Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Heron Resources Ltd

Publié le 08 décembre 2014

Kate Lens Delivers Highest Grade Intercept 26% Zn+Pb + 2% Cu Over 12.3m

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Copper | Nickel | Precious Metals | Zinc |

Kate Lens Delivers Highest Grade Intercept 26% Zn+Pb + 2% Cu Over 12.3m

Untitled Document

Kate Lens Delivers Highest Grade Intercept – 26% Zn+Pb + 2% Cu Over 12.3m

Assay Results (Kate Lens):

WNDD0007: 12.3m @ 20.0% Zn, 2.1% Cu, 6.1% Pb, 0.8g/t Au & 53g/t Ag from 414m
WNDD0007: 2.4m @ 20.1% Zn, 1.6% Cu, 4.2% Pb, 2.1g/t Au & 40g/t Ag from 435m


New Significant Intercepts:


WNDD0009: 7.3m of massive to semi-massive sulphides from 309m (Kate Lens)
WNDD0009: 2.0m of chalcopyrite stringer sulphides from 198m (H Lens)
WNDD0009: 3.45m of massive and semi-massive sulphides from 202.8m (H Lens)
WNDD0010: 2.4m of chalcopyrite stringer sulphides from 205.5m (H Lens)


SYDNEY, AUSTRALIA / ACCESSWIRE / December 7, 2014 / Heron Resources Limited (ASX:HRR, TSX:HER) ("Heron" or the "Company") is pleased to report the receipt of the highest grade intercept recorded for Kate Lens since its discovery at the Company’s 100% owned Woodlawn Zinc-Copper Project in New South Wales. In addition, a number of other significant sulphide intercepts have been recorded along the southern boundary of the modelled Kate Lens EM plate conductor and on the edges of the H Lens.

Assay Results:
Assay results for diamond hole WNDD0007, Kate Lens, have been received and recorded two very high grade massive sulphide intercepts locate approximately 30m south-east (up-plunge) from WLTD015, the initial discovery hole (Figure 1). The grades reported over the full intercept width represent the highest zinc grades recorded from this lens since its discovery.

The results from WNDD0007 add to the existing intercepts received for the Kate lens including:

- WNDD0007: 12.3m grading 20.0% Zn, 2.1% Cu, 6.1% Pb, 0.8g/t Au & 53g/t Ag from 414m downhole;
- WNDD0007: 2.4m grading 20.1% Zn, 1.6% Cu, 4.2% Pb, 2.1g/t Au & 40g/t Ag from 435m downhole;
- WNDD0001: 14.4m grading 4.6% Zn, 4.1% Cu, 0.8% Pb, 1.0g/t Au and 57g/t Ag from 374m downhole (previously reported);
- WNDD0002: 8.8m grading 12.6% Zn, 1.6% Cu, 7.5% Pb, 2.3g/t Au and 152g/t Ag from 374m downhole (previously reported);
- WNDD0002: 2.3m grading 12.0% Zn, 0.6% Cu, 5.4% Pb, 1.3g/t Au and 116g/t Ag from 368m downhole (previously reported);
- WLTD015: 32.0m grading 4.6% Zn,1.8% Cu, 1.2% Pb, 0.6g/t Au and 21g/t Ag from 376m downhole;
Incl. 9.0m grading 16.1% Zn, 2.0% Cu, 4.0% Pb, 0.8g/t Au and 52g/t Ag (previously reported)

In addition to the assay results received for Kate lens, the 2014 drilling program has also returned from other lenses:

- WNDD0002: 1.5m grading 6.5% Zn, 1.4% Cu, 2.0% Pb, 1.2g/t Au, 66g/t Ag from 217m downhole (H Lens)
- WDRC0010: 8.0m grading 3.6% Zn, 1.3% Cu, 2.6% Pb, 1.0g/t Au, 65g/t Ag from 37m downhole (G Lens)

Full details of the intercepts drilled and assayed to date are provided in Tables 1 and 2 at the end of this report.

Figure 1 Long-section looking east for the Kate Lens showing recent drilling and modelled DHEM plate


To view the graphic in its original size, please click here

New Intercepts:
The current drilling program has been successful in intersecting significant Woodlawn style massive sulphides in multiple lenses. Two further intercepts into the Kate Lens have been recorded in holes WNDD0009 and WNDD0010 with these two holes being located on the southern boundary of the modelled Kate Lens EM plate conductor, defined by previous drilling to the north. These two holes will provide a valuable platform for further downhole EM survey work to provide important information on the southern extension of the Kate Lens plus also potentially identify new lens positions stratigraphically below the Kate Lens.

As noted in previous drilling updates, the 2014 drilling program at Woodlawn has been very successful in intersecting massive sulphides across multiple lenses. Significant intercepts recorded but assays not yet available include:

- WNDD0009: 7.3 metres of massive to semi-massive sulphides from 309 metres (Kate Lens)
- WNDD0010: 12.5 metres of pyrite stringers & semi-massive sulphides from 354 metres (Kate Lens edge weakly mineralised)
- WNDD0009: 2.0m of chalcopyrite stringer sulphides from 198m (H Lens)
- WNDD0009: 3.45m of massive and semi-massive sulphides from 203m (H Lens)
- WNDD0010: 2.4m of chalcopyrite stringer sulphides from 206m (H Lens)
- WNDD0006: 5.0 metres of massive sulphides from 625 metres (I Lens) (previously reported)
- WNDD0006: 3.0 metres of massive sulphides from 664 metres (New Lens) (previously reported)
- WNDD0006: 9.8 metres of massive sulphides from 699 metres (New I2 Lens) (previously reported)
- WNDD0008: 6.6 metres of massive sulphides from 434 metres (Kate Lens) (previously reported)

The Company is extremely pleased with the progress achieved to date with the 2014 drilling program. The results and data collected continues to provide strong support for defining further extensions to the known mineralised positions along with improving the discovery potential for new lenses.

About Heron Resources Limited:
Heron is engaged in the exploration and development of base and precious metal deposits in Australia. Heron’s projects include the high grade Woodlawn Zinc-Copper Project located 250km southwest of Sydney, New South Wales, and the Kalgoorlie Nickel Project located north of Kalgoorlie, Western Australia. In addition the Company holds a number of other high quality exploration properties located in the Lachlan Fold Belt, New South Wales.

For further information, please visit www.heronresources.com.au or contact:

Australia:
Mr Wayne Taylor
Managing Director and Chief Executive Officer:
Tel: +61 8 9215 4444
Email: heron@heronresources.com.au

Canada:
Tel: +1 905 727 8688 (Toronto)

Technical Information:
Table 1 Drill hole details for diamond drill holes relevant to this update (earlier holes reported previously)

Hole No

WMG East (m)

WMG North (m)

WMG RL (m)

Surface Dip

WMG Surface Azimuth

Depth (m)

Target

WNDD0001

8,995

19,402

2,793

-65.0

88.0

425.5

Kate Lens

WNDD0002

9,011

19,400

2,793

-58.2

95.1

434.5

Kate Lens

WNDD0003

8,996

19,402

2,793

-71.1

88.8

463.2

Kate Lens

WNDD0004

8,977

19,637

2,786

-70.4

86.0

272.5

I Lens (up-dip)

WNDD0005

8,976

19,638

2,787

-65.3

78.7

263.6

I Lens (up-dip)

WNDD0006

8,548

19,749

2,787

-70.0

96.8

95.2

I/I2/D Lens (down-dip)

WNDD0007

8,997

19,350

2,792

-60.0

91.0

580.6

Kate Lens

WNDD0008

8,969

19,353

2,791

-68.1

88.6

469.1

Kate Lens

WNDD0009

9,155

19,342

2,793

-76.9

80.9

480.2

H Lens & Kate Lens

WNDD0010

9,151

19,302

2,791

-78.6

80.2

377.0

H Lens & Kate Lens

WNDD0011

8,995

19,402

2,793

-65.0

80.5

44.0 (in progress)

Kate Lens

Notes: WMG = Woodlawn Mine Grid

Table 2 Details of massive sulphide intercepts and reported grades from current Heron campaign

Hole No

From (m)

To (m)

Downhole Width (m)

Estimated True Width (m)

Zn (%)

Cu (%)

Pb (%

Au (g/t)

Ag (g/t)

WNDD0001

373.6

388.0

14.4

11.5

4.6

4.1

0.8

1.0

56.8

WNDD0002

368.0

370.3

2.3

1.9

12.0

0.6

5.4

1.3

116

WNDD0002

374.0

382.7

8.8

7.2

12.6

1.6

7.5

2.3

152

WNDD0007

414.3

426.6

12.3

9.8

20.1

2.1

6.1

0.8

52.9

WNDD0007

434.7

437.1

2.4

1.9

20.1

4.4

4.4

1.6

39.7

WNRC0010

37.0

45.0

8

6.4

3.6

1.3

2.6

1.0

65.4

Notes: True width is an estimate of the actual thickness of the intercept based on interpreted lens orientation (approximately 80% of downhole width); grades are weighted average grades, weighted by length of samples intervals downhole, which are nominally 1 metre. No weighting was applied for differences in specific gravity.

Compliance Statement (JORC 2012 and NI43-101)
The technical information in this news release relating to the exploration results at the Woodlawn Project is based on information compiled by Mr Rod Arnold, who is a Member of the Australian Institute of Geoscientists. Mr Arnold is a full time employee of Heron Resources Limited and has sufficient experience, which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results and "qualified person" as this term is defined in Canadian National Instrument 43-101 ("NI 43-101"). Mr Arnold has reviewed this press release and consents to the inclusion in this news release of the information in the form and context in which it appears.

CAUTIONARY NOTE REGARDING FORWARD-LOOKING INFORMATION
This news release contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities laws, which are based on expectations, estimates and projections as of the date of this news release. This forward-looking information includes, or may be based upon, without limitation, estimates, forecasts and statements as to management’s expectations with respect to, among other things, the timing and amount of funding required to execute the Company’s exploration, development and business plans, capital and exploration expenditures, the effect on the Company of any changes to existing legislation or policy, government regulation of mining operations, the length of time required to obtain permits, certifications and approvals, the success of exploration, development and mining activities, the geology of the Company’s properties, environmental risks, the availability of labour, the focus of the Company in the future, demand and market outlook for precious metals and the prices thereof, progress in development of mineral properties, the Company’s ability to raise funding privately or on a public market in the future, the Company’s future growth, results of operations, performance, and business prospects and opportunities. Wherever possible, words such as “anticipate”, “believe”, “expect”, “intend”, “may” and similar expressions have been used to identify such forward-looking information. Forward-looking information is based on the opinions and estimates of management at the date the information is given, and on information available to management at such time. Forward-looking information involves significant risks, uncertainties, assumptions and other factors that could cause actual results, performance or achievements to differ materially from the results discussed or implied in the forward-looking information. These factors, including, but not limited to, fluctuations in currency markets, fluctuations in commodity prices, the ability of the Company to access sufficient capital on favourable terms or at all, changes in national and local government legislation, taxation, controls, regulations, political or economic developments in Canada, Australia or other countries in which the Company does business or may carry on business in the future, operational or technical difficulties in connection with exploration or development activities, employee relations, the speculative nature of mineral exploration and development, obtaining necessary licenses and permits, diminishing quantities and grades of mineral reserves, contests over title to properties, especially title to undeveloped properties, the inherent risks involved in the exploration and development of mineral properties, the uncertainties involved in interpreting drill results and other geological data, environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins and flooding, limitations of insurance coverage and the possibility of project cost overruns or unanticipated costs and expenses, and should be considered carefully. Many of these uncertainties and contingencies can affect the Company’s actual results and could cause actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, the Company. Prospective investors should not place undue reliance on any forward-looking information. Although the forward-looking information contained in this news release is based upon what management believes, or believed at the time, to be reasonable assumptions, the Company cannot assure prospective purchasers that actual results will be consistent with such forward-looking information, as there may be other factors that cause results not to be as anticipated, estimated or intended, and neither the Company nor any other person assumes responsibility for the accuracy and completeness of any such forward-looking information. The Company does not undertake, and assumes no obligation, to update or revise any such forward-looking statements or forward-looking information contained herein to reflect new events or circumstances, except as may be required by law.


No stock exchange, regulation services provider, securities commission or other regulatory authority has approved or disapproved the information contained in this news release.

Appendix 1 – JORC 2012 Table 1

Section 1: Sampling Techniques and Data

(Criteria in this section applies to all succeeding sections)

Criteria

JORC Code explanation

Commentary

Sampling techniques

  • Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.
  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.
  • Aspects of the determination of mineralisation that are Material to the Public Report.
  • Samples from the diamond-core holes are being taken from mostly NQ sized core (with a small proportion of HQ sized core), and sampled on a nominal 1 metre basis taking into account smaller sample intervals up to geological contacts. The core is cut in half along the core orientation line (where available) and then one portion is quartered for assaying, the half core is preserved for metallurgical testing and the remaining quarter is retained as reference material in the core trays.
  • Samples from the RC holes are being produced from a 4.5 inch sized bit and sampled on an initial 4 metre down-hole composite basis, with zones of mineralisation being samples over 1 metre intervals. The 4 metre composites are taken via a spear method into the plastic sample bags, while the 1 metre samples are split via a riffle splitter.
  • These sampling methods are standard industry methods and are believed to provide acceptably representative samples for the type of mineralisation likely to be encountered.

Drilling techniques

  • Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details.
  • Diamond-core drilling is being undertaken by a McCulloch DR800 rig with HQ sized core being drilled to approximately between 80-200m before switching to NQ size. Various techniques are employed to ensure the hole is kept within limits of the planned position. The core is laid out in standard cores trays.
  • The RC drilling has been undertaken by a Schramm T450WSI rig that is drilling a 4.5 inch hole with face sampling hammer. A booster and auxiliary compressor is used to increase the volume and pressure of air. The 1 metre samples are fed through a cyclone and riffle splitter before passing into green plastic bags which are laid out in rows on the ground. A dust suppression system is in use.

Drill sample recovery

  • Method of recording and assessing core and chip sample recoveries and results assessed.
  • The core is transported to an enclosed core logging area and recoveries are recorded. Recoveries to date have been better than 95%. The core is orientated and marked with 1 metre downhole intervals for sampling.
  • The recoveries for the RC drilling are also recorded and have mostly been 100%.

Logging

  • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.
  • Both diamond core and RC holes are fully geologically logged by geologists. Geotechnical logging is also being undertaken on selected sections of the core. Samples for metallurgical testing are being kept in a freezer to reduce oxidation prior to being transported to the metallurgical laboratory.

Sub-sampling techniques and sample preparation

  • For all sample types, the nature, quality and appropriateness of the sample preparation technique.
  • All core samples are crushed then pulverised in a ring pulveriser (LM5) to a nominal 90% passing 75 micron. An approximately 250g pulp sub-sample is taken from the large sample and residual material stored.
  • A quartz flush (approximately 0.5 kilogram of white, medium-grained sand) is put through the LM5 pulveriser prior to each new batch of samples. A number of quartz flushes are also put through the pulveriser after each massive sulphide sample to ensure the bowl is clean prior to the next sample being processed. A selection of this pulverised quartz flush material is then analysed and reported by the lab to gauge the potential level of contamination that may be carried through from one sample to the next.
  • The RC samples are pulverised directly in the LM5 ring pulveriser with the same quartz flush procedure as above.

Quality of assay data and laboratory tests

  • The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.
  • Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.
  • Sample preparation and assaying was conducted through ALS Laboratories, Orange, NSW with certain final analysis of pulps being undertaken at the ALS Laboratory in Brisbane QLD.
  • Gold is determined by 30g fire assay fusion with ICP-AES analysis to 1ppb LLD.
  • Other elements by mixed acid digestion followed by ICP-AES analysis.
  • Laboratory quality control standards (blanks, standards and duplicates) are inserted at a rate of 5 per 35 samples for ICP work.

Verification of sampling and assaying

  • The verification of significant intersections by either independent or alternative company personnel.
  • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.
  • Discuss any adjustment to assay data.
  • An internal review of results was undertaken by company personnel. No independent verification was undertaken at this stage.
  • All field and laboratory data has been entered into an industry standard database using a contract database administrator (DBA) in the Company’s Perth office. Validation of both the field and laboratory data is undertaken prior to final acceptance and reporting of the data.
  • Quality control samples from both the Company and the Laboratory are assessed by the DBA and reported to the Company geologists for verification. All assay data must pass this data verification and quality control process before being reported.

Location of data points

  • Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.
  • The drill collars were initially located with a combination of handheld GPS and licenced surveyor using a DGPS system, with accuracy of about 1m. The final drill collars are “picked up” by a licenced surveyor.

Data spacing and distribution

  • Data spacing for reporting of Exploration Results.
  • Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.
  • Whether sample compositing has been applied.
  • The diamond drilling is mostly following-up in various directions from previous intercepts with a nominal intercept spacing of no less than 40m. This drill hole spacing will be sufficient to provide Mineral Resource estimates in the future.

Orientation of data in relation to geological structure

  • Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.
  • The drilling orientation is designed to intersect the mineralised lenses at a close to perpendicular angle. The mineralised lenses are dipping at approximately 50-70 degrees to the west and the drilling is approximately at 60 degrees to the east. This will vary from hole to hole.

Sample security

  • The measures taken to ensure sample security.
  • Samples are being secured in green plastic bags and are being transported to the ALS laboratory in Orange, NSW via a courier service or with Company personnel.

Audits or reviews

  • The results of any audits or reviews of sampling techniques and data.
  • A review and assessment of the laboratory procedures was under taken by company personnel resulting in some changes to their sample pulverising procedure.


Section 2: Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

  • Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.
  • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.
  • The Woodlawn project is located 250km south-west of Sydney in the state of New South Wales. The area is near the top of the Great Australian Dividing range and has an elevation around 800m above sea-level. The mineral and mining rights to the project are owned 100% by the Company through the granted, special mining lease 20 (SML20). The lease is completing its second 21 year term on the 16 November 2014 and the Company has applied for an extension of this term for a further 21 years. The Company is not aware of any reason why SML20 will not be renewed.
  • The project area is on private land owned by Veolia who operate a waste disposal facility that utilises the historical open-pit void. An agreement is in place with Veolia for the Company to purchase certain sections of this private land to facilitate future mining and processing activities. A cooperation agreement is also in place between Veolia and the Company that covers drilling and other exploration activities in the area.

Exploration done by other parties

  • Acknowledgment and appraisal of exploration by other parties.
  • The Woodlawn deposit was discovered by the Jododex JV in 1970 and open-pit mining began in 1978 and continued through to 1987. The project was bought outright by Rio Tinto (CRA) in 1984 who completed the open-pit mining. Underground operations commenced in 1986 and the project was sold to Denehurst Ltd in 1987 who continued underground mining up until 1998. The mineral rights to the project were then acquired by TriAusMin Ltd in 1999 who conducted further studies on a tailings re-treatment and revived underground operation. Heron took 100% ownership of the project in August 2014 following the merger of the two companies. Some 980 surface and underground drillholes have been completed on the project to date and several studies undertaken.

Geology

  • Deposit type, geological setting and style of mineralization.
  • The Woodlawn deposit comprises volcanogenic massive sulphide mineralisation consisting of stratabound lenses of pyrite, sphalerite, galena and chalcopyrite. The mineralisation is hosted in the Silurian aged Woodlawn Felsic Volcanic package of the Goulburn sub-basin on the eastern side of the Lachlan Fold Belt.

Drill hole Information

  • A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:
    • easting and northing of the drill hole collar
    • elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
    • dip and azimuth of the hole
    • down hole length and interception depth
    • hole length.
  • A table detailing the drill hole information is given in the body of the report.

Data aggregation methods

  • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.
  • Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.
  • The reported assays are weighted for their assay interval width. The majority of the assay interval widths are 1 metre, but this weighting does take into account the non 1 metre intervals and weights the average assay results accordingly.
  • For the results reported here no weighting was included for specific gravity measurements that have been taken for all sample intervals. This is because the recorded specifics gravities were all consistently around the 3.9 - 4.5 level.

Relationship between mineralization widths and intercept lengths

  • These relationships are particularly important in the reporting of Exploration Results.
  • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.
  • The massive sulphide zone intercepted in the drilling to date is at an angle to the drill axis and therefore the true width is estimated to be some 0.8 of down-hole width. That is, a down-hole intercept of 16m equates to a true width of 12m. This is only an approximation at this stage and will be better estimated as the orientation of the lenses is better defined.

Diagrams

  • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.
  • A long-section showing the hole positions relevant for current phase of exploration is included in the release. Other maps and diagrams showing the location of the Woodlawn Project are included in other recent Company releases.

Balanced reporting

  • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.
  • The reporting is considered to be balanced and all relevant results have been disclosed for this current phase of exploration.

Other substantive exploration data

  • Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.
  • There is no other substantive exploration data that has been generated for inclusion in this report.
  • The drillholes are being cased with either 40 or 50 millimetre PVC tubing for down-hole EM surveying.

Further work

  • The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).
  • The drilling program is ongoing at the Woodlawn Project and a systematic program is planned to test the up-dip and down-dip extensions to a number of the known ore lenses.

To view this press release as a PDF file, click onto the following link:
public://news_release_pdf/HeronDec72014.pdf

Source: Heron Resources Limited


Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Heron Resources Ltd

EXPLORATEUR
CODE : HRR.AX
ISIN : AU000000HRR6
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Heron Res. est une société développant des projet miniers de nickel et de cobalt basée en Australie.

Heron Res. détient divers projets d'exploration en Australie.

Ses principaux projets en exploration sont BIG FOUR HERON - GOONGARRIE, BIG FOUR - GOONGARRIE, SIBERIA NORTH, BULONG - MAIN, BULONG - EAST, HAMPTON (KNP PROJECT), BIG FOUR PLACER - GOONGARRIE, GOONGARRIE HILL - GOONGARRIE, GOONGARRIE SOUTH - GOONGARRIE, HIGHWAY - GOONGARRIE, SCOTIA - GOONGARRIE, JUMP-UP DAM, LAVERTON NICKEL et MT ZEPHYR en Australie.

Heron Res. est cotée en Australie. Sa capitalisation boursière aujourd'hui est 18,7 millions AU$ (13,5 millions US$, 12,6 millions €).

La valeur de son action a atteint son plus haut niveau récent le 13 avril 2007 à 1,47 AU$, et son plus bas niveau récent le 03 avril 2020 à 0,02 AU$.

Heron Res. possède 415 010 016 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports Financiers de Heron Resources Ltd
01/11/2016Heron Resources September 2016 Quarterly Report
Projets de Heron Resources Ltd
25/11/2015Woodlawn Phase II drilling program completed – High grade in...
05/09/2007IN-FILL DRILLING RESULTS JUMP-UP DAM PROJECT
Communiqués de Presse de Heron Resources Ltd
29/07/201629 Jul 2016: Quarterly Activities Report - June 2016
25/07/2016Heron lodges full Woodlawn Feasibility Study on SEDAR
14/07/2016Lapse and Cancellation of Unlisted Options
11/07/2016Ceasing to be a substantial holder for AYC
01/07/2016Project Update - Clarification
30/06/2016Project Update
28/06/2016ASX/TSX-Heron delivers robust Feasibility Study for Woodlawn...
28/06/2016Media-Heron delivers robust Feasibility Study for Woodlawn P...
28/06/2016TSX-Heron delivers Woodlawn Project Feasibility Study
06/06/2016Herons Woodlawn Zinc-Copper Project Feasibility Study is on ...
02/06/201601 Jun 2016: Cleansing Statement
31/05/201630 May 2016: Alchemy Signs Farm In Agreement over Projects i...
31/05/2016Farm-In Agreement with Alchemy Resources
02/02/2016Heron Resources Announces Quarterly Update on High Grade Woo...
01/02/2016Heron Resources Announces Quarterly Update on High Grade Woo...
28/01/2016Heron Resources December 2015 Quarterly Report
20/01/2016Lapse and Cancellation of Unlisted Options
22/12/2015High Grade Lisa Lens Intercept Completes the Phase II Drilli...
22/12/2015Heron's High Grade Lisa Lens Intercept Completes the Phase I...
03/12/2015Heron Constitution
01/12/2015Release of Woodlawn Retreatment Project Report (NI43-101)
01/12/2015Release of Woodlawn Retreatment Project 2015 Mineral Resourc...
25/11/2015Woodlawn Phase II Drilling Program Completed - High Grade In...
29/10/2015Unaudited Interim Financial Report for 3 months ended 30 Sep...
29/10/2015Management's Discussion and Analysis for 3 Months ended Sep ...
20/10/2015Heron Confirms 10Mt (M+I) of High Grade Tailings at 6.2% ZnE...
07/10/2015Woodlawn Drilling Update - 27.7m @ 23.4% ZnEq from 401m dept...
07/10/2015Heron Resources: Woodlawn Drilling Update: 27.7m at 23.4% Zn...
21/09/2015Kate Lens Definition Drilling continues to impress: 26.6m of...
21/09/2015Heron Resources Limited - Kate Lens Definition Drilling Cont...
09/09/2015Woodlawn Feasibility Study on Track
09/09/2015Heron Resources Announces Woodlawn Feasibility Study on Trac...
08/09/2015Appendix 3Y - Wayne Taylor
07/09/2015Appendix 3Y - Robertson
29/08/2015Annual Financial Report, MD&A and Quarterly Financial
29/08/2015Appendix 4G and Corporate Governance Statement
19/08/2015Heron Resources Appoints Mr. Mark Sawyer as Non-Executive Di...
17/08/2015Appendix 3B New issue announcement
17/08/2015Issue of Placement Shares - Sec 708A Cleansing Notice
17/08/2015Stage 1 Equity Funding Package of $6.8M Completed with Green...
17/08/2015Heron Resources Completes Stage 1 Equity Funding Package of ...
12/08/2015Woodlawn Zinc-Copper Project Fly-through released
12/08/2015Heron's Woodlawn Zinc-Copper Project Fly-Through Released
04/08/2015Wide Kate Lens Up-dip Intercept: 34.0m @ 20.8% ZnEq
24/07/2015Heron Announces Equity Funding Package of up to $20M with Gr...
21/07/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
20/07/2015Excellent Drilling Results Continue at Woodlawn - Kate Lens ...
06/07/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m @ 40.6...
06/07/2015Woodlawn Phase II Drilling Continues to Deliver: 7.1m at 40....
22/04/2015Preliminary Economic Assessment Delivers Strong Business Cas...
18/04/2015Unaudited Interim Financial Report for 3 and 9 months ended ...
18/04/2015Heron Management's Discussion and Analysis March 2015 Quarte...
13/04/2015Appendix 3X: Initial Director's Interest Notice
09/04/2015Heron appoints Non-Executive Director
08/04/2015Heron Appoints Non-Executive Director
13/03/2015Woodlawn Phase 1 Drilling Program Successfully Completed - O...
26/02/2015Woodlawn Mining Lease Renewed for 15 Years
18/02/2015Woodlawn Drilling Update - High Grade Results from new Lisa ...
13/02/2015Heron Half Year Financial Report
13/02/2015General Meeting Results
13/02/2015Management's Discussion and Analysis for 3 & 6 Months ended ...
10/02/2015Woodlawn Zinc Copper Project Successful Metallurgical Test W...
03/02/2015Woodlawn Drilling Update Further Shallow High-Grade Results
27/01/2015Advancing the Woodlawn Project
14/01/2015Woodlawn Drilling Update - G Lens Delivers Strong Results an...
22/12/2014Woodlawn High Grade Assays and New Massive Sulphide Intercep...
16/12/2014Appendix 3X Initial Director's Interest Notice
16/12/2014Notice of initial substantial holder
13/12/2014Notification of date of General Meeting
13/12/2014Update on Board Spill Meeting
08/12/2014Kate Lens Delivers Highest Grade Intercept 26% Zn+Pb + 2% Cu...
26/11/2014Appendix 3Y Change of Director's Interest Notice
24/11/2014Nominations to Heron Board - Section249N and 249P
21/11/2014Chairman's Response
21/11/2014Results of Meeting
01/12/2009A quarterly communication
12/06/2009Receipt of request to put resolutions at general meeting
23/11/2007And CVRD Inco Approve Program & Budget for KNP Pre Feasibili...
20/11/2007Completes placement
16/11/2007HERON COMPLETES SHARE PLACEMENT
17/09/2007Volume 2, Issue 2, September 2007
29/08/2007RESOURCE ESTIMATE BOYCE CREEK NICKEL LATERITE PROJECT
16/07/2007announces Mining Leases Granted for Jump up Dam Project
31/05/2007An announcement from Heron Resources
05/04/2007Completion of A$27.8 million share placement
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (HRR.AX)
0,045+0.00%
AUSTRALIA
AU$ 0,045
27/05 11:00 -
0%
Cours préc. Ouverture
0,045 0,045
Bas haut
0,045 0,045
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,045 -%
Volume var. 1 mois
0 -%
24hGold TrendPower© : -5
Produit
Développe
Recherche Cobalt - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 01/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
20220,00%0,050,05
2021-8,16%0,080,04
2020-48,96%0,110,02
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,26 US$+2,68%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,87%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,64 CA$-1,86%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,23 CA$+4,04%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+4,26%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,88 CA$+0,53%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,71 US$+0,19%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :