Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Golden Predator.

Publié le 16 novembre 2009

Intersects 11.12 gpt Gold over 25.40 m including 52.35 gpt Gold over 2.70 m from the Tom Zone at Gol

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Precious Metals |
=======================================================================
      Golden Predator Intersects 11.12 gpt Gold over 25.40 m including
      52.35 gpt Gold over 2.70 m from the Tom Zone at Gold (Scheelite)
      Dome, YT
=======================================================================

Vancouver, British Columbia, November 16, 2009: Golden Predator Royalty
& Development Corp. (TSX-V:GPD) (the "Company") is pleased to report
assays from 14 diamond drill holes completed this summer at the Gold
(Scheelite) Dome Project.  Six of the holes, drilled in the Tom Zone
along the north slope of Sabbath Creek, were targeting an area of
auriferous calc-silcate alteration first drilled by Golden Patriot
Mining Inc. which completed 310 meters of drilling in five drill holes
during the 2003 field season.  With the intersection this summer of
11.12 grams per tonne gold from 10.25-35.65 m in drill hole GD09-007,
the Tom Zone has gained importance as a primary focus for the 2010
field season.  The Tom Zone is one of several distinct gold targets
identified to date within the 30 square kilometer soil geochemical
anomaly present at Gold (Scheelite) Dome.  The Company is planning an
accelerated campaign next year to further evaluate the numerous known
gold targets as well as identify additional gold targets within the
very large anomaly area.

Drilling at the Tom Zone formed part of a larger Phase 1 drilling
campaign on the Project undertaken by True North Mining Corp., the
Company's wholly-owned Yukon subsidiary, which also included first time
drilling at the Toby and Hawthorne Vein Zones.  Each of the six holes
(1,173 m) drilled at Tom returned gold values >1 gpt.  The Tom Zone
drilling targeted extensions of gold mineralization intersected in
diamond drill core during Golden Patriot's 2003 exploration program and
was designed in particular to follow up the previous best intersection
from that program of 6.40 m at 7.09 gpt Au from 5.00 m in diamond drill
hole SH03-30.  Drill hole GD09-004 was collared 85 m to the south of
SH03-30, at the location of 2003 diamond drill hole SH03-31.  This 2003
hole was shut down prematurely due to poor recovery and drilling
problems, and was designed to target test pit 97-14, which returned up
to 25,000 ppb Au in grab samples.  Drill hole GD09-004 intersected
narrow quartz-sulfide veins and up to 2% coarse-grained arsenopyrite in
partially oxidized phyllite, which returned 1.78 m of 3.50 gpt Au from
5.39 m. The hole also intersected 0.21m of 75.33 gpt Au in partially
oxidized calc-silicate skarn-altered phyllite/quartzite from 5.18 m.
This interval likely represents an intersection through transported
material.  However, given the nature of the local topography, it is
unlikely that this material was transported over any great distance,
and this result provides evidence for high grade mineralization in the
immediate Tom Zone area, above drill hole GD09-004. 

Hole GD09-005 was drilled 100 m to the north-east of hole SH03-30, and
35 m behind drill hole SH03-29, which previously returned 1.22 m of
5.06 gpt Au from 20.12 m.  Hole 005 intersected calc-silicate skarn and
semi-massive to massive, coarse-grained arsenopyrite, with minor pyrite
and pyrrhotite and trace chalcopyrite, which returned a best result of
4.15m of 6.23  gpt Au from 26.77 m, and disseminated and vein-hosted
arsenopyrite associated with tourmaline and actinolite alteration,
which returned 1.95 m of 3.75  gpt Au from 55.7 m.  Hole GD09-006 was
drilled 50 m south-east, directly along section, of hole SH03-30, and
also intersected calc-silicate skarn with semi-massive coarse-grained
arsenopyrite.  This hole returned a best result of 1.03 m of 21.64 gpt
Au from 13.62 m.  Hole GD09-007 was collared on the same setup as 006,
but was oriented 45� to the west, and was designed to target the
mineralization intersected in drill hole 006. Two mineralized
intersections  comprising clinopyroxene and tremolite-actinolite
altered phyllite and up to 25% coarse-grained
arsenopyrite+pyrite+pyrrhotite+ chalcopyrite were identified, and
returned best results of 2.70 m of 52.35 gpt Au from 13.00 m and 10.45
m of 12.96 gpt Au from 25.20 m. Holes GD09-008 and 009 were drilled 90
and 25 m west of hole GD09-006, respectively. These were vertical holes
designed to test the possibility of flat-lying mineralization, however,
they did not intersect the zones of skarn-altered semi-massive sulphide
mineralization identified in holes GD09-005, 006 and 007. Minor gold
mineralization in these holes was associated with weak calc-silicate
skarn alteration and quartz veins in silicified phyllite.

----------------------------------------------------------------------------
     Drill Highlights from Tom Zone - Gold (Scheelite) Dome Project, YT
                     Assay Intervals greater than 1 gpt
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                                            Interval,
Drill Hole #         From, m       To, m           m     Au, gpt     Au, opt
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-004                5.18      7.16(1)       1.98       10.87        0.32
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-005               21.34       30.92        9.58        2.56        0.07
----------------------------------------------------------------------------
       Including       27.44       30.92        3.48        5.39        0.16
----------------------------------------------------------------------------
       Including       30.01       30.92        0.91       12.59        0.37
----------------------------------------------------------------------------
GD09-005               55.70       57.63        1.93        2.46        0.07
----------------------------------------------------------------------------
GD09-005              161.99    163.15(2)       1.16        1.17        0.03
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-006               13.62       15.54        1.92       11.55        0.34
----------------------------------------------------------------------------
       Including       13.62       14.65        1.03       21.64        0.63
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-007               10.25     35.65(3)      25.40       11.12        0.32
----------------------------------------------------------------------------
       Including       10.25       18.60        8.35       17.56        0.51
----------------------------------------------------------------------------
       Including       13.00       15.70        2.70       52.35        1.53
----------------------------------------------------------------------------
       Including       25.20       35.65       10.45       12.96        0.38
----------------------------------------------------------------------------
       Including       26.65       27.91        1.26       21.87        0.64
----------------------------------------------------------------------------
       Including       30.97       33.92        2.95       19.08        0.56
----------------------------------------------------------------------------
GD09-007              240.15      243.25        3.10        1.12        0.03
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-008               59.93       61.49        1.56        1.23        0.04
----------------------------------------------------------------------------
GD09-008               64.61       66.60        1.99        1.00        0.03
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-009               77.90       79.67        1.77        1.00        0.03
----------------------------------------------------------------------------

(1) Includes first recovered core interval from 5.18-5.39 m which appears
    less oxidized and may be locally transported.
(2) Part of a larger interval assaying 0.49 gpt over 12.14 m.
(3) Includes 9.50 m interval starting at 15.70 m that assays less than 500
    ppb Au.

Gold mineralization at Tom is apparently associated with calc-silicate
skarn that is partially retrograde altered and contains significant
amounts of arsenopyrite, pyrrhotite, pyrite, and chalcopyrite.
Preliminary petrographic analyses have identified relict
clinopyroxene-plagioclase partly altered to tremolite-actinolite,
variable quartz, biotite or phlogopite, local carbonate, and sericite,
as well as scheelite.  Gold mineralization is, at least in part,
associated with geochemical enrichment in W-As-Bi-Te-Ag-Se.

The remaining eight holes were drilled on the Hawthorne
quartz--arsenopyrite-stibnite-scorodite Vein and represent the first
drilling at this occurrence.  The Hawthorne Vein was originally staked
and identified in 1916, and was explored by hand and mechanical
trenching intermittently between 1933 and 1965, then again 1997, when
Kennecott Canada Exploration Inc. trenched along the Vein footwall
while exploring for a bulk mineable gold deposit.  The Company has
completed eight closely-spaced shallow drill holes to explore for gold
mineralization within the Vein and to work out vein geometry.  The Vein
contains up to 5% arsenopyrite+pyrite and possibly stibnite and 1%
scorodite with narrower quartz-sulphide veinlets also observed in the
footwall to the Vein. Highlights from this drilling include:

----------------------------------------------------------------------------
Drill Highlights from the Hawthorne Vein - Gold (Scheelite) Dome Project, YT
                     Assay Intervals greater than 1 gpt
----------------------------------------------------------------------------

----------------------------------------------------------------------------
                                            Interval,
Drill Hole #         From, m       To, m           m     Au, gpt     Au, opt
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-010               56.39       57.93        1.54        1.43        0.04
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-012               20.00       22.15        2.15        3.79        0.11
----------------------------------------------------------------------------
GD09-012               48.96       50.40        1.44        1.92        0.06
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-013               48.68       50.39        1.71        2.29        0.07
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-014               14.20       27.43       13.23        1.40        0.04
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-015               24.35       25.81        1.46        2.81        0.08
----------------------------------------------------------------------------
GD09-015               36.35       38.87        2.52        5.17        0.15
----------------------------------------------------------------------------
GD09-015               92.77       94.37        1.60        2.34        0.07
----------------------------------------------------------------------------

----------------------------------------------------------------------------
GD09-016               14.74       16.46        1.72        1.96        0.06
----------------------------------------------------------------------------

Results of the drilling indicate that the Hawthorne Vein is a complex
structure that pinches and swells and appears to have some development
of anastamosing secondary veinlets in its footwall.  During the winter
drilling hiatus, the Company's geologists will review known structural
and geochemical data for the Hawthorne area to determine what, if any,
follow up work is warranted for this showing in 2010.

Further information about Gold (Scheelite) Dome, including a geologic
description of the property, as well as information on the Company's
other Yukon projects can be found in the Company's news release dated
September 28, 2009.

Quality Assurance - Quality Control

ACME Analytical Laboratories of Vancouver, B.C. performed all sample
preparation and analyses. Core samples were logged and sampled at the
Project site under the supervision of the Project Geologist and then
expedited in sealed bags to Whitehorse where they were shipped via
common carrier to Vancouver.  After being received and logged in at the
laboratory, a 2 kg split of core was dried then crushed to 80% -10
mesh.  A 250 g split was then pulverized to 85% -200 mesh.

A 15 g split of each sample was analyzed by ICP-MS after aqua regia
digestion to yield a 37 element scan.  All samples yielding greater
than 500 ppb gold then underwent a 30 g fire assay with an ICP-ES
finish.

QA/QC procedures followed for the diamond drilling program include
submittal of assay standards for analysis approximately every 30
samples as well as a blank and a duplicate sample of quarter core at
approximately the same frequency.

All assays are reported as drilled width and are not to be interpreted
as true widths.  Dr. Art Ettlinger, P.Geo. & Vice-President of
Corporate Development is the Qualified Person for the above Project and
is responsible for the technical content of this news release.

About Golden Predator Royalty & Development Corp.

Golden Predator's corporate mandate is to establish a self-funded
precious metals exploration company with an immediate focus on
exploring for and developing world class gold deposits in the Yukon's
Tintina Gold Belt, where the Company is aggressively exploring its Gold
(Scheelite) Dome, Antimony Mountain and Brewery Creek Projects. Brewery
Creek, a permitted former producer, hosts an indicated resource of 3.98
million tonnes grading 1.135 gpt Au (145,000 oz) and an inferred
resource of 2.2 million tonnes grading 2.01 gpt Au (143,000 oz) using a
cutoff grade of 0.5 gpt Au (Simpson, 2009).

The Company's Yukon operations are supported by four divisions: the
Royalty Division partially self-finances the Company's exploration
activities through its passive royalty stream, holding 29 properties.
The Advanced Assets Division includes the Taylor Mine and Mill which
hosts a 43-101 silver resource, as well as the Company's Alkalic Gold
program in Wyoming and the Lewis-Phoenix and Bonterra joint ventures.
The Nevada Division is drilling a number of its properties with
bonanza-style gold mineralization, including Angel's Camp, Adelaide and
Golden Ridge, to identify one or more targets for the near term
production of small-tonnage high grade ores. The Company intends,
through its strategic use of modular mills at its Taylor and Humboldt
mill sites, to become a mid-tier precious metals producer. The Non-Core
Assets Division is responsible for disposing of non-core properties to
augment the Company's treasury and royalty portfolio.
 
For additional information:

Golden Predator Royalty & Development Corp.
William Sheriff, Chairman & CEO (604) 648-GOLD
John Legg, President (604) 648-4653

Neither TSX Venture Exchange nor the Investment Industry Regulatory
Organization of Canada accepts responsibility for the adequacy or
accuracy of this release.

This press release contains projections and forward-looking information
that involve various risks and uncertainties regarding future events.
Such forward-looking information can include without limitation
statements based on current expectations involving a number of risks
and uncertainties and are not guarantees of future performance. There
are numerous risks and uncertainties that could cause actual results
and Golden Predator's plans and objectives to differ materially from
those expressed in the forward-looking information. Actual results and
future events could differ materially from those anticipated in such
information. These and all subsequent written and oral forward-looking
information are based on estimates and opinions of management on the
dates they are made and are expressly qualified in their entirety by
this notice. Except as required by law, Golden Predator assumes no
obligation to update forward-looking information should circumstances
or management's estimates or opinions change.

=======================================================================
Copyright (c) 2009 GOLDEN PREDATOR ROYALTY & DEVELOPMENT CORP. (GPD)
All rights reserved.  For more information visit our website at
http://www.goldenpredator.com/ or send mailto:info@goldenpredator.com
=======================================================================
.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Golden Predator.

PRODUCTEUR
CODE : GPY.V
ISIN : CA38116P1053
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Golden Predator. est une société développant des projet miniers d'or basée au Canada.

Golden Predator. est en développement de projets d'or et d'argent en USA, et détient divers projets d'exploration au Canada.

Son principal projet en production est BALD MOUNTAIN en USA, son principal projet en développement est TAYLOR MINE en USA et ses principaux projets en exploration sont BREWERY CREEK, CLEAR CREEK, LANTERN DEPOSIT, ST. ELMO, BUENA VISTA/FRENCH BOY, CEDAR (NEVADA), BOND, OGOPOGO, DEL, AGATE, MEL, DAD, LED, CHOPIN, MCCONNEL, DOME HILL, GOLD (SCHEELITE) DOME, HARLAN, PHOENIX JV, ANTIMONY MOUNTAIN, WINDFALL LAKE, ALBERTA SUN, TUSCARORA, AFGAN, GREW CREEK, ADELAIDE, WILLOUGHBY, ALKALIC, ANGEL'S CAMP, GOLDEN RIDGE ( NEVADA), PAN, TONKIN PROJECT, SONORA GULCH, MARG, BRUIN CREEK et BROWNS CREEK au Canada et GUIJOSO et MAGISTRAL I au Mexique.

Golden Predator. est cotée au Canada. Sa capitalisation boursière aujourd'hui est 14,7 millions CA$ (11,6 millions US$, 9,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 19 novembre 2010 à 9,80 CA$, et son plus bas niveau récent le 25 avril 2014 à 0,03 CA$.

Golden Predator. possède 91 570 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Golden Predator.
16/09/2011Corporate Presentation - Precious Metal Summit (September 15...
20/08/2009Corporate presentation August 2009
Dans les médias de Golden Predator.
22/01/2019Golden Predator extends 3 Aces mineralization
Rapports annuels de Golden Predator.
receives 2,533,333 Shares of Silver Predator Corp.; Provides...
2008 Annual Report
Financements de Golden Predator.
23/09/2011Extends 950,000 Warrants
22/06/2011Golden Predator and Seabridge Gold Agree to Contribute Selec...
Nominations de Golden Predator.
13/02/2013Appoints Financial Advisor
Projets de Golden Predator.
18/08/2016(3ace Property)Predator Pours First Gold from Bulk Sample
15/08/2016(3ace Property)Predator Discovers Coarse Visible Gold in New Vein at 3 Aces...
27/09/2012(Brewery Creek)arranges USD $35,000,000 Loan Facility with RK Mine Finance;...
16/07/2012(Brewery Creek)and Tr'ondek Hwech'in First Nation Update Brewery Creek Proj...
10/07/2012(Brewery Creek)Drilling extends Brewery Creek\222s Bohemian Zone...
05/03/2012(Brewery Creek)Drills Third Major Brewery Creek Discovery; Classic Zone Hos...
05/01/2012(Pan)continues to expand North Slope Zone at its Brewery Creek Pr...
05/12/2011(Pan)Calculates NPV of Royalty Interest in Pan Project at USD $32...
01/09/2011Acquires Livingstone District; Now Controls Largest Land Pos...
11/08/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at Br...
11/08/2011(Brewery Creek)Continues Easterly Extension of Bohemian-Schooner Zone at ...
26/07/2011(Harlan)Commences Drill Program on its Enticing Harlan Project in ...
18/07/2011(Brewery Creek)Investigates Gold Recovery from Existing Heap Leach Pad at ...
05/07/2011(Grew Creek)drills 92.0 m of 2.02 g/t Gold; Commences Resource Calcu...
01/06/2011(Brewery Creek)Triples 2011 Budget, Adds Second Drill, and Plans for Third ...
26/05/2011(Grew Creek)Intersects 98.3 m of 1.83 g/t Gold at Carlos Zone, Grew Cree...
26/04/2011(Brewery Creek)Intersects 74 m of 7.08 g/t Gold 250m East of Bohemian Zone,...
21/04/2011(Harlan)Increases Land Position in the Yukon's Selwyn Basin to 7,800...
14/04/2011(Swede Dome)Stakes 4 Project Areas in Historic Yukon Placer Headwaters
08/04/2011(Brewery Creek)Intercepts 28 m of 5.06 g/t Gold at Brewery Creek's Bohemian...
24/03/2011(Brewery Creek)expands Bohemian Discovery with 32.9 m of 3.01 g/t Gold at ...
22/02/2011(Brewery Creek)COMMENCES 2011 YUKON DRILL PROGRAM
24/01/2011(Harlan)Acquires Harlan Property, Yukon
06/01/2011(Mcconnel)Acquires McConnell Property, Yukon
30/11/2010(Gold (scheelite) Dome)Intercepts 21.95 m of 1.00 g/t Gold from Hawthorne Ridge Zon...
10/12/2009(Brewery Creek)Intersects 20.17 gpt Gold over 1.90 m and 4.72 gpt Gold over...
16/11/2009(Gold (scheelite) Dome)Intersects 11.12 gpt Gold over 25.40 m including 52.35 gpt G...
05/11/2009(Antimony Mountain)Intersects 12.45 gpt Gold over 4.88 m including 28.81 gpt Go...
10/08/2009(Adelaide)completes Technical Report on the Adelaide Project, Nevada
08/06/2009(Brewery Creek)GOLDEN PREDATOR ACQUIRES BREWERY CREEK PROJECT, YT
11/02/2009(High Grade Gp) Reports on Initial Exploration at High Grade Project
Communiqués de Presse de Golden Predator.
02/08/2016Golden Predator Increases Previously Announced Offering to C...
26/07/2016Golden Predator Closes C$16.36 Million Financing; Includes C...
13/07/2016Golden Predator Commences Geotechnical and Metallurgical Dri...
06/07/2016Golden Predator Increases Previously Announced Offering to C...
27/06/2016Golden Predator and Tr’ondëk Hwëch’in Amend Brewery Creek Pr...
27/06/2016Golden Predator Announces $7,300,000 Investment By Eric Spro...
20/06/2016Golden Predator Intersects 11.43m of 31.82 g/t Gold at 3 Ace...
16/06/2016Golden Predator Retires 10,312,154 Common Shares
13/06/2016Tony Lesiak Appointed to Golden Predator’s Board of Director...
10/06/2016Golden Predator Exercises Option to Acquire Shares
08/06/2016Till Capital Receives $1,546,823 CDN From Sale of Golden Pre...
07/06/2016McEwen Mining’s Stefan Spears Appointed to Golden Predator’s...
06/06/2016Golden Predator Reports Initial Gold Gravity Recoveries of 8...
25/01/2016Golden Predator Recovers 79.9 to 90.8% Gold from 3 Aces Prel...
04/01/2016Golden Predator Announces TSXV Approval of Castle West Prope...
06/10/2015Golden Predator Chairman Increases Holdings
02/10/2015Golden Predator Announces Stock Option Grant
30/09/2015Golden Predator Arranges CDN $300,000 Line of Credit
30/09/2015Golden Predator Arranges CDN$300,000 Line of Credit
14/09/2015Golden Predator Confirms Continuity of High Grade Gold from ...
14/09/2015IIROC Trading Resumption - GPY
14/09/2015IIROC Trading Halt - GPY
11/09/2015Golden Predator announces re-election of board at Annual Gen...
03/09/2015Golden Predator Announces Board and Management Appointments;...
03/09/2015IIROC Trading Resumption - GPY
02/09/2015Golden Predator Announces Board and Management Appointments;...
02/09/2015Till Capital Announces Board and Executive Changes
24/08/2015Till Capital Reports on Golden Predator Annual General Meeti...
21/08/2015IIROC Trading Halt - GPY
30/07/2015Golden Predator Adopts Advance Notice Policy
16/07/2015Golden Predator Announces Convertible Debenture Financing
22/06/2015Golden Predator Receives 3 Aces Permit
21/04/2015Golden Predator Completes First Note Payable Payment
30/03/2015Golden Predator Announces Joint Venture and Option Agreement...
16/03/2015Golden Predator Announces Joint Venture and Option Agreement...
02/12/2014Metallurgical Tests Indicate 93.5% to 98.3% Overall Gold Rec...
20/11/2014Golden Predator Files Preliminary Economic Assessment Result...
12/11/2014Golden Predator Announces Positive Preliminary Economic Asse...
22/10/2014Golden Predator Appoints Janet Lee-Sheriff as Chief Executiv...
04/09/2014Gravity Tests Indicate 87% to 96% Gold Recovery at Golden Pr...
25/08/2014Golden Predator Leases the Castle West Property, Nevada
05/08/2014Preliminary Economic Assessment on Brewery Creek Project, Yu...
15/07/2014Golden Predator Commences Preliminary Metallurgical Characte...
10/07/2014Golden Predator Announces Former Yukon Premier Dennis Fentie...
21/02/2013to start trading as Americas Bullion Royalty Corp. (TSX:AMB)...
19/02/2013and Tr\222ondek Hwech\222in ...
19/02/2013and Tr'ondek Hwech'in Disagree with YESAB
07/02/2013Approves Creation of Shareholder Rights Plan, Finalizes Name...
30/01/2013Silver Predator and Redtail Metals Sign Exploration Agreemen...
24/01/2013(Rogue)Discovers High-grade Gold Mineralization on Rogue B Property...
18/01/2013Announces Name Change to Gold Bullion Royalty Corp.
08/01/2013Tr'ondek Hwech'in and Golden Predator Continue to Work Toget...
08/01/2013Tr'ondëk Hwëch'in and Golden Predator Continue to Work Toget...
05/11/2012(Brewery Creek)- Classic Zone Drilling Intersects 41.2 m of 1.04 g/t Go...
12/10/2012William Sheriff, Chairman & CEO, Interviewed on BNN's Commod...
11/10/2012(Alkalic)Announces New Brewery Creek Discovery; Open-Ended Lone Star ...
11/10/2012(Alkalic)Announces New Brewery Creek Discovery: Open-Ended Lone Star ...
04/10/2012(Brewery Creek)Lower Fosters Zone Drilling Intersects 29.0 m of 1.86 g/t Go...
19/07/2012New Mineralization Encountered at Moosehead Pit, Brewery Cre...
16/07/2012and Tr\222ond\353k Hw\353ch\222in ...
28/06/2012JOINT NEWS RELEASE: Golden Predator Corp. and Seabridge Gold...
07/06/2012Joint News Release: Golden Predator Corp. and Seabridge Gold...
01/05/2012Announces Resource Estimate at Brewery Creek Project of 580,...
22/03/2012(Brewery Creek)Sleeman Zone Drilling Intersects 40.9 m of 1.81 g/t Gold and...
15/03/2012(Brewery Creek)Bohemian-Schooner Zone Drilling Intersects 24.0 m of 1.47 g/...
23/02/2012(Grew Creek)Intersects 68 m of 5.96 g/t Gold at Carlos Zone, Grew Creek ...
22/02/2012(Brewery Creek)East Big Rock Zone Drilling Intersects 15.2 m of 1.93 g/t Go...
20/01/2012Upcoming Events
12/01/2012(Brewery Creek)intersects 30.5 m of 1.97 g/t Gold at its Brewery Creek Proj...
10/01/2012(Harlan)announces New Gold Discovery at Cache Creek (Harlan) Project...
09/01/2012(Brewery Creek)Encounters 35.1 m of 1.63 g/t Gold and 136.72 g/t Silver at ...
12/09/2011100%\240OF\240EXPIRING\240WAR...
29/08/2011(Pan)Brewery Creek\222s Expanding Sle...
05/08/2011and Ross River Dena Council Sign Traditional Knowledge P...
30/06/2011(Pan)Continues to Expand Brewery Creek's Bohemian-Schooner Zone
21/06/2011(Grew Creek)Intersects 46.7m of 3.78 g/t Gold at Carlos Zone, Grew Creek...
17/03/2011RECEIVES 5,000,000 SHARES OF SILVER PREDATOR CORP.
29/09/2009Provides Update on Yukon Projects
28/07/2009Drilling Commences at Gold Dome Project, Yukon Territory
07/03/2009Completes Spin-Out
05/03/2009Announces Voting Results of Special Meeting
03/03/2009Timing of Shareholders Meeting To be Held On March 4, 2009
26/02/2009to Retire Convertible Debentures of Subsidiary
13/02/2009Confirms Date of Shareholder Meeting
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (GPY.V)
0,160+0.00%
TSX-V
CA$ 0,160
01/09 16:52 -
0%
Cours préc. Ouverture
0,160 0,160
Bas haut
0,155 0,160
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,160 -%
Volume var. 1 mois
201 699 -%
24hGold TrendPower© : 50
Produit Gold
Développe Silver
Recherche Antimony - Copper - Gold - Silver - Tungsten - Uranium
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 02/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :