June Quarter Activities Report and Appendix 5b

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Cash | Nickel |

June Quarter Activities Report and Appendix 5b

9ea3d2e9-ac48-48ab-a6a8-966e47f9a00e.pdf

QUARTERLY REPORT

June 2016

Highlights

  • Devon Mine current mining phase nearing completion.

  • Repayment of Standby Finance Facility - GME now debt free.

  • Review of other gold assets underway - see post quarter event.

  • $1.5 million Cash in the bank at the end of the quarter after paying back the Standby Funding Facility.

  • Post the end of the Quarter, GME has entered into an agreement with Zeta Resources Ltd (Zeta, ASX:ZER) on the Murrin Murrin Project located within the highly prospective North-Eastern Goldfields of Western Australia.

  • Murrin Murrin contains a JORC 2012 (547Kt @ 3.12 g/t Au for 54,875 ounces) indicated gold resource. (Refer - Zeta ASX announcement 22 January 2014)

Production Devon Gold Mine

Steady progress has been made over the last quarter. To date, approximately 75% of the total volume (450,000 bank cubic metres - inclusive of waste & ore) has now been mined. Four batches of ore totalling 28,100 wet tonnes (42% of total ore) have been processed through the Saracen's Carosue Dam processing facility.

Sale of gold ore from Batches 1 through 4 have been finalised. The gold price applicable to respective ore sales is determined by the monthly average price as set by the DMP mineral royalties division. The average gold price for the months of April and May were AUD$1620.46 and AUD$1721.36 respectively. Funds from these sales have been received and are included in the financial results reported for the quarter and reflect the positive influence that the Devon mining operation is having on the Company.

By the end of the current quarter significant waste material had been removed from the western wall of the pit down to the main pit floor currently at 23.5 metres below surface (i.e. 374 mRL). For the remainder of the campaign at Devon the strip ratio has reduced significantly allowing access to the remaining higher grade ore and the further development of the pit to its maximum depth of 45 metres.

At the end of June approximately 55,000 BCM's (roughly 148,570 tonnes) in total remain to be mined from the pit and includes a forecasted 25,000 wet tonnes of high grade ore averaging 6.3 g/t.

Mining of the Devon pit is expected to be completed by mid August with all ore planned to be processed by the end of the September Quarter.

At the end of the quarter four batches of ore have been processed at Saracen's Carosue Dam processing plant. A total of 26,300 dry tonnes have been treated - the final agreed tonnes and grade of the individual batches are listed below: -

Batch 1 - 5,832 dry tonnes averaging 4.14 g/t April - Gold Sale Price $1621.46 Batch 2 - 9,633 dry tonnes averaging 3.61 g/t April - Gold Sale Price $1621.46 Batch 3 - 6,244 dry tonnes - averaging 6.26 g/t May-- Gold Sale Price $1721.36 Batch 4 - 4,579 dry tonnes - averaging 6.43 g/t May - Gold Sale Price $1721.36

Processing recoveries, determined from metallurgical testwork minus a processor's deduction, for ore batches have been extremely good ranging from 90.1 to 94.2%.

Figure 1. Batch 5 being built at Devon ready for transport and processing in July through the Carosue Dam Processing Facility.

The photograph below (Figure 2) shows the Devon pit as it was at the end of June 2016. The view is of the Southern Pit looking south and shows the pit floor approximately 23.5 metres below surface at the 374 mRL. Pleasingly, the mining operation has progressed as expected and pit shapes are in line with designs. The ore block model has also performed according to expectation indicating that the time and effort spent drilling and modelling the deposit has removed significant risk during the economic valuation and mining phases of the project.

Figure 2. The Devon Southern pit looking south as it was at the end of June 2016.

Mining progress is timely and costs are running on budget. Further updates will be provided as the development progresses.

As per the announcement made by GME on the 27 June 2016, the Company is pleased to confirm that the Company has now repaid the $1.5 million Standby Funding Facility provided by Zeta Resources Ltd (Refer ASX announcement 17 March 2016) for the development of the Devon Gold Mine.

The Company is now debt free and has sufficient working capital to fund the project through to completion.

Review of Gold Assets

GME has commenced reviewing the potential of its gold prospects outside of Devon, in particular within the, Abednego, Laverton Downs Project and Hawks Nest areas. In addition to current Project areas GME will also be pursuing other opportunities within the North-eastern Goldfields of WA. Post the end of the quarter, GME has entered into an agreement with Zeta Resources, the detail of which can be found under the Post Quarterly Event Section of this report.

NiWest Nickel Laterite Heap Leach Project

Metallurgical test work on the development of the flow sheet for NiWest Nickel Laterite Heap Leach- SX-EW project is currently on hold as an austerity measure. On completion of the Devon Gold Project the Company will be well funded and will undertake a review of all options to progress the flow sheet development for NiWest.

Post Quarterly Event

On 14 July 2016 GME announced that it had entered into a binding term sheet for the purpose of entering into a Joint Venture Agreement with Zeta Resources Ltd (Zeta, ASX:ZER) on the Murrin Murrin Project located within the highly prospective North-Eastern Goldfields of Western Australia. The binding Term Sheet was executed by Golden Cliffs NL (GCNL) a 100% owned subsidiary of GME and Kumarina Resources Pty Ltd (KMR) a 100% own subsidiary of Zeta.

The key terms include:-

  1. GCNL will fund $1.5 million dollars in exploration and development costs to earn a 50

    % interest in the Murrin Murrin Project within 24 months of date of agreement.

  2. GCNL can elect to withdraw from the Earn In at any time, provided it has spent at least

    $250,000 on exploration and development.

  3. On completion of the Earn In, both GCNL and KMR agree to enter into a 50:50 Joint Venture to further develop the project.

  4. GCNL will be Manager of the Project and will manage the Joint Venture in accordance with the Joint Venture Committee directions.

  5. On and from the Commencement of the Joint Venture the Parties will contribute to expenditure on the Project in proportion to their joint venture interest. A dilution formula applies if either party does not contribute.

Lire la suite de l'article sur www.publicnow.com

GME Resources Ltd

PRODUCTEUR
CODE : GME.AX
ISIN : AU000000GME7
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

GME Resources est une société de production minière de nickel basée en Australie.

GME Resources est productrice de nickel, de cobalt en Australie, en développement de projets de cobalt et de nickel en Australie, et détient divers projets d'exploration en Australie.

Ses principaux projets en production sont MURRIN NORTH, HEPI et MURRIN MURRIN en Australie, ses principaux projets en développement sont MT KILKENNY et MACEY HILL en Australie et ses principaux projets en exploration sont WANBANNA, NIWEST, WAITE KAURI, MERTONDALE, EUCALYPTUS, LINDEN, ILGARARI et BINDAH en Australie.

GME Resources est cotée en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 46,4 millions AU$ (33,5 millions US$, 30,9 millions €).

La valeur de son action a atteint son plus bas niveau récent le 27 juin 2003 à 0,01 AU$, et son plus haut niveau récent le 18 mai 2007 à 1,12 AU$.

GME Resources possède 463 600 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Projets de GME Resources Ltd
04/09/2008(Murrin North)Wanbanna and Murrin North RC drill programme delivers result...
10/07/2008(Hepi)Hepi Grade Control Drilling Delivers High Nickel Grades and ...
19/06/2008(Hepi) Acquires the Major Components for its Hepi Heap Leach Demon...
21/04/2008(Niwest)ANNOUNCES EXPANDED NICKEL DEVELOPMENT
Communiqués de Presse de GME Resources Ltd
25/07/2016June Quarter Activities Report and Appendix 5b
14/07/2016GME Expands North Eastern Goldfields Gold Assets
28/06/2016Standby Funding Facility Repaid and Devon Gold Mine Update
27/06/2016Standby Funding Facility Repaid and Devon Gold Mine Update
26/05/2016Devon Gold Mine Progress Update
12/04/2016First Ore Parcel Processed from Devon Gold Mine
01/04/2015Drilling results - Fairfield Gold Prospect
28/01/2015NiWest Nickel Laterite Project - Key Process Patents Granted
21/10/2014Notice of Annual General Meeting and Explanatory Statement
31/07/2008June 2008 Quarterly Activities Report
30/04/2008 March 2008 Quarterly Activity Report
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (GME.AX)BERLIN (GM9.BE)
0,100+5.26%0,053+1.92%
AUSTRALIA
AU$ 0,100
28/03 11:00 0,010
5,26%
Cours préc. Ouverture
0,095 0,099
Bas haut
0,099 0,100
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,100 -%
Volume var. 1 mois
100 000 -%
24hGold TrendPower© : 44
Produit Cobalt - Nickel
Développe Cobalt - Nickel
Recherche Cobalt - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 11/01/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20240,00%
20239,89%0,120,08
202240,00%0,150,06
202130,00%0,130,05
2020-16,67%0,060,03
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :