Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Lake Shore Gold Corporation

Publié le 30 juillet 2015

Lake Shore Gold Reports First Half and Second Quarter 2015 Financial and Operating Results

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Dollar | G Mexico |

Lake Shore Gold Reports First Half and Second Quarter 2015 Financial and Operating Results

X


07/30/2015

TORONTO, ONTARIO -- (Marketwired) -- 07/30/15 -- Lake Shore Gold Corp. (TSX:LSG)(NYSE MKT:LSG) ("Lake Shore Gold" or the "Company") today announced financial and operating results for the first half ("H1/15") and second quarter ("Q2/15") of 2015. Full details of the results are provided in the Company's Consolidated Financial Statements and Management's Discussion & Analysis, which are available on the Company's website at www.lsgold.com and on SEDAR at www.sedar.com.

A number of record half-year performances were achieved in H1/15, including:

  • Gold sales of 98,500 ounces (45,900 ounces in Q2/15)
  • Cash operating costs(1)of US$551 (based on production costs of $67.2 million (US$597 in Q2/15 based on production costs of $33.8 million)
  • All-in sustaining costs(2)of US$809 (US$877 in Q2/15)
  • Revenue of $146.6 million ($67.4 million in Q2/15)
  • Cash earnings from mine operations and earnings from mine operations of $79.6 million and $37.6 million, respectively ($33.7 million and $14.2 million in Q2/15)
  • Cash flows from operating activities of $62.3 million ($26.4 million in Q2/15)

Net earnings in H1/15 were $13.8 million or $0.03 per common share ($1.7 million or $0.00 per share in Q2/15). The Company generated solid cash flows and profitability in H1/15 at the same time that exploration expenditures increased $11.5 million compared to the first half of 2014 ("H1/14") mainly as a result of drilling success being achieved at the 144 Trend. During H1/15, drilling at the 144 Trend further extended the dimensions of the 144 Gap Zone and also resulted in the discovery of a second gold zone called the 144 Gap SW Zone. Finance expense in H1/15 declined $3.4 million from H1/14 as a result of further progress in reducing debt levels. On May 29, 2015, the Company completed the repayment of its senior secured debt. Cash and bullion(4) at July 29, 2015 totaled $83.8 million.

Tony Makuch, President and CEO of Lake Shore Gold, commented: "During H1/15, we had solid production and record performances in gold sales, unit costs and in a number of key financial measures. Based on our strong results, we have been able to increase our cash and bullion by 36% so far in 2015 at the same time as we have completed the repayment of our senior secured debt and significantly increased our commitment to exploration.

"Looking at exploration, 2015 has already been a very successful year. At the 144 Trend, we have continued to extend the dimensions of the 144 Gap Zone and have announced the discovery of a second significant gold zone, called the 144 Gap SW Zone. At Bell Creek, we more than doubled our reserve base earlier this year and, in May, announced a new underground exploration program to accelerate growth in reserves and resources and to help us evaluate the large resource base below the current reserve.

"Based on our strong first half, and our expectations for the second half of 2015 ("H2/15"), we are very well positioned to meet our revised guidance for 2015, including production of at least 180,000 ounces of gold at cash operating costs averaging better than US$650 per ounce sold and all-in sustaining costs below US$950 per ounce sold. Other catalysts over the remainder of 2015 will include additional drill results as we commence our underground exploration programs at both the 144 Trend and Bell Creek."

Consolidated Financial Information

Three months ended June 30, Six months ended June 30,

2015 2014 2015 2014
(in $'000, except the per share amounts)







Revenue $ 67,442 $ 75,091 $ 146,566 $ 136,550
Production costs $ 33,789 $ 32,732 $ 67,220 $ 62,405
Earnings from mine operations $ 14,205 $ 22,058 $ 37,550 $ 36,347
Net earnings $ 1,714 $ 12,907 $ 13,780 $ 17,494
Basic net income per share $ 0.00 $ 0.03 $ 0.03 $ 0.04
Cash flows from operating activities $ 26,399 $ 36,828 $ 62,254 $ 61,756

Key Performance Drivers

Three months ended June 30, Six months ended June 30,

2015 2014 2015 2014
Tonnes milled
327,100
309,800
627,000
593,600
Grade
4.2
5.4
4.9
5.3
Average mill recoveries
96.8%
96.6%
96.7%
96.6%
Ounces recovered
42,600
52,300
95,600
96,900
Ounces poured
44,400
53,500
96,400
99,200
Ounces sold
45,900
53,500
98,500
96,500
Average price (US$/oz) $ 1,197 $ 1,289 $ 1,208 $ 1,291
Average price ($/oz) $ 1,470 $ 1,404 $ 1,488 $ 1,416
Cash operating costs (US$/oz) $ 597 $ 560 $ 551 $ 588
Cash operating costs ($/oz) $ 734 $ 610 $ 680 $ 645
All - in sustaining costs (US$/oz) $ 877 $ 784 $ 809 $ 862
All - in sustaining costs ($/oz) $ 1,078 $ 854 $ 999 $ 946
Cash earnings from mine operations ($000s) $ 33,746 $ 42,460 $ 79,578 $ 74,341
Adjusted net earnings(5) ($000s) $ 554 $ 12,947 $ 11,656 $ 18,410
Adjusted net earnings per share ($/share) $ 0.00 $ 0.03 $ 0.03 $ 0.04

Outlook

The Company revised its full-year 2015 guidance on July 8, 2015. Production in 2015 is now expected to total at least 180,000 ounces, which compares to the previous guidance of between 170,000 and 180,000 ounces. Cash operating costs per ounce sold for the year are now targeted at below US$650 versus previous guidance of between US$650 and US$700, while all-in sustaining costs are targeted at under US$950 per ounce sold compared to the former target range of US$950 to US$1,000. The Company remains on track to mine and process approximately 1.3 million tonnes in 2015 at an average grade now expected to exceed the Company's full-year 2015 guidance of 4.4 grams per tonne.

2015 Targets
Revised 2015
Targets
Initial 2015
Targets
Q2/15
(Actual)
H1/15
(Actual)
Ounces produced (in thousands) 180.0 170.0 -180.0 42,600 95,600
Cash operating costs (US$/oz) 650 - 700 597 551
All-in sustaining costs (US$/oz) 950 - 1,000 877 809
Total production costs ($ millions) 125 125 33.8 67.2
Key Assumptions in Targets



Average gold price (US$/oz) 1,170 1,170 1,197 1,208
US$/C$ exchange rate (US$) 0.81 0.90 0.81 0.81

Exploration work at the 144 Trend is progressing on schedule, with the Company targeting an initial resource for the 144 Gap Zone for the end of 2015 (to be released in early 2016). Exploration expenditures in H2/15 at the 144 Trend are expected to total approximately $14.0 million, which will fund the completion of the exploration drift from Thunder Creek, approximately 40,000 metres of underground drilling into the 144 Gap Zone and approximately 55,000 metres of surface drilling. At Bell Creek, the Company will invest approximately $6.0 million during H2/15 to complete 32,500 metres of underground drilling and 800 metres of development as part of the new underground exploration program.

Conference Call

Lake Shore Gold will also host a conference call and webcast on Thursday, July 30, 2015 at 2:30 pm EST to discuss the Company's H1/15 and Q2/15 financial and operating results (see call-in numbers that follow). The call will also be webcast and available on the Company's website.

Conference ID: 88975669

Participant call-in: 647-788-4919 or 877-291-4570 (North American toll free number)

Replay number: 416-621-4642 or 800-585-8367 (North American toll free number)

Re-dial ID: 88975669

Available until: 11:59 pm (August 6, 2015)

Qualified Person

Scientific and technical information contained in this press release related to mine engineering and production has been reviewed and approved by Natasha Vaz, P.Eng., Vice-President, Technical Services, who is an employee of Lake Shore Gold Corp., and a "qualified person" as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Scientific and technical information related to resources, exploration drilling and all matters involving mine production geology contained in this press release, or source material for this press release, was reviewed and approved by Eric Kallio, P.Geo., Senior Vice-President, Exploration. Mr. Kallio is an employee of Lake Shore Gold Corp., and is a "qualified person" as defined by NI 43-101.

About Lake Shore Gold

Lake Shore Gold is a Canadian-based gold producer that is generating net free cash flow from its wholly owned operations in the Timmins Gold Camp. The Company produces gold from two mines, Timmins West and Bell Creek, with material being delivered for processing to the Bell Creek Mill. In addition to current operations, the Company also has a number of highly prospective projects and exploration targets, all located in and around the Timmins Camp. The Company's common shares trade on the TSX and NYSE MKT under the symbol LSG.

Footnotes


(1) Cash operating costs are disclosed on a per ounce sold basis. Cash operating costs and cash operating cost per ounce sold are Non-GAAP measures. In the gold mining industry, cash operating costs and cash operating costs per ounce are common performance measures but do not have any standardized meaning. Cash operating costs are derived from amounts included in the Consolidated Statements of Comprehensive Income (Loss) and include mine site operating costs such as mining, processing and administration as well as royalty expenses, but exclude depreciation, depletion and share-based payment expenses and reclamation costs. Cash operating costs per ounce are based on ounces sold and are calculated by dividing cash operating costs by commercial gold ounces sold; US$ cash operating costs per ounce sold are derived from the cash operating costs per ounce sold translated using the average Bank of Canada C$/US$ exchange rate for the period. The Company discloses cash operating costs and cash operating costs per ounce as it believes the measures provide valuable assistance to investors and analysts in evaluating the Company's operational performance and ability to generate cash flow. The most directly comparable measure prepared in accordance with GAAP is total production costs. A reconciliation of cash operating costs and cash operating cost per ounce to total production costs for the three and six months ended June 30, 2015 and 2014 is set out on page 19 of the Company's MD&A filed on SEDAR at www.sedar.com and at www.lsgold.com.




(2) All-in sustaining costs are disclosed on a per ounce sold basis. All-in sustaining costs and all-in sustaining cost per ounce sold are Non-GAAP measures. These measures are intended to assist readers in evaluating the total costs of producing gold from current operations. While there are no standardized meanings across the industry for these measures, the Company's definitions conform to the all-in sustaining costs definition as set out by the World Gold Council in its guidance note dated June 27, 2013. The Company defines all-in sustaining costs as the sum of production costs, sustaining capital (capital required to maintain current operations at existing levels), corporate general and administrative expenses, in-mine exploration expenses and reclamation cost accretion related to current operations. All-in sustaining costs exclude growth capital, growth exploration expenditures, reclamation cost accretion not related to current operations, interest expense, debt repayment and taxes. The costs included in the calculation of all-in sustaining costs are divided by commercial gold ounces sold to obtain the all-in sustaining cost per ounce; US$ all-in sustaining cost per ounce sold is translated using the average Bank of Canada C$/US$ exchange rate for the period. The most directly comparable measure prepared in accordance with GAAP is total production costs. A reconciliation of all-in sustaining cost to amounts included in the Consolidated Statements of Comprehensive Loss (Income) for the three and six months ended June 30, 2015 and 2014 is set out on page 20 of the Company's MD&A filed on SEDAR at www.sedar.com and at www.lsgold.com.




(3) Total production cost is the most directly comparable GAAP measure for both cash operating costs and all-in sustaining costs. Included in total production cost for the periods covered in this press release are non-cash share-based payment expense including: $0.2 million for the first six months of 2015 and 2014 and $0.1 million for the second quarter of 2015 and 2014. The calculation of cash operating cost per ounce sold and all-in sustaining cost per ounce sold exclude this non-cash payment expense.




(4) Bullion relates to gold poured in doré which has not yet been included in revenues and for which cash has not yet been received valued at market prices.




(5) Adjusted net earnings (loss) excludes impairment charges, other income/losses (which includes gains/losses and other costs incurred for acquisition and disposal of mining interests, unrealized and non-cash realized gains/losses on financial instruments) as well as significant non-cash non-recurring items. The Company also excludes the net (earnings) losses from the Company's investments in associates as well as write down/off of investments in associates. The Company excludes these items from net earnings (losses) to provide a measure which allows the Company and investors to evaluate the operating results of the core operations of the Company and its ability to generate operating cash flows to fund working capital requirements, future capital expenditures and service outstanding debt. A reconciliation of adjusted net earnings (loss) to net earnings (loss) for the three and six months ended June 30, 2015 and 2014 is set out starting on page 21 of the Company's MD&A filed on SEDAR at www.sedar.com and at www.lsgold.com.

FORWARD-LOOKING STATEMENTS

All statements, other than statements of historical fact, contained or incorporated by reference in this press release including, but not limited to, any information as to the future financial or operating performance of Lake Shore Gold Corp., constitute "forward-looking information" or "forward-looking statements" within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for "safe harbor" under the United States Private Securities Litigation Reform Act of 1995, and are based on expectations, estimates and projections as of the date of this press release or, in the case of documents incorporated by reference herein, as of the date of such documents. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in our other filings with the securities regulators of Canada and the SEC in the United States.

Other than as specifically required by law, the Company does not intend, and does not assume any obligation, to explain any material difference between subsequent actual events and such forward-looking statements, or to update any forward-looking statement to reflect events or circumstances after the date on which such statement is made or to reflect the occurrence of unanticipated events, whether as a result of new information, future events or results or otherwise. These forward-looking statements represent management's best judgment based on facts and assumptions that management considers reasonable, including that: there are no significant disruptions affecting operations, whether due to labour disruptions, supply disruptions, power disruptions, damage to equipment or otherwise; permitting, development, operations, expansion and acquisitions at the Timmins Gold Complex continue on a basis consistent with the Company's current expectations; permitting, development and operations at the Bell Creek Complex continue on a basis consistent with the Company's current expectations; the exchange rate between the Canadian dollar and the U.S. dollar stays approximately consistent with current levels; certain price assumptions for gold and silver hold true; prices for fuel, electricity and other key supplies remains consistent with current levels; production and cost of sales forecasts meet expectations; the accuracy of the Company's current mineral reserve and mineral resource estimates hold true; and labour and materials costs increase on a basis consistent with the Company's current expectations. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions.

Forward-looking statements include, but are not limited to, possible events, statements with respect to possible events, statements with respect to the future price of gold and other metals, the estimation of mineral resources and reserves, the realization of mineral reserve and resource estimates, the timing and amount of estimated future production, costs of production, expected capital expenditures, costs and timing of the development of new deposits, success of exploration and development activities, permitting time lines, currency fluctuations, requirements for additional capital, government regulation of exploration and mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, completion of acquisitions and their potential impact on the Company and its operations, limitations on insurance coverage and the timing and possible outcome of pending litigation. In certain cases, forward-looking statements can be identified by the use of words such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved".

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. As well as those factors discussed in the section entitled "Risk Factors" in this press release and the Company's most recently filed AIF, known and unknown risks which could cause actual results to differ materially from projections in forward-looking statements include, among others: fluctuations in the currency markets; fluctuations in the spot and forward price of gold or certain other commodities (such as diesel fuel and electricity); changes in interest rates; changes in national and local government legislation, taxation, controls, regulations and political or economic developments in Canada and Mexico or other countries in which the Company may carry on business in the future; business opportunities that may be presented to, or pursued by, the Company; the Company's ability to successfully integrate acquisitions; operating or technical difficulties in connection with mining or development activities; employee relations; the speculative nature of gold exploration and development, including the risks of obtaining necessary licenses and permits; diminishing quantities or grades of reserves; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks).

Although the Company has attempted to identify important factors (which it believes are reasonable) that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Source: Lake Shore Gold Corp.

Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Lake Shore Gold Corporation

PRODUCTEUR
CODE : LSG.TO
ISIN : CA5107281084
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Lake Shore Gold est une société de production minière d'or basée au Canada.

Lake Shore Gold détient divers projets d'exploration au Canada.

Son principal projet en production est TIMMINS MINE au Canada et ses principaux projets en exploration sont BELL CREEK, BLAKELOOK, THORNE, THUNDER CREEK, WEST TIMMINS et BAND ORE au Canada et LA BUFA, UNIVERSO, MONTAÑA DE ORO et LLUVIA DE ORO au Mexique.

Lake Shore Gold est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 956,5 millions CA$ (734,7 millions US$, 646,6 millions €).

La valeur de son action a atteint son plus bas niveau récent le 01 février 2002 à 0,02 CA$, et son plus haut niveau récent le 11 mars 2011 à 4,42 CA$.

Lake Shore Gold possède 463 220 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de Lake Shore Gold Corporation
28/02/2011Completes US$50 Million Corporate Revolving Credit Facility
28/07/2010Signs Term Sheet for Corporate Revolving Credit Facility of ...
16/02/2010Closing of Second Tranche of Flow-Through Financing
31/12/2009Announces Closing of First Tranche of Flow-Through Financing
04/12/2009Announces Closing of Private Placement Financing
19/02/2008 Announces Private Placement of $64.5 Million at 30% Premium...
Nominations de Lake Shore Gold Corporation
06/11/2013Lake Shore Gold Appoints Diane Francis to Board of Directors
19/03/2013Lake Shore Gold Announces Appointment of Philip C. Yee as Vi...
30/05/2008Announces Management Appointments
27/02/2007Appoints Hannu Virtanen as VP, Project Development
Rapports Financiers de Lake Shore Gold Corporation
03/12/2013Lake Shore Gold Produces 16,700 Ounces in November, Company ...
06/11/2013Lake Shore Gold Reports Lower Costs, Improved Grades and Hig...
24/06/2013Lake Shore Gold Reports Improving Operating Performance, Com...
15/05/2013Lake Shore Gold Reports First Quarter 2013 Results
09/08/2012Lake Shore Gold Reports Strong Second Quarter Results
12/01/2012Reports 2011 Operating Results, Pours 26,550 Ounces in Fourt...
10/08/2011Announces Second Quarter 201 =?ISO-8859-1?Q?1=20Financial=20...
26/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Results,=20In...
04/05/2011Announces First Quarter 2011 =?ISO-8859-1?Q?=20Production=20...
11/08/2010Continued Progress During Second Quarter 2010
15/05/2008Announces First Quarter 2008 Results
Projets de Lake Shore Gold Corporation
10/12/2013Lake Shore Gold Increases 2014 Production Guidance
19/03/2013Lake Shore Gold Reports Solid Progress in 2012, Company Near...
30/01/2013Lake Shore Gold Reaches Agreement to Sell Mexican Properties...
21/01/2013(Thunder Creek)Lake Shore Gold Discovers New Mineralization 850 Metres Sout...
26/07/2012Lake Shore Gold and Revolution Resources Amend Option Agreem...
14/06/2012Lake Shore Gold Completes Credit Facility Agreement for Up t...
07/06/2012Lake Shore Gold Announces Significant Extension of High-Grad...
28/05/2012Lake Shore Gold Resumes Mining Operations at Timmins West Mi...
12/04/2012Lake Shore Gold Enters Agreement for Credit Facility of Up t...
04/04/2012Lake Shore Gold Provides Update on Incident at Timmins West ...
03/04/2012Lake Shore Gold Corp. Reports on Incident at Timmins West Mi...
31/03/2012Lake Shore Gold Files Technical Report for Timmins West Mine
22/02/2012Lake Shore Gold Announces Large Increase in Resources at Gol...
14/10/2011(Timmins Mine)Reports Higher Commercial Production from Timmins Mine in Th...
22/08/2011Completes Acquisition of Fen =?ISO-8859-1?Q?n-Gib=20Project=...
16/08/2011(Bell Creek)Reports 400 Metre Extension of Gold Mineralization at Bell C...
30/06/2011(Band Ore)en Share Mining Corporation Acquires Band Ore Gold Property ...
05/05/2011to Acquire Fenn-Gib Project from Barrick Gold in Exchange fo...
02/05/2011Announces New Resources at =?ISO-8859-1?Q?=20Marlhill=20and=...
29/03/2011(Band Ore)to Acquire 19% of Golden Share Through Sale of 100% Interest
28/02/2011(Timmins Mine)Lake Shore Gold Discovers Significant New Gold Zone at 144 P...
24/02/2011(Timmins Mine)Intersects Wide, High-Grade Mineralization at Timmins Mine, ...
25/01/2011(Timmins Mine)Lake Shore Gold to Nearly Triple Gold Production in 2011
25/01/2011(Thunder Creek)Confirms Broad Mineralized Envelope With High-Grade Sections...
06/01/2011(Timmins Mine)Declares Commercial Production =?ISO-8859-1?Q?=20at=20Timmin...
01/12/2010(Bell Creek)Announces Initial Resource a Bell Creek Mine, Large Deposit ...
29/06/2010(Thunder Creek)Ramp Reaches & Intersects High-Grade Gold Mineralization
23/06/2010Intersects High-Grade Mineralization at Thorne...
04/05/2010(West Timmins)Advances Third Major Gold Target
01/04/2010(Ti-pa-haa-kaa-ning (tpk))Agrees to Sell 50% Interest in Ti-pa-haa-kaa-ning Gold Prope...
18/02/2010(Timmins Mine)Major Extensions to Timmins Mine Mineralization, Thunder Cre...
17/02/2010(Timmins Mine)Reports Results of Underground Exploration at 650-Level Test...
17/02/2010(Casa Berardi)Extends Casa Berardi "G Zone"
26/01/2010(Thunder Creek)Extends Thunder Creek to Depth, Confirms High-Grade Core and...
18/01/2010(Bell Creek)Continues to Define and Extend Large New Gold System at Bell...
06/11/2009(Bell Creek)Confirms Presence of Large New Gold System
29/10/2009(Timmins Mine)Results of Underground Drilling and Development at Timmins M...
07/10/2009Releases Updated National Instrument 43-101 Report for Timmi...
01/10/2009(Bell Creek)Reports Extension to High grade mineralization at Bell Creek
25/08/2009(Thunder Creek)Continues to Establish Large Gold System at Thunder Creek
24/08/2009Reports High-Grade Intercepts From Underground Drilling at T...
21/07/2009(Bell Creek)Discovers Substantial New High-Grade Extension at Bell Creek
07/07/2009(Bell Creek)Confirms Deep Extensions of Gold Mineralization at Bell Cree...
16/12/2008Significantly Extends Rusk Zone and Announces New High-Grade...
10/12/2008(Bell Creek)Significantly Extends Bell Creek Mineralization
10/07/2008(Bell Creek)Intersects New Gold Zone and Extends Mineralization at Bell ...
31/03/2008(Thunder Creek)Intersects 8.57 Grams Gold Per Tonne Over 9.00 Metres at the...
Communiqués de Presse de Lake Shore Gold Corporation
28/07/2016Lake Shore Bancorp posts 2Q profit
27/04/2016Lake Shore Bancorp posts 1Q profit
01/04/2016Tahoe Resources Inc. and Lake Shore Gold Corp. Complete Busi...
31/03/2016Lake Shore Gold Announces Shareholder Approval of Plan of Ar...
31/03/2016Lake Shore Gold Announces Filing of Annual Information Form ...
24/02/2016Lake Shore Gold reports 4Q loss
19/01/2016Lake Shore Gold Reports Strong 2015 Operating Cost Performan...
08/01/2016Lake Shore Gold Reports Full Year and Fourth Quarter 2015 Pr...
07/01/2016Lake Shore Gold (LSG) Jumps: Stock surges 10.1%
14/12/2015Is Oriental Financial Group Inc. (OFG) A Good Stock To Buy?
27/11/2015Lake Shore Gold Corp Ordinary Shares (Canada) (LSG): Are Hed...
29/10/2015Lake Shore Gold posts 3Q loss
16/10/2015Lake Shore Gold Announces Details of Nine Month and Third Qu...
14/10/2015Lake Shore Gold Produces 136,200 Ounces in First Nine Months...
18/09/2015Lake Shore Gold Completes Acquisition of Temex Resources Cor...
16/09/2015Lake Shore Gold Reports High-Grade Intersections From Initia...
14/09/2015Temex Shareholders Overwhelmingly Approve Arrangement Agreem...
14/08/2015Lake Shore Gold Acquires Additional Equity Interest in IDM M...
04/08/2015Lake Shore Gold Acquires Significant Equity Interest in IDM ...
31/07/2015Lake Shore Gold Enters Into Arrangement Agreement With Temex...
30/07/2015Lake Shore Gold posts 2Q profit
30/07/2015Lake Shore Gold Reports First Half and Second Quarter 2015 F...
28/07/2015Lake Shore Bancorp posts 2Q profit
17/07/2015Lake Shore Gold Announces Details of First Half and Second Q...
16/07/2015Lake Shore Gold Proposes to Acquire Temex Resources Corporat...
14/07/2015Lake Shore Gold Announces First Half and Second Quarter 2015...
08/07/2015Lake Shore Gold Produces 95,600 Ounces in First Half of 2015...
25/06/2015IIROC Trade Resumption - LSG
27/04/2015Lake Shore Gold Continues to Intersect Significant Gold Mine...
08/04/2015Lake Shore Gold Announces Details of Annual General Meeting ...
26/03/2015Lake Shore Gold posts 4Q loss
16/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
14/03/2015Lake Shore Gold Announces 29% Increase in Ore Reserves
13/03/2015Lake Shore Gold Announces Details of Year-End and Fourth Qua...
03/03/2015Lake Shore Gold Identifies Thick, High-Grade Core of Gold Mi...
24/01/2014Lake Shore Gold's Preliminary 2013 Operating Cost Per Ounce ...
07/01/2014Lake Shore Gold Achieves Record Production of 134,600 Ounces...
16/12/2013Lake Shore Gold Extends Maturity of Standby Line of Credit a...
24/10/2013Announces Details of Third Quarter 2013 Conference Call and ...
09/10/2013Lake Shore Gold Reports Solid Third Quarter 2013 Operating R...
13/08/2013Lake Shore Gold Reports Record Production and Lower Operatin...
29/07/2013Announces Details of Second Quarter 2013 Conference Call and...
05/07/2013Lake Shore Gold Reports Record Production in Second Quarter ...
16/05/2013Lake Shore Gold Announces Results of Shareholders' Meeting
10/05/2013Lake Shore Gold Announces Amendments to Shareholder Meeting ...
09/05/2013Lake Shore Gold Completes Sale of Mexican Portfolio to Revol...
07/05/2013Announces Details of First Quarter 2013 Conference Call and ...
22/04/2013Lake Shore Gold to Hold Annual Meeting in Toronto on May 15,...
08/04/2013Lake Shore Gold Reports First Quarter 2013 Production of 23,...
28/03/2013(Bell Creek)Lake Shore Gold Files Bell Creek Mine Reserve Technical Repo...
12/03/2013Announces Details of Full Year and Fourth Quarter 2012 Confe...
25/02/2013Lake Shore Gold to Reduce Carrying Value of Assets
06/02/2013Lake Shore Gold Announces Management Change
01/02/2013Lake Shore Gold to Draw $35 Million Standby Line of Credit
28/01/2013Lake Shore Gold Announces Launch of Investor Webinar Series
11/01/2013Lake Shore Gold Announces Adoption of Corporate Governance M...
10/01/2013Achieves 2012 Production Target, Company Poised for Sharply ...
11/12/2012on Track for Strong Finish to 2012, Processing Capacity Incr...
08/11/2012Lake Shore Gold Reports Third Quarter 2012 Results, Company ...
25/10/2012Announces Details of Third Quarter 2012 Conference Call and ...
10/10/2012Lake Shore Gold Reports Third Quarter 2012 Production of 20,...
18/09/2012Announces Exercise of Underwriters' Over-Allotment Option fo...
11/09/2012Lake Shore Gold Announces Management Change
07/09/2012Completes C$90 Million Convertible Senior Unsecured Debentur...
16/08/2012Announces C$75 Million Convertible Senior Unsecured Debentur...
10/08/2012GoldPennyStars.com Profiles Alerted Penny Gold and Metals St...
13/07/2012Announces Details of Second Quarter 2012 Conference Call and...
04/07/2012Reports Strong Second Quarter Production of 24,426 Ounces of...
13/06/2012Lake Shore Gold Forecasts 2012 Cost Savings While Remaining ...
25/05/2012Lake Shore Gold Reports Smoke from Forest Fire Results in Pr...
18/05/2012Files Timmins West Mine Reserve Technical Report
10/05/2012Exceeds Targets and Achieves Continued Operating Improvement...
01/05/2012Lake Shore Gold Reports Significant New Drill Intercepts at ...
01/05/2012Reports Significant New Drill Intercepts at Fenn-Gib Open-Pi...
05/04/2012Lake Shore Gold announces filing of Gold River Trend Technic...
05/04/2012Lake Shore Gold Announces First Quarter 2012 Operating Resul...
02/04/2012Lake Shore Gold Announces Reserve Estimate for Timmins West ...
30/03/2012(Bell Creek)Lake Shore Gold Announces Large Increase in Measured and Ind...
26/03/2012Lake Shore Gold Announces Fourth Quarter and Full-Year 2011 ...
23/03/2012Announces Details of Fourth Quarter and Full-Year 2011 Confe...
08/03/2012Lake Shore Gold and Franco-Nevada Complete $50 Million Royal...
28/02/2012Lake Shore Gold Announces Results of Preliminary Economic As...
28/02/2012Announces Results of Preliminary Economic Assessment for Tim...
15/02/2012Lake Shore Gold Confirms Large-Scale Resource for Timmins We...
08/02/2012and Franco-Nevada Enter Agreement for $50 Million Royalty an...
17/01/2012(Thorne)Lake Shore Gold Announces New Extension at Thorne Property, ...
04/01/2012Lake Shore Gold Announces Filing of Fenn-Gib Technical Repor...
29/12/2011(Thunder Creek)Announces Filing of Thunder Creek Technical Report
14/12/2011Signs Formal Agreement for Option on Company's Mexican Explo...
28/11/2011Completes Sale of Land to Golden Share Mining for Significan...
15/09/2011Enters Into Letter Agreement for Option on Company's Mexican...
30/08/2011Reports Extensions of Gold Mineralization Along Strike and t...
05/08/2011Announces Details of Second Quarter 2011 Conference Call and...
29/07/2011U=2ES=2E Listing on NYSE A =?ISO-8859-1?Q?mex=20Approved,=20...
26/07/2011Continues to Define and Ex =?ISO-8859-1?Q?tend=20Mineralizat...
19/07/2011Releases Production Resultsfor Second Quarter and First Six-...
16/06/2011Reports Wide, High-Grade Intercepts from Near-Surface Drilli...
08/06/2011Announces Management Appointme =?ISO-8859-1?Q?nts,=20Creates...
14/03/2011Lake Shore Gold Achieves Major Milestones in 2010, on Track ...
01/02/2011Increases Interest in Northern Superior Resources Inc.
22/07/2010Confirms & Expands Mineral
27/05/2010Completes Sale of 50% Interest in Ti-pa-haa-kaa-ning JV
12/05/2010Changes to Board of Directors
05/05/2010Announces Continued Progress
27/04/2010Expands Resource Potential at Timmins Mine
11/03/20102009 Year End Results
17/12/2009Completes Acquisition of "Bell Creek West" Properties
15/12/2009Announces Management Changes
15/12/2009Added to S&P/TSX Composite Index
24/11/2009Announces Changes to Board of Directors
06/11/2009and West Timmins Mining Complete Business Combination
27/08/2009and West Timmins Agree to Business Combination
06/08/2009Advances Projects on Schedule and Budget and Achieves Explor...
24/06/2009Reports 12.75 Grams Per Tonne Over 83.40 Metres at Thunder C...
16/05/2008Announces Approval of Special Resolutions at Annual and Spec...
05/05/2008Comments on May 15, 2008 Shareholder Vote
16/04/2008Announces Revised Agreement With Hochschild Mining; Second P...
16/04/2008 Announces Management Changes
28/03/2008Announces 2007 Year End Results and Provides 2008 Outlook
24/03/2008Announces Management Changes
18/03/2008Announces Annual Meeting and Revised Date for Special Meetin...
25/02/2008 Completes Financing and Enters Into Strategic Alliance With...
17/07/2007Commences Drilling at Blakelock and Expands its Property Pos...
23/04/2007Completes Due Diligence on Bell Creek Acquisition
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (LSG.TO)Other OTC (LSGGF)
2,07+4.29%2,29-0.87%
TORONTO
CA$ 2,07
07/04 15:32 0,090
4,29%
Cours préc. Ouverture
1,92 2,01
Bas haut
2,00 2,07
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  2,07 -0,481%
Volume var. 1 mois
10 132 648 -0,481%
24hGold TrendPower© : 41
Produit Gold
Développe
Recherche Copper - Gold - Lead - Silver - Zinc
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 19/11/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
12,02 US$+10,12%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,55%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,65 CA$+11,34%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,74 CA$+2,77%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,90%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :