Medusa Mining Ltd

Publié le 31 janvier 2014

Medusa Mining Limited Quarterly Activities Report: Period Ended 31 December 2013

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Copper | Philippines |

Medusa Mining Limited Quarterly Activities Report: Period Ended 31 December 2013

COMO, WESTERN AUSTRALIA--(Marketwired - Jan 30, 2014) - Medusa Mining Limited (MML.AX)(MML.L) -

Snapshot of Medusa:

  • Un-hedged, low cost, gold producer focused on organic growth in the Philippines
  • Successful Capital Raising of A$34 million during the quarter
  • Commissioning of new mill delayed to 6 December 2013 due to powercell failures
  • December 2013 quarter production of 11,587 ounces (YTD: 26,089 ounces)
  • Safety - No lost time accidents during the quarter.

OVERVIEW:

  • Successfully raised gross proceeds of A$34 million via a placement
  • Exploration drilling utilised four underground drill rigs at Co-O and two surface rigs at Tambis
  • Crosscutting south from the 8L Shaft has reached all the veins on the resource model.
  • Commissioning of the new SAG Mill was delayed until 6th December due to powercell failure.
  • The new SAG Mill operated at 1,800 tpd in the last days of December
  • Gold Production of 11,587 ounces for the quarter

Co-O MINE PRODUCTION & DEVELOPMENT

  • Level development continued on the 8L and all the veins in the resource model were intersected. The Great Hamish Veins (including Footwall and Hangingwall veins), Jereme Veins and Catto Veins are now being developed.
  • Development and stoping continued on all 8 levels during the quarter.
  • Production and development is continued on the Don Pedro and Don Pedro East Veins.
  • Exploration drilling continued on the 8L, 2L and on the 3L west of the Tinago Fault.
  • Production of 11,587 ounces was down on the September quarter's production (14,502 ounces) due to powercell failure with the new SAG Mill, which was not operational until 6th December 2013.
  • The grade was lower due to milling low grade stockpiles and development ore was lower due to mining narrow vein lodes.

Co-O MINE EXPLORATION

  • Drilling is continuing with two underground rigs on contract and two Company owned rigs. Surface exploration, including geophysical surveys is on-going

TAMBIS AREA - BANANGHILIG GOLD DEPOSIT

  • Diamond drilling at the B2 area is temporarily suspended pending results and planning of the 2014 exploration and development programmes

CORPORATE & FINANCIALS (unaudited)

  • Total cash and cash equivalent in gold on metal account at the end of quarter of approximately US$20.77 million
  • Successfully raised gross proceeds of A$34 million via the placement of 18,890,390 shares at A$1.80 per share to clients of Euroz Securities Limited
  • Retirement of Non-executive Chairman Mr Geoff Davis (Founding Managing Director) and appointment of Mr Andrew Teo as his replacement

PROJECT OVERVIEW

The locations of the Company's projects are shown on Figures 1 and 2.

To view Figure 1, please visit the following link: http://media3.marketwire.com/docs/mml0130fig1.jpg.

To view Figure 2, please visit the following link: http://media3.marketwire.com/docs/mml0130fig2.jpg.

HEALTH, SAFETY & ENVIRONMENT

There were no Lost Time Accidents and no environmental breaches during the quarter.

EXECUTIVE ORDER ON MINING SECTOR REFORMS IN THE PHILIPPINES

On 06 July 2012, Philippine President Benigno Aquino III signed Executive Order No. 79 entitled "Institutionalizing and Implementing Reforms in the Philippine Mining Sector Providing Policies and Guidelines to Ensure Environmental Protection and Responsible Mining in the Utilization of Mineral Resources" ("EO 79").

On 10 September 2012, the Department of Environment and Natural Resources ("DENR") issued Administrative Order No. 2012-07 ("Rules and Regulations to Implement EO-79" or "EO-79 IRR"), and on 08 October 2012, issued Administrative Order No. 2012-07-A2 ("EO-79 Amended IRR") to revise Sections 3, 7 and 9 of EO-79 IRR. EO-79 IRR and its amendments took effect on October 25, 2012.

The implications of the EO-79 with regards to the Company's projects are discussed in the June 2012 and September 2012 quarterly reports to the ASX. There has been no change in the Company's view since then.

On March 07, 2013, the Secretary of the Department of Environment and Natural Resources (DENR) approved the lifting of the moratorium on acceptance of applications for Exploration Permits and Financial and Technical Assistance Agreements.

The new legislation on mining taxes and royalties is yet to be finalised for submission to Congress.

EXECUTIVE ORDER ON EXTRACTIVE INDUSTRIES TRANSPARENCY IN THE PHILIPPINES

On 26 November 2013, Philippine President Benigno Aquino III signed Executive Order No. 147 entitled "Creating the Philippine Extractive industries transparency Initiative" ("EO 147").

Pursuant to Section 14 of the EO 79, the Philippine government commits to participate in the Extractive Industries Transparency Initiative (EITI) that sets international standards for transparency and accountability in the extractive industries and in government. Established in 2003, the EITI is a global coalition of governments, companies and civil society collaborating to improve honest and responsible management of revenues from natural resources, particularly oil, gas, metals and minerals.

Through EO 147, the Philippine government has instituted the Philippine Extractive Industries Transparency Initiative (PH-EITI), which commits to ensure greater transparency and accountability in the extractive industries, specifically in the way the government collects, and companies pay taxes from extractive industries;

The implications of the EO 147 with regards to the Company's projects are not considered to have any negative impact and the Company sees the Executive Order as a positive commitment by the Philippine Government to adopt good governance practices in accordance with International Guidelines of the EITI.

MINERAL RESOURCES AND ORE RESERVES

The Company's current mineral resources (including the Saugon resource) and ore reserves were previously reported in accordance with the guidelines of the JORC Code 2004 (Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). Refer to announcement of 08 August 2013, the September 2013 Quarterly Report, and the 2013 Annual Report.

The Co-O and Bananghilig deposits are currently undergoing review, interpretations and revised mineral resource and ore reserve estimations in accordance with the guidelines of the recently adopted JORC Code 2012. Since there may be material changes to the mineral resources and ore reserves, due to changes in gold price, mining dilution and so forth, the Company will not be reporting the resources and reserves until the revised estimations have been completed and signed off by the independent Competent Persons. The revised resources and reserves for Co-O and Bananghilig are expected to be reported during the September 2014 quarter.

Co-O MINE

Production

The production statistics for the December 2013 quarter and half-year with comparatives for the previous three quarters are summarised in Table 1 below.

Table I. Gold production statistics

Qtr ended Qtr ended Qtr ended Qtr ended HY ended
Unit 31 Dec
2013
30 Sep
2013
30 Jun
2013
31 Mar
2013
31 Dec
2013
Tonnes mined WMT 108,264 114,380 103,028 83,134 222,644
Ore milled DMT 98,590 91,461 92,567 73,273 190,051
Head grade g/t 4.51 5.68 5.97 6.76 5.07
Recovery % 85 % 87 % 88 % 89 % 86 %
Gold produced ozs 11,587 14,502 15,642 14,021 26,089
Cash costs (1) US$/oz $ 526 $ 339 $ 355 $ 296 $ 422
Gold sold ozs 11,774 15,560 16,236 17,760 27,334
Average gold price received US$ $ 1,262 $ 1,336 $ 1,410 $ 1,630 $ 1,304

Note:

(1) Net of development costs and includes royalties and local business taxes

The Company produced 11,587 ounces of gold for the quarter, at an average head grade of 4.51 g/t and cash costs of US$526 per ounce, inclusive of royalties and local business taxes (YTD cash costs of US$422 per ounce). Cash costs were higher during the quarter primarily due to lower gold production.

Gold production for the quarter was low due to the following reasons:

  • late commissioning of the new SAG Mill;
  • milling of marginal ore from low grade stockpiles;
  • milling of development ore sourced from narrow vein lodes.

The new SAG Mill commenced operations on 6th December 2013 and on the last days of December 2013, it achieved 1,800 tonnes per day.

Operations

Mine Development

The 8 level Shaft has been operating and during October, new sheave wheels, ropes, skips and man cages were fitted to the Shaft and the haulage speed increased from 2 m/s to 5.3 m/s.

The two ore pass system from the 6 level to 8 level loading pocket were completed and are operational.

Development continued on levels 1 to 8. During the quarter, all the veins in the resource model on the 8 level were intersected with the crosscut heading south. Development on all these veins continued during the quarter. The veins developed during the quarter were narrow, but as the south crosscut reached the Great Hamish Veins, the veins were wider and the grade from development improved towards the end of December.

Development and production continued on the Don Pedro and Don Pedro East Vein during the quarter and an exploration winze was commenced on the Don Pedro East vein from the 8 level to the 9 level.

Stoping on levels 1 to 6 continued, with stoping on the Don Pedro veins on the 8 level.

Co-O Mill

The new SAG Mill commenced operations on 6th December 2013 following the re-instalment of the repaired powercells. The Mill operated for the rest of December and in the last days of December achieved 1,800 tonnes per day.

The Dominion mill was relined during December and will commence operating in January 2014. The Kurimoto Ball mill will be relined in January and be ready to operate in February 2014.

The Detox, Thickener, CIL tanks, Gold Room and associated equipment with "Wet" processing were all successfully operated during the quarter.

Co-O Mine Drilling

Underground diamond drilling continued during the quarter utilising two large and two smaller portable drilling rigs. A total of 20 holes were completed at Levels 2, 3 and 8 for an advance of 6,160 metres.

Currently there are four diamond drill rigs operating two (on contract), two (owned by the company) on Levels 2, 3 and 8.

The Company has recently purchased an additional six portable underground diamond drill rigs to be deployed at various levels within the mine to assist in exploring for zones of additional mineralisation.

Table II. Co-O surface and underground drill hole results of ≥ 0.5 metres at ≥ 3 g/t gold. (Refer Appendix A for JORC Code, 2012 Edition - Table 1 Report)

Hole Number East(4) North(4) RL(4) Depth
(metres)
Dip
(deg.)
Azimuth
(deg.)
From
(metres)
Width(2)
(metres)
Gold
Grade
(1), (3)
(uncut)
(g/t gold)
UNDERGROUND EXLORATION DRILL HOLES - LEVEL 3
L3-64W-010 613348.2 913026.6 60.5 492.00 -25 124 335.60 1.10 20.30
L3-64W-011 613341.2 913031.9 61.4 255.40 +3 331 223.65 0.90 3.47
241.65 1.00 3.20
L3-64W-012 613343.1 913032.7 61.4 256.80 +3 013 65.50 1.40 5.19
L3-64W-014 613344.3 913032.9 61.3 327.40 +3 020 74.50 2.20 3.70
UNDERGROUND EXLORATION DRILL HOLES - LEVEL 8
L8-19E-001 614207.3 913105.2 -192.0 487.10 +3 247 62.85 1.00 5.88
L8-29E-008 614274.0 912908.3 -190.6 473.40 +3 174 57.80 0.65 47.77
85.95 1.00 4.60
169.30 1.20 5.30
203.80 0.50 3.78
L8-29E-009 614276.3 912912.8 -190.6 452.20 +3 093 80.65 0.85 16.77
186.60 5.80 5.62
236.55 1.00 78.50
326.60 0.40 5.33
338.25 4.15 16.51
includes 340.40 1.00 43.77
L8-29E-010 614274.0 912908.3 -190.7 474.30 +3 142 194.50 1.00 13.53
292.00 1.70 40.50
includes 292.00 0.75 73.73

Notes:

1. Composited intercepts' 'weighted average grades' calculated by using the following parameters:
(i) no upper gold grade cut-off applied;
(ii) lower cut-off grade of 3.0 g/t gold;
(iii) high-grade samples (≥ 20 g/t gold) within composited interval are individually reported; and
(iv) ≥ 0.5 metres down hole intercept width at ≥ 3.0 g/t gold, or
(v) ≥ 6 gram.metres,and
(vi) maximum of 1.0 metre of down-hole internal dilution at ≤ 3 g/t gold.
2. Intersection widths are downhole drill widths not true widths;
3. Assays are by Philsaga Mining Corporation's laboratory; and
4. Grid coordinates based on the Philippine Reference System 92. RL is elevation in metres relative to Mine Datum.

Co-O EXPLORATION

IP Survey

The ground Induced Polarisation ("IP") and Resistivity ("RES") survey is ongoing within the Co-O tenements including the Co-O mine environs. During the December 2013 quarter, approximately 67 line kilometres of IP survey were completed. Heavy rain has hampered the survey and it is now expected that the balance (~104 line kilometres) will be completed early in the June 2014 quarter, with interpretation being carried out during the June/September 2014 quarters.

Ground Magnetics Survey

A Ground Magnetics survey is ongoing, using the same grid as the IP survey. A total of approximately 118 line kilometres were completed during the December quarter. Approximately 94 line kilometres remains to be completed, and is expected to be completed at the same time as the IP survey, with interpretation being carried out concurrent with the IP interpretation.

Reconnaissance Programmes

Reconnaissance mapping and sampling programmes are ongoing.

TAMBIS REGION

The Tambis project comprising the Bananghilig Gold Deposit (Figure. 2) is operated under a Mining Agreement with Philex Gold Philippines Inc. over Mineral Production Sharing Agreement ("MPSA") 344-2010-XIII, which covers 6,262 hectares.

The Executive Order on Mining (EO 79) signed on 6 July 2012, by the President of the Philippines, will have no immediate impact on the Bananghilig Project as the Company can continue to explore, conduct feasibility studies and planning.

BANANGHILIG GOLD DEPOSIT

The announcement of 12 September 2011 summarises the Tambis regional geological setting, local geological setting, deposit description and mineralisation. Additional information is contained in the September 2011 quarterly report dated 24 October 2011, drilling updates on 17 January 2012, 8 August 2012, 21 November 2012, and 02 April 2013, operations update on 08 July 2013, and resource estimation updates on 29 January 2013 and 08 August 2013.

Indicated & Inferred Mineral Resource Estimation

The Bananghilig resource was previously announced in accordance with the guidelines of the JORC Code 2004 (Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves). Refer to announcement of 08 August 2013, the September 2013 Quarterly Report, and the 2013 Annual Report.

The Bananghilig deposit is currently undergoing review, interpretation and revised mineral resource and estimation in accordance with the guidelines of the recently adopted JORC Code 2012. Since there may be material changes to the mineral resources, due to changes in gold price, and so forth, the Company will not be reporting the project's mineral resources until the revised estimations have been completed and signed off by the independent Competent Persons. The revised mineral resources for Bananghilig are expected to be reported during the September 2014 quarter.

Bananghilig Scoping & Pre-Feasibility Study (1)

On 09 April 2013, the Company published the results of a first pass Scoping Study(1) of the Bananghilig Gold Deposit. The Scoping Study was carried out and reported under the guidelines of the JORC Code 2004, therefore the results of the Scoping Study do not now necessarily comply with the requirements of the JORC Code 2012 and will not be reported henceforth.

(1) The Scoping Study referred to in the announcement dated 9 April 2013 was based on low-level technical and economic assessments of Indicated and Inferred Mineral Resources, as defined under the guidelines of JORC Code 2004, and is insufficient to support estimation of Ore Reserves or to provide assurance of an economic development case at this stage, or to provide certainty that the conclusions of the Scoping Study will be realised.

A Feasibility Study was initiated on the completion of the Scoping Study. Sterilisation and geotechnical drilling programmes were completed in early October 2013.

A decision was made towards the end of the September quarter to temporarily suspend the feasibility study given the mineralisation being encountered at the new B2 discovery area, as well as given consideration to the depressed gold price and commissioning of the new Co-O milling circuit.

B2 Discovery Area

During the September reporting period, two large capacity diamond drilling rigs completed two diamond drill holes (TDH332 & TDH334) within the B2 area for a total advance of 622.6 metres.

Figure 3 shows the Bananghilig area geology showing the position of the new B2 mineralisation discovery, beneath the limestone cover, relative to the Bananghilig resource.

To view Figure 3, please visit the following link: http://media3.marketwire.com/docs/mml0130fig3.jpg.

Figure 4 shows the drill hole projection plan of the B2 drill holes relative to the Bananghilig 2013 resource model.

To view Figure 4, please visit the following link: http://media3.marketwire.com/docs/mml0130fig4.jpg.

B2 Drilling Results

Results of diamond drilling at B2 were announced on 2 April 2013 and 8 July 2013, in the March 2013, June 2013 and September 2013 Quarterly Reports, and the September 2013 Annual Report. Results have subsequently been received for all outstanding sample submissions as well as for the holes completed during this quarter. Significant intercepts for completed drill holes are included in Table III below.

Geotechnical and Sterilisation Drilling Programmes

The Geotechnical drilling and test pitting programmes were completed in first week of October with one last diamond drill hole completed for a total of 60 metres. Drilling was carried out to investigate sites suitable for infrastructure associated with the potential development of the Bananghilig resource, including plant site, waste, tailings and process water storage facilities. Sterilisation drilling programme was completed in the same areas. No significant assay results have been received for any of the drilling programmes in these areas.

Regional Exploration

Reconnaissance mapping and sampling is on-going within the Tambis Region.

Table III. Bananghilig B2 Discovery Area drill hole results ≥ 1 g/t gold. (Refer Appendix B for Table 1 prepared in accordance with JORC Code 2012)

Hole Number East(4) North(4) RL(4) Depth
(metres)
Dip
(deg.)
Azimuth
(deg.)
From
(metres)
Width(2)
(metres)
Gold
Grade
(1), (3)
(g/t gold)
BANANGHILIG - B2 DISCOVERY AREA
TDH328 613241.7 945191.7 214.6 312.50 -60 130 260.20 1.45 8.82
289.20 15.60 1.51
TDH330 613626.8 945064.5 123.7 294.50 -56 130 154.85 16.50 3.78
includes 159.05 0.55 40.64
includes 161.05 0.75 16.71
197.85 5.80 0.93
TDH332 613554.7 945020.3 142.1 320.50 -60 130 170.35 7.00 7.27
includes 174.70 1.00 45.49
236.30 0.70 22.40
254.50 7.55 5.79
includes 254.50 1.00 21.90
includes 259.70 1.00 14.69
TDH334 613001.7 944955.1 147.5 302.10 -60 130 80.30 9.50 2.77
200.15 6.85 1.26

Notes:

1. Composited intercepts' 'weighted average grades' calculated by using the following parameters:
(i) no upper gold grade cut-off applied;
(ii) lower cut-off grade of 0.5 g/t gold;
(iii) high-grade samples (>10 g/t gold) within composited interval are individually reported;
(iv) ≥ 5 metres down hole intercept width at ≥ 1.0 g/t gold, or
(v) ≤ 5 metres down hole intercept width at ≥ 5 gram per metres, and
(vi) maximum of 3 metres of downhole internal dilution at ≤0.5 g/t gold;
2. Intersection widths are downhole drill widths not true widths;
3. Assays are by Intertek McPhar Mineral Services Inc. in Manila; and
4. Grid coordinates and RL (elevation) based on the Philippine Reference System 92.

LINGIG

The Lingig prospect is located in Mineral Production Sharing Agreement 343-2010-XIII with an area of 3,824 hectares over which the Company has an operating agreement.

Detailed geological mapping was completed during the quarter. Data compilation from the mapping, soil sampling, and geophysical surveys will commence during the March 2014 quarter. Interpretations will be reviewed prior to planning drill targets.

USA PORPHYRY COPPER-GOLD PROSPECT

A Memorandum of Agreement with Corplex Resources Inc. covers the Usa prospect, which is located within MPSA application XIII-00077. Processing of the tenement application is progressing.

SAUGON DEPOSIT

Detailed and reconnaissance geological mapping, trenching and sampling programmes are on-going.

FINANCIALS (unaudited)

As at 31 December 2013, the Company had total cash and cash equivalent in gold on metal account of approximately US$20.77 million (30 September 2013: US$5.99 million).

The Company sold 11,774 ounces of gold at an average price of US$1,262 per ounce (September 2013 quarter: sold 15,560 ounces at an average price of US$1,336 per ounce).

During the quarter, the Company incurred,

  • exploration expenditure of US$4.1 million (September 2013 quarter: US$4.4 million);
  • US$2.7 million on capital works associated sustaining capital at the mine and mill and costs for the new mill construction and infrastructure (September 2013 quarter: US$8.9 million); and
  • US$8.3 million on continued mine development (September 2013 quarter: US$9.2 million).

CORPORATE

  • During the quarter, the Company raised gross proceeds of A$34,002,702 via the issue of 18,890,390 shares at A$1.80 each to clients of Euroz Securities Limited. (refer announcement dated 31 October 2013)
  • Mr Geoff Davis (Founding Managing Director of Medusa) retired as Non-executive Chairman on 22 November 2013 and was succeeded by Non-executive Director, Mr Andrew Teo.

JORC CODE 2012 COMPLIANCE - CONSENT OF COMPETENT PERSONS

Medusa Mining Limited

Information in this report relating to Exploration Results has been reviewed and is based on information compiled by Mr Gary Powell who is a member of The Australian Institute of Geoscientists. Mr Powell is a Non-Executive Director and has sufficient experience, which is relevant to the style of mineralisation and type of deposits under consideration, and to the activity which they are undertaking, to qualify as a "Competent Person" as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Powell consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

DISCLAIMER

This report contains certain forward-looking statements. The words 'anticipate', 'believe', 'expect', 'project', 'forecast', 'estimate', 'likely', 'intend', 'should', 'could', 'may', 'target', 'plan' and other similar expressions are intended to identify forward-looking statements. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements.

Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Medusa, and its officers, employees, agents and associates, that may cause actual results to differ materially from those expressed or implied in such statements.

Actual results, performance or outcomes may differ materially from any projections and forward-looking statements and the assumptions on which those assumptions are based.

You should not place undue reliance on forward-looking statements and neither Medusa nor any of its directors, employees, servants or agents assume any obligation to update such information.

Board of Directors:
Andrew Teo (Non-executive Chairman)
Peter Hepburn-Brown (Managing Director)
Raul Villanueva (Executive Director)
Ciceron Angeles (Non-executive Director)
Robert Weinberg (Non-executive Director)
Gary Powell (Non-executive Director)
Capital Structure:
Ordinary shares: 207,794,301
Unlisted options: 1,575,000
Listings:
ASX and LSE (MML.L)

To view Appendix A and Appendix B, please visit the following link: http://media3.marketwire.com/docs/mml0130appendix.pdf.

ABN: 60 099 377 849

Lire la suite de l'article sur finance.yahoo.com
Données et statistiques pour les pays mentionnés : Philippines | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Philippines | Tous

Medusa Mining Ltd

EXPLORATEUR
CODE : MML.AX
ISIN : AU000000MML0
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Medusa Mining est une société de production minière d'or et de cuivre basée en Australie.

Medusa Mining détient divers projets d'exploration aux Philippines.

Ses principaux projets en exploration sont CO-O, CORPLEX, ABACUS, ANOLING et APICAL aux Philippines.

Medusa Mining est cotée au Canada, au Royaume-Uni, en Australie et en Allemagne. Sa capitalisation boursière aujourd'hui est 125,7 millions AU$ (90,7 millions US$, 79,5 millions €).

La valeur de son action a atteint son plus haut niveau récent le 03 juin 2011 à 8,60 AU$, et son plus bas niveau récent le 27 juin 2017 à 0,27 AU$.

Medusa Mining possède 207 790 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Présentations des Compagnies de Medusa Mining Ltd
05/09/2016Investor Presentation September 2016
14/02/2011Investor Presentation February 2011
18/08/2008Aegis report
16/06/2008 BGF Equities Research Report
12/03/2008Fairfax ResearchContent-class: urn:content-classes:message
31/07/2007 Quarterly Activity Report
11/03/2007Investor Presentation
Dans les médias de Medusa Mining Ltd
17/06/2008Building a low cost production base with blue sky potential
13/03/2007Broker Report
Rapports annuels de Medusa Mining Ltd
: 2013 Annual Report
: 2011 Annual Report
Annual Report and Notice of Meeting
2006 Annual Report
Nominations de Medusa Mining Ltd
31/05/2013: Retirement and Appointment of CFO
25/01/2013: New Board Appointments
09/06/2011Board Restructure Following TSX Delisting to Oversee the Nex...
09/07/2010Appointment of Non-Executive Chairman
15/02/2010Appointment of director
15/09/2009Appointment of Director
Rapports Financiers de Medusa Mining Ltd
21/02/2012: Interim Financial Results
27/04/2011March 2011Quarterly Report
22/02/2011MEDUSA ACHIEVES RECORD HALF-YEAR PROFIT
07/09/2009Records strong 2009 financial results
Projets de Medusa Mining Ltd
08/04/2013(Co-o): Co-O Mill & Mine Expansion Update
21/02/2013(Co-o): Co-O Drilling Update
18/10/2012(Co-o): Co-O Mine Shafts Update
15/08/2012(Co-o): Co-O Mine Geology and Mineralisation Update
10/07/2012(Co-o): Co-O Drilling Update
10/07/2012(Co-o)Limited: Co-O Drilling Update
16/04/2012(Co-o): Co-O Drilling Update
21/03/2012(Co-o): Co-O Operations-Unscheduled Mill Maintenance
05/04/2011(Co-o)Co-O DRILLING CONTINUES HIGH GRADE RESULTS
01/12/2010(Saugon) - Saugon Drilling Expands High-Grade Gold-Silver Potential
30/06/2010(Co-o)Co-O Mine Update
29/03/2010(Co-o)Co-O Mine drilling update
16/03/2010(Co-o)Co-O expanded mill commissionning
17/07/2009(Co-o)Co-O mine reserve now 500 000 ounces
19/01/2009(Co-o) Co-O MINE RESOURCES INCREASED 40% TO 1.2 MILLION OUNCES
01/12/2008MAJOR NEW HIGH GRADE VEIN DISCOVERY
12/08/2008(Co-o)Co-O MINE RESOURCE EXPANSION
07/05/2008(Co-o)WIDE-HIGH GRADE INTERSECTION AT Co-O MINE
26/03/2008(Co-o)Co-O MPSA GRANTED
21/01/2008(Co-o)NEW CATTO VEIN EXTENSIONS DISCOVERED
01/10/2007(Co-o)Co-O Mine Expansion
04/09/2007713,000 resource ounces and growing
15/08/2007CO-O MINE RESOURCE DRILL HOLE RESULTS
09/07/2007New Discoveries
20/06/2007(Anoling)POSITIVE RESULTS FROM ANOLING GOLD PROJECT
16/05/2007(Co-o)Co-O Mine Update
19/03/2007(Anoling)Anoling Gold Project tenements granted
23/05/2006Tambis project exploration, Philippines
Communiqués de Presse de Medusa Mining Ltd
20/06/2016Relocation of Office Premises
09/05/2016Investor Presentation May 2016
06/05/2016Market Briefing May 2016 – Medusa Mining Ltd
02/05/2016Cancellation of Unquoted Securities (Options)
05/04/2016Terms of Appointment of CEO
21/03/2016CEO Appointment
22/01/2016CEO Appointment Update
20/01/2016Exploration Pipeline and Tenement Review
18/01/2016L8 Shaft Upgrade
18/01/2016Mineral Resources and Reserves Statement Addendum to 2014 An...
18/01/2016Cancellation of Unquoted Securities
09/10/2015Notice of Annual General Meeting and Proxy Form
05/10/2015Investor Presentation October 2015
25/09/2015Annual Mineral Resources & Ore Reserve Update Statement
04/09/2015Annual Mineral Resources Update Statement
03/09/2015Asset Impairment of US260M
27/08/2015ASX Appendix 4E and Financial Results for ended year June 30...
27/08/2015Full Year Results 2015
28/07/2015Investor Presentation July 2015
27/07/2015Quarterly Report June 2015
07/07/2015Co-O Mine Service Shaft Update
13/04/2015Investor Presentation April 2015 – Zurich and London
09/04/2015Co-O Mine Geology & Service Shaft Updates
21/01/2015Exploration Pipeline and Tenement Review
16/01/2015L8 Shaft Upgrade
12/01/2015Cancellation of Unquoted Securities
12/01/2015Mineral Resources and Reserves Statement Addendum to 2014 An...
09/12/2014Appendix 3Z – Directors Final Notice (Gary Raymond Powell)
21/11/2014Results of Annual General Meeting November 2014
20/11/2014Executive Appointments
13/02/2014Fatality Underground
13/02/2014Medusa Mining Limited: Fatality Underground
31/01/2014Medusa Mining Limited Quarterly Activities Report: Period En...
28/01/2014Operations Update
28/01/2014Medusa Mining Limited: Operations Update
21/01/2014Operations Update
29/10/2013: Quarterly Activities Report Period Ended 30 September 2013
23/10/2013: SAG Mill Update
04/09/2013: Operations Update-New Mill and Level 8
31/07/2013: Quarterly Activities Report Period Ended 30 June 2013
08/07/2013(Co-o): Co-O Operations Update
02/05/2013: Quarterly Activities Report Period Ended 31 March 2013
15/04/2013: Investor Presentation April 2013
30/10/2012: Quarterly Activities Report Period Ended 30 September 2012
29/08/2012: Full Year Results
06/08/2012(Co-o): Co-O Mine Mineral Resource Update
31/07/2012: Quarterly Activities Report Period Ended 30 June 2012
30/04/2012: Investor Presentation May 2012
24/04/2012: Quarterly Activities Report Period Ended 31 March 2012
10/02/2012: Investor Presentation February 2012
30/01/2012December 2011 Quarterly Report
17/01/2012: Bananghilig Deposit Drilling Update
16/12/2011: Appendix 3B
05/12/2011: Issue of Performance Rights
24/10/2011: Investor Presentation
29/08/2011Achieves Record Full Year Profit
24/08/2011ASX Announcement
22/08/2011(Co-o): Co-O Mine Mineral Reserve Estimate
28/07/2011ASX Announcement - Quarterly Report
25/01/2011- Medusa Quarterly Report
24/05/2010AIM cancellation & admission to the official list
07/05/2010Copper portfolio - Lingig update
08/03/2010Bonus issue of shares
25/01/2010Notice of no corporate associations
09/10/2009Lingig drilling extends mineralisation
12/08/2009ASX Announcement
03/07/2009MML - ASX Ann - S&P/ASX 200 Index
22/06/2009ASX Announcement
01/06/2009MML - ASX Announcement
26/02/2009UNDERWRITTEN A$24.5 MILLION PLACEMENT
28/01/2009Quarterly Report
05/11/2008ASX Announcement
23/09/2008ASX Announcement
19/09/2008Crosby Makes $182 Million Takeover Bid for Medusa Mining
20/08/2008ASX Announcement
25/07/2008ASX Announcement
10/06/2008ASX Announcement
11/04/2008Joint Venture With Bunawan Mining Corporation
14/03/2008Half Year Financial Report – 31 December 2007
25/02/2008IRON ORE TARGETS IDENTIFIED
13/11/2007LINGIG PORPHYRY COPPER DISCOVERY
31/10/2007 QUARTERLY ACTIVITIES REPORT PERIOD ENDING 30 SEPTEMBER 2007
16/08/2007Ambrian Morning Research
01/08/2007Heads of Agreement and Placement with Sierra Mining Ltd
16/07/2007Barobo Mineralised Corridor
13/06/2007 Acquisition of Co-O Mine Royalty
25/05/2007Equity Research
15/05/2007ASX Announcement
30/04/2007Quarterly Report March 2007
21/03/2007Releases
08/03/2007 Dismissal of motion for reconsideration on CO-o mise
13/06/2006appointement of nominated advisor & broker - AIM London
17/05/2006Acquisition of Apical gold project, Philippines
10/04/2006Alternative Investment Market (AIM) London
16/03/2006half year financial report 31 december 2005
30/01/2006Gold Production started, increasing quickly from here
21/01/2006ANALYSIS : MEDUSA MINING
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
AUSTRALIA (MML.AX)TORONTO (MLL.TO)
0,605-15.38%7,43-0.80%
AUSTRALIA
AU$ 0,605
08/07 11:00 -0,110
-15,38%
Cours préc. Ouverture
0,715 0,615
Bas haut
0,600 0,625
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,605 -%
Volume var. 1 mois
123 619 -%
24hGold TrendPower© : -44
Produit
Développe
Recherche Gold
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 02/03/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
2022-14,79%0,950,60
2021-7,79%0,990,66
20200,00%1,070,40
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,75 AU$+0,52%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,11 US$+2,21%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,55 GBX-0,90%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$-8,33%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,47 CA$+3,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,25 CA$-3,42%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$+0,00%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,79 CA$-3,76%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,57 US$+0,84%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,04 AU$+0,00%Trend Power :