Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Copper Creek Ventures

Publié le 06 août 2013

Lower initial capital cost and significant smelting capacity are among key elements for a refocused

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Angola | Bushveld | Cobalt | Copper | Report | Zinc |
 
Ivanplats Limited

www.ivanplats.com
August 6, 2013

Lower initial capital cost and significant smelting capacity
are among key elements for a refocused
development study for Ivanplats' Kamoa copper discovery

KINSHASA, DEMOCRATIC REPUBLIC OF CONGO � Ivanplats Executive Chairman Robert Friedland and Chief Executive Officer Lars-Eric Johansson announced today that key elements have been established for a new study to help set the stage for the cost-effective development of a mine and processing plant at the company's Kamoa copper discovery on the Central African Copperbelt in the Democratic Republic of Congo's Katanga Province.

The refocused Kamoa development study, to be prepared in conformance with the requirements set out in Canada's National Instrument 43-101, is expected to result in the declaration of the first mineral reserves at Kamoa and to report on the establishment of an appropriately phased approach to achieving first production and progressive expansion of the Kamoa Project.

Ivanplats is proposing two principal phases of development:

  • The first phase of mining would target production of high-grade copper mineralization from shallow, underground resources to yield a high-value concentrate. Initial mill feed would come from Kansoko Sud and lead into the Centrale area of Kamoa's gently-dipping mineralized zones that collectively contain estimated Indicated Resources of 224 million tonnes grading 3.85% copper (at a 3.0% copper cutoff and a minimum 3.0-metre vertical mining thickness). Resource details are contained in the March 2013 Kamoa Technical Report, available at www.sedar.com.
  • The planned second phase would entail a major expansion of the mine and mill and construction of a large smelter, supported by the full extent of the Kamoa resources.
Mr. Friedland said the revised mining scenario was being developed to deliver the best balance of a lower initial capital cost and shortest time to first production, while maintaining the company's commitment and momentum toward a major mine, mill and smelting operation.

"This scenario, if confirmed by current studies and financial modelling, could provide for a 2017 start of copper production from Kamoa's first phase of development, subject to available financing. It would require significantly lower capital costs than previously considered launch scenarios, while preserving the viability of our medium- and longer-term development options."

A recommended initial production rate will form part of the development study being prepared by Hatch Ltd., of South Africa, one of the world's leading mining engineering consultants. Projected to be completed in the second half of 2014, the study will be based on development of the estimated mineral resources described in the March 2013 Kamoa Technical Report, excluding Inferred Resources.

In addition, an updated preliminary economic assessment of the preferred development scenario now underway is expected to be finished in the fourth quarter of this year.

Building of mine-access decline at Kamoa planned to begin early next year

Mr. Johansson said that excavation of the first mine-access decline at Kamoa is expected to begin early next year. The decline would provide machinery with access to the high-grade, near-surface copper resources that would be targeted for the planned first phase of production using the room-and-pillar mining method.

"To get into production as quickly as possible, our current strategy is to start with a smaller, simpler and more capital-efficient mine. Given the Kamoa Project's significant estimated Mineral Resource tonnage and its large lateral extent, we continue to believe that potential mining rates of up to 20 million tonnes per annum eventually could be achieved by operating in multiple mining areas and completing a series of production expansions to maximize the mine's capacity."

Construction of smelter an integral part of development plan

Mr. Johansson said Ivanplats is committed to build a smelter that will have the capacity to serve other mines in the Katanga district, create hundreds of additional skilled jobs as part of the project's major economic stimulus to the region and support the government's policy of adding in-country value to mineral production.

"A smelter also will improve the long-term economics of the project by reducing transportation costs and generating significant additional revenues through sales of the sulphuric acid by-product of the smelting process."

The Hatch development study will assess the most cost-effective smelter capacity and relevant smelting processes. It also will provide details on equipment, capital and operating costs as part of an analysis of the scope of proposed mining and processing to confirm Kamoa's commercial viability.

Timing of the smelter construction is dependent, in part, on the provision of additional generating capacity within the DRC's power supply grid.

In 2011, Ivanplats and DRC's state-owned power company, La Soci�t� Nationale d'Electricit� (SNEL), agreed to upgrade two existing hydroelectric power plants, Mwadingusha and Koni, to feed up to 113 megawatts into the national power supply grid. SNEL would provide the Kamoa project with 100 megawatts from the grid, which would be sufficient to operate the initial mine. In April 2013, SNEL signed a further memorandum of understanding with Ivanplats to upgrade a third hydroelectric power plant -- Nzilo 1 -- that is projected to provide approximately an additional 100 megawatts to the grid upon its planned completion in 2022, entitling Kamoa to receive another 100 megawatts from the grid. A combined total of 200 megawatts from the grid would cover the power requirements of Kamoa's smelter and future mine expansions.

The start-up scenario to be examined in the development study will consider the necessity of the sale of copper concentrates as an interim measure pending Ivanplats' completion of its planned smelter in the vicinity of the Kamoa mine.

"The DRC government earlier this year mandated an end to exports of copper and cobalt concentrates, which is intended to encourage investments in additional mineral processing facilities within the DRC," Mr. Johansson said.

"The restriction presently is due to take effect in 2014. The country's current mining code requires a permit for the export of unprocessed minerals, which should be granted if insufficient processing facilities exist within the DRC or if it can be demonstrated that exports would generate a net benefit to the country.

"We believe our planned Kamoa development would meet the DRC's export criteria, if required. The Hatch development study will include a review of the economic impact of copper concentrate sales and the company will investigate regulatory procedures required to conduct limited-term concentrate sales as a prelude to, and in the context of, our integrated plan to build a major smelter in the DRC to produce higher-value blister copper," Mr. Johansson added.

"Significant improvements in transportation infrastructure in Central Africa in recent years, including railways in neighbouring Zambia and Angola, appear to make deliveries of copper concentrates by road and rail to third-party smelters viable and attractive during Kamoa's early years of production."

The development study's conclusions will be discussed with the DRC government. Additional studies are underway to advance the geotechnical, engineering and metallurgical understanding of Kamoa in support of the development study. Stantec Inc., of Arizona, USA, is preparing the mine plan based on the resources in the March 2013 Kamoa Technical Report. Four rigs are drilling at Kamoa to obtain further core for the Phase 4 metallurgical studies to help fine tune the optimal copper recovery process. Further hydrological drilling and testing is scheduled for the first half of 2014 to improve Kamoa's hydrological models.

Discussions well advanced with potential strategic partners

Mr. Friedland said that confidential discussions and the conduct of due diligence are well advanced with a selected number of leading international private and state-owned mining companies that have expressed interest in potential participation in the Kamoa Project. Ongoing talks could lead to the formation of a significant strategic partnership or syndicate for continued exploration and development of the Kamoa discovery and associated infrastructure.

Kamoa is world's largest undeveloped high-grade copper discovery

A new independent estimate detailed in the March 2013 Kamoa Technical Report more than doubled the high-grade Indicated Mineral Resources at Ivanplats' Kamoa copper discovery. Kamoa now ranks as Africa's largest high-grade copper discovery and the world's largest undeveloped high-grade copper discovery.

At a 2% copper cut-off grade, Kamoa's Indicated Resources presently total 550 million tonnes grading 3.04% copper and containing 36.9 billion pounds of copper. At the 2% cut-off, Kamoa also has 93 million tonnes of Inferred Resources grading 2.64% copper, which contain an estimated 5.4 billion pounds of copper.

At a lower, 1% copper cut-off grade and a minimum vertical mining thickness of three metres, Kamoa's Indicated Mineral Resources total 739 million tonnes grading 2.67% copper and containing 43.5 billion pounds of copper. In addition, Inferred Mineral Resources are estimated to total 227 million tonnes grading 1.96% copper and containing 9.8 billion pounds of copper.

The January resources estimate was prepared by AMEC, based on core from 555 holes drilled to December 10, 2012, in accordance with CIM Guidelines and under the direction of AMEC's Technical Director Dr. Harry Parker.

Kamoa Project description

The Kamoa Project is a very large, stratiform copper deposit with adjacent prospective exploration areas within the Central African Copperbelt, approximately 25 kilometres west of the town of Kolwezi and about 270 kilometres west of the Katanga provincial capital of Lubumbashi. Ivanplats holds its 95% interest in the Kamoa Project through a subsidiary company, African Minerals Barbados Limited SPRL (AMBL). A 5%, non-dilutable interest in AMBL was transferred to the DRC government on September 11, 2012, for no consideration, pursuant to the DRC Mining Code. Ivanplats also has offered to sell an additional 15% interest to the DRC government on commercial terms to be negotiated.

In August 2012, the DRC government granted mining licences for the Kamoa Project that cover a total of 400 square kilometres. The licences are valid for 30 years and can be renewed at 15-year intervals.

Qualified Person

Disclosures of a scientific or technical nature in this news release have been reviewed and approved by David Broughton, Ivanplats' Executive Vice President of Exploration, who is a Qualified Person under the terms of National Instrument 43-101. Ivanplats has prepared NI 43-101-compliant technical reports for the Kamoa Project, the Platreef Project and the Kipushi Project, which are available under the Company's SEDAR profile at www.sedar.com. These technical reports include relevant information regarding the effective date and the assumptions, parameters and methods of the mineral resource estimates on the Kamoa Project cited in this news release, as well as information regarding data verification, exploration procedures and other matters relevant to the scientific and technical disclosure contained in this news release in respect of the Kamoa Project. The Kamoa development study by Hatch Ltd. will be prepared to a pre-feasibility level of confidence as defined by NI 43-101.

About Ivanplats

Ivanplats (TSX:IVP), with offices in Canada, the United Kingdom and South Africa, is advancing and developing its three principal projects:
  • The Kamoa copper discovery in a previously unknown extension of the Central African Copperbelt in the DRC's Province of Katanga.
  • The Platreef Discovery of platinum-group elements, nickel, copper and gold on the Northern Limb of the Bushveld Complex in South Africa.
  • The historic, high-grade Kipushi zinc-copper mine, also on the Copperbelt in the DRC and now being dewatered and upgraded to support a future return to production of copper, zinc and other metals following a care-and-maintenance program conducted between 1993 and 2011.
Ivanplats also is evaluating other opportunities as part of its objective to become a broadly based international mining company.

Information contacts

Investors
    Bill Trenaman +1.604.331.9834
Media
    North America: Bob Williamson +1.604.512.4856
    South Africa: Jeremy Michaels +27.11.088.4348

Website: www.ivanplats.com

Forward-looking statements

Statements in this release that are forward-looking statements are subject to various risks and uncertainties concerning the specific factors disclosed here and elsewhere in the company's periodic filings with Canadian securities regulators. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may," "potential," "should" and similar expressions are forward-looking statements. Information provided in this document is necessarily summarized and may not contain all available material information.

Statements in this release that constitute forward-looking statements or information include, but are not limited to: potential mining rates; the goal to declare the first mineral reserves at Kamoa; completion and results of a development study; start of production, targeted production rate and grade of the copper resources; start of the excavation of the first decline; construction of a smelter; sale of copper concentrates; rehabilitation of the three hydro-electric power plants in the DRC and the quantity power the three plants are expected to provide to the grid; completion of other studies in support of the development study; and the formation of a significant strategic partnership to further develop the project.

The estimation of Mineral Resources is inherently uncertain and involves subjective judgments about many relevant factors. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The accuracy of any such estimates is a function of the quantity and quality of available data, and of the assumptions made and judgments used in engineering and geological interpretation (including estimated future production from the Kamoa Project, the anticipated tonnages and grades that will be mined and the estimated level of recovery that will be realized), which may prove to be unreliable and depend, to a certain extent, upon the analysis of drilling results and statistical inferences that may ultimately prove to be inaccurate. Mineral Resource estimates may have to be re-estimated based on: (i) fluctuations in copper or other mineral prices; (ii) results of drilling; (iii) metallurgical testing and other studies; (iv) proposed mining operations, including dilution; or (v) the evaluation of mine plans subsequent to the date of any estimates.

All such forward-looking information and statements are based on certain assumptions and analyses made by Ivanplats' management in light of their experience and perception of historical trends, current conditions and expected future developments, as well as other factors management believes are appropriate in the circumstances. These statements, however, are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking information or statements. Important factors that could cause actual results to differ from these forward-looking statements include those described under the heading "Risks and Uncertainties" in the company's most recently filed MD&A. Readers are cautioned not to place undue reliance on forward-looking information or statements.

Click here to read the news release in PDF Format


HOME CORPORATE PROJECTS NEWS CONTACT

SUBSCRIBE |
� Copyright 2013, Ivanplats Ltd, All Rights Reserved.
Données et statistiques pour les pays mentionnés : Angola | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Angola | Tous

Copper Creek Ventures

CODE : CPV.V
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Copper Creek est une société d’exploration minière de cuivre basée au Canada.

Copper Creek est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 13,1 millions CA$ (10,2 millions US$, 8,4 millions €).

La valeur de son action a atteint son plus haut niveau récent le 20 août 2010 à 2,30 CA$, et son plus bas niveau récent le 28 février 2014 à 0,01 CA$.

Copper Creek possède 33 480 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Copper Creek Ventures
06/02/2013How to Profit From A Potential Doubling in Copper Prices
04/02/2013Copper – Upside Breakout. Gold/Silver To Follow?
17/04/2012Gold, Silver and Copper Stocks Investing Strategie
01/04/2012Dr Copper suggests, its the longs that are the Gamblers
12/06/2011Commodity Wrap: Wheat, Copper look bearish
21/05/2011Copper Stocks Gleaming in Gold's Glow
19/05/2011Copper is Talking, Massive Infrastructure Projects to Boost ...
Projets de Copper Creek Ventures
17/12/2013Reed Copper Project November Development Highlights
11/12/2013Exploration Company Drills 24 m of 3.26% Copper
22/10/2013Tower Provides Rabbit North Exploration Update; Assays up to...
16/10/2013Equitas Acquires Copper \226 Gold Project C...
04/10/2013Tower Discovers New Porphyry Copper Mineralized System at JD...
26/09/2013BRR Webcast Sipa Intersects Thick Primary Copper Sulphides
19/09/2013TSX Venture Company: Sheslay Copper Gold Porphyry Project Dr...
06/08/2013Lower initial capital cost and significant smelting capacity...
23/07/2013Avrupa resumes drilling at Monte da Bela Vista
22/07/2013Diamond Drilling Commences at Oxy's Bore Copper Prospect
10/06/2013Ivanplats files Mining Right Application for its Platreef p...
04/06/2013Astorius Resources Acquires Hautete Claim In The Prolific Ba...
28/05/2013Thaduna Copper Project - Drilling Update
25/05/2013Venture Copper Company Expects Production by Q4 2013
21/05/2013SolGold - New Ecuadoran Mining Bill Lifts Cascabel Copper Go...
15/05/2013McEwen Mining's Los Azules Copper Project Continues to Grow!
09/05/2013Project Update =2D HALLS CREEK COPPER PROJECT
18/04/2013Development of Ivanplats' Kamoa copper discovery not affecte...
11/04/2013Ivanplats reaches agreement on upgrading of a third hydroele...
28/03/2013McEwen Mining Inc=2E: Los Azules Copper Project Exploration ...
19/02/2013North Announces Results of 2012 Exploration Program=2C Redst...
17/01/2013New independent resource estimate more than doubles high-gr...
17/01/2013Los Azules Copper Project Continues to Grow
30/10/2012Halls Creek Copper Project Joint Venture
22/10/2012Drilling To Commence At El Secreto Gold, Silver And Copper P...
11/10/2012BRR Broadcast - KBL Mining delivers additonal high grade cop...
10/10/2012Pilot Gold announces Preliminary Economic Assessment results...
19/09/2012Pilot Gold reports 5.94 g/t gold, 12.6 g/t silver and 0.53% ...
10/09/2012Boseto Copper Project Officially Opened
04/09/2012New Copper-Gold Discovery at Lorena
21/08/2012Boxxer Updates Activities On DOK Copper-Gold Molybdenum Proj...
16/08/2012Finance News Network Interview - KBL reveals new copper and ...
15/08/2012Joe Exploration
10/08/2012Cobriza Intersects 292 metres of 0.33% Copper Equivalent* at...
03/08/2012Boxxer Enters Letter Of Intent To Acquire 23 Mineral Claims ...
01/08/2012Pilot Gold reports 0.64 g/t gold and 0.52% copper over 134.9...
20/07/2012Thick High Grade Copper Intersected at Mango
18/07/2012New Hana Signs Definitive Agreement to Option the Formerly P...
18/07/2012Pilot Mountain Tungsten - Copper Project Update Presentation
12/07/2012Cobriza Intersects 142 metres of 0.51% Copper Equivalent* at...
11/07/2012Focus Acquires Porphyry Copper-Molybdenum Project, Peru; His...
03/07/2012Extensive Drilling Programme to Commence at Black Hill Silve...
25/06/2012[cuy_announcements] New Copper Discovery at Wilkins
22/06/2012VMS Acquires Large Land Package Adjacent to the Reed Copper ...
04/06/2012Boseto Copper Project Commissioning & Dev Plan Updates
25/05/2012Boxxer Commences Drilling On Its East Breccia Copper Propert...
14/05/2012North Reviews Historical Resource Estimate At Redstone Prope...
09/05/2012RAINBOW EXPANDS BIG STRIKE LAND PACKAGE 4.4% COPPER SHOWING ...
02/05/201229% Increase in Contained Copper at Plutus Deposit
01/05/2012North Announces Exploration Program at Redstone Property=2C ...
30/04/2012Credence Copper Revival: Junior Teaches Old Arizona Mine Ne...
26/04/2012North Provides Clarity Regarding Permitting of Carmacks Proj...
19/04/2012Camino Begins Soil Sampling Program at El Secreto Gold, Silv...
19/03/2012NORTHISLE ANNOUNCES START OF AN INDUCED POLARIZATION SURVEY ...
12/03/2012[pressrelease] Nama Copper/Cobalt Exploration Project, Zambi...
01/03/2012North Announces Design Changes At Carmacks Copper Mine
21/02/2012Camino Signs Letter Of Intent For El Secreto Gold, Silver A...
08/02/2012Pilot Gold reports first resource for the Halilaga copper-go...
01/02/2012Commencement of Feasibility Study Update for Carmacks Copper...
14/12/2011Octagon Capital issues site visit report on Oracle Ridge Cop...
05/12/2011Calibre Announces Start of 5,000 Metre Drill Program at Rosi...
24/11/2011Ca=F1ariaco Norte Copper Project Update
14/10/2011Quadra FNX Announces A 9% Increase In Q3 2011 Copper Product...
31/08/2011Pilot Gold Returns 0=2E48 G/T Gold And 0=2E64% Copper Over 1...
24/08/2011Kiska Cuts Long Gold and Copper Intersections, Whistler Proj...
27/07/2011/ ANDOVER REPORTS 16.5 METER INTERCEPT OF 6.6 % COPPER EQUIV...
25/07/2011Resource Stocks=e2?? Stacking The Odds With Copper And Gold
29/06/2011Status Update - Ca=F1ariaco Norte Copper Project
16/06/2011Boxxer Options Second Canadian Copper-Molybdenum-Silver Prop...
Communiqués de Presse de Copper Creek Ventures
14/12/2013Global Economic Indicator
05/12/2013Uranium | Diamonds | Copper
20/11/2013Astorius Resources Commences Geophysical Survey on its Babin...
14/11/2013Columbus Copper
04/11/2013Week in Review: Uranium / Copper / Mexico
23/10/2013Columbus Copper
23/09/2013McEwen Mining Announces Updated Preliminary Economic Assessm...
17/09/2013Columbus Copper
02/09/2013Long-Term Chart
02/09/201363 metres at 1.1% Copper in Primary Copper Sulphide
23/08/2013What Does a Secular Bull Market Look Like.
16/08/2013Kings Documentary
15/08/2013Stocks Begin to Breakout
14/08/2013Joe Sampling Program
09/08/2013Breakout
25/07/2013Smart Money Making A Huge Bet On Copper
16/07/2013More Shallow Copper Results at 7B
16/07/2013Hello / Heavy copper PCB
26/06/2013Focus Options Aurora Project to Red Copper Resources
20/06/2013Thickest Copper Intersection to Date at Enigma
17/06/2013North Deposit Drilling Intersects Multiple Zones of Minerali...
11/06/2013Columbus Copper
08/06/2013Nexvu Capital Blog: World Copper Fact Book 2012
06/06/2013Significant Primary Sulphide Copper Intersections at Thaduna
30/05/2013Columbus Copper
08/05/2013Columbus Copper
08/05/2013North Announces Loan Agreement
06/05/2013TAD Acquires the Iskut Copper Gold Prospect in BC
21/04/2013Nexvu Capital Blog: Copper - Buy=2C Sell=2C Hold=3F
16/04/2013Nexvu Capital Blog: Copper versus Gold
23/03/2013Nexvu Capital Blog: Copper Update - The History of Copper in...
11/03/2013Nexvu Capital Blog: Copper Update - Junior Performance Disco...
19/02/2013Cascabel Copper Porphyry Earn-In Agreement Re-negotiated
08/02/2013McEwen Grows Los Azules Copper Count - by The Northern Miner
29/01/2013North and Yukon Energy Corporation Sign Letter Of Intent
11/12/2012Extensive Copper Mineralisation Confirmed at Mount Angelo No...
14/11/2012Bloodwood Delivers Strong Copper and Gold Results
09/11/2012BRR Broadcast - Mineral Hill Copper-Gold Results
08/11/2012Petrology Confirms Porphry Copper-Gold at Crater Mountain
05/11/2012Kiska receives Thorn Phase 2 Drilling Results from Brixton I...
01/11/2012North Completes 2012 Feasibility Study Update For Carmacks
30/10/2012NCU - NORTH DEPOSIT MINERALIZATION REMAINS OPEN INTERSECTING...
26/09/2012Crater Mountain Porphyry Copper-Gold Mineralisation
03/09/2012BRR Broadcast - New Copper Gold Lode Confirmed
03/09/2012BRR Webcast - Enigma Copper Update
10/08/2012[cuy_announcements] Wilkins Copper Update
08/08/2012Infographic=3A Copper Part II =2D Supply and Demand
08/08/2012Boxxer Intersects 2.32% Copper, 0.01% Molybdenum And 31.2g/T...
08/08/2012North Appoints LeClair and Koutsouras to Board and Grants Op...
20/07/2012North Mining Provides Corporate Update
19/07/2012[cuy_announcements] Assays received for Wilkins Copper Gold ...
17/07/2012Infographic=3A Copper Part 1 =2D History and Uses
28/06/2012McEwen Mining Announces Resource Update at the Los Azules Co...
20/06/2012A Blind Creek Resources Ltd Exploration Team Finds 5 Metre W...
20/06/2012Best Copper Zone to Date Intersected at Crater Mountain, PNG
06/06/2012ALL ANOMALOUS GOLD AND COPPER AREAS AT CRATER
30/05/2012Ocean Park Drills 201.4 metres of 0.52% Copper at Adelita Pr...
10/05/2012McEwen Mining Expansion Drilling Intersects 0=2E53% Copper O...
03/05/2012Ocean Park Drills 105.2 metres of 1.03% Copper at Adelita Pr...
27/04/2012Gold Results on the Prince John Prospect
26/04/2012Internationa Enexco Further Drill Results From Contact Coppe...
23/04/2012North Files Consolidated Financial Statements and Annual Inf...
17/04/2012Best Copper Intersection Ever Recorded At Pilot Mountain
20/03/2012Excelsior Engages In=2DSitu Copper Recovery Permitting Exper...
16/03/2012North Mining to attend Mines and Money Hong Kong 2012
15/03/2012GOLD PORPHYRY ZONE FURTHER INDENTIFIED
14/03/2012Atui Porphyry Copper System Confirmed and Extended
08/03/2012North Adopts Shareholder Rights Plan
28/02/2012Morning Notes, U.S. Copper Opportunity
21/02/2012Boxxer Intersects Significant Copper-Gold-Silver Mineralizat...
20/02/2012Pilot Mt Tungsten - Copper Project - Further Drill Results
20/02/2012New Strategic Kalahari Copperbelt Prospecting Licences
09/02/2012New High Grade Copper-Gold-Silver-Molybdenum Discovery at Me...
06/02/2012Alliance Secures Option over Chilean Copper-Gold Properties
05/02/2012Pilot Mt Tungsten - Copper Project First Drill Results
04/02/2012North Mining Grants Stock Options
18/01/2012Higher Grade Copper Zone at Zeta NE confirmed by drilling
12/01/2012Corporate Update: Copper Joe Drilling, Acquisition and Priva...
12/01/2012Boss Drilling Program Intersects Significant Copper Minerali...
09/01/2012NCU - NORTH DEPOSIT CONTINUES TO EXPAND - NC1127 INTERSECTS ...
09/01/2012North Deposit Continues to Expand - NC1127 Intersects Minera...
30/11/2011Proposed Acquisition, Copper Joe Update, Issuance of Stock O...
24/10/2011Resource Update Leichardt Copper Project - Mt Isa
14/10/2011Boxxer Announces Airborne Survey Outlines Five Large Magneti...
06/09/2011Boxxer Drilling Intersects 19.1 Metres Of 0.76% Copper Equiv...
18/08/2011Brixton Intersects Gold, Silver and Copper Mineralization at...
16/08/2011NCU - NORTH DEPOSIT CONTINUES TO EXPAND, DRILLING MULTIPLE I...
04/08/2011Bloomsbury Minerals - copper research
26/07/2011Boxxer Intersects 15.3 Metres Of 0.61% Copper Equivalent At ...
13/06/2011Summer Drilling Program Begins, Gold and Copper Mineralizati...
19/05/2011Drilling Intersects 453.2 metres averaging 0.72 g/t Gold, 3....
10/05/2011Pilot Gold adds copper and silver to TV Tower gold property
03/05/2011Drilling Identifies New Copper Gold Targets and Expands Rain...
12/04/2011Golden Alliance Reports Cocha Copper-Silver-Gold Project Dri...
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (CPV.V)FRANKFURT (DJ5.F)
0,390+1.30%0,262-1.50%
TSX-V
CA$ 0,390
30/04 16:59 0,010
1,3%
Cours préc. Ouverture
0,385 0,445
Bas haut
0,390 0,445
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,390 -%
Volume var. 1 mois
3 000 -%
24hGold TrendPower© : -44
Produit
Développe
Recherche
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,70 AU$-0,65%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,94 US$+9,34%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,53 GBX-1,31%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,69 CA$+13,03%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,60 CA$+1,83%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$+2,63%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,87 CA$+5,65%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,61 US$+0,98%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+5,56%Trend Power :