Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Canada Lithium Corp

Publié le 23 novembre 2009

launches pilot-scale metallurgical test; undertakes review of open-pit potential

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Lithium |

Canada Lithium launches pilot-scale metallurgical test; undertakes review of open-pit potential

TSXV: CLQ

TORONTO, Nov. 23 /CNW Telbec/ - Canada Lithium Corp. (TSXV: CLQ) announced today that a 20-tonne bulk sample comprised of drill core obtained during the current 7,000-metre drill program and from bulk pegmatite material taken from the former mine site has been sent for metallurgical pilot plant test work in the first stage of a Bankable Feasibility Study for the Quebec Lithium Project.

The 20-tonne bulk sample has been sent to SGS Lakefield, which will commence the first stage of pilot plant metallurgical testwork to produce a battery-grade lithium carbonate product. As previously reported, bench-scale metallurgical tests at SGS successfully produced battery-grade 99.6% lithium carbonate (Li2CO3) using standard flow-sheet processes.

"This pilot-scale test work is the next phase of metallurgical tests for our project development, following a successful first stage," said Canada Lithium President and CEO Peter Secker. "Results from this pilot metallurgical test will be used for the feasibility study next year. The material will also provide additional samples under the terms of our marketing agreement with Mitsui in Japan."

In addition, the Company has commissioned engineering firm BBA Inc. to determine the potential for an open-pit operation rather than an underground mine. The analysis was initiated following the announcement in early November that the conceptual target had doubled to 29-30 million tonnes grading 1.1%-1.2% Li2O. (The potential quantity and grade is conceptual in nature and there has been insufficient exploration to define a mineral resource. It is uncertain if further exploration will result in the discovery of a mineral resource. This estimate cannot be considered current and reliable.)

"Our initial concept was a ramp-access underground operation, but with the geological studies undertaken to date, we have commissioned our engineering consultants BBA Inc. to model the open-pit potential," Mr. Secker said.

The digitizing and modeling of all historical data from the 400 holes drilled when the mine was operating up to the mid-1960s was undertaken by Caracle Creek International Consulting (CCIC) this past fall. This work culminated in the new conceptual target estimate of 29-30 million tonnes, well above the historical NI 43-101 non-compliant resource of 15 million tonnes grading 1.4% Li2O.The CCIC-supervised 7,000-metre drill program is now 70% complete and initial assays are expected in the near future. The majority of the drill program is focused on twinning historical drill holes in order to prepare a 43-101 compliant resource estimate. The pre-feasibility study currently under way is on track for completion in the first quarter of 2010.

The historical estimate of 15 million tonnes at 1.14% Li2O is not compliant with NI-43-101 due to the fact that the original core samples from the historic drilling programs were lost when the mine closed down in 1965 and the assay data cannot be verified. A Qualified Person has not done sufficient work to classify the historical estimate as current mineral resources; Canada Lithium Corp. is not treating the historical estimate as current mineral resources; and the historical estimate should not be relied upon.

The conceptual tonnage exploration target was prepared by Michelle Stone, P.Geo., a Senior Geologist with CCIC. Ms. Stone is an independent Qualified Person as defined by NI 43-101. Ms. Stone has read and approved the contents of this news release.

Mitch Lavery, P.Geo., is the Qualified Person for the Quebec Lithium Project in accordance with NI 43-101. Mr. Lavery has read and approved the contents of this news release.

As noted above, test samples were processed by SGS Lakefield. Gary Pearse, B.Sc Geol Engineering, M.Sc Econ., is the designated QP within the meaning of the term in NI 43-101. Mr. Pearse has reviewed and approves the content of this release.

Canada Lithium Corp. is a Canadian-based resource and exploration company trading under the symbol CLQ on the TSX-V. The Company has initiated a prefeasibility study on the Quebec Lithium Project, which will include environmental, metallurgical, geological and engineering studies. It has an agreement with Japanese metals trading firm, Mitsui and Co. Ltd., to market a portion of Canada Lithium Corp.'s product in China, Korea and Japan. Metallurgical tests have produced battery-grade lithium from deposit samples.

Please visit our new updated Canada Lithium website at www.canadalithium.com.

Corporate Office: 401 Bay St., Suite 2010, P.O. Box 118, Toronto, Ont. M5H 2Y4

    Neither the TSX Venture Exchange nor its Regulation Services Provider (as
    that term is defined in the policies of the TSX Venture Exchange) accepts
    responsibility for the adequacy or accuracy of this release.

Forward-looking Information

The statements made in this press release may contain certain forward-looking statements concerning potential developments affecting the business, prospects, financial condition and other aspects of Canada Lithium Corp. The actual results of the specific items described in this release, and the company's operations generally, may differ materially from what is projected in such forward-looking statements. Although such statements are based upon the best judgments of Canada Lithium Corp. management as of the date of this release, significant deviations in magnitude, timing and other factors may result from business risks and uncertainties including, without limitation, the Company's dependence on third parties, general market and economic conditions, technical factors, the availability of outside capital, receipt of revenues and other factors, many of which are beyond the control of the Company. Canada Lithium Corp. disclaims any obligation to update information contained in any forward-looking statement.

For further information: Peter Secker, President and CEO, (416) 361-2821; Olav Svela, Director, Investor Relations, (416) 361-2821, osvela@canadalithium.com; Dan Symons, Renmark Financial Communications Inc., (514) 939-3989, dsymons@renmarkfinancial.com

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Canada Lithium Corp

EN DÉVELOPPEMENT
CODE : CLQ.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Canada Lithium est une société développant des projet miniers d'or basée au Canada.

Canada Lithium est en développement de projets d'or et de lithium au Canada, et détient divers projets d'exploration au Canada.

Son principal projet en développement est QUEBEC LITHIUM au Canada et son principal projet en exploration est TULLY GOLD au Canada.

Canada Lithium est cotée au Canada. Sa capitalisation boursière aujourd'hui est 86,9 millions CA$ (66,6 millions US$, 56,3 millions €).

La valeur de son action a atteint son plus bas niveau récent le 26 décembre 2008 à 0,05 CA$, et son plus haut niveau récent le 31 décembre 2010 à 6,69 CA$.

Canada Lithium possède 362 204 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Rapports annuels de Canada Lithium Corp
2007 Annual report
Financements de Canada Lithium Corp
22/09/2008Private Placement 1st Tranche Closes
Nominations de Canada Lithium Corp
12/08/2013Appoints Former FMC Process Plant Manager at Val d'Or Proces...
01/06/2012Appoints General Manager; Process Plant Manager
21/03/2012Appoints Former Senior
01/12/2011Provides Update on Québec Lithium Project; Appoints Vice
24/01/2011(Quebec Lithium)Appoints Quebec-based GENIVAR
12/05/2010Appoints BBA Inc. to conduct
07/10/2009Appoints New CFO and Investor Relations Direc
Projets de Canada Lithium Corp
04/10/2013Announces Project Update
20/06/2013Project Update
04/04/2013Announces Project Update
20/03/2013Announces Water Discharge; Mine and Plant Commissioning Cont...
31/01/2013Provides Project Update
07/01/2013Goes 'Prime Time' Tonight on Discovery Channel
23/08/2012Announces Project On Track for Year-end Commissioning; Lithi...
10/07/2012Project Update: Major Process Equipment Received; Full-time ...
23/04/2012Secures C$92-million financing; long lead-time equipment arr...
23/09/2011Announces Drill Results including 32 metres grading 1.29% Li...
25/08/2011Announces Drill Results and Permitting Update
06/07/2011Announces Key Personnel Appointments and Equipment Purchases...
21/06/2011Files NI 43-101 Compliant Feasibility Study Technical Report...
30/05/2011(Quebec Lithium)Granted Construction Permit for Québec Lithium Project
02/05/2011(Quebec Lithium).: Default Announcement Pursuant to National Policy 12-203
11/04/2011(Quebec Lithium)to Vigorously Defend Lawsuit
17/03/2011(Quebec Lithium)Appoints AMC Mining
13/03/2011(Quebec Lithium)Provides Background Information on the Quebec Lithium Projec...
28/02/2011(Quebec Lithium)Canada Lithium Appoints Quebec-based GENIVAR Inc. to Manage ...
06/07/2010(Quebec Lithium)Project update; drilling intersects 66.3 metres grading
22/03/2010(Quebec Lithium)plans 42.6-million-lb-per-year lithium carbonate mine by lat...
04/03/2010(Quebec Lithium)Completes 43-101 resource estimate
20/01/2010(Quebec Lithium)Intersects higher-grade lithium and confirms depth potential...
02/11/2009(Quebec Lithium)Doubles Conceptual Target Estimate To 29-30 Million Tonnes G...
Communiqués de Presse de Canada Lithium Corp
21/01/2014Sirocco and Canada Lithium announce new
24/12/2013Receives $10-Million Bridge Loan
04/12/2013Sirocco and Canada Lithium combining to form
18/11/2013Posts Milestone Achievement with First Continuous Lithium Ca...
13/11/2013Completes $14.4-Million
22/10/2013Announces $12.5 Million Bought Deal Public Offering
16/09/2013(Quebec Lithium)Resumes Commissioning of Quebec Lithium Plant
03/09/2013Announces $5-Million Prepayment from Off-take Partner Tewoo-...
29/08/2013To Vigorously Defend Against a Class Action Lawsuit Related ...
21/08/2013Announces Process Plant Maintenance/Upgrade Program; Commiss...
24/07/2013Produces Battery-Grade Lithium Carbonate in Initial Sample
05/07/2013Announces Completion of
02/07/2013Produces Initial Run of 99.1% Lithium Carbonate; Awarded ISO...
15/05/2013Completes Offering of $27.6
10/05/2013announces grant of option to
07/05/2013Announces CSA Approval to Operate its Process Plant Kiln
29/04/2013Announces $21.1 Million Convertible Debenture Bought Deal Fi...
22/04/2013Commissioning Update
12/04/2013Announces Project Update and Appointment of New CFO
27/03/2013Announces Results of Water Discharge Tests; Metal Levels Wit...
25/03/2013Completes $15 Million Offering
15/02/2013Granted up to $6.5 million for Lithium Metal Pilot Plant fro...
10/01/2013Signs Off-take Agreement with Marubeni for up to 5,000 tonne...
29/10/2012Completes Initial Debt Drawdown; Commences Tailings Construc...
11/10/2012Completes Updated Feasibility Study; Significant Increase in...
06/06/2012Announces Closing of
04/06/2012Announces Receipt of
30/05/2012Closes $30 Million Equity
23/05/2012Announces Pricing of $30
01/05/2012Announces Filing of
01/03/2012will be attending the 2012 Prospectors and Developers Associ...
01/03/2012has recently been in the news following the announcement of ...
13/02/2012Announces C$75-million Debt
25/10/2011featured in prestigious mining publication
13/06/2011Confirms Québec Lithium
13/06/2011Confirms Québec Lithium Mine Viability; Schedules Site C...
16/05/2011Announces Revised Mineral
10/08/2010Signs Purchase Agreement to Sell Tully Gold Prospect
26/07/2010Chosen for world's first
29/06/2010Read all about it: Canada Lithium adds electric-vehicle news...
23/06/2010Listed on Senior TSX Exchange
18/05/2010Gains Listing on U.S. Trading
29/03/2010CEO sees soaring demand as electric vehicles gain popularity
23/11/2009launches pilot-scale metallurgical test; undertakes review o...
05/11/2009Focuses on Advanced Quebec Project; Relinquishes Interest in...
14/10/2009Initiates Environmental Impact Study
05/10/2009And Gold Summit Complete Drilling at Nevada
30/09/2009Produces 99.6% Battery-Grade Lithium From Tes
05/09/2008Debenture Redemption
05/09/2008BLK Sale to Cuprus of Ferro and Wekusko Options
05/09/2008BLK Sale to Cuprus of Ferro and Wekusko Options
05/09/2008BLK Sale to Cuprus of Ferro and Wekusko Options
19/08/2008 Debenture Redemption
25/06/2008Acquires Nevada Lithium Brine Prospect
17/10/2007Final batch of results from Glacier drilling and further pro...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (CLQ.TO)
0,240-5.88%
TORONTO
CA$ 0,240
05/11 15:19 -0,020
-5,88%
Cours préc. Ouverture
0,255 0,245
Bas haut
0,240 0,245
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,240 -%
Volume var. 1 mois
31 800 -%
24hGold TrendPower© : -37
Produit
Développe Lithium
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 22/02/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :