Metallurgy Results Indicate Uranium Recoveries Of Up To 94% at Juniper Ridge

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada | Report | Uranium |
Metallurgy Results Indicate Uranium Recoveries Of Up To 94% at Juniper Ridge

October 4, 2012                              

Crosshair Energy Corporation (NYSE MKT: CXZ) (TSX: CXX) (�Crosshair�
or the �Company�) is pleased to announce the results of its 2012 metallurgy testing of mineralized samples from the Juniper Ridge uranium project in southern Wyoming. Total U3O8 extraction from 63 to 94 percent was achieved at a somewhat lower acid consumption than what had been recorded in the historic tests.

�These results are significant because the samples representing the average grade of the mineralized zone achieved an average 77 percent extraction,� said Mark Ludwig, Crosshair President and Chief Executive Officer. �Following these very positive results, additional metallurgical analysis will be conducted to test potential uranium recovery in simulated heap leach conditions.�

Eleven bottle roll tests were completed on five core composite samples representing the high grade (0.2920% and 0.0845% U3O8), average grade (0.0674% U3O8), and low grade (0.0435% and 0.0273% U3O8) mineralized zones from the Juniper Ridge property. The highest uranium extractions of 85 to 93 percent were obtained from the two highest grade composites. Six samples representing the average grade of the resource ranged from 68 to 84 percent with an average extraction of 77 percent. Three tests on the lowest-grade composite yielded uranium extractions ranging from 63% to 77%, the latter resulting from leaching parameters considered to be near-optimum.

Uranium extraction was also determined to be extremely rapid, with essentially all of it taking place during the first four hours. These results are generally consistent with the 89 to 92 percent uranium extractions obtained in 1978 by Hazen Research on finely ground samples from the Juniper Ridge deposit. The primary objective of this 2012 analysis was to assess the metallurgical response of the uranium mineralization from relatively coarse samples (-0.25 in.).

Testing was conducted at Inter-Mountain Labs (IML) in Sheridan, Wyoming, by R and D Enterprises, Inc. of Casper Wyoming, under the supervision of T.P. McNulty and Associates of Tucson, Arizona, all of whom are independent of Crosshair.

About Crosshair
Crosshair is a prominent player in the exploration and development of uranium and vanadium projects in the US and Canada. Its Bootheel and Juniper Ridge projects have established resources and are located in uranium mining friendly Wyoming.  Bootheel has the potential to be mined using in-situ recovery methods while Juniper Ridge appears to be suitable for an open-pit heap leach operation. The CMB Uranium/Vanadium Project is located in Labrador, Canada and has four currently defined resources - C Zone, Area 1, Armstrong and Two Time Zone.  The Crosshair team is composed of knowledgeable and experienced professionals with global experience in exploration, mining and corporate finance that are committed to operating in an environmentally responsible manner.

Mark Ludwig, P.E., President and CEO of Crosshair and a Qualified Person as defined by National Instrument 43-101, has reviewed and approved the technical information contained in this news release. Mr. Ludwig has verified the data disclosed in this news release, including sampling, analytical and test data underlying the information disclosed in this news release.

Additional information about the Juniper Ridge Project can be found in the technical report filed on SEDAR at www.sedar.com entitled: �Juniper Ridge Uranium Project, Carbon County, Wyoming, USA, 43-101 Mineral Resource Technical Report� dated February 21, 2012. For more information on Crosshair and its properties, please visit the website at www.crosshairenergy.com.

ON BEHALF OF THE CROSSHAIR BOARD
"Mark J. Morabito"
EXECUTIVE CHAIRMAN

T: 604-681-8030
F: 604-681-8039
E: info@crosshairenergy.com
www.crosshairenergy.com

For Investor Relations, please call:
Bevo Beaven
720-932-8300

Cautionary Note Regarding Forward-Looking Information
Information set forth in this news release may involve forward-looking statements under applicable securities laws. Forward-looking statements are statements that relate to future, not past, events. In this context, forward-looking statements often address expected future business and financial performance, and often contain words such as "anticipate", "believe", "plan", "estimate", "expect", and "intend", statements that an action or event "may", "might", "could", "should", or "will" be taken or occur, or other similar expressions. Forward-looking statements or information relate to, among other things additional uranium mineralization, uranium recoveries, and the exploration potential of the Company's properties. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the following risks: the risks associated with outstanding litigation, if any; risks associated with project development; the need for additional financing; operational risks associated with mining and mineral processing; fluctuations in uranium and other commodity prices; title matters; environmental liability claims and insurance; reliance on key personnel; the potential for conflicts of interest among certain officers, directors or promoters with certain other projects; the absence of dividends; competition; dilution; the volatility of our common share price and volume; tax consequences to U.S. shareholders and other risks and uncertainties, including those described in the Risk Factors section in the Company�s Annual Report on Form 20-F for the financial year ended April 30, 2012 filed with the Canadian Securities Administrators and available at www.sedar.com. Forward-looking statements are made based on management's beliefs, estimates and opinions on the date that statements are made and the Company undertakes no obligation to update forward-looking statements if these beliefs, estimates and opinions or other circumstances should change, except as required by law. Investors are cautioned against attributing undue certainty to forward-looking statements.
Copyright � 2012 Crosshair Energy Corporation, All rights reserved.
You are receiving this email because you have signed up for our mailing list.

Our mailing address is:
Crosshair Energy Corporation
1240-1140 West Pender St
Vancouver, BC V6E 4G1
Canada

Add us to your address book
  

.
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Metallurg est une société de production minière basée aux Etats-Unis D'Amerique.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Financements de
05/09/2013Radcliff Metallurgical Study Results / 15,000,000 Unit Priva...
Projets de
01/06/2017Plymouth Minerals' Metallurgical Testwork confirms developme...
20/04/2017Trilogy Metals Announces Metallurgical, Geotechnical and Hyd...
06/04/2017Plymouth Minerals Reports Exceptional Metallurgical Results ...
15/03/2017KTN.v Reports Follow Up Metallurgical Leach Testing Underway
15/03/2017KOOTENAY REPORTS FOLLOW UP METALLURGICAL LEACH TESTING UNDER...
07/03/2017Corazon Mining Reports 7.38% Cobalt Concentrate at Mt Gilmor...
07/02/2017Metallurgical Testing and Drill Data at Bullfrog Golds Nevad...
22/01/2017KOOTENAY REPORTS METALLURGICAL TESTING ON LA CIGARRA DEPOSIT...
22/08/2016Metals of Africa reports further High Grade Metallurgical Re...
08/06/2016Metals of Africa reports exceptional Metallurgical Results a...
21/04/2016Pilot Gold Commences Core Drilling and Metallurgical Program...
30/09/2015Balmoral Reports Positive Metallurgical Results From Initial...
24/11/2014WPG completes metallurgical sampling program at Tarcoola gol...
28/10/2014Global Recoveries of 94.6% Gold and 97.8% Copper Realized in...
20/08/2014Borborema Gold Project - Drilling, Metallurgy and Optimisati...
27/06/2014Freegold Announces Positive Metallurgical Test Results Golde...
05/05/2014Gruyere Metallurgical Testing Delivers High Recoveries
11/10/2013Released ASX Announcement: Positive Metallurgy Results - Pil...
04/09/2013New Talisman Stock Exchange Release today - Maiden Ore Reser...
01/08/2013Natougou Gold Deposit - Positive Metallurgical Test Results
18/07/2013Melkior Reports 95% Gold Recovery from Preliminary Metallurg...
24/04/2013Melkior Reports 87% Gold Recoveries from Preliminary Metallu...
28/01/2013FURTHER METALLURGICAL TESTING ON NEW LIBERTY ORE
11/12/2012International Tower Hill Announces Positive Metallurgical T...
16/08/2012Advanced Explorations Inc. Metallurgical Pilot Plant Test Re...
24/07/2012European Uranium Completes Metallurgical Drilling Program at...
15/05/2012Excellent metallurgical gold recoveries confirmed & final pl...
12/04/2012Focus Metals Releases Update on Lac Knife Metallurgical Test...
29/02/2012Rogue Iron Ore Commences Metallurgical Testing On Radio Hil...
Communiqués de Presse de
06/03/2017Vendetta's Metallurgical Test Work Yields Excellent Recoveri...
01/03/2017Wellgreen Platinum Ltd. - Wellgreen Platinum Announces Resul...
10/02/2017Wellgreen Platinum Ltd. - Wellgreen Platinum Announces Compl...
04/08/2016Pilot Gold =E2?? RC=2FCore Drill Results & Metallurgical Upd...
25/01/2016Lundin Gold Announces Positive Metallurgical Results at Frut...
22/10/2015KOOTENAY REPORTS POSITIVE RESULTS AND HIGH RECOVERY RATES FR...
17/09/2015Pilot Gold reports metallurgical results from Valley Porphy...
13/07/2015Pilot Gold reports metallurgical results from upper gold hos...
29/07/2014Asanko Gold Announces Positive Metallurgical Results from Dy...
06/03/2014Lexam Preliminary Metallurgical Work Yields Ex =?ISO-8859-1?...
03/02/2014Exceptional Metallurgical Test Results from Gruyere Prospect
29/01/2014Northern Vertex Provides Metallurgical Update for Phase I - ...
18/07/2013Melkior Resources reports 95% gold recovery from preliminary...
12/07/2013Positive 7B Metallurgical Tests
05/07/2013Northern Vertex Advises Metallurgical Results on Low Grade M...
02/07/2013Metallurgical Results For Crucero Gold Project's A-1 Zone
02/07/2013Silver Bull Announces Updated Metallurgical Test Results On ...
30/05/2013Brewery Creek\222s Metallurgical...
01/05/2013Goldrock News Release =2D Arizaro Metallurgical Results
13/03/2013McEwen Mining Los Azules Metallurgical Update
14/02/2013Metallurgy Tests Return Favourable Results for In=2DSitu Rec...
11/12/2012Preliminary Metallurgical Recoveries Exceed 95%
26/10/2012Quest Engages Hatch to Undertake Advanced Metallurgical and
16/10/2012Aldridge - Aldridge Confirms Metallurgical Performance
04/10/2012Metallurgy Results Indicate Uranium Recoveries Of Up To 94% ...
27/09/2012Moneta Announces Positive Metallurgical Results on Golden Hi...
20/09/2012Metallurgical Developments Continue to Advance and De-Risk P...
30/07/2012Positive Metallurgical Results for Crater Mountain, PNG
15/05/2012Quest Completes Bulk of Phase II Metallurgical Testwork: Pro
10/05/2012SGS Mineral Services Metallurgical Test Results
01/12/2011Aldridge - Aldridge Minerals Announces Results of Yenipazar ...
11/10/2011Encouraging Metallurgical Testwork at Fekola [Papillon Reso...
16/08/2011METALLURGY OF THE ROSE DEPOSIT LITHIUM RECOVERY OF 90.7% AT ...
25/05/2011Quest Reviews Rare Earth Element Mineralogy and Metallurgy o
18/05/2011METALLURGICAL TESTWORK INDICATES POTENTIAL FOR SINTER FINES ...
15/02/2011Preliminary Metallurgical Testwork Yields Excellent Results
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
Cours préc. Ouverture
Bas haut
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  - -
Volume var. 1 mois
-
Produit
Développe
Recherche
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,82 AU$+1,69%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,04 US$+1,38%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,54 GBX-2,53%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,52 CA$+6,78%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
16,05 CA$+2,62%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+2,13%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,19 AU$-7,32%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,90 CA$+1,60%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
51,43 US$-0,46%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+0,00%Trend Power :