Chart eurGOLD   Chart eurSILVER  
 
Matière à reflexion
Point de propriété sans liberté ; point de liberté sans sûreté.
Pierre Dupont de Nemours  
Recherche :
DERNIÈRES INFO.  :
SOCIÉTÉ MINIÈRE  :
Abonnez-vous
Ecrivez-nous
Add to Google
Rechercher sur Ebay :
METAUX PRECIEUX (US $)
Gold 1390,562,96
Silver 22,42-0,08
Platinum 1460,002,50
Palladium 735,900,90
MARCHES MONDIAUX
DOWJONES 15295-6
NASDAQ 3459-4
NIKKEI 14835351
ASX 5041-101
CAC 40 3967-84
DAX 8352-179
HUI 2592
XAU 97-3
MONNAIES (€)
AUS $ 1,3347
CAN $ 1,3339
US $ 1,2916
GBP (£) 0,8563
Sw Fr 1,2537
YEN 132,1870
RATIOS & INDEXES
Gold / Silver62,02
Gold / Oil14,48
Dowjones / Gold11,00
MATIERES PREMIERES
Copper 3,310,01
WTI Oil 96,05-0,11
Nat. Gas 4,270,01
Indices des Marchés
Cours des métaux
Or & Argent industriels
RSS
Precious Metals
Graph Generator
Statistiques par Pays
Statistiques par Métal
Publicité sur 24hGold
Projets sur Google Earth
( 0 vote, 0/5 ) Imprimer l'article
     
Tweet

SilverCrest Main Zone Expansion Drilling

11.2 metres (36.73 feet) grading 3.47 gpt Gold - 167.1 gpt Silver

Santa Elena Project, Mexico

TSX-V: SVL

For Immediate Release

VANCOUVER, B.C. June 5, 2008 - SilverCrest Mines Inc. (the "Company") is pleased to report results for the next series of core holes at its Santa Elena Project located in northern Mexico.

The drill program is currently drilling hole SE08-92. The nine core holes reported below (see attached drill plan for hole locations) are part of the current program to expand the reported NI 43-101 Indicated and Inferred resources (see news release dated January 15, 2008) for the project. The most notable intercepts of this series of holes were encountered in hole SE08-80 which intercepted 11.2 metres (36.73 feet) grading 3.47 gpt gold and 167.1 gpt silver and hole SE08-79 with 15.9 metres (52.15 feet) grading 1.63 gpt gold and 161.0 gpt silver. The detailed results are shown below.

*Conversions are based on a ratio of 1:50 Au:Ag and assume 100% metal recovery. All numbers are rounded.

Hole SE08-81 and SE08-82 are located in the eastern extension on the Main Zone and represent high level epithermal mineralization in stockwork veining with narrowing higher grade mineralization near the surface. The stockwork zone is approximately 30 metres wide and anomalous in Au, Ag, Ba, and Sb which are generally indicative of the upper portions of an epithermal system. The downward extension of these intercepts is noted in hole SE08-80 which encountered 11.2 metres of 3.47 gpt Au and 167.1 gpt Ag. Hole SE08-83 was lost due to down hole problems and will be re-drilled.

Overall, the results for the expansion drilling continue to show strong, continuous mineralization over significant widths (11 to 16 metres) as drilling moves east and to depth. Average width of the Main Zone in the eastern area is approximately 15 metres which is consistent with the rest of the deposit. Silver grades continue to increase to the east and to depth. The Main Zone still remains open to the east and to depth and will be further tested with the remaining holes of the Phase II drill program.  A new resource estimate is underway with results expected in the second quarter of 2008.

Holes SE08-76, SE08-77 and SE08-78 are considered "wild cat" holes and are outside the area of the current resources of the Main Zone. These holes were completed in the Ara�a Target area with results showing broad anomalous barium and antimony with only trace gold and silver. The Company believes that the alteration and mineralization in this area is high level epithermal in nature and therefore above the zone of gold and silver mineralization.

Previously unreported hole number SE08-69 showed an intercept of  2.2 metres in the Main Zone at a depth of 415.8 to 418.0 metres grading 1.4% zinc and 34 gpt silver. This intercept suggests that the Main Zone in this area is exhibiting typical epithermal zonation characteristics with increasing base metals and decreasing gold and silver values to depth.

The Company's current NI 43-101 compliant resource is based on 40 drill holes and the on-going drill program is currently drilling hole SE08-92.  Including the holes reported above, the Company has provided results for 84 holes. Detailed results for the drilling, surface and underground sampling related to the resource calculation can be found in numerous press releases filed on SEDAR (sedar.com) or on the Company's web site (www.silvercrestmines.com).

The most recent resource estimate for Santa Elena is shown in the table below:

Santa Elena Silver and Gold Resources

1 Conforms to NI 43-101, 43101CP and current CIM definitions for resources. All numbers are rounded. Measured resources included in Indicated. 2 Cutoff grade is 30 gpt Ag equivalent (0.5 gpt Au equivalent). 3 Conversion of gold to silver based on 60:1 silver to gold ratio, assumes 100% metal recovery.

All samples were analyzed at ALS-Chemex Labs in Hermosillo, Mexico and North Vancouver, BC, Canada. N. Eric Fier, CPG, P.Eng. and Chief Operating Officer for SilverCrest Mines Inc. and  Qualified Person for this news release has reviewed and approved its contents.

The Santa Elena Project is located approximately 150 kilometres northeast of Hermosillo, Sonora, Mexico and is easily accessible with excellent local infrastructure. The Company has the right to acquire a 100% interest in the property.

SilverCrest Mines Inc. is a "Silver Focused" exploration and development company with a portfolio of high grade silver deposits and exploration properties located in Mexico and El Salvador. This property portfolio, which includes reported indicated and inferred silver resources and substantial exploration potential, provides an important base from which SilverCrest can develop its corporate objective of becoming a significant silver asset based company. The Company's immediate initiative is to acquire and develop substantial silver resources and ultimately to operate high grade silver mines throughout North, Central and South America.

This news release contains forward-looking statements, which address future events and conditions, which are subject to various risks and uncertainties. The Company's actual results, programs and financial position could differ materially from those anticipated in such forward-looking statements as a result of numerous factors, some of which may be beyond the Company's control.  These factors include: the availability of funds; the timing and content of work programs; results of exploration activities and development of mineral properties, the interpretation of drilling results and other geological data, the uncertainties of resource and reserve estimations, receipt and security of mineral property titles; project cost overruns or unanticipated costs and expenses, fluctuations in metal prices; currency fluctuations; and general market and industry conditions.

Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made.  The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, undue reliance should not be placed on forward-looking statements.

On Behalf of SilverCrest Mines Inc.

"J. Scott Drever"

J. Scott Drever, President

For further information, please contact:

Fred Cooper
1311 Howe Street, Suite 405
Vancouver, BC V6Z 2P3

Telephone:

(604) 691-1730

Fax:

(604) 691-1761

Email:

info@silvercrestmines.com

Website:

www.silvercrestmines.com

Toll Free:

1-866-691-1730 (Canada & USA)

The TSX-Venture Exchange has not reviewed and does not accept responsibility for the accuracy or adequacy of this release

SilverCrest Mines Inc. Copyright �2008 | info@silvercrestmines.com


 

.

Tweet

SilverCrest Mines

PRODUCTEUR
CODE : SVL.V
ISIN : CA8283651062
CUSIP : 828365
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Alerte Watchlist Portefeuille Note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie
Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de SilverCrest Mines
01/06/2010Greg McCoach - Mining Speculator June 2010
01/06/2010Corporate Presentation - June 2010
31/03/2010 Funding In Place, Construction on Schedule for 2010 Product...
01/01/2010Why invest in SilverCrest Mines?
10/06/2009Corporate report June 2009
01/04/2009SilverCrest Mines Update
02/03/2009Updated Resource Estimate for Santa Elena project
16/01/2009Santa Elena grows for SilverCrest
02/06/2008 Less Than A Year Away From Production At Santa Elena
21/04/2008Moving Towards Production at Santa Elena
31/03/2008New Recommendation
22/11/2006Corporate Presentation
Dans les médias de SilverCrest Mines
14/03/2012Scott Drever=2C President of SilverCrest Interview on BNN
07/10/2011SilverCrest Mines Inc. Joins OTCQX
22/09/2008Objective Capital research
25/10/2007Analysis by David and Eric Coffin
17/11/2006Follow up N° 4
Rapports annuels de SilverCrest Mines
2009 Annual Report
2008 annual report
Annual Report 2007
Annual Report 2006
Financements de SilverCrest Mines
20/05/2011Closes $30 Million Bought Deal Financing
28/04/2011Announces CAD$30.0 Million Bought Deal Common Share Financin...
20/03/2008Completes Private Placement; Amends $3.0 Million Macquarie F...
13/03/2008Announces First Closing Of Private Placement
Attributions d'options de SilverCrest Mines
29/03/2008 Engages Marketing Consultant and Grants Stock Options
Nominations de SilverCrest Mines
31/01/2013Appoints Vice President, Corporate Development
04/11/2011(Santa Elena)Appoints V.P. Corporate Development for Mexico and General M...
15/02/2011SilverCrest Appoints of Mr. Brent McFarlane Vice President, ...
Rapports Financiers de SilverCrest Mines
15/08/2012Reports Q2=2C 2012 Financial Results
10/04/2012Announces 2011 Financial Results Cash Flow from Operations o...
29/11/2011Reports $5.1 Million Third Quarter Cash Flow from Operation...
30/08/2011Announces Second Quarter Earnings of $790,000 and Cash Flow ...
02/08/2011Form 40-F Registration Statement Effective
Projets de SilverCrest Mines
13/11/2012(Santa Elena)Drilling Update for Santa Elena Mine
20/03/2012(La Joya Durango)Reports 58m @ 164.7 gpt Ag Eq* at La Joya
16/02/2012(La Joya Durango)Reports Coloradito Target Results at La Joya Property=3B Pot...
23/01/2012(La Joya Durango)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Cruz De Mayo)s Corporate Resources Silver Equivalent Inferred Resources ...
23/01/2012(Santa Elena)s Corporate Resources Silver Equivalent Inferred Resources ...
12/01/2012(Santa Elena)Reports Record Production in Q4 at Santa Elena=3B =E2?=A2 Si...
05/01/2012(La Joya Durango)Announces Initial Resources at La Joya Property=3B +100 mill...
30/11/2011(La Joya Durango)Commences Phase II Drilling at La Joya=3B Phase II Surface S...
17/11/2011(La Joya Durango)Identifies Large Bulk Tonnage Target at La Joya=3B Hole 17 i...
21/10/2011(La Joya Durango)SilverCrest Discovers New Mineralized “Contact Zone” at La J...
14/10/2011(Santa Elena)Reports Increased Santa Elena Production in Q3 Silver Produc...
22/09/2011(Santa Elena)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
22/09/2011(Cruz De Mayo)Begins Drilling at Cruz de Mayo, Reports on Santa Elena Nort...
10/08/2011(La Joya Durango)Video Tour of La Joya Mine Project, Durango Mexico
13/07/2011(Santa Elena)Declares Commercial Production at Santa Elena Mine; Pours 74...
07/06/2011(La Joya Durango)Reports Additional La Joya Drill Results, More High Grade Si...
26/04/2011(Santa Elena)Files NI 43-101 Technical Report for Santa Elena Reserve Up...
13/04/2011(Santa Elena)Santa Elena Mine Commissioning Phase Update, Silver And Gold...
12/04/2011(Santa Elena)Announces Santa Elena Expansion Plan Net Present Value of US...
13/03/2011(La Joya Durango)Reports La Joya Initial Drill Results; Up to 19.2 Metres of ...
06/01/2011(Santa Elena)Santa Elena Mine Start-Up Phase Update
01/12/2010(La Joya Durango)Acquires New Major Mexico Property
09/09/2010(Santa Elena)Completes First Metals Pour at Santa Elena
14/08/2009(Santa Elena)to Acquire 100% of the Santa Elena Project
09/06/2009(Santa Elena)Announces Agreement With MacQuarie Bank Limited For US12.5 M...
17/04/2009(Santa Elena)Revises Letter of Intent with Sandstorm Resources Ltd. for D...
13/03/2009(Santa Elena)Gold Production Payments and Convertable Loan to Finance Dev...
28/11/2008Completed pre-feasibility study for Santa Elena project
15/08/2008Receives Environmental Impact Assessment Approval; NI43-10...
01/07/2008 HIGH GRADE SILVER DEPOSITS IN EL SALVADOR AND MEXICO
30/06/2008(Santa Elena)Santa Elena prefeasibility study completed
26/06/2008(Santa Elena)Pre-Feasibility Results at Santa Elena, Mexico
05/06/2008(Santa Elena)Main Zone Expansion Drilling 11.2 metres (36.73 feet) gradin...
21/05/2008(Santa Elena) Submits Environmental Impact Assessment; Receives Land Use ...
08/04/2008(Santa Elena)Continues to Expand Main Zone at Santa Elena, Mexico
21/02/2008(Santa Elena)Updates Progress at the Santa Elena Project, Mexico
09/01/2008(Santa Elena)Continues to Intercept High Grade Gold and Silver at the San...
04/01/2008(Santa Elena)Resource Expansion at Santa Elena and Cruz de Mayo
20/12/2007(Santa Elena)Secures Surface Rights for Santa Elena Project, Mexico
29/11/2007(Santa Elena)Intercepts 32.9 Metres of 367 gpt (10.7 Ounces) Silver & Sil...
15/11/2007(Cruz De Mayo)SilverCrest Announces Resource Increase Indicated Resources ...
18/10/2007(Santa Elena)SilverCrest Intercepts 51.4 Metres of 1.53 gpt Gold and 126 ...
26/09/2007(Santa Elena) Continues to Expand Santa Elena Deposit, Northern Mexico
11/09/2007(Santa Elena)Mobilizes Second Drill Rig to Santa Elena Project, Mexico
06/09/2007(Santa Elena)Significantly Expands Mineralization at Santa Elena Project,...
26/07/2007(Cruz De Mayo)Reports Final RC Drill Results and Preliminary Metallurgy at...
05/07/2007(Cruz De Mayo)Reports More Silver at Cruz de Mayo, Mexico
24/05/2007(Cruz De Mayo)Reports New Silver Discovery at Cruz de Mayo, Mexico
10/05/2007(Cruz De Mayo)Updates Progress at the Santa Elena Project, Mexico
Communiqués de Presse de SilverCrest Mines
21/12/2012Reports Additional La Joya High Grade Intercepts 80m of 78.8...
04/12/2012(Santa Elena)s Santa Elena Resource Infill and Expansion Drilling
27/11/2012Reports Additional La Joya High Grade Intercepts 45.0m of 13...
05/10/2012Announces $26.1 Million Bought Deal
27/09/2012Reports High Grade Surface Sampling and Additional Drill Res...
30/01/2012Presenting At the Silverseek Online Forum
09/01/2012Retires Bank Debt Ahead of Schedule
07/10/2011Commences Trading on OTCQX
17/06/2011Announces Appointment of New Director, Reconfirmation of Sha...
31/05/2011Files Form 40-F Registration Statement with SEC
14/01/2011updates Market On US Trading Status
29/07/2010Initial Gold & Silver Production Imminent
06/05/2010& Goldsource Appoint Director of Communications
22/09/2009Analyst Coverage by Jennings Capital
13/07/2009New office
24/06/2009Eric Fier on Newsmakers
17/11/2008At Hard Assets Conference, San Francisco
24/09/2008New Video Tour: Underground Silver Deposits at Santa Elena
13/07/2008Report
10/07/2008Signs Agreement For $3.0 Million Feasibility Finance Facilit...
21/04/2008Initiation Report
01/03/2008Announces US$3.0 Million Feasibility Finance Facility & Prop...
19/09/2007Intercepts 10.1 Metres of 6.53 gpt Gold and 218.7 gpt Silve...
08/03/2007Completes Second Phase Drill Program at Cruz de Mayo, Mexico
Commenter cet article
Vous devez être connecté pour commenter un article8000 caractères max.
 
Connectez vous
Email : Mot de passe : Login
Inscrivez-vous Mot de passe oublié
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (SVL.V)Other OTC (STVZF.PK)
1,81-1.09%2,84+3.27%
TSX-V
CA$ 1,81
23/05 15:59 -0,020
-1,09%
Cours préc. Ouverture
1,83 1,83
Bas haut
1,80 1,86
Année b/h Var. YTD
1,72 -  2,74 -31,44%
52 sem. b/h var. 52 sem.
1,61 -  2,92 -8,59%
Volume var. 1 mois
71 600 -13,40%
24hGold TrendPower© : -44
Produit Gold - Silver
Développe Gold - Silver - Zinc
Recherche Silver
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Vous devez être connecté pour accéder au portefeuille (gratuit)
TOP NEWSRELEASES
Variation annuelle
DateVariationMaxiMini
2013-38,01%
201257,84%3,171,55
20111,09%2,261,07
2010125,93%2,200,81
2009102,50%0,950,36
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois