Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Tenajon Resources Corp.

Publié le 21 février 2008

Intersects 36.6 metres averaging 0.087% Molybdenum at Moly Brook, Newfoundla

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | K Street |

 
A NORTHAIR GROUP COMPANY

SUITE 860 - 625 HOWE STREET Ÿ VANCOUVER, BC  Ÿ V6C 2T6  CANADA Ÿ TEL: 604-687-7545  FAX: 604-689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

February 21, 2008                                                                                                                                    #08-05

 

Tenajon Intersects 36.6 metres averaging 0.087% Molybdenum at Moly Brook, Newfoundland

Molybdenum Zone Successfully Extended Northwards Across the Moly Brook Fault

 

Tenajon Resources Corp (TSX-V:TJS) (the ?Company?) today announced that assay results have been received for the final  four  holes from the 2007 exploration drill program at its Moly Brook Property located on the south coast of Newfoundland.  Drilling has successfully extended the Moly Brook Zone to the north of the Moly Brook Fault (the ?fault?), extending the Moly Brook Zone to a strike length of approximately 750 metres with the zone being open along strike and dip.  Hole MB 07-09, one of three holes drilled north of the fault, intersected a 100.48 metre section averaging 0.055% Mo (0.0917% MoS2).  Within the section there is a higher grade intercept averaging 0.087% Mo (0.145% MoS2)over 36.6 metres.  Hole MB-07-12 the most southerly hole drilled to date into the Moly Brook Zone intersected a 36.58 metre section averaging 0.055% Mo (0.0917% MoS2).  Within the intercept is an 11.28 metre section averaging 0.104% Mo (0.173% MoS2).  The ultimate width of the zone has not been determined as several of the holes drilled ended in significant mineralization. 

 

The Moly Brook deposit occurs at the north end of a trend of molybdenum bearing occurrences that have seen little work completed on them.  Approximately 1.8 km to the south of the 2007 drilling, Buchans Mining completed two short packsack, small diameter drill holes in 1964.  Both holes intersected anomalous molybdenum values with one of the holes averaging 0.057% Mo (0.095% MoS2) over its entire length of 27.53 metres.    The last 7.61 metres of the hole averaged 0.118% Mo (0.197% MoS2).  The Buchans drilling was completed before the implementation of NI 43-101 and  Tenajon has no way of verifying the results.

 

?Results from this drilling campaign have shown that the Moly Brook project has the potential to host a significant bulk tonnage molybdenum deposit.  This acquisition has proved to be a valuable asset for Tenajon and complements the Ajax Molybdenum deposit which hosts an inferred resource of 448 million tonnes averaging 0.063% Mo (623.4 million pounds) and an indicated mineral resource of 38.8 million tonnes averaging 0.064% Mo (56.4 million pounds) at a 0.04% Mo cut-off.? said Bruce McLeod, President & CEO of Tenajon.   Mr. McLeod adds, ?We are currently in the implementation phase of a multi-drill follow up program on the Moly Brook Property which is to commence early this spring?.

 

In 2007, Tenajon completed twelve holes totaling 3,633 metres in length at Moly Brook. The holes tested the target zone over a 750 metre strike length.   Holes MB07-09 to MB07-11 were drilled to test the potential for molybdenum mineralization to the north of the Moly Brook Fault, which was previously thought to cut-off the Moly Brook Zone.   Soil sampling to the north showed the area to host low molybdenum values, however I.P. surveying outlined a zone of high chargeability at depth that appeared to be the potential continuation of the Moly Brook deposit.  Holes MB 07-9 and 11 intersected sections hosting molybdenum mineralization similar to that to the south of the fault and successfully extending the Moly Brook Zone to the north of the fault.  Hole MB 07-12 was drilled to test the zone 100 metres to the south of Hole MB 07-06 (64 metres @ 0.057% Mo).  The results are summarized below and complete results for the 2007 drill program are attached at the end of this press release.

 

Hole   

Length (metres)

From (metres)

To   (metres)

Interval  (metres)

Mo    (%)

MoS2   (%)

MB07-09

313.33

165.48

265.48

100.48

0.055

 0.092

 

INC

195.35

231.95

36.6

0.087

 0.145

 

 

295.05

311.2

13.11

0.051

 0.083

MB07-10

276.15

No Significant Results

MB07-11

295.96

205.74

227.08

21.34

0.054

 0.090

MB07-12

 

206.09

242.62

36.58

0.055

 0.092

 

INC

209.09

220.37

11.28

0.104

 0.173

 

The section intersected in Hole MB 07-09 is associated with the zone of high chargeability.  It appears that north of the Moly Brook Fault the zone has been down dropped resulting in it being buried.  Geophysical profiles show the associated zone of high chargeability to extend at least 600 metres to the north (the limits of the survey) of Hole MB 07-9.     

 

Drilling has traced the Moly Brook zone over a 750 metre strike length with the zone being open along strike to the south and north.   The zone has been traced over a 300 metre vertical elevation and is also open at depth.   Width is variable to 400 metres with the ultimate width having not been determined as several of the holes ended in significant mineralization.  A drill plan can be found by following the enclosed link:  http://www.tenajon.com/i/maps/MolyBrook/2008-01-15DHLocationMap.jpg.

 

At the Moly Brook Property molybdenite occurs primarily along the rims of a series of north trending, subvertical sheeted veins and fracture faces over an up to 450 x 1,100 metre area.  On occasion quartz vein stockwork is formed with molybdenite occurring in all of the vein orientations.  Molybdenite also occurs as disseminations within the intrusion.  Up to 3% combined pyrite and chalcopyrite are commonly associated the molybdenite.

 

The work at Moly Brook was completed by Geoscott Consultants under the supervision of Dave Visagie, P. Geo., a Qualified Person as defined by NI 43-101. 

 

At Moly Brook, drill core is sawn into halves with one half being sent for analysis and the other kept for future reference.  All samples are prepared at Eastern Analytical using a 600 gram split with the resultant pulp being analyzed at Acme Analytical Labs using a 4 acid digestion with analysis by Induced Couple Plasma (ICP).  A stringent program of check, blank and duplicate sampling is employed throughout with duplicates standards and blanks being entered into the sample stream at regular intervals. 

 

On Behalf of the Board of Directors

TENAJON RESOURCES CORP.

 

Per:  D. Bruce McLeod

                                               

D. Bruce McLeod, President

 

FOR MORE INFORMATION CONTACT THE COMPANY AT 1-604-687-7545 or Toll Free 1-888-338-2200

Internet:  www.tenajon.com   Email:  info@northair.com

_________________________________________________________________________________________________________________________________________________

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release. This news release may contain forward looking statements which are not historical facts, such as ore reserve estimates, anticipated production or results, sales, revenues, costs, or discussions of goals and exploration results, and involves a number of risks and uncertainties that could cause actual results to differ materially from those projected. These risks and uncertainties include, but are not limited to, metal price volatility, volatility of metals production, project development, ore reserve estimates, future anticipated reserves and cost engineering estimate risks, geological factors and exploration results.   See the Company?s filings for a more detailed discussion of factors that may impact expected results.

 


2007 Moly Brook Drill Results

To accompany Tenajon Resources News Release Dated February 21, 2008

 

 

Hole

From
(metres)

To
(metres)

Interval (metres)

Mo
(%)

MoS2
(%)

MB 07-1

4.27

7.32

3.05

0.037

0.062

and

46.93

62.17

15.24

0.029

0.048

and

119.48

123.13

3.65

0.048

0.080

 

 

 

 

 

 

MB 07-2

18.89

391.97

373.08

0.066

0.110

Incl.

18.89

40.23

21.34

0.134

0.227

and

226.16

335.89

109.73

0.097

0.162

or

182.58

391.97

209.39

0.077

0.128

 

 

 

 

 

 

MB 07-3

107.90

315.16

207.26

0.084

0.140

Incl.

132.28

244.15

111.87

0.108

0.180

or

150.57

217.63

67.06

0.138

0.230

 

 

 

 

 

 

MB 2007-4

14.02

392.35

378.33

0.078

0.130

Incl.

14.02

35.36

21.34

0.100

0.167

 

53.64

84.12

30.48

0.081

0.135

 

87.12

108.51

21.39

0.100

0.167

or

53.64

108.51

54.87

0.085

0.142

 and

148.13

211.84

63.71

0.122

0.203

 and

248.72

276.15

27.43

0.091

0.152

 and

336.50

392.35

55.85

0.091

0.152

 

 

 

 

 

 

MB 2007-5

31.39

317.91

286.52

0.074

0.123

Incl.

31.39

37.49

6.10

0.137

0.228

 and

55.78

83.21

27.43

0.095

0.158

or

31.39

83.21

51.82

0.081

0.135

 and

128.93

152.10

23.17

0.099

0.165

 

208.18

317.91

109.73

0.085

0.142

Incl.

238.65

272.19

33.54

0.106

0.177

and

296.57

317.91

21.34

0.088

0.147

 

 

 

 

 

 

MB 2007-6

196.90

218.26

21.36

0.071

0.118

 

242.62

260.91

18.29

0.091

0.152

 

285.29

300.52

15.23

0.050

0.083

 or

196.90

300.58

103.68

0.046

0.077

 

 

 

 

 

 

MB 2007-7

81.07

101.94

20.87

0.064

0.107

 

131.97

145.08

13.11

0.055

0.092

 

190.80

206.96

16.16

0.056

0.093

 

255.42

283.77

28.35

0.038

0.063

Incl. 

280.11

283.77

3.66

0.124

0.207

 

 

 

 

 

 

MB 2007-8

30.78

304.80

274.02

0.085

0.142

Incl.

80.47

91.14

10.67

0.142

0.237

 

110.95

120.09

9.14

0.177

0.295

or

74.37

291.39

217.02

0.097

0.162

Incl.

182.88

291.39

108.51

0.125

0.208

 

 

 

 

 

 

MB07-09

165.48

265.48

100.48

0.055

 0.092

Incl.

195.35

231.95

36.60

0.087

 0.145

 

295.05

311.20

13.11

0.051

 0.083

 

 

 

 

 

 

MB07-10

No Significant Results

 

 

 

 

 

 

MB07-11

205.74

227.08

21.34

0.054

 0.090

 

 

 

 

 

 

MB07-12

206.09

242.62

36.58

0.055

 0.092

Incl.

209.09

220.37

11.28

0.104

 0.173

 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Tenajon Resources Corp.

EXPLORATEUR
CODE : TJS.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Tenajon Res. est une société d’exploration minière d'or et d'argent basée au Canada.

Tenajon Res. détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont SUMMIT LAKE MINE, KANSAS CLAIMS, SILVER COIN, AJAX, MOLY BROOK, SUMMIT LAKE, STAR (LUPIN JV) et KANSAS au Canada.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de Tenajon Resources Corp.
15/09/2008(Moly Brook)Announces High Grade Drill Results from Moly Brook, Newfound...
08/07/2008(Moly Brook)Announces High grade Near Surface Results From Moly Brook, N...
26/03/2008(Burn) Intersects Anomalous Molybdenum Values Over 150m Strike Len...
29/02/2008(Moly Brook)Commences Mobilization of 2008 Drilling Program for the Moly...
21/02/2008(Moly Brook) Intersects 36.6 metres averaging 0.087% Molybdenum at Moly ...
05/02/2008(Ajax) Announces Drilling On Ajax Continues to Intersect Near Sur...
Communiqués de Presse de Tenajon Resources Corp.
26/08/2009Closing of Business Combination
29/06/2009Creston Moly Signs Definitive Agreement to Acquire Tenajon R...
27/05/2009Business Combination with Tenajon Resources Corp.
12/06/2008Closes Gold Asset Sale to Kansas PartnerThread-Topic: Tenajo...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (TJS.V)Other OTC (TJRUF)
0,180-10.00%0,160-11.11%
TSX-V
CA$ 0,180
25/08 09:35 -0,020
-10%
Cours préc. Ouverture
0,200 0,200
Bas haut
0,180 0,200
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,180 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : 7
Produit
Développe
Recherche Gold - Molybdenum - Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 25/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,09 US$+0,45%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,57 GBX+5,19%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,55 CA$+1,19%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,00 CA$-0,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+0,00%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,19 US$+1,48%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :