32 0.16 2.3 0.0042 Primary
"" 192.3 212.3 20.0 0.13 0.03 1.9 0.0053 Primary
"" 222.1 274.1 52.1 0.31 0.24 3.5 0.0018 Primary
"" 284.9 404.5 119.6 0.61 0.25 4.3 0.0012 Primary
Including 324.9 389.2 64.3 0.82 0.32 5.0 0.0011 Primary
CB-116 222.5 411.7 189.2 0.15 0.08 1.4 0.0012 Primary
Including 242.0 369.7 127.7 0.16 0.10 1.5 0.0011 Primary
"" 445.7 465.7 20.0 0.17 0.08 2.0 0.0014 Primary
CB-117 55.8 124.2 68.4 0.13 0.45 2.5 0.0017 Leach
Including 57.1 75.1 18.0 0.21 1.06 3.8 0.0017 Leach
"" 124.2 239.5 115.3 0.48 0.07 2.3 0.0026 Oxide
Including 124.2 136.2 12.0 0.96 0.12 3.0 0.0032 Oxide
Including 214.0 228.0 14.0 1.65 0.03 1.0 0.0040 Oxide
CB-118 222.0 608.7 386.7 0.27 0.09 2.6 0.0047 Primary
Including 288.3 355.6 67.3 0.35 0.07 2.6 0.0096 Primary
Including 548.0 576.0 28.0 0.43 0.17 6.1 0.0031 Primary
CB-119 353.7 405.7 52.0 0.17 0.04 1.2 0.0052 Primary
"" 504.8 559.3 54.5 0.21 0.06 2.0 0.0055 Primary
"" 565.6 579.9 14.3 0.29 0.15 1.5 0.0028 Primary
"" 590.7 595.5 4.8 0.34 0.11 4.1 0.0095 Primary
"" 603.7 639.2 35.5 0.26 0.10 2.4 0.0089 Primary
"" 655.8 670.1 14.3 0.17 0.05 2.2 0.0372 Primary
"" 683.7 705.0 21.3 0.18 0.07 1.5 0.0209 Primary
"" 718.6 738.6 20.0 0.11 0.02 2.0 0.0140 Primary
"" 720.6 842.6 122.0 0.01 0.04 3.3 0.0098 Primary
Including 768.3 842.6 74.3 0.22 0.058 4.3 0.0083 Primary


Exploration Drill Holes

Hole CB-105 was collared 1,200m to the east of previously published hole CB-68 and drilled from the southeast to northwest to test for the depth extension of the Ccalla East deposit. From 667.2m to 957.6m, 290.4m of copper primary mineralization averaging 0.31% Cu, 0.12g/t Au and 2.7g/t Ag was intersected, including a number of intervals grading between 0.47% Cu to 0.84% Cu. From 989.9m to 1090.5m the hole intersected intervals of the principal porphyry grading from 0.26% Cu to 1.0%C u and 0.10g/t Au to 0.68g/t Au between barren latite dikes. The hole bottomed in mineralization at a vertical depth of 600m.

Hole CB-113 was collared in the Ccalla East deposit, also from the southeast to the northwest but 500m to the south of CB-105.  No significant values were intercepted suggesting a potential southern limit to the Ccalla East deposit.

Hole CB-117 was collared at the northern end  of the Ccalla deposit and targeted the deeper portions of potential northern extension of the supergene enrichment zone beyond the current resource model limits. From 55.8m to 124.2m, 68.4m of a mineralized leached cap was intercepted grading 0.45g/t Au and 2.5g/t Ag, including 18m grading 1.06 Au g/t and 3.8g/t Ag. This is underlain by 115.3m of oxide copper mineralization grading 0.48% Cu, 0.07g/t Au and 2.3 g/t Ag, including 12.0m averaging 0.96% Cu and 14.0m grading 1.65% Cu. The supergene mineralization is still open to the north and nearer to surface and is targeted for further extension with additional drilling in the future.

Hole CB-118 was collared between holes CB-68 and CB-105in the Ccalla East deposit, but directed to the southeast. From 222m to 608m, 386.7m of primary copper mineralization was intersected grading 0.27% Cu, 0.09g/t Au and 2.6g/t Ag, including 67.3m averaging 0.35%Cu, 0.07g/t Au, and 2.6g/t Ag, and 28.0m grading 0.43% Cu, 0.17g/t Au and 6.1g/t Ag.

Hole CB-119 was collared in Ccalla East 150m to the south of CB-118 and drilled to the northwest. From 353.7m to 705.0m, a number of intervals of primary copper mineralization grading from 0.17% Cu to 0.34% Cu were intercepted.

Step Out Drill Holes

Hole CB-114 was a step out hole at the north end of the Ccalla deposit. From 56m to 92.2m, 36.2m of oxide copper mineralization was intersected grading 0.56% Cu, including 15.1m of 0.80% Cu. At depth, two intervals of primary copper mineralization of 74.8m and 15.7m length and averaging 0.20% Cu and 0.10% Cu respectively were intersected.

Hole CB-115 was collared in the western border of the Ccalla deposit,. From surface to 4.2m, a mineralized leached cap was intersected grading 0.56g/t Au, 18.9g/t Ag. This was successively underlain by 114.5m of oxide copper mineralization averaging 0.36% Cu, 0.18g/t Au and 2.0g/t Ag, including 10.0m grading 0.93% Cu, 0.31 g/t Au, 2.4g/t Ag, and by 46.1m of primary mineralization grading 0.32% Cu, 0.16 g/t Au, 2.3g/t Ag. Three more intervals of primary mineralization were intersected, the last of which consisted of 119.6m averaging 0.61% Cu, 0.25g/t Au, 4.3g/t Ag, including 64.4m grading 0.82% Cu, 0.32g/t Au and 5.0g/t Ag. The hole bottomed in mineralization.

Hole CB-116 was a step out hole drilled off the southern margin of the Azulccaca deposit. Two intervals of primary copper mineralization were intersected, including 127.7m grading 0.16% Cu and 20.0m grading 0.17% Cu.

Infill Drill Holes

Hole CB-109 was collared in the Ccalla deposit. From surface to 146m, oxide copper mineralization grading 0.46% Cu, 0.40 g/t Au and 2.0 g/t Ag was intersected, including intervals of 14.0m averaging 0.70% Cu, 0.35 g/t Au, 1.7g/t Ag, and 64m grading 0.53% Cu, 0.48g/t Au, and 2.1g/t Ag. Below this, 61.5m of primary mineralization averaging 0.22% Cu, 0.10g/t Au and 1.4g/t Ag was intersected.

Hole CB-110 was drilled in the Ccalla deposit and. From surface to 2.2m oxide copper mineralization averaging 0.35% Cu, 0.41g/t Au and 2.1g/t Ag was intersected. This was underlain by 51.4m of enriched chalcocite mineralization grading 0.45% Cu, 0.44g/t Au, 3.5g/t Ag, including 10.0m averaging 0.91% Cu, 0.32g/t Au, 4.4g/t Ag. From 132.1m to 261.8m, 129.7m of primary mineralization grading 0.48% Cu, 0.37g/t Au, 4.0g/t Ag was intersected, including 89.9m averaging 0.57% Cu, 0.48g/t Au and 4.3g/t Ag.

Hole CB-111 was located in the Ccalla deposit. From surface, an 88.5m interval of oxide copper mineralization averaged 0.93% Cu, 0.10g/t Au, 2.2g/t Ag, including 51.5m grading 1.24% Cu. This was underlain by four separate intervals of copper primary mineralization grading between 0.19% Cu and 0.28% Cu.

Hole CB-112 was located in the Ccalla deposit. From surface to 86.7m, the hole intersected oxide copper mineralization averaging 0.43% Cu, 0.31g/t Au, 3.3g/t Ag, including 26.8m grading 0.73% Cu, 0.35g/t Au, 4.8g/t Ag. This was underlain by 103.6m of primary mineralization averaging 0.79% Cu, 0.58g/t Au, 5.2g/t Ag, including 67.9m grading 1.06% Cu, 0.84g/t Au and 6.8g/t Ag.

A map showing the locations of the drill holes is available at Panoro's website, www.panoro.com. Three drills continue working on the step-out, exploration and infill drilling targeting continued growth of the resource and upgrade of the high grade pit area to the Indicated category.

About Panoro

Panoro's strategic focus is to move its advanced stage projects to the feasibility and development stages and to explore its other projects. The Company owns the advanced Cotabambas Copper-Gold and Antilla Copper-Molybdenum Projects which include Inferred level resources of:

Cotabambas:   404.1 Mt @ 0.42% Cu, 0.23g/t Au and 2.84g/t Ag @ 0.2% Cueq cut-off (AMEC 2012)
    (in situ content of 3.75 billion lbs. Cu, 3.0 million oz. Au, 36.9 million oz. Ag)
     
Antilla:   154 Mt @ 0.47% Cu and 0.009% Mo @ 0.25% Cu cut-off (AMEC, 2009)
    (in-situ content of 1.6 billion lbs. Cu and 30 million lbs. Mo)


Panoro is very well positioned to continue advancing the exploration at the Antilla and Cotabambas Projects.  The Company completed a $15 million financing in March 2013 and is planning to continue its exploration activities, updating the resource estimates for both projects in 2013 and commencing Preliminary Economic Assessments.  Additional drill results will be announced as they are received from the ongoing exploration at Cotabambas Cu/Au/Ag Project.

Panoro's significant portfolio of properties is located primarily in the south-eastern region of Peru. This region contains a number of important copper and copper/gold deposits including Xstrata's Las Bambas and Antapaccay Copper Projects and the Tintaya Copper Mine. In September 2010, Xstrata announced US$5.7 billion of investment to develop the Las Bambas and Antapaccay projects. The region also includes First Quantum Minerals' Haquira Copper Project, HudBay Minerals' Constancia Copper Project and Southern Copper's Los Chancas Copper Project.

Luis Vela, a P. Geo Qualified Person under National Instrument 43-101, has reviewed and approved the scientific and technical information in this press release.

On behalf of the Board of Panoro Minerals Ltd.

Luquman Shaheen, M.B.A., P.Eng., P.E.
President & CEO

This release was prepared by management of the Company who takes full responsibility for its contents. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

SOURCE: Panoro Minerals Ltd.

For further information:

Panoro Minerals Ltd.
Luquman Shaheen, President & CEO
Phone: 604.684.4246
Fax: 604.684.4200
Email: info@panoro.com
Web: www.panoro.com

Renmark Financial Communications Inc. 
Barbara Komorowski:
bkomorowski@renmarkfinancial.com
Media - Lynn Butler:
lbutler@renmarkfinancial.com
Tel.: (514) 939-3989 or (416) 644-2020
www.renmarkfinancial.com

Panoro Minerals Ltd

EN DÉVELOPPEMENT
CODE : PML.V
ISIN : CA69863Q1037
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Panoro est une société d’exploration minière de cuivre basée au Canada.

Panoro est en développement de projets de cuivre et de molybdène au Perou.

Son principal projet en développement est ANTILLA au Perou et ses principaux projets en exploration sont COTABAMBAS, EL ROSAL, LA RAMADA et COCHASAYHUAS au Perou.

Panoro est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 29,7 millions CA$ (21,5 millions US$, 20,2 millions €).

La valeur de son action a atteint son plus haut niveau récent le 06 avril 2007 à 0,94 CA$, et son plus bas niveau récent le 13 mars 2009 à 0,06 CA$.

Panoro possède 258 150 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Panoro Minerals Ltd
16/07/2014Completes Bought Deal Financing and Hudbay Private Placement
09/03/2012Closes Bought Deal Private Placement to Raise $13.8 Million
23/02/2012Announces $10,002,000 Bought Deal Financing
08/07/2011Announces Closing of Second and Final Tranche of Financing
04/07/2011Announces Closing of First Tranche of Financing
05/01/2010Closes $622,800 Private Placement
Attributions d'options de Panoro Minerals Ltd
16/08/2011(Cotabambas)Restarts Cotabambas Drill Program and Grants Options
19/02/2008Company Grants Stock Options
Nominations de Panoro Minerals Ltd
08/05/2011. Retains Renmark Financial Communications Inc.
22/02/2011Announces Appointment of Mr. David W. Huber as Chief Financi...
08/06/2010Appoints Kallpa Securities SAB as Sponsor for Listing on Lim...
25/03/2010Appoints Richard Mundie To Board of Directors
18/04/2008 Lays Foundation for Future with Orderly CEO Succession, App...
Projets de Panoro Minerals Ltd
15/07/2013(Cotabambas)Intersects 128.9 Meters Grading 1.29 % Cu, 0.96 g/t Au and 9...
06/05/2013(Cotabambas)Intersects 103.6 Meters Grading 0.79 %Cu, 0.58 g/t Au and 5....
28/01/2013(Antilla)Recommences Antilla Cu/Mo Project, Peru
01/11/2012(Cotabambas)Announces Results from Ongoing Exploration At 100% Owned ...
10/07/2012Adds Significant Potential for Additional Resources With Dis...
20/06/2012Announces Approval of Environmental Impact Assessment (EIAsd...
16/04/2012(Cotabambas)Intersects 114.1 metres Grading 1.70% Copper, 1.2 G/t Gold a...
12/12/2011Welcomes Option Agreement between Strait Gold and Teck for t...
05/10/2011(Cotabambas)Completes Geophysical Program and Advances 24,400 m Drill Pr...
29/03/2011(Cotabambas)Completes Three Year Community Agreement and Plans Expansion...
17/02/2011(Cotabambas)Project Update
23/07/2010(Antilla)Initial Assay Results Of The Infill Drilling Program At Pano...
23/06/2010(Antilla)Infill Drilling Program Making Progress at Panoro's Antilla...
29/09/2009(Alicia Property)Options Alicia Cu-Au Property in Peru to Strait Gold Corpora...
28/01/2009(Antilla)Successful Completion of 2008 Exploration Program at Antilla...
03/09/2008(Antilla)Antilla, Peru, Further Results Meet and Exceed Expectations,...
13/08/2008(Antilla)Encouraging First Results Indicating Continuity of Grade and...
25/06/2008(El Rosal)Acquires Additional Mineral Concessions at El Rosal Project,...
03/12/2007(El Rosal)Final Drilling Permit for El Rosal received Field Work under...
21/11/2007Progress on the Permitting Front and Community Relations App...
Communiqués de Presse de Panoro Minerals Ltd
17/06/2016Panoro Minerals Announces Filing of Antilla Cu/Mo Project Pr...
01/06/2016Panoro Minerals Announces Receipt of Second Early Deposit Pa...
24/05/2016Panoro Announces Appointment of Chief Financial Officer
02/05/2016Panoro Reports Positive Preliminary Economic Assessment For ...
19/04/2016Panoro Minerals Announces Receipt of First Early Deposit Pay...
02/12/2015Panoro Minerals Announces Approval of Expanded Environmental...
25/11/2015Panoro Minerals Announces Interim CFO
02/11/2015Panoro Announces Ms. Kathryn Johnson as Chief Financial Offi...
22/09/2015IIROC Trading Resumption - PML
22/09/2015Panoro Reports Updated Preliminary Economic Assessment Resul...
22/09/2015IIROC Trading Halt - PML
09/04/2015IIROC Trading Resumption - PML
09/04/2015Panoro Reports Positive Preliminary Economic Assessment for ...
09/04/2015IIROC Trading Halt - PML; AHC
05/02/2014Announces Granting of Options
20/01/2014(Cotabambas)Continues to Intersect Good Copper-Gold Grades at the Cotaba...
31/12/2013- Death of Director - Jaime Quijandr=EDa Salm=F3n
16/12/2013(Antilla)announces significant increase and upgrade for Antilla Cu/Mo...
30/10/2013(Cotabambas)Increases Copper and Gold Resources by 40% at the Cotabambas...
14/03/2013completes C$15 million bought deal financing
25/02/2013(Cotabambas)Intersects 110.8 Meters Grading 1.64 % Cu, 0.68 g/t Au and 6...
21/01/2013(Cotabambas)Intersects 92 Metres Grading 0.95 %Cu, 0.49 g/t Au and 6.2 g...
11/12/2012completed Table from December 11, 2012 Press Release
11/12/2012(Cotabambas)Intersects 60 Metres Grading 1.55% Cu, 0.57 g/t Au and 7 g/t...
26/10/2012(Cotabambas)Announces Filing of NI 43-101 Technical Report for Cotabamba...
24/10/2012(Cotabambas)Announces Filing of NI 43-101 Technical Report for Cotabamba...
17/10/2012Announces Granting of Options and Appointment of VP Expl...
28/09/2012(Antilla)Arbitration Committee Confirms Termination of Joint Venture ...
27/09/2012Arbitration Committee Confirms Termination of Joint Venture ...
11/09/2012(Cotabambas)Cotabambas Project Resource Estimate Shows Increase to 3.75 ...
13/06/2012(Cotabambas)Intersects 55.35 Metres Grading 0.97% Copper, 0.16 G/t Gold ...
19/01/2012(Cotabambas)Intersects Near Surface Enriched Zone With 92.35 Metres Grad...
04/01/2012Announces Approval of Application to the British Columbia an...
07/12/2011(Cotabambas)Continues to Intersect High Grade Copper-Gold Mineralization...
15/06/2011Announces Corporate Plans
11/05/2011(Cotabambas)Intersects 206 Metres Grading 0.51% Cu and 0.31 g/t Au at th...
07/03/2011(Cotabambas)Announces First Drill Results for the Cotabambas Copper Gold...
13/02/2010Retains Ascenta Capital Partners for Investor Relations
22/06/20091.6 Billion pound Copper Inferred Resource Estimate at the E...
15/06/2009annual general meeting
02/06/2008Exploration Program Commenced at Antilla Project
21/05/2008With Permit in Hand Panoro to Start Drilling Program at the ...
13/05/2008Announces Proposed Implementation of Shareholders Rights Pla...
07/04/2008 Changes Name of Subsidiary in Peru to Panoro Apurimac S.A.
17/03/2008 Grants Consorcio Minero Horizonte Option to earn 50% in Coc...
21/01/2008 Starts First of Four Drill Programs
05/12/2007 Signs Formal Agreement with Antilla Community Drilling in e...
04/10/2007Two of the Company's Projects Designated as Projects of Nati...
18/09/2007Progress Report since the Acquisition of Cordillera de las M...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (PML.V)FRANKFURT (PZM.F)
0,115+0.00%0,070+0.00%
TSX-V
CA$ 0,115
18/04 14:56 -
0%
Cours préc. Ouverture
0,115 0,120
Bas haut
0,115 0,120
Année b/h Var. YTD
0,100 -  0,140 -17,86%
52 sem. b/h var. 52 sem.
0,100 -  0,150 -17,86%
Volume var. 1 mois
4 000 -11,54%
24hGold TrendPower© : 5
Produit
Développe Copper - Molybdenum
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 16/06/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-8,00%
2023-10,71%0,150,11
2022-9,68%0,210,10
2021-8,82%0,230,11
2020142,86%0,200,07
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :