June 2015 Quarterly Production and Market Update

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   K Street | Manganese |

June 2015 Quarterly Production and Market Update

OM HOLDINGS LIMITED

(ARBN 081 028 337)

No. of Pages Lodged: 8
30 July 2015
ASX Market Announcements
ASX Limited
4th Floor
20 Bridge Street
SYDNEY NSW 2000
Dear Sir/Madam

JUNE 2015 QUARTERLY PRODUCTION AND MARKET UPDATE

The Board of OM Holdings Limited ("OMH" or "the Company") is pleased to provide the following update.

OPERATING PERFORMANCE

HIGHLIGHTS

OM SARAWAK (75%, Samalaju, Malaysia)

• Ferrosilicon produced during the quarter of 16,294 tonnes
• Overall construction progress of Phase 1 of the OM Sarawak ferrosilicon production facility (expressed in terms of cumulated earned value) stands at approximately 93.6% at the end of June 2015
• Completed testing and commissioning of Workshop A03 which has achieved commercial production during the quarter
• Workshop B01 and B02 have started testing and commissioning in June 2015
• Workshop B03, B04 and B05 are in full scale equipment installation works during the quarter

EXPLORATION AND MINING (OMM, 100% owned Bootu Creek Manganese Mine)

• June 2015 quarterly manganese ore production of 190,686 tonnes grading 35.23%
• June 2015 quarterly manganese ore shipments of 164,817 dry tonnes (173,114 wet tonnes) grading 35.85%

#08 - 08, Parkway Parade

80 Marine Parade Road, 449269 Singapore

Tel: 65-6346 5515 Fax: 65-6342 2242

Email address: [email protected]

Website: www.omholdingsltd.com

ASX Code: OMH


PROCESSING (OMQ, 100% owned Smelter and Sinter Plant in Qinzhou)

• OMQ resumed production with one furnace on 28 April 2015 with total production of 7,129 tonnes of High Carbon Ferro Manganese ("HCFeMn") during the June

2015 Quarter

• HCFeMn sold during the quarter of 2,077 tonnes

MARKETING AND TRADING, AND MARKET UPDATE

• 498,386 tonnes of equity and third party ores and alloys were transacted during the quarter. These included approximately 10,834 tonnes of ferrosilicon from our smelter in Sarawak
• China's crude steel production between April to June 2015 amounted to 207.8 million tonnes, representing a 0.36% quarter-on-quarter decrease
• World crude steel production for the June 2015 Quarter was 409.89 million tonnes, representing a slight 2.40% quarter-on-quarter decrease

2


OM MATERIALS (SARAWAK) SDN BHD ("OM Sarawak") (75%, Samalaju, East

Malaysia)

OM Sarawak owns a Ferro Alloy Smelting Project in the Samalaju Industrial Park in Sarawak, Malaysia (the "Project"). The Project consists of 8 Main Workshops and a total of 16 units of
25.5 MVA furnaces with a design capacity to produce 308,000 tonnes of ferrosilicon alloys per annum.
For Phase 1 of the Project, Plant A (consisting of A01, A02 and A03 Workshops) has achieved commercial production. With the additional production capacity of the A03
Workshop, a total of 16,294 tonnes of ferrosilicon was produced in the 2nd quarter of 2015.
For Plant B, Main Workshops B01 and B02 have started testing and commissioning in June
2015. Main Workshops B03 to B05 is currently undergoing full scale equipment installation works.

Commercial Operation

OM Sarawak continues to maintain an upward trajectory generated from the successful tapping and production from furnace 1 to 4 of the A01 and A02 Workshops. With the successful tapping and addition of furnace 5 and 6 from the A03 Workshop in the June 2015
Quarter, the production output of ferrosilicon continues to move towards fulfilling the design production capacity of 308,000 tonnes of ferrosilicon alloy per annum.
During the June 2015 Quarter, a total of 16,294 tonnes of ferrosilicon was produced.

Construction

The overall construction progress expressed as the cumulated earned project value was approximately 93.6% at the end of June 2015.

EPC's Delivery and Performance

The EPC contract works for civil, structural, equipment fabrication and installation work's cumulated earned value was approximately 93.6% complete at the end of the June 2015
Quarter.
The major milestones achieved in the June 2015 Quarter were the successful commencement of Workshop A03 and the commencement of testing and commissioning for both the B01 and B02 Workshops.
Construction of the remaining civil and structural works in Plant B is currently being done by the EPC contractor. Equipment installation work and construction of the auxiliary buildings for the remaining B03, B04 and B05 Main Workshops are currently underway.

3



A03 Main Workshop furnace 6 tapping in progress

B01 Main Workshop getting ready for commercial production

4


EXPLORATION AND MINING

OM (MANGANESE) LTD ("OMM")

BOOTU CREEK MANGANESE MINE (100%, Northern Territory, Australia)

Production from the Bootu Creek Manganese Mine for the June 2015 Quarter is summarised below:

Unit

Jun

2015

Quarter

YTD

2015

Mar

2015

Quarter

Mining

Total Material Mined Ore Mined - tonnes Ore Mined - Mn grade

Production Lumps - tonnes Lumps - Mn grade Fines/SPP - tonnes

Fines/SPP - Mn grade

Total Production - tonnes

Total Production - Mn grade

Sales

Lumps - tonnes Lumps - Mn grade Fines/SPP - tonnes Fines/SPP - Mn grade Total Sales - tonnes Total Sales - Mn grade

bcms dt

%

dt

%

dt

%

dt

%

dt

%

dt

%

dt

%

1,477,765

521,111

22.00

130,981

34.72

59,705

36.32

190,686

35.23

131,039

36.04

33,778

35.11

164,817

35.85

2,939,242

981,771

21.57

234,104

34.81

114,620

36.56

348,724

35.59

222,284

35.46

65,894

36.18

288,178

35.62

1,461,477

460,660

21.09

103,123

34.93

54,915

36.82

158,038

35.59

91,246

34.62

32,116

37.30

123,361

35.32

Mining

During the June 2015 Quarter, mining activities were conducted in the Yaka, Tourag and Chugga South deposits early in the quarter, and subsequently concentrated across the Chugga South, GoGo and Shekuma deposits later in the quarter.
In the later part of the June 2015 Quarter, full mining operations were focused on the Chugga South and Chugga Bridge deposits, and also on the higher grade GoGo and Shekuma deposits. Concentration of the mining fleets within the eastern limb of the Bootu Creek Syncline added further efficiency and unit cost improvements given the deposits relative proximity to the processing plant, mining workshop and associated infrastructure.
Higher grade ores from the Chugga South, GoGo and Shekuma deposits are expected to form the basis of plant feed for the medium term adding to expected improved processing plant mass yields.

Processing

The mine achieved ore production of 190,686 tonnes for the June 2015 Quarter at an average grade of 35.23% Mn as the benefit of higher yielding ores from the higher grade deposits were treated through the plant later in the June 2015 Quarter.

5


Logistics

During the June 2015 Quarter, a total of 164,817 dry tonnes (173,114 wet tonnes) of manganese product was exported through the Port of Darwin in 5 vessels.

Unit Operating Costs

The C1 unit cash operating cost for the June 2015 Quarter improved to A$3.53/dmtu (US$2.75/dmtu) based on increased mining efficiencies, improved process plant yields and cost reduction strategies.

PROCESSING

OM MATERIALS (QINZHOU) Co Ltd ("OMQ") (100%, Guangxi, China)

Production from the Qinzhou smelter and sinter plant for the June 2015 Quarter is summarised below:

Jun

2015

Quarter

YTD

2015

Mar

2015

Quarter

Tonnes

Production

High Carbon Ferro Manganese ("HCFeMn") Mn Sinter Ore

Sales

High Carbon Ferro Manganese ("HCFeMn") Mn Sinter Ore

7,129

0

2,077

0

7,129

0

8,316

0

0

0

6,239

0

Production

During the June 2015 Quarter, OMQ produced 7,129 tonnes of HCFeMn as production resumed with one furnace on 28 April 2015.

Sales

During the June 2015 Quarter, OMQ secured sales of 2,077 tonnes of HCFeMn.

MARKETING AND TRADING, AND MARKET UPDATE

During the June 2015 Quarter, a total of 498,386 tonnes of ores and alloys was transacted. This included about 10,834 tonnes of ferrosilicon from the ramp up of OM Sarawak's furnaces.
According to Worldsteel, crude steel production in China between April to June 2015 amounted to 207.8 million tonnes, representing a 3.90% increase against the March 2015
Quarter. However, this was 0.36% lower comparing to the corresponding quarter in 2014 signifying some slow-down in steel production.
Towards the end of June 2015, prices of 44% Mn declined further by US$0.20/dmtu from the previous quarter, falling to US$3.00/dmtu CIF China.

6


OM Holdings Limited

CORPORATE

Tshipi é Ntle Manganese Mining (Pty) Ltd ("Tshipi")

OMH has an effective 13%
interest in Tshipi through its 26% strategic
partnership with
Ntsimbintle Mining (Proprietary) Limited, the majority (50.1%) owner of Tshipi.
Tshipi owns 2 manganese prospects in the world class Kalahari Manganese field, namely
Tshipi Borwa and Tshipi Bokone.

Tshipi Borwa Manganese Mine

Tshipi exports for the June 2015 Quarter totalled 509,359 tonnes (Q2 2014: 534,836 tonnes)
representing a 4.8% decrease from the corresponding quarter in 2014.
Construction on the primary crushing circuit of the 2.4 million tonne per annum processing plant was completed in the June 2015 Quarter.

CAPITAL STRUCTURE

There were no movements in the share capital structure of the Company during the quarter. As at 30 June 2015, the Company had 733,423,337 ordinary shares, 25,000,000 convertible notes and 31,200,000 unlisted warrants on issue.
Yours faithfully

OM HOLDINGS LIMITED


Heng Siow Kwee/Julie Wolseley

Company Secretary

7


BACKGROUND PROFILE OF OM HOLDINGS LIMITED

OMH Holdings Limited (OMH) was listed on the ASX in March 1998 and has its foundations in metals trading - incorporating the sourcing and distribution of manganese ore products.
OMH is involved in mining manganese product in Australia and South Africa and is constructing a smelter in Sarawak, Malaysia to produce ferrosilicon and ferro-manganese intermediate products. The smelter project is owned 75% by OMH.
The first phase of the Sarawak smelter project commenced production in September 2014 and will ramp up to full commercial production by the end of 2015. When completed the ferrosilicon production facility's capacity of 308,000 tonnes per annum will make it one of the largest ferrosilicon smelters globally.
OMH, through a wholly owned subsidiary, owns the Bootu Creek manganese mine in the Northern Territory. This mine has the capacity to produce up to 1,000,000 tonnes of manganese product per annum.
OMH also owns a 26% investment in Ntsimbintle Mining (Proprietary) Ltd, which, in turn owns
50.1% interest in the world class Tshipi Borwa ("Tshipi") manganese mine in South Africa. This mine has the capacity to produce up to 2,400,000 tonnes of manganese product per annum when the permanent processing plant is completed.
The manganese products of Bootu Creek, and those from Tshipi, are exclusively marketed through the OMH's trading division and OM Tshipi Pte Ltd (33.33% owned) respectively. Through all these activities OMH has established itself as a significant manganese supplier to the Chinese market.

8

Lire la suite de l'article sur www.noodls.com

OM Holdings Limited

PRODUCTEUR
CODE : OMH.AX
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

OM Holdings est une société de production minière basée aux Bermudes.

OM Holdings est productrice de manganese en Australie.

Son principal projet en production est BOOTU CREEK MINE en Australie.

OM Holdings est cotée en Australie. Sa capitalisation boursière aujourd'hui est 341,0 millions AU$ (221,6 millions US$, 207,0 millions €).

La valeur de son action a atteint son plus bas niveau récent le 08 janvier 2016 à 0,03 AU$, et son plus haut niveau récent le 18 octobre 2018 à 1,70 AU$.

OM Holdings possède 733 419 968 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de OM Holdings Limited
10/03/2009Corporate Presentation
Nominations de OM Holdings Limited
13/05/2008 Announces Key Appointments
Rapports Financiers de OM Holdings Limited
30/08/20161H 2016 Interim Financials
Projets de OM Holdings Limited
25/09/2009(Bootu Creek Mine)Wins Key Northern Territory Export Award for the Second Year
28/07/2009(Bootu Creek Mine)Sets New Benchmarks with June Quarter Manganese Production, ...
05/03/2009(Bootu Creek Mine)Substantial Increase in Bootu Creek Manganese Resources and ...
Communiqués de Presse de OM Holdings Limited
01/08/2016June 2016 Quarterly Production & Market Update
20/06/2016Appendix 3Y for Mr. Tan Peng Chin
20/05/2016Results of Annual General Meeting
17/05/2016Appendix 3Y for Mr. Tan Peng Chin
26/04/2016March 2016 Quarterly Production & Market Update
26/04/20162015 Annual Report
20/04/2016Notice of AGM Explanatory Statement and Proxy Form
08/04/2016OM Sarawak - Issue of CPS
01/04/2016Audited Full Year Accounts FY2015
15/01/2016OM (Manganese) Ltd - Voluntary Administration
15/12/2015Bootu Creek Manganese Project-Suspension of Mining Operation
05/11/2015OMH Presentation
30/10/2015September 2015 Quarterly Production and Market Update
28/08/2015Half Year Accounts 2015
30/07/2015June 2015 Quarterly Production and Market Update
31/03/2015Audited Financial Statements for year ended 31 December 2014
31/03/2015Completion of Sale of 5% Interest in Sarawak Project
09/02/2015December 2014 Quarterly Production and Market Update
30/10/2014September 2014 Quarterly Production and Market Update
22/10/2009Quarterly Report for period ended 30 September 2009
28/09/2009Media Conference, 11am (AEST) - Sydney and Dial In
24/08/2009Maintains Strong Growth Platform and Posts $10.8M First Half...
27/05/2009Confirms New Manganese Production Strategy
30/01/2009OMH Group Achieves Record Annual Production at Australian an...
15/01/2009Results Of Special General Meeting
07/01/2009Letter to Shareholders
06/01/2009Update - Takeover Protection Provisions
23/12/2008Ltd: Adoption of Takeover Protection Provisions (Notice of M...
22/12/2008Close Out of Foreign Exchange Contracts and Further Investme...
15/12/2008Announces Revised Manganese Production and Marketing Strateg...
27/11/2008Consolidated Minerals Acquires 11% Shareholding Position
28/08/2008Merrill Lynch Research Report
01/08/2008Reaffirms Strong Growth, Business Outlook After Deciding to ...
12/08/2008Launches On-Market Share Buy-Back
05/06/2008High Profile Businessman to Join OMH Board
01/05/200831 MARCH 2008 QUARTERLY MARKET UPDATE
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (OMH.AX)
0,465+0.65%
AUSTRALIA
AU$ 0,465
24/04 11:00 -
0,65%
Cours préc. Ouverture
0,462 0,460
Bas haut
0,460 0,475
Année b/h Var. YTD
0,400 -  0,520 -3,12%
52 sem. b/h var. 52 sem.
0,400 -  0,670 -31,11%
Volume var. 1 mois
455 433 8,14%
24hGold TrendPower© : -32
Produit Manganese
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2024-7,92%
2023-28,87%0,850,50
2022-21,11%1,030,59
202153,85%1,280,51
202014,71%0,630,25
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
10,92 US$-1,71%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+0,00%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,38 CA$-3,64%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,32 CA$+0,46%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$-2,08%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,77 CA$-1,12%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,10 US$-0,89%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :