Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Penser est parler tout bas, parler est penser tout haut
Max Mueller  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1388,780,38
Silver 22,58-0,10
Platinum 1476,50-4,00
Palladium 745,002,75
MARCHES MONDIAUX
DOWJONES 15335-13
NASDAQ 3496-3
NIKKEI 15347-14
ASX 518526
CAC 40 402322
DAX 845658
HUI 26115
XAU 97-3
MONNAIES (€)
AUS $ 1,3143
CAN $ 1,3214
US $ 1,2893
GBP (£) 0,8451
Sw Fr 1,2471
YEN 132,1340
RATIOS & INDEXES
Gold / Silver61,50
Gold / Oil14,38
Dowjones / Gold11,04
MATIERES PREMIERES
Copper 3,34-0,02
WTI Oil 96,55-0,16
Nat. Gas 4,100,01
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
Dans la même rubrique 
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

Monday, November 03, 2008
Nautilus Minerals Locks Down Major Equipment Cost and Maintains Build Schedule

News Release Number 2008-30


Toronto Ontario, November 3, 2008 - Nautilus Minerals Inc. (TSX & AIM: NUS) (the "Company" or "Nautilus") announces that Technip USA Inc ("Technip") has awarded the three major fixed-price contracts for the Riser and Lifting System ("RALS") to major offshore oil and gas suppliers in Houston, Texas. Technip has confirmed that it remains on target to deliver the RALS system for US$116 million. Additionally, Nautilus confirms it remains on program to deliver first ore at Solwara 1, in Q4 2010.

Stephen Rogers, CEO of Nautilus, said: "Leading offshore oil and gas suppliers are providing proven equipment at fixed prices for integration with the Mining Support Vessel ("MSV"). The entire spread for Solwara 1 is being built in a factory environment and transported to site on the MSV, which reduces project schedule and cost escalation risk."

The RALS components along with the Seafloor Mining Tools ("SMT's") are the primary equipment items for the Solwara 1 offshore copper-gold project. The MSV is being provided by North Sea Shipping AS ("NSS") of Norway under charter as an operating cost to Nautilus.

Phase 1 Schedule

Key Solwara 1 project milestones:
  • MSV hull launch date - July 2009
  • Commence mining equipment integration - January 2010
  • MSV sea trials begin - June 2010
  • Mining systems pre-commissioning complete - October 2010
  • Materials handling works complete - September 2010
  • First ore - December 2010
Project Update

Seafloor Mining Tools: The engineering design and assembly of the SMT by Soil Machine Dynamics Ltd. is progressing with completion anticipated in Q1 2010. Procurement will start before the end of 2008 and assembly will commence in Q2 2009.

Riser and Lifting System: Technip is on schedule and budget with engineering, procurement and construction of the RALS which transports material from the seafloor to the MSV. Contract awards have been made to GE Vetco Gray Inc. for the riser pipe, connectors and associated transition joints, to Le Tourneau Technologies Inc. for the riser handling and pumping equipment and to GE Hydril USA LLC for provision of the subsea slurry lift pump. These companies are leaders in their respective fields in the offshore oil and gas sector.

Mining Support Vessel: The construction of the 160-metre MSV being built by NSS continues in Turkey. The first fabricated blocks of the hull have been placed in the slipway and the build is being supervised by NSS in the presence of the classification society Det Norske Veritas (http://www.nautilusminerals.com/i/misc/Shipyard.jpg).

Mining License ("ML") Application: Nautilus submitted its application for a ML to the Department of Mines in PNG on 3 October 2008, thereby commencing the formal review process.

Materials Handling: The extracted copper and gold rich ore will be transported to nearby East New Britain for stockpiling prior to export overseas for treatment and onwards sale to the smelter market. Enquiry documents to obtain expressions of interest on the provision of cargo barges have been issued to the market. Studies have commenced in conjunction with the PNG Port Authority to examine the potential use of its existing Rabaul facility for the landing, stockpiling and export of the Solwara 1 ore.

Summary: The last remaining major capital contracts to be placed are for the dewatering plant and the shipyard integration works. When they have been finalised, Nautilus can then complete its capital expenditure estimates for the Solwara 1 Project, expected in Q1 2009.

Forward Looking Statements

This press release includes certain "forward-looking statements." All statements, other than statements of historical fact, are forward-looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove accurate and actual results and future events could differ materially from those anticipated in such statements. Such information contained herein represents management's best judgment as of the date of release based on information currently available. The company does not assume the obligation to update any forward-looking statement.

About Nautilus Minerals Inc.

Nautilus is the first company to commercially explore the ocean floor for gold and copper seafloor massive sulphide deposits and is positioning itself to become an emerging producer in 2010. The Company's main focus is the Solwara 1 Project, which is located in the territorial waters of Papua New Guinea in the western Pacific Ocean. Nautilus is listed on the TSX and on AIM, and has among its largest shareholders two of the world's leading international resource companies, Teck (7.2%) and Anglo American (5.7%). Metalloinvest, one of the largest and fastest growing mining and metallurgical holding companies in Russia, beneficially owns 22.4% of its shares through Gazmetall Holding (Cypress) Limited.

For more information please refer www.nautilusminerals.com or contact:

Investor Relations
Nautilus Minerals Inc. (Toronto)
Email: investor@nautilusminerals.com
Tel: +1 (416) 551 1100

Australian Project Office
Tel: +61 (7) 3318 5555

Numis Securities Limited
Nominated adviser: John Harrison
Corporate broking: James Black
Tel: + 44(0) 20 7260 1000

Neither the TSX nor the London Stock Exchange accept responsibility for the adequacy or accuracy of this press release.

View News Release in PDF Format:
Associated File: http://www.nautilusminerals.com/i/pdf/2008-11-03_NR.pdf
77 KB in size, approx. 15 seconds to download at 56.6Kbps

You can also view this News Release on our website at:
http://www.nautilusminerals.com/s/Media-NewsReleases.asp?ReportID=326479

� 2008 Nautilus Minerals Inc. All Rights Reserved.
Tweet

Nautilus Minerals Inc.

EN DÉVELOPPEMENT
CODE : NUS.TO
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Nautilus Minerals Inc.
01/09/2008Corporate Fact Sheet
09/07/2008Papua New Guinea Factsheet
09/07/2008Environment Quarter 2 2008 Solwara 1 Environmental
27/06/2007Latest Corporate Presentation and Interview with CEO David H...
26/02/2007Latest Newsletter, Q2 2007
Dans les médias de Nautilus Minerals Inc.
09/01/2013Discrepancies, denials in C$238m hostile bid for Nautilus Mi...
01/11/2012Nautilus Minerals says goodbye to longtime president and CEO
28/08/2012Nautilus Minerals seeks partner for PNG undersea project
16/08/2012Nautilus Minerals - This $1 Stock Is Worth A Look
19/07/2012Nautilus Minerals seeks dispute resolution outside arbitrati...
17/01/2011Nautilus Minerals shares surge on deep sea-mining lease
07/10/2009Nautilus' seabed minerals set to be treated in Tasmania
21/09/2007Neptune and Nautilus both progressing on vast seafloor minin...
10/07/2006Barrick invests in deep-sea mining
Rapports annuels de Nautilus Minerals Inc.
Releases Annual Report and Proposes New Director at AGM in V...
Annual Report and Annual General Meeting
2008 Annual report
Annual Report and Annual General Meeting
Annual Results
2007 Annual report
Financements de Nautilus Minerals Inc.
28/03/2013Files Preliminary Prospectus for C$40M Rights Offering
11/09/2012Closes Second Tranche of Private Placement
07/08/2012receives final proceeds from first tranche of Private Placem...
06/08/2012Closes First Tranche of Private Placement
10/06/2011Withdraws Capital Raising
15/05/2011Files Prospectus
20/12/2007Teck Cominco Exercises 3 Million US$5 Warrants
29/11/2007C$39.1 million Private Placement Closed
27/09/2007Seafloor Exploration Boosted by US$39 Million Private Placem...
Attributions d'options de Nautilus Minerals Inc.
04/06/2008AGM Voting Results, Management Changes, Grant of Options
Nominations de Nautilus Minerals Inc.
31/10/2012appoints interim President and CEO
03/03/2011Appoints Vice President Investor Relations and Communication...
Rapports Financiers de Nautilus Minerals Inc.
14/11/2012Announces Financial Results for Q3 2012
02/08/2012Announces Financial Results for Q2 2012
07/05/2012Announces Financial Results for Q1 2012
11/11/2011Reports Solid Third Quarter Results
15/06/2011First Quarter Results
24/03/2011Annual Results
12/11/2010Announces Financial Results for Q3 2010 and Business Update
10/08/2010Announces Financial Results for Q2 2010
14/05/2010Announces Financial Results for Q1 2010
01/05/2009Financial Results for First Quarter 2009
14/08/2008Financial Results for Second Quarter 2008
12/11/2007Financial Results for the 3rd Quarter ended September 30, 20...
29/08/2007Financial Results for the 2nd Quarter ended June 30, 2007
30/05/2007Financial Results for the First Quarter ended 31 March, 2007
Projets de Nautilus Minerals Inc.
13/11/2012(Solwara 1)Terminates Equipment Build for Its Solwara 1 Project
20/05/2011(Solwara 1)Completes Drilling Program
06/05/2011(Solwara 1)Secures Key Production Component
14/04/2011(Solwara 1)Forms Strategic Partnership And Secures Vessel
29/03/2011(Solwara 1)PNG Government Confirms Investment in Solwara 1
14/03/2011(Solwara 1)PNG Government to Invest in Solwara 1
22/02/2011(Solwara 1)PNG Government Option
11/02/2011(Solwara 12)Unveils a Second High Grade Copper Deposit in Bismarck Sea
25/01/2011(Solwara 1)Confirms High Grade Gold Mineralisation
17/01/2011(Solwara 1)Granted Mining Lease
06/01/2011(Solwara 1)Intersects More High Grade Copper
04/11/2009(Solwara 1)Discovers Two New High Grade SMS Systems in the Bismarck Sea
11/09/2009(Solwara 1)Granted Environmental Permit Approval in Principle for Solwa...
11/06/2009Confirms High Grades in Phase One of 2009 Tongan Exploration...
19/05/2009(Solwara 1)Solwara 1 Development Project Update
13/05/2009Drilling Discovers New-High Grade Zones
17/12/2008(Solwara 1)Announces Deferral of Solwara 1 Mining System Equipment Buil...
17/09/2008Teck Cominco Discovers Four High-grade Copper-Gold-Zinc SMS ...
11/09/2008(Solwara 1)Discovers Additional, High-grade, Copper - Zinc Systems, Sol...
05/09/2008(Solwara 1)Discovers Solwara 10, a New High-Grade Copper - Zinc System
20/06/2008(Solwara 1)Vessel Contract for Solwara 1 Development Signed
23/05/2008(Solwara 1)Confirms Marketable Concentrate from Solwara 1 Ore
03/04/2008(Solwara 1)US$116 Million Contract Awarded for Nautilus's Solwara 1 Dev...
30/11/2007(Solwara 1)2007 Technical report
19/11/2007(Solwara 1)Electromagnetic Survey Results Outline Continuity and Extens...
13/11/2007(Solwara 1)Significant High-Grade Copper and Gold Results at Solwara 1...
04/10/2007(Solwara 1)Project Development Update - Solwara 1 Offshore Copper-Gold ...
24/09/2007Significant High-Grade Copper and Gold Deposit at Solwara 1 ...
04/09/2007(Solwara 1)Solwara 1 Drilling Program Update
11/07/2007(Solwara 1)Significant Massive Sulphide Drill Intercepts at Solwara 1
20/06/2007(Solwara 1)Assays Confirmed at Solwara 5, 6 and 7
07/06/2007(Solwara 1)Programme Update - Discovery of Solwara 8
21/03/2007Launches World's Largest Commercial Exploration Program For ...
31/01/2007(Solwara 1)2007 Technical report
Communiqués de Presse de Nautilus Minerals Inc.
03/04/2013General Investor Update
14/01/2013Regarding Previously Announced Unsolicited Take-Over Bid
08/01/2013Responds to Announcement of Unsolicited Take-Over Bid
17/12/2012End of Year Shareholder Update
17/12/2012End of Year Shareholder Update
10/10/2012Issues Stock Options and Loan Shares
02/10/2012Issues Options and Loan Shares
02/10/2012Issues Options and Loan Shares
18/09/2012Defines 410 million tonne Inferred Mineral Resource(i)
06/10/2011Closes C$27.6 Million Final Tranche of Private Placement
31/08/2011US$100 Million to Be Raised in Private Placement
11/08/2011Granted Exploration Tenements in Fijian Waters
22/07/2011Awarded Exploration Tenements in Eastern Pacific
26/08/2010Issues Options
04/08/2010Conference Attendance Update (Second Half 2010)
25/06/20102010 AGM Voting Results
23/06/2010Releases Offshore Production System Definition and Cost Stud...
26/02/2010Confirms Recent SMS Discoveries in Papua New Guinea with Ass...
24/02/2010Upcoming Conferences
10/09/2009High Success Rates Exploring from MV Fugro Solstice
20/08/2009Company Update and Forthcoming Events
14/08/2009Maintains Strong Cash Position with $233 Million at End Q2 2...
26/06/2009AGM Voting Results
26/06/2009Correction to AGM Results
28/04/2009Featured in Discover Magazine
08/04/2009Mining Warden's Hearing Completed
16/03/2009Ends 2008 with $231 Million in Cash
23/02/2009Mining Lease Hearing Date Set
18/02/2009Exploration Success Continues for Nautilus Minerals in Tonga
17/02/2009Teck Confirms Seafloor Massive Sulphide Exploration Plans
24/11/2008Upcoming Events
12/11/2008Announces US$266 Million at September 30, 2008
05/11/2008Anglo American Increases Stake in Nautilus to 11.1%
03/11/2008Locks Down Major Equipment Cost and Maintains Build Schedule
17/10/2008Change to Board of Directors
25/06/2008Continues 2008 Exploration Program
18/06/2008Celebrates its 2nd Birthday and Completes CEO Hand Off
23/05/2008Seed Capital Investment
07/05/2008Phase One Deep Sea Exploration Program Completed in PNG
01/05/2008 Signs Contract with Canyon Offshore Inc.
14/04/2008 Appoint New President and CEO
29/02/20082008 Global Metals & Mining Conference - Nautilus Presentati...
27/11/2007Report of Extraordinary General Meeting Results
14/11/2007Expands its Exploration Interests in the Western Pacific
08/11/2007Escrow Release
01/11/2007EGM
20/09/2007World's First Commercial Electromagnetic Survey of Seafloor ...
23/08/2007Deep Sea Copper-Gold Company Moves Up to TSX
20/08/2007C$289M of Cash Secure in Bank and Continued Exploration Succ...
01/08/2007Employee Options Issued
17/07/2007Eleven Exploration Licences Granted to Nautilus in PNG
16/07/2007Robotics and Deep Sea Experts add to Nautilus Project Delive...
06/07/2007Takes Over Offshore Development at Solwara 1
23/06/2007Annual General Meeting Results
31/05/2007Shipyard Contract Signed
30/01/2007US$100 million Project Financing for the Solwara 1 deep sea ...
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TORONTO (NUS.TO)OTC BB (NUSMF.PK)
0,220-4.35%2,07-1.90%
TORONTO
CA$ 0,220
17/05 15:59 -0,010
-4,35%
Cours préc. Ouverture
0,230 0,220
Bas haut
0,220 0,230
Année b/h Var. YTD
0,210 -  0,620 -50,00%
52 sem. b/h var. 52 sem.
0,210 -  2,15 -89,57%
Volume var. 1 mois
419 905 -12,00%
24hGold TrendPower© : -28
Produit
Développe Copper - Gold - Silver - Zinc
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-74,12%
2012-60,28%2,900,85
2011-5,73%3,641,95
201051,33%2,761,31
200966,67%1,620,92
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Recevez les dossiers Investisseur
High Desert Gold
Sélectionnez
& cliquez