June 2016 Quarterly Production Report

27 July 2016

June 2016 Quarterly Production Report

Fortescue Metals Group Limited (ASX: FMG, Fortescue)

Fortescue has released its June 2016 quarterly production results, reporting shipments of 43.4 million tonnes of iron ore with cash production costs (C1) of US$14.31 per wet metric tonne (wmt), a reduction of three per cent compared to the March 2016 quarter and 35 per cent over the prior twelve months.

Guidance for FY17 has also been released targeting shipments between 165-170mt and C1 costs in the range of US$12-13/wmt.

Operating cash flows throughout the quarter supported additional debt repayments, with net debt lowered to US$5.2 billion at 30 June 2016 inclusive of cash balances of US$1.6 billion and total debt repayments of US$2.9 billion during FY16.

Chief Executive Officer, Nev Power, said "Our June quarter result demonstrates the consistent delivery of outstanding operational performance across all aspects of our business. Costs have been lowered for the tenth consecutive quarter and our continued focus on productivity and efficiency measures will drive C1 costs even lower in FY17."

"With net debt reduced to US$5.2 billion, we are fast approaching our initial balance sheet targets and will continue to apply cash flows to further reduce debt."

"Our team continued to innovate and deliver sustainable cost improvements through a focus on productivity and efficiency at our world class mining and infrastructure assets to generate long term value for our shareholders."

HIGHLIGHTS - JUNE 2016 QUARTER

  • US$14.31/wmt C1 cost

  • 43.4mt shipped

  • US$1.6 billion of cash on hand at 30 June 2016

  • Net debt of US$5.2 billion with net gearing1 below 40 per cent

  • FY16 C1 cost of US$15.43/wmt

    PRODUCTION SUMMARY

    (million tonnes)

    Q4 FY16

    Q3 FY16

    VAR%

    Q4 FY15

    VAR%

    Ore mined

    47.8

    43.4

    10%

    42.1

    14%

    Overburden removed

    48.6

    44.7

    9%

    41.4

    17%

    Ore processed

    42.8

    42.3

    1%

    41.0

    4%

    Total ore shipped including third party product

    43.4

    42.0

    3%

    42.4

    2%

    C1 (US$/wmt)

    14.31

    14.79

    -3%

    22.16

    -35%

    Note: Tonnage references are based on wet metric tonnes (wmt). Fortescue ships product with approximately 8-9 per cent free moisture.

    Fortescue Metals Group Limited PO Box 6915

    ABN 57 002 594 872 East Perth, Western Australia

    Level 2, 87 Adelaide Terrace P +61 8 6218 8888 East Perth, Western Australia 6004 E [email protected]

    MINING, PROCESSING AND SHIPPING

  • Fortescue's rolling twelve month total recordable injury frequency rate (TRIFR) was 4.3 at the end of the June 2016 quarter, a 15 per cent reduction over the prior financial year. This reduction is an important milestone on the journey towards zero injuries.

  • Mining, processing, rail and shipping continued to perform well reflecting the sustainability of productivity and efficiency measures. Underlying cost reductions achieved during the quarter were offset by higher exchange rates and fuel prices resulting in a US$13.10/wmt C1 cost in the month of June 2016.

    During the quarter, the Solomon Autonomous Haulage System fleet safely transported the 200 millionth tonne of material using driverless trucks.

  • Strip ratios on a combined basis were 1.0 for the quarter. The continued improvement in OPF upgrade performance has increased ore recovery, with strip ratios at the Chichester and Solomon Hubs each averaging 1.0 during the quarter.

    Strip ratios are expected to average 1.4 over the next five years, however, options to further improve OPF and mining performance continue to be developed and are expected to lower strip ratios over that time frame.

  • Total ore shipments are set out below:

    (million tonnes)

    Q4 FY16

    Q3 FY16

    Q4 FY15

    Shipments - Fortescue mined ore

    43.4

    41.7

    40.9

    Shipments - Fortescue equity ore

    43.4

    41.8

    41.3

    Total ore shipped including third party product

    43.4

    42.0

    42.4

    FY17 GUIDANCE

  • 165-170mt of shipments.

  • US$12-13/wmt C1 cost. C1 costs are expected to progressively reduce over the course of FY17 as productivity and efficiency gains take full effect. Cost guidance remains subject to key variables such as exchange rate and oil price which have been assumed to average $0.75 and US$50 per barrel (WTI) respectively.

  • Average strip ratios of 1.1. Strip ratios are expected to be slightly higher in the September 2016 quarter and will gradually reduce over the course of FY17.

  • Price realisations of between 85 and 90 per cent of the Platts 62 CFR index and an average moisture content of 8.5 per cent.

  • Sustaining capital expenditure of US$2.00/wmt.

  • Construction of eight Very Large Ore Carriers (VLOCs) continues on schedule. Options are currently being negotiated for the funding of future VLOC payments of $270 million in FY17 and US$180 million in FY18.

  • Tugs and infrastructure at Port Hedland are estimated to have a capital cost less than US$200 million. FY17 capital expenditure on the project is US$90 million with the balance due in FY18. Options to fund this project are also being considered.

  • Depreciation and amortisation charges to reduce to US$7.10/wmt shipped.

    ABORIGINAL ENGAGEMENT

    • Direct Aboriginal employment rose to 14% at the end of the June quarter. Fortescue and its contractors employ more than 1,100 Aboriginal people across Fortescue sites.

    • Fortescue's second intake of its Trade Up Program occurred during the quarter and currently has 36 participants. The program provides a pathway to a trade qualification for Aboriginal employees. In addition, Fortescue's Apprenticeship Program has 10 Aboriginal apprentices from a total of 41 participants.

    • Fortescue's Billion Opportunities program was recognised at a national level at the annual Supply Nation Connect Awards in May. Fortescue currently has 38 Aboriginal businesses providing goods and services with the total value of contracts awarded under the Billion Opportunities program maintained at AUD$1.8 billion.

      MARKETING

    • Iron ore and steel markets remained positive during the June 2016 quarter. Increased Chinese demand from the property and infrastructure sectors together with low inventory and strong exports supported steel production. These combined effects drove the average Platts 62 CFR index iron ore price to US$55.66/dmt for the June 2016 quarter, 15 per cent higher than the March 2016 quarter.

    • Fortescue's average realised price was US$48.79/dmt for the quarter, an 88 per cent realisation on the Platts 62 CFR index after adjusting for timing differences associated with provisional pricing.

    • Average price realisation for FY16 was 88 per cent or US$45.36 after taking into account the full impact of all provisional price timing differences and revenue adjustments.

      BALANCE SHEET

    • Cash on hand was US$1.6 billion at 30 June 2016.

    • Net debt was US$5.2 billion, inclusive of cash on hand and finance lease liabilities of US$0.5 billion at 30 June 2016.

    • US$1.7 billion of debt was repaid during the quarter through redemption of US$577 million of 2019 Senior Unsecured Notes and $1.15 billion of the Term Loan. Total debt repayments in FY16 were US$2.9 billion.

    • Net gearing has dropped below 40 per cent with gross gearing2 expected to fall below 40 per cent during FY17.

  • Sustaining capital expenditure in FY16 was US$1.33/wmt, well below original guidance of US$2.00/wmt and slightly above revised guidance of US$1.21/wmt due to timing, higher exchange rates and fuel prices. Capital expenditure on construction of eight VLOCs was US$48 million, in line with guidance.

  • Prepayment balances are US$0.6 billion at 30 June 2016 with scheduled amortisation of US$0.4 billion in FY17 and US$0.2 billion in FY18, subject to future additions and rollovers.

    CORPORATE

  • Discussions with Vale SA continue and Fortescue remains hopeful that an agreement can be concluded before the end of the year.

  • A second towage licence was awarded to Fortescue for the construction of marine and landside tug haven facilities at Port Hedland. The towage services have been awarded for an initial term of 15 years, commencing in 2019.

  • Fortescue is exploring the level of external interest in a number of potential lithium projects located within its tenement holdings in the Pilbara.

    EXPLORATION & DEVELOPMENT

  • Exploration activity was primarily focused on Fortescue's iron ore tenements in the Pilbara. Total capitalised exploration expenditure in FY16 was US$31 million, in line with previous guidance. FY17 exploration expenditure is expected to be US$40 million.

  • Fortescue continues to undertake early stage, low cost exploration on copper-gold prospective tenements in South Australia and New South Wales and is assessing high potential, early stage exploration tenements in highly prospective areas of Ecuador. This exploration is in line with Fortescue's strategy of focussing on its core iron ore business while creating low cost future optionality.

  • Development planning is underway for replacement of Firetail within the next five years. This strategy involves progressive steps to develop satellite ore bodies and, in the medium to long term, will require the extension of rail infrastructure. High level capital cost estimates of this development are expected to range between US$1.0 to US$1.5 billion and, depending on the preferred strategy, are likely to be incurred between FY19 to FY21.

  • The Iron Bridge magnetite project remains subject to market conditions and joint venture approval.

MEDIA CONTACT INVESTOR RELATION CONTACT

Luke Forrestal Stuart Gale

E: [email protected] E: [email protected] M: 0411 479 144

REPORTING CALENDAR

Full Year Results Report: 22 August 2016 September Quarterly Report: 20 October 2016

Investor presentation: 1 November 2016

Investor site tour: 2 and 3 November 2016

Annual General Meeting: 9 November 2016

Online: www.fmgl.com.au

Twitter: twitter.com/FortescueNews

Youtube: www.youtube.com/user/FortescueMetalsGroup Investor Relations: [email protected] Media: [email protected]

1 Net gearing is defined as net debt / (net debt + equity)

2 Gross gearing is defined as gross debt / (gross debt + equity)

Lire la suite de l'article sur www.publicnow.com

Fortescue Metals Group

EN DÉVELOPPEMENT
CODE : FMG.AX
ISIN : AU000000FMG4
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Fortescue Metals est une société développant des projet miniers de fer basée en Australie.

Fortescue Metals détient divers projets d'exploration en Australie.

Ses principaux projets en développement sont CHRISTMAS CREEK et NULLAGINE IRON en Australie et son principal projet en exploration est SOLOMON GROUP en Australie.

Fortescue Metals est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 76,3 milliards AU$ (48,9 milliards US$, 45,9 milliards €).

La valeur de son action a atteint son plus bas niveau récent le 29 janvier 2016 à 1,41 AU$, et son plus haut niveau récent le 19 avril 2024 à 24,52 AU$.

Fortescue Metals possède 3 113 799 936 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Fortescue Metals Group
2012 Annual Report and Notice of Meeting
2009 Annual report
Nominations de Fortescue Metals Group
23/09/2016Fortescue announces changes to Key Management Personnel
22/02/2013New Appointments to Fortescue's Board of Directors
08/01/2013Appointment of Director Operations
01/09/2011Changes to Fortescue's Board of Directors
19/08/2011Changes to Fortescue's Board of Directors
15/07/2011New Chief Executive Officer Key Terms of Engagement
Rapports Financiers de Fortescue Metals Group
19/08/2011Annual Financial Report 2011
Projets de Fortescue Metals Group
14/09/2015Fortescue enters into ground-breaking deal for first Aborigi...
21/08/2015Fortescue ore reserves and mineral resources update
17/06/2015Iron ore miners look beyond current price rebound with conce...
13/03/2013Increase in Nyidinghu Resource to 2.46 Billion Tonnes
10/12/2012announces sale of 25% interest in NJV
Communiqués de Presse de Fortescue Metals Group
21/08/2016Media release FY16 results
21/08/2016Corporate presentation FY16 results
21/08/2016Appendix 4G Key to Corporate Governance Disclosures
21/08/2016FY16 Annual Report including Appendix 4E
21/08/2016Notification of dividend / distribution August 2016
19/08/2016Fortescue Ore Reserves and Mineral Resources Update 2016
03/08/2016Appendix 3Y Change of Director's Interest Notice (1)
28/07/2016Fortescue’s CEO for a Day is a true trailblazer
26/07/2016June 2016 Quarterly Production Report
14/07/2016Fortescue’s family values the key to VTEC’s success
13/07/2016FY16 Annual Production Update
07/07/2016Fortescue is supporting our nation’s living narrative
27/06/2016Alert: Jobseekers targeted by online scam
28/01/2016Fortescue empowering aspiring Aboriginal leaders
27/01/2016December 2015 Quarterly Production Report
15/12/2015FY2016 Performance Rights Granted
25/11/2015Fortescue Announces Results Of Offer To Purchase For Cash Ce...
25/11/2015Fortescue completes US$750 million debt tender
11/11/2015Fortescue: debt ore
16/10/2015Zacks Industry Rank Analysis Highlights: Rio Tinto Group, BH...
15/10/2015Buy into Mining without Jumping on a Grenade
14/10/2015September 2015 Quarterly Production Report
09/10/20152015 Notice of Annual General Meeting
07/10/2015Response to media speculation regarding potential asset sale...
07/10/2015FY2015 Vesting and Lapse of Performance Rights
23/09/2015Dividend reinvestment plan allocation price (3)
16/09/2015Appendix 3Y Change of Director's Interest Notice
24/08/2015Notification of Dividend/Distribution
24/08/2015FY2015 Corporate Presentation
24/08/2015Fortescue's full year results stengthen operating position
24/08/2015Appendix 4G Key to Disclosures
23/08/20152015 Annual Report
20/08/2015Revised Securities Trading Policy
18/08/2015Media speculation regarding potential asset sale
18/08/2015Appendix 3Y Change of Director's Interest
06/08/2015COLUMN-Why Chevron, Adani, Fortescue show commodity mega-pro...
05/08/2015Response to media speculation regarding potential asset sale
23/07/2015June 2015 Quarterly Report
19/06/2015Traditional Owner Joint Venture awarded $85 million Fortescu...
26/05/2015Fortescue soars on Chinese investment rumours
21/05/2015Australian government rejects iron ore inquiry
23/04/2015Fortescue bond trades up massively in secondary market
23/04/2015Fortescue pays up to get $2.3 bln bond over the line
23/04/2015Fortescue Issues US$2,300 million of Senior Secured Notes
22/04/2015Fortescue Bond Offering In Response to Strong Capital Market
22/04/2015Launch of High Yield Bond Offering
21/04/2015Fortescue CEO hands over the reins for a day
16/04/2015March 2015 Quarterly Report
13/04/2015Organisational review leads to roster changes
27/03/2015Fortescue sponsors Boao Forum for Asia for the seventh conse...
27/03/2015Applications open for Fortescue Community Support program
25/03/2015Fortescue: Fix you
25/03/2015Fortescue call for iron ore output cap sparks regulator revi...
25/03/2015Iron ore production by Australian exporters
23/03/2015PRESS DIGEST - Wall Street Journal - March 23
19/03/2015Fortescue Refinancing Update
19/03/2015Fortescue Announces Termination With Respect To Its Invitati...
17/02/2015Steeling Fortescue for the New Normal
16/02/2015Appointment of Company Secretary
16/02/2015FY15 Half Year Results Corporate Presentation
20/02/2013HY2013 Results Presentation
20/02/2013HY2013 Results and Appendix 4D
08/01/2013Response to Platts article
14/11/20122012 AGM Presentation
22/12/20112011 Roundup
09/12/2011VTEC Graduation in Roebourne
25/11/2011WA Registrar of Aboriginal Sites Visits Solomon
30/09/2011News Release
22/07/2010escalates its objection to MRRT
16/05/2008Fortescue proudly announces the loading of its first ship at...
15/05/2008FIRST ORE ON SHIP
28/04/2008Monthly Construction Report - March 2008
20/11/2007Lodgement of Note Holder Monthly Report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (FMG.AX)FRANKFURT (FVJ.F)
24,52-2.33%14,90-1.23%
AUSTRALIA
AU$ 24,52
19/04 15:54 -0,590
-2,33%
Cours préc. Ouverture
25,10 24,88
Bas haut
24,04 25,03
Année b/h Var. YTD
23,69 -  29,88 -16,57%
52 sem. b/h var. 52 sem.
19,00 -  29,88 8,40%
Volume var. 1 mois
6 092 428 -0,929%
24hGold TrendPower© : 47
Produit
Développe Iron
Recherche Iron
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
202417,10%
20232,07%23,8718,91
20226,77%22,9914,50
2021-18,01%26,5813,91
2020113,00%9,9410,12
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,20 US$+1,45%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX+2,59%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,46 CA$-2,38%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,84 CA$-1,31%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,82 CA$-4,21%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,80 US$+0,72%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :