Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Sherwood Copper Corp.

Publié le 14 janvier 2008

Intersects High Grade Copper-Gold Mineralization at Area 118 and Copper Keel,

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | K Street |

A NORTHAIR GROUP COMPANY

SUITE 860 - 625 HOWE STREET ? VANCOUVER, BC  ? V6C 2T6  CANADA ? TEL: (604) 687-7545  FAX: (604) 689-5041

PRESS RELEASE

FOR IMMEDIATE RELEASE

 

January 14, 2008                                                                                                                  #08-01

 

Sherwood Intersects High Grade Copper-Gold Mineralization at Area 118 and Copper Keel, Minto Mine

4.2% Cu over 5.1m at Area 118-Area 2 junction and 3.1% Cu over 4.1m at Copper Keel S.

 

VANCOUVER, BRITISH COLUMBIA - Sherwood Copper Corporation (SWC: TSX-V) today announced results for an additional 25 holes from its 101 hole drill program completed in the fall of 2007 at the high grade Minto copper-gold mine in the Yukon.  Highlights from the latest batch of results include further confirmation of high grade copper-gold mineralization where the Area 118 and Area 2 deposits join, further high grades from the Copper Keel South prospect, and near surface mineralization at the Ridgetop East and Ridgetop West prospects.  Highlights of these recent results are tabulated below, while complete results for the latest 25 holes are attached.

 

Hole ID

Target

Interval

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

07SWC-263

Area 118

118M

230.3

240.4

10.1

33.1

2.45

0.96

9.5

including

 

 

230.7

235.8

5.1

16.7

4.19

1.57

15.3

07SWC-243

Copper K.

CK

68.2

72.3

4.1

13.5

3.10

2.27

20.0

07SWC-241

Copper K.

CK

88.2

90.3

2.1

6.9

2.84

1.79

16.7

07SWC-248

Ridgetop E

 

1.7

27.6

25.9

85.0

0.57

0.06

1.3

including

 

 

1.7

6.2

4.5

14.8

2.06

0.09

3.6

07SWC-252

Ridgetop W

 

8.0

31.4

23.4

76.8

0.64

0.65

4.1

including

 

 

27.2

31.4

4.2

13.8

1.93

1.21

6.1

 

?Sherwood?s successful 2007 exploration program continues to deliver high grades from a variety of targets,? said Stephen Quin, Sherwood?s President & CEO. ?Especially encouraging are the high grade results on the northeast side of Area 118, where it joins the Area 2 deposit, indicating potential for a contiguous zone of higher grade mineralization.?  A recently completed positive Pre-feasibility Study (PFS) on Area 2 did not incorporate any of the very positive drill intersections from 2007. The discovery of Area 118, immediately adjacent to Area 2, is very exciting since it offers further potential beyond that set out in the PFS.  

 

?Beyond Area 118, Sherwood?s exploration crew also discovered near surface, high grade mineralization at Copper Keel, and identified shallowly buried mineralization at Ridgetop West and Ridgetop East,? said Mr. Quin.  ?Each of these areas has the potential to provide additional near surface resources beyond those considered in the recently released pre-feasibility study.?

 

Sherwood anticipates reporting the remaining assays from the 2007 drill program near the end of January, 2008.  Geology models for new NI 43-101 compliant mineral resource estimates are currently under construction and planning for a significant 2008 exploration program has already begun.

 

  

2007 Drill Program

At 23,292 metres of drilling, the 101-hole campaign was more than 40% larger than originally budgeted, a direct result of the significant discoveries made during 2007.  Including this announcement, results for 92 holes have now been released and those for 9 additional holes are pending. 

 

The objective of the 2007 exploration program was to more fully define the limits of the Area 2 deposit and provide technical information for the pre-feasibility study, but mostly to broadly test a wide swath of the Minto property to the south, west and between the Minto and Area 2 deposits.  These are areas where various combinations of prior drilling, geophysics and Sherwood?s geological interpretation suggested potential for the discovery of further high grade copper-gold mineralization.   

 

In the 2007 program, ten holes were drilled for geotechnical and metallurgical purposes; five in the Minto pit and five at the Area 2 deposit, while 91 holes were drilled for exploration purposes.  Significant new discoveries were made in the Area 118, Copper Keel and Airstrip areas and in the Gap between the Minto Mine and Area 2.  All of these prospects are discussed in more detail in the March 5, 2007 news release and are identified on the accompanying maps:

www.sherwoodcopper.com/i/pdf/2008-01-14PriorityExplorationCorridor.pdf and http://www.sherwoodcopper.com/i/pdf/Gradient-Array-IP-Sept07.pdf).

 

This release includes assay results for exploration holes at Airstrip Central (1 hole); Airstrip Southwest (3 holes); Area 118 (3 holes), Copper Keel South (3 holes); Ridgetop East (13 holes) and Ridgetop west (2 holes).  For  current drill hole locations, please view the accompanying map:

(www.sherwoodcopper.com/i/pdf/2008-01-14Phase2DHLocationMap.pdf).

 

Minto Project

The Minto project encompasses a high-grade open pit copper-gold deposit located in the Yukon Territory of Canada.  Sherwood acquired the Minto project in June 2005 and, in just two years from its acquisition, completed a bankable feasibility study, arranged project financing, and built a $100 million open pit copper-gold mine.  Commercial production commenced on October 1, 2007.  In parallel with these development activities, Sherwood has been running an exceptionally successful exploration program that has resulted in multiple discoveries of high grade copper-gold mineralization across its Minto Mine property.

 

Sherwood

Sherwood?s successful consolidation of the ownership of the Minto project provides a unique investment opportunity ? participation in a high-grade, open pit copper-gold mine located in Canada with tremendous exploration potential on the property.

 

Quality Assurance

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in National Instrument 43-101 and reviewed by Stephen P. Quin, P. Geo., President & CEO for Sherwood Copper Corporation.  The exploration activities at the Minto project site are carried out under the supervision of Brad Mercer, P. Geol., Exploration Manager with Sherwood.

 

The analytical method for the copper, gold and silver analyses is multistage acid digestion of the samples followed by atomic absorption spectroscopy for copper and fire assay with atomic absorption spectroscopy finish for gold and silver carried out by ALS Chemex in North Vancouver.  When visible gold is noted in drill core samples or regular fire assay values appear abnormally high, the pulp and screen metallic assay method is used to determine the total gold content and gold contents of different size fractions. This is considered industry best practice when dealing with coarse gold mineralization where a nugget effect is suspected. This determination is accepted as the most representative value and is used in the assay database for resource calculations. Blank and standard samples are used for quality assurance and quality control, and any check samples that assay outside the expected ranges results in the entire batch being re-assayed.  After the completion of planned drill programs at Minto, random check assays will be carried out by Acme Analytical of Vancouver.

 

Assay intervals reported herein are drill core lengths unless otherwise stated.  Because the deposit is essentially flat lying and most drill holes reported to date are vertical, true widths are generally expected to be the same as reported core lengths unless otherwise stated. 

 

Additional Information

Additional information on Sherwood and its Minto Project can be obtained on Sherwood?s website at http://www.sherwoodcopper.com.

 

On behalf of the board of directors

SHERWOOD COPPER CORPORATION

?Stephen P. Quin?

Stephen P. Quin

President & CEO

 

 

 

 

 

For further information please contact Stephen Quin, President of Sherwood Copper Corp.

or Brad Kopp or Kristy Reynolds at (604) 687-7545 or (888) 338-2200

** INTERNET ADDRESS: www.sherwoodcopper.com **

 

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this press release. This news release may contain forward looking statements which are not historical facts, such as ore reserve estimates, anticipated production or results, sales, revenues, costs, or discussions of goals and exploration results, and involves a number of risks and uncertainties that could cause actual results to differ materially from those projected. These risks and uncertainties include, but are not limited to, metal price volatility, volatility of metals production, project development, ore reserve estimates, future anticipated reserves and cost engineering estimate risks, geological factors and exploration results.   See the Company?s filings for a more detailed discussion of factors that may impact expected results.

 

 

2007 Drill Statistics ? Minto Property

 

 

Phase I

Phase II

Total

Status

Drill Area and Type of Hole

Feb - April

May - Oct

2007

Assay Data Released

Assay Data Pending

Exploration Holes

 

 

 

 

 

Airstrip SW

 0

 11

11

11

0

Airstrip C.

 0

 2

2

1

1

Area 2

 0

8

8

8

0

Area 118

 0

28

28

22

6

Copper Keel S.

 0

4

4

4

0

Gap

6

 0

6

6

0

IROD

 0

4

4

0

Ridgetop E

 0

25

25

24

1

Ridgetop W

 0

 3

3

2

1

 

6

85

91

82

9

Geotech / Met Holes

 

 

 

 

 

Area 2

 

5

5

5

0

Minto

5

 

5

5

0

 

5

5

10

10

0

Summary All Holes

 

 

 

 

 

# of Holes

11

90

101

92

9

# of Metres

2,701

20,917

23,292

 

 


Details of Drill Results

To accompany Sherwood Copper News Release Dated January 14, 2008

 

Hole ID

& Target

Interval ID

From

(m)

To

(m)

Interval (m)

Interval (ft)

Copper (%)

Gold (g/t)

Silver (g/t)

07SWC-169 to 228

 

Holes 07SWC-169 To 07SWC-228 Previously Released

 

 

 

 

 

 

 

 

 

07SWC-229

 

156.9

164.7

7.8

25.6

0.62

0.25

2.1

?Airstrip SW?

 

187.0

193.5

6.5

21.3

0.49

0.07

1.0

 

 

203.5

209.7

6.2

20.3

1.12

0.63

6.2

 

 

 

 

 

 

 

 

 

07SWC-230 to 231

 

Holes 07SWC-230 To 07SWC-231 Previously Released

 

 

 

 

 

 

 

 

 

07SWC-232

 

38.4

41.6

3.2

10.5

0.72

0.06

1.7

?Area 118?

 

93.5

134.4

40.9

134.2

0.39

0.07

1.2

 

including

130.5

134.5

4.0

13.1

0.98

0.22

3.8

 

 

 

 

 

 

 

 

 

07SWC-233

 

153.5

155.4

1.9

6.2

0.52

0.03

2.0

?Airstrip SW?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-234

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-235

 

162.8

169.7

6.9

22.6

0.90

0.12

1.1

?Airstrip SW?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-236

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-237

 

Geochemically anomalous ? no significant intersections

?Airstrip C?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-238

 

Hole 07SWC-238 Previously Released

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-239 to 240

 

ASSAYS PENDING

 

 

 

 

 

 

 

 

 

07SWC-241

 

88.2

90.3

2.1

6.9

2.84

1.79

16.7

?Copper Keel S?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-242

 

Geochemically anomalous ? no significant intersections

?Copper Keel S?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-243

 

68.2

72.3

4.1

13.5

3.1

2.27

20.0

?Copper Keel S?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-244

 

6.8

35.9

29.1

95.5

0.41

0.08

1.5

?Ridgetop E?

including

6.8

13.5

6.7

22.0

0.83

0.06

3.5

 

 

 

 

 

 

 

 

 

07SWC-245

 

78.0

79.4

1.4

4.6

1.83

0.90

5.6

?Ridgetop W?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-246 to 247

 

Holes 07SWC-246 To 07SWC-247 Previously Released

 

 

 

 

 

 

 

 

 

07SWC-248

 

1.7

63.4

61.7

202.4

0.32

0.03

0.9

?Ridgetop E?

including

1.7

27.6

25.9

85.0

0.57

0.06

1.3

 

including

1.7

6.2

4.5

14.8

2.06

0.09

3.6

 

 

 

 

 

 

 

 

 

07SWC-249

 

Hole 07SWC-249 Previously Released

?Ridgetop E?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-250

 

53.9

113.7

59.8

196.2

0.29

0.07

0.1

?Ridgetop E?

including

53.9

68.0

14.1

46.3

0.49

0.14

1.3

 

including

53.9

58.0

4.1

13.5

0.78

0.23

4.0

 

and

77.2

94.3

17.1

56.1

0.35

0.07

1.1

 

 

 

 

 

 

 

 

 

07SWC-251

 

ASSAYS PENDING

?Ridgetop E?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-252

 

8.0

31.4

23.4

76.8

0.64

0.65

4.1

?Ridgetop W?

including

27.2

31.4

4.2

13.8

1.93

1.21

6.1

 

 

98.5

105.9

7.4

24.3

0.34

0.04

1.2

 

 

128.9

133.4

4.5

14.8

0.39

0.03

1.1

 

 

164.2

166.8

2.6

8.2

0.78

0.16

1.9

 

 

215.8

220.0

4.2

13.8

0.68

0.05

1.1

 

 

 

 

 

 

 

 

 

07SWC-253

 

22.0

40.6

18.6

61.0

0.37

0.11

1.2

?Ridgetop E?

including

22.0

27.2

5.2

17.1

0.64

0.15

1.6

 

 

35.5

40.6

5.1

16.7

0.70

0.25

2.5

 

 

 

 

 

 

 

 

 

07SWC-254

 

Hole 07SWC-254 Previously Released

?Ridgetop E?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-255

 

21.3

23.2

1.9

5.9

1.31

0.32

2.8

?Area 118?

 

239.0

249.8

10.8

35.4

0.78

0.27

2.2

 

 

277.2

288.6

11.4

37.4

0.93

0.92

5.5

 

including

285.4

288.6

3.2

10.5

1.89

1.00

11.9

 

 

316.0

328.0

12.0

39.4

0.61

0.24

2.5

 

 

 

 

 

 

 

 

 

07SWC-256

 

44.4

57.0

12.6

41.3

0.76

0.03

1.9

?Ridgetop E?

including

44.4

49.4

5.0

16.4

0.97

0.03

1.0

 

 

80.9

119.7

38.8

127.3

0.55

0.16

1.2

 

including

80.8

88.6

7.8

25.6

1.55

0.66

4.0

 

 

 

 

 

 

 

 

 

07SWC-257

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-258

 

42.5

84.4

41.9

137.5

0.47

0.06

1.1

?Ridgetop E?

including

42.5

67.8

25.3

83.0

0.61

0.10

1.6

 

including

58.9

64.6

5.7

18.7

1.34

0.34

3.9

 

 

 

 

 

 

 

 

 

07SWC-259

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-260

 

Geochemically anomalous ? no significant intersections

?Ridgetop E?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-261

 

4.8

9.1

4.3

14.1

1.06

0.06

1.2

?Ridgetop E?

 

50.9

56.7

5.8

19.0

0.40

0.05

0.9

 

 

131.5

142.3

10.8

35.4

0.45

0.12

1.6

 

 

 

 

 

 

 

 

 

07SWC-262

 

2.4

5.8

3.4

11.2

0.88

0.16

2.8

?Ridgetop E?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-263

 

54.9

82.6

27.7

90.9

0.57

0.08

1.1

?Area 118 - Area 2?

including

54.9

60.0

5.1

16.7

1.53

0.16

2.6

Junction

 

181.0

183.7

2.7

8.9

1.83

1.50

7.1

 

 

230.3

240.4

10.1

33.1

2.45

0.96

9.5

 

including

230.7

235.8

5.1

16.7

4.19

1.57

15.3

 

 

283.0

290.4

7.4

24.3

0.47

0.09

1.6

 

 

 

 

 

 

 

 

 

07SWC-264

 

5.5

24.9

19.4

63.6

0.33

0.06

1.7

?Ridgetop E?

including

5.5

9.1

3.6

11.8

0.45

0.04

0.8

 

 

19.2

24.9

5.7

18.7

0.59

0.15

4.5

 

 

 

 

 

 

 

 

 

07SWC-265

 

2.2

37.9

35.7

117.1

0.45

0.03

0.8

?Ridgetop E?

including

2.2

17.9

15.7

51.5

0.59

0.05

1.2

 

 

57.5

59.5

2.0

6.2

2.03

0.05

1.8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-266

 

50.5

90.4

39.9

130.9

0.41

0.13

1.5

?Ridgetop E?

including

50.5

64.4

13.9

45.6

0.80

0.27

2.6

 

 

 

 

 

 

 

 

 

07SWC-267

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

07SWC-268

 

22.2

24.8

2.6

8.5

1.02

0.05

2.6

?Ridgetop E?

 

46.5

57.5

11.0

36.1

0.71

0.30

2.4

 

 

86.2

91.1

4.9

16.1

0.74

0.26

2.6

 

 

 

 

 

 

 

 

 

07SWC-269

 

ASSAYS PENDING

?Area 118?

 

 

 

 

 

 

 

 

Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Sherwood Copper Corp.

CODE : SWC.V
CUSIP : 82442N 103
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Sherwood Copper est une société développant des projet miniers de cuivre basée au Canada.

Sherwood Copper est cotée au Canada et aux Etats-Unis D'Amerique. Sa capitalisation boursière aujourd'hui est 56,5 millions CA$ (46,4 millions US$, 36,8 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 8,26 CA$, et son plus bas niveau récent le 21 novembre 2008 à 1,01 CA$.

Sherwood Copper possède 53 853 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Sherwood Copper Corp.
2007 Annual report
Financements de Sherwood Copper Corp.
29/02/2008 Signs Committed Term Sheet for Corporate Credit Facility wi...
15/02/2008 Announces $7.2 million Flow-through Financing
Nominations de Sherwood Copper Corp.
01/04/2008Makes Key Appointments to its Board & Management
16/01/2008 Appoints Kevin Weston as Chief Operating Officer
Rapports Financiers de Sherwood Copper Corp.
27/08/2008Reports Continued Strong Financial Results for the Three Mon...
22/07/2008Reports Increased Copper Production & Reduced Costs in Secon...
30/05/2008Reports Strong Results from Operations in First Quarter 2008
Projets de Sherwood Copper Corp.
26/01/2009(Minto Mine)Capstone Mining Corp. Commences US$ 3 Million Resource Expan...
10/12/2008(Minto Mine)Capstone Mining Corp. Reports Final Drill Intercepts of Nea...
13/11/2008(Kutcho Creek)Increases Continuity of High Grade Copper Trend at its Kutch...
07/11/2008(Minto Mine)Raises US$37.5 million from Minto Precious Metal ProductionT...
04/11/2008(Minto Mine)Reports New Copper-Gold Discovery at Minto Mine and possible...
22/09/2008(Kutcho Creek)Reports Further High Grade Intercepts from its Kutcho Copper...
18/09/2008(Minto Mine)Reports Thick Intervals of Near Surface Copper-Gold Minerali...
02/09/2008(Kutcho Creek)Reports Multiple High Grade Intercepts from its Kutcho Coppe...
28/08/2008(Minto Mine)Reports High Rainfall temporarily restricts access to its Mi...
21/08/2008(Minto Mine)Reports Further High Grade Copper-Gold Results From Areas 2 ...
17/07/2008(Minto Mine)Releases Further High Grade Copper-Gold from Area 2 & Area 1...
14/07/2008(Kutcho Creek)Reports High Grade Intercepts from the Kutcho Drill Program
17/06/2008(Minto Mine)Announces Significant Increase in Copper-Gold Resources at M...
17/04/2008(Minto Mine)Reports Minto Copper-Gold Mine Achieves & Exceeds Design Cap...
10/03/2008(Kutcho Creek) Completes Funding Arrangements for Kutcho Project & Begins ...
25/02/2008(Minto Mine)Reports 2007 Production Results & 2008 Production Estimate f...
13/02/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization in 4 Separa...
14/01/2008(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Area 118...
18/12/2007(Minto Mine) Reports Phase 2 Mill Expansion at Minto Copper-Gold Mine Co...
12/12/2007(Minto Mine) Reports Results of Pre-feasibility Study for Expansion of M...
07/12/2007(Minto Mine)Reports Groundwork has Commenced on Carmacks to Stewart Tran...
03/12/2007(Minto Mine)Intersects High Grade Copper-Gold Mineralization at Ridgetop...
29/10/2007(Minto Mine) Intersects High Grade Copper-Gold Mineralization at Area 11...
25/10/2007(Minto Mine) Ships first Minto Mine Concentrates from Skagway
25/09/2007(Minto Mine)Receives Encouraging Results From 2007 Gradient IP Geophysic...
19/09/2007Discovers High Grade at Airstrip & Expands High Grade at Are...
05/09/2007(Minto Mine)Reports "On budget & Ahead of Schedule" Phase 1 Construction...
25/07/2007(Minto Mine)Delivers First Concentrates from Minto Mine to Port of Skagw...
15/06/2007(Minto Mine)Phase 2 Exploration Program Underway at Minto Copper-Gold Mi...
12/06/2007(Minto Mine)Reports Excellent Metallurgical Test Results from Area 2 at ...
24/05/2007(Minto Mine)Discovers High Grade Copper-Gold Mineralization in Minto 'Ga...
24/04/2007(Minto Mine)Awarded Funding from the Yukon Government to Advance Area 2 ...
12/04/2007(Minto Mine)Expands Scope of Pre-feasibility Study on Minto Copper-Gold ...
11/04/2007Accelerates Phase 2 Mill Expansion at Minto Copper-Gold Mine...
Communiqués de Presse de Sherwood Copper Corp.
23/01/2009Capstone Mining Corp. Reports Debt Repayments, Funding of De...
24/12/2008Capstone Mining Corp. Mails Offer to Purchase to its Debentu...
24/11/2008Reports Cash Flow from Mining Operations of $29.9 million in...
21/11/2008Announces Closing of Precious Metal Transaction
19/09/2008sets Shareholder Meeting Date for Capstone Combination
05/08/2008Reports Higher Copper Production Forecast for 2009 & Updated...
25/07/2008Reports Phase 3 Mill Throughput Increase to 3,200tpd Approve...
30/06/2008Finalizes Exploration Agreement with Northern Tiger Resource...
12/06/2008Reports Results of Preliminary Economic Assessment for Kutch...
05/06/2008Holds Successful Annual Meeting & Reports on Strategic Objec...
28/05/2008and Western Keltic Announce Closing of Business Combination
07/04/2008and Western Keltic Mines Inc. Announce Planned Business Comb...
06/03/2008 Increases Holdings to Approximately 93% of Western Keltic S...
03/03/2008Signs Exploration Memorandum of Understanding with Firestone...
22/02/2008Acquires 91.7% of Western Keltic Shares & Extends Offer for ...
12/02/2008Takes up 85.6% of Western Keltic Shares & Extends Offer for ...
30/01/2008Extends Offer for Western Keltic Mines to February 11, 2008
24/12/2007 Mails Offer for Western Keltic Mines
26/11/2007 Announces Agreement for Acquisition of Western Keltic Mines
29/10/2007 Appear on BNN TV
12/10/2007 Holds the Official Opening Ceremony for the Minto Mine, Yuk...
04/10/2007 Reports that Minto Mine Declares Commercial Production
17/07/2007Identifies Two Extensive Copper-Gold Systems at Minto Projec...
16/07/2007Reports Geotech Program Results in Improved Pit Slopes at Mi...
29/05/2007reports Yukon Utilities Board Approves Revised Power Purchas...
15/05/2007reports Yukon Government Support for Revamped Power Purchase...
10/05/2007Nominates Industry Leader for election to its Board of Direc...
02/05/2007Announces Yukon Utilities Board Turns Down Provisions of the...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SWC.V)
1,05-7.89%
Dernières informations avant suppression de la cote
Cours préc. Ouverture
1,14 1,04
Bas haut
1,02 1,12
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  1,05 -%
Volume var. 1 mois
0 -%
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 07/09/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,31 US$+3,10%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$-1,49%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,00 CA$+2,56%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,85 CA$-1,07%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,40 US$-0,39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :