Fermer X Les cookies sont necessaires au bon fonctionnement de 24hGold.com. En poursuivant votre navigation sur notre site, vous acceptez leur utilisation.
Pour en savoir plus sur les cookies...
AnglaisFrancais
Cours Or & Argent en

Metanor Resources Inc.

Publié le 28 octobre 2014

METANOR REPORTS ITS FINANCIAL RESULTS FOR THE QUARTER AND YEAR ENDED JUNE 30TH, 2014 WITH A NET INCO

( 0 vote, 0/5 ) Imprimer l'article
  Article Commentaires Commenter Notation Suivre la société  
0
envoyer
0
commenter
Mots clés associés :   Canada |

METANOR REPORTS ITS FINANCIAL RESULTS FOR THE QUARTER AND YEAR ENDED JUNE 30TH, 2014 WITH A NET INCO

Publish on 10-27-2014
METANOR REPORTS ITS FINANCIAL RESULTS FOR THE QUARTER AND YEAR ENDED JUNE 30TH, 2014 WITH A NET INCO

October 27, 2014 - Val-d'Or, Quebec, Canada: Metanor Resources Inc. ("Metanor") (TSX - V: MTO) is pleased to report on its financial results and accompanying notes for the quarter and year ending June 30th 2014 (Q4).  This press release should be read in conjunction with Metanor's financial statement for the year ended June 30th 2014 and related Management's Discussion and Analysis (MD&A), which can be found on the Company website www.metanor.ca or on SEDAR www.sedar.com.  All amounts are in Canadian dollars unless otherwise stated.

Q4 2014 Highlights  

  • Gold sales of 12,468 ounces on gold production of 13,083 ounces.
  • Total of $16,523,725 in revenues from gold sales.
  • Net Income of $ 1,078,441 for the quarter. 
  • Milled 61,905 tonnes of ore at a feed grade of 6.8 g/T and a recovery of 96.9%.
  • Cash Cost of $873 per ounce sold in Q4 (US$786/oz at an exchange rate of US$0.90/CA$1.00).
  • Sustaining cost of CND$1,051 per ounce sold (US$946/oz using an exchange rate of US$0.90/CND$1.00).
  • All-In cost of $1,123 per ounce sold in Q4 (US$ 1,010/oz at an exchange rate of US$0.90/CA$1.00).

Full-Year 2014 Highlights 

  • Total of $38,488,620 in revenues from gold sales.
  • Net loss of  $2,875,391 for the year. 
  • Cash Cost of $908 per ounce sold(US$817/oz at an exchange rate of US$0.90/CA$1.00).
  • Sustaining cost of CND$1,071 per ounce sold (US$964/oz using an exchange rate of US$0.90/CND$1.00).
  • All-In cost of $1,195 per ounce sold (US$ 1,076/oz at an exchange rate of US$0.90/CA$1.00).

Operating and financial results

Quarter ended

June 30th 2014

Quarter ended

March 31st 2014

Quarter ended

December 31st 2013*

Quarter ended

September 30th 2013

Year total

Operational results

Tonnes milled (Tonnes)

61,905

60,497

62,033

55,591

240,026

Feed grade (g/T)

6.8

6.7

6.6

6.0

6.52

Mill recovery rate

96.9%

96.8%

97.5%

97.1%

97.1%

Ounces produced

13,083

12,641

12,751

10,373

48,848

Ounces sold

12,468

13,700

10,427

10,269

46,864

Underground development (metres)

1,411

1,751

1,492

1,277

5,931

Diamond drilling (metres)

17,374

10,550

9,164

7,237

44,325

Financial results                 (Thousand dollars)

Gold Sales

16,524

18,408

3,557

0

38,489

Operating Costs

(10,632)

(12,833)

(2,221)

0

(25,686)

Royalties

(271)

(333)

(117)

0

(721)

Depreciation & Depletion

(2,894)

(4,609)

(1,070)

0

(8,573)

Gross Profit

2,726

633

149

0

3,508

Net Results

1,078

(1,919)

(410)

(1,624)

(2,875)

*As of December 1st 2013, the Bachelor Mine reached commercial production status.

Ghislain Morin, president and chief executive officer, and Serge Roy, executive chairman of the board, declared: « We are very pleased with our quarterly results which show that Metanor generates positive income, and improves its financial situation while continuing its underground drilling and development at the Bachelor Mine. »

Outlook for the coming quarters 

 Metanor continues to develop new drifts to the west at the Bachelor Mine and will continue the diamond drilling in the coming months  to eventually add new resources and reserves.

About Metanor

Metanor is a Canadian based gold mining company with a focus on adding value per share through efficient production, exploration, and development of it properties.

Qualified Person

Pascal Hamelin, P.Eng, Vice-president of Operations, is the Qualified Person under NI 43-101 responsible for reviewing and approving the technical information contained in this news release.

Cautionary Language and Forward-Looking Statements

This press release includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future exploration drilling, exploration activities, anticipated metal production, internal rate of return, estimated ore grades, commencement of production estimates and projected exploration and capital expenditures (including costs and other estimates upon which such projections are based) and events or developments that the Company expects, are forward looking statements. Although the Company believes the expectations expressed in such forward looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in forward-looking statements.

Neither the TSX Venture Exchange, nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

For more information, please contact:

Ronald Perry, Vice-President, Contact: 514-262-8286, Email: [email protected].



Lire la suite de l'article sur www.noodls.com
Données et statistiques pour les pays mentionnés : Canada | Tous
Cours de l'or et de l'argent pour les pays mentionnés : Canada | Tous

Metanor Resources Inc.

EXPLORATEUR
CODE : MTO.V
ISIN : CA59138Q1037
Suivi et investissement
Add to watch list Add to your portfolio Add or edit a note
Ajouter une alerte Ajouter aux Watchlists Ajouter au portefeuille Ajouter une note
ProfilIndicateurs
de Marché
VALEUR :
Projets & res.
Communiqués
de Presse
Rapport
annuel
RISQUE :
Profile actifs
Contactez la cie

Metanor est une société d’exploration minière d'or et de palladium basée au Canada.

Metanor détient divers projets d'exploration au Canada.

Ses principaux projets en exploration sont NELLIGAN, OPINACA, VASSAN, WAHNAPITEI, BARRY, BACHELOR LAKE / HEWFRAN et DUBUISSON au Canada.

Metanor est cotée au Canada, aux Etats-Unis D'Amerique et en Allemagne. Sa capitalisation boursière aujourd'hui est 36,4 millions CA$ (28,1 millions US$, 23,9 millions €).

La valeur de son action a atteint son plus haut niveau récent le 31 décembre 2007 à 1,37 CA$, et son plus bas niveau récent le 29 janvier 2016 à 0,03 CA$.

Metanor possède 62 820 000 actions en circulation.

Votre avis nous interesse, merci de laisser un commentaire ou de noter cet article.
Evaluer : Note moyenne :0 (0 vote) Voir les mieux notés
 
Dans les médias de Metanor Resources Inc.
17/09/2007Mill to Turn
26/01/2007Still Mad About Metanor
12/07/2006Mad about Metanor
Financements de Metanor Resources Inc.
23/02/2015Announces Amendment to Outstanding Convertible Debentures a...
14/06/2013Closes Second Tranche of Increased Private Placement
28/02/2011CLÔTURE D'UN PLACEMENT PRIVÉ DE 7 095 850$
21/02/2011CLOSING OF A PRIVATE PLACEMENT OF $7,095,850
Nominations de Metanor Resources Inc.
31/05/2007 Hires Mr. C. Imbeault As General Manager And Updates Booste...
Rapports Financiers de Metanor Resources Inc.
04/04/2011METANOR RECEIVES US$9M FROM SANDSTORM
Projets de Metanor Resources Inc.
06/10/2016(Bachelor Lake / Hewfran)MeTANOR RECOUPE 12,0 g/t Au SUR 3,9 M?TRES DANS UN NOUVEAU S...
13/07/2016(Barry)Etude technico economique pour le projet Barry
30/06/2016RECOUPE 10,4 g/t Au SUR 8,8 MeTRES a LA MINE BACHELOR
12/04/2016Publish on 04-12-2016 Metanor begins drilling campaign to up...
29/01/2014Radio Show on Metanor Resources
27/01/2014s on Metanor Resources Inc
20/08/2013MarketWatch on Metanor Resources
01/06/2011(Barry)METANOR DRILLED A NEW GOLD HORIZON AT BARRY
26/04/2011(Bachelor Lake / Hewfran)BACHELOR LAKE PROJECT UPDATE
06/04/2011(Bachelor Lake / Hewfran)ENCOURAGING RESULTS ON THE NEW GOLD ZONE AT BACHELOR/HEWFRAN
20/06/2008(Barry)BARRY PIT IS GROWING: Encouraging Positive Preliminary Resul...
14/06/2007(Bachelor Lake)Surface Stripping Begins - Bachelor Lake Property
Communiqués de Presse en Français de Metanor Resources Inc.
30/03/2011METANOR REÇOIT 9 MILLIONS DE DOLLARS US DE SANDSTORM
Communiqués de Presse de Metanor Resources Inc.
30/06/2016Publish on 06-30-2016 METANOR INTERSECTS 10.4 g/t Au OVER 8....
23/06/2016Publish on 06-23-2016 METANOR INCREASES TOTAL OUNCES IN NEW ...
14/06/2016Publish on 06-13-2016 METANOR DISCOVERS NEW GOLD ZONES ON TH...
19/05/2016Publish on 05-19-2016 METANOR INTERSECTS 2.3 g/t Au OVER 60M...
12/05/2016Publish on 05-11-2016 METANOR INTERSECTS 2.1 g/t Au OVER 40M...
27/04/2016Publish on 04-27-2016 METANOR CONFIRMS HIGH GRADE EXTENSION ...
27/04/2016Publish on 04-20-2016 Metanor confirms the extension of the ...
21/01/2016Publish on 01-21-2016 METANOR INTERSECTS 7.5 g/t Au OVER 7.2...
21/01/2016Metanor Intersects 7.5 g/t Au Over 7.2 m at Bachelor Mine
21/01/2016Publish on 01-20-2016 METANOR PUBLISHES THE RESULTS FROM THE...
20/01/2016Metanor Publishes the Results From the Geophysic Survey on t...
17/12/2015Publish on 12-17-2015 METANOR INTERSECTS 5.4 g/t Au OVER 10....
17/12/2015Metanor Intersects 5.4 g/t Au Over 10.0 Meters on the Moroy ...
29/10/2015Metanor Intersects 6.7 g/t Au Over 38.4 Meters Near Surface
28/10/2015Metanor Reports its Financial Results for the Quarter and Ye...
27/10/2015Publish on 10-27-2015 METANOR CONFIRMS THE DISCOVERY OF A NE...
22/09/2015Publish on 09-22-2015 METANOR INTERSECTS 10.1 g/t Au OVER 26...
22/09/2015IIROC Trading Resumption - MTO
22/09/2015Metanor Intersects 10.1 g/t Au Over 26.2 Meters Near Surface
21/09/2015IIROC Trading Halt - MTO
16/09/2015Publish on 09-16-2015 METANOR INTERSECTS 7.2 g/t OVER 8.1 ME...
15/09/2015Metanor Intersects 7.2 g/t Over 8.1 Meters at Bachelor Mine
10/08/2015Publish on 07-17-2015 METANOR PRODUCED 10,277 OUNCES DURING ...
10/08/2015Publish on 08-06-2015 METANOR INTERSECTS 10.2 g/t OVER 13.1 ...
10/08/2015Publish on 07-30-2015 METANOR INTERSECTS 12 g/t OVER 3.25 ME...
10/08/2015Publish on 08-10-2015 METANOR REPORTS A FATAL ACCIDENT AT IT...
30/07/2015Metanor Intersects 12 g/t Over 3.25 Meters at Bachelor Mine
29/07/2015Metanor Intersects 11.9 g/t Au Over 11.85 Meters at Bachelor...
17/07/2015Metanor Produced 10,277 Ounces During Quarter Ended June 30t...
25/06/2015IIROC Trading Resumption - MTO
22/06/2015Publish on 06-02-2015 METANOR PROVIDES UPDATE
22/06/2015Metanor Intersects 22.85 g/T Over 4.04 Meters at Bachelor Mi...
09/04/2015Metanor Reports Larger Intersection With 6.14 g/t Over 15 Me...
30/03/2015Intersects 8.64 g/T Over 5.8 Meters at Bachelor Mine
27/03/2015Metanor Resources Inc.: Maturity Date of Debentures Extended...
20/03/2015Metanor: Update on Private Placement
17/03/2015Publish on 03-12-2015 NEW GOLD CORRIDOR AT BACHELOR MINE
17/03/2015Publish on 03-17-2015 METANOR INTERSECTS 6.1 g/T OVER 6.8 ME...
17/03/2015Metanor Intersects 6.1 g/T Over 6.8 Meters at Bachelor Mine
17/03/2015Intersects 6.1 g/T Over 6.8 Meters at Bachelor Mine
12/03/2015Metanor Resources Inc.: New Gold Corridor at Bachelor Mine
09/03/2015Publish on 02-27-2015 METANOR REPORTS ITS FINANCIAL RESULTS ...
09/03/2015Publish on 02-24-2015 METANOR ANNOUNCES AMENDMENT TO CONVERT...
07/03/2015METANOR ANNOUNCES AMENDMENT TO CONVERTIBLE DEBENTURES AND PR...
27/02/2015Metanor Reports its Financial Results for the Quarter Ended ...
23/02/2015Metanor Announces Amendment to Outstanding Convertible Deben...
13/02/2015Metanor Produces 3,425 Ounces During the Month of January
19/01/2015METANOR PRODUCED 8,332 OUNCES DURING THE QUARTER ENDING DECE...
19/01/2015Metanor Produced 8,332 Ounces During the Quarter Ending Dece...
28/11/2014Metanor Reports its Financial Results for the Quarter Ended ...
28/10/2014METANOR REPORTS ITS FINANCIAL RESULTS FOR THE QUARTER AND YE...
27/10/2014Metanor Reports its Financial Results for the Quarter and Ye...
10/10/2014Metanor Produces 11,598 Ounces During the Quarter Ended Sept...
08/10/2014METANOR intersected 25.80 g/t Au over 5.6 m at Barry
18/09/2014Metanor Resources Inc.: Grant of Incentive Options
15/09/2014Metanor Resources Inc.: Corporate Update
15/08/2014Metanor Expands its "B" Vein Above Level 10 by Intersecting ...
15/08/2014Metanor Resources Inc.: Corporate Update
10/07/2014Metanor Produces 13,083 Ounces of Gold During the Quarter En...
05/06/2014Record Production at Bachelor Mine; Metanor Produces 5,202 O...
20/02/2014Communiqu=C3=A9 de presse - 20 f=C3=A9vrier 2
06/02/2014Communiqu=C3=A9 de presse - 6 f=C3=A9vrier 20
23/01/2014Communiqu=C3=A9 de presse - 23 janvier 2014
13/01/2014Article on Metanor - Sector Newswire
09/01/2014Communiqu=C3=A9 de presse - 9 janvier 2014
16/12/2013Article on Metanor - Sector Newswire
11/12/2013Communiqu=C3=A9 de presse -11 d=C3=A9cembre 2013
18/11/2013Article on Metanor - Sector Newswire
14/11/2013BNN Commodities Show
08/11/2013Communiqu=C3=A9 de presse - 7 novembre 201
21/10/2013MarketWatch - The Wall Street Journal
17/10/2013Produces 3,231 Ounces in September at Bachelor
07/10/2013Sector Newswire
07/10/2013Communiqu=C3=A9 de presse - 7 octobre 2013
07/10/2013(Barry)Initiates a 15,000 Meter Drill Program at Barry
23/09/2013Communiqu=C3=A9 de presse - 23 septembre 2013
23/09/2013(Barry)Commencement of 30,000 Meter Drill Program at BACHELOR and B...
04/09/2013Intersects 17.66 g/t Over 12.55 m at Bachelor
23/08/2013Communiqu=C3=A9 de presse - 20 ao=C3=BBt 2013
13/08/2013Sector Newswire - August 9, 2013
13/08/2013Precious Metals Review, August 9, 2013
30/07/2013Communiqu=C3=A9 de presse - 30 Juillet 2013
11/07/2013Communiqu=C3=A9 de presse - 14 Juillet 2013
11/07/2013Produces a Monthly Record of 3,215 Ounces in June
17/06/2013Communiqu=C3=A9 de presse - 14 Juin 2013
29/05/2013Communiqu=C3=A9 de presse - Mai 2013
29/05/2013May 2013
29/05/2013Intersects 8.49 g/T Over 15.24 m, and 14.17 g/T Over 5.64 m ...
22/05/2013Provides Bachelor Project Update
08/05/2013s Bylaws With Advance Notice Requirement for Director Nomina...
29/04/2013Provides Bachelor Project Update and Intersects 7.57 g/T Ove...
02/04/2013News Release
28/03/2013Video - Ron Perry - Metanor
19/02/2013Pours Record Gold Bar of 868 Oz
07/02/2013Produces 2,236 oz of Gold in January at its Bachelor Project
28/01/2013TR: Latest Article regarding Metanor on WSJ Marketwatch.com
21/01/2013Intersects 29.63 g/t Over 4.42m, 14.79 g/t Over 14.02m and 1...
14/01/2013TR: Metanor article in Northern Miner
11/12/2012Produces 1,715 Oz in November vs 1,250 Oz in October at the ...
13/11/2012Continues the Development of the Bachelor Project Toward Com...
17/10/2012Continues to Pour Gold at Bachelor-97.4% Recovery at the Mil...
26/09/2012Announces the Signing of a Socio-Economic Participation Agre...
21/09/2012Grants Stock Options
14/09/2011Latest Article on Metanor
06/09/2011TR: latest article on the web
06/09/2011TR: Latest Industrial Alliance CoreTalk on MTO
26/08/2011TR: Latest NEWS Release on Metanor send to our mailing list ...
16/06/2011Communiqu=E9 de presse - METANOR
14/06/2011LATEST METANOR VIDEO
09/06/2011Latest featured note on Metanor
04/02/2010Analyst Coverage
20/02/2009Interview with Ronald Perry, VP & Treasurer of Metanor Resou...
28/11/2007Update of the Bulk Sampling at the Barry Deposit
30/10/2007 Receives Positive Preliminary Economic Assessment on Barry ...
23/10/2007Higher grades at the Barry Deposit
11/10/2007 Bulk Sampling has begun at the Barry Open Pit
28/09/2007Adoption of a Shareholder Rights Plan, modification of the S...
06/09/2007acquires more properties and Renegotiates NSR royalties
04/09/2007now holds 100% of Bachelor Property / Update on Bachelor and...
08/05/2007Re-Evaluates The Barry Gold Deposit
14/03/2007Update: Refurbishing of the Bachelor Lake Gold Mill
Publication de commentaires terminée
 
Dernier commentaire publié pour cet article
Soyez le premier à donner votre avis
Ajouter votre commentaire
TSX-V (MTO.V)FRANKFURT (M3R.F)
0,580+0.00%0,070+20.69%
TSX-V
CA$ 0,580
25/09 16:54 -
0%
Cours préc. Ouverture
0,580 0,580
Bas haut
0,580 0,610
Année b/h Var. YTD
 -  -
52 sem. b/h var. 52 sem.
- -  0,580 -%
Volume var. 1 mois
232 400 -%
24hGold TrendPower© : -11
Produit
Développe
Recherche Cobalt - Gold - Nickel
 
 
 
Analyse
Interactive chart Add to compare
Graphique
interactif
Imprimer Comparer Exporter
Dernière mise à jour le : 03/12/2010
Vous devez être connecté pour accéder au portefeuille (gratuit)
Top Newsreleases
LES PLUS LUS
Variation annuelle
DateVariationMaxiMini
 
Graphique 5 ans
 
Graphique 3 mois
 
Graphique volume 3 mois
 
 
Nouvelles des Sociétés Minières
Plymouth Minerals LTDPLH.AX
Plymouth Minerals Intersects Further High Grade Potash in Drilling at Banio Potash Project - Plannin
0,12 AU$-8,00%Trend Power :
Santos(Ngas-Oil)STO.AX
announces expected non-cash impairment
7,73 AU$-1,90%Trend Power :
Oceana Gold(Au)OGC.AX
RELEASES NEW TECHNICAL REPORT FOR THE HAILE GOLD MINE
2,20 AU$+0,00%Trend Power :
Western Areas NL(Au-Ni-Pl)WSA.AX
Advance Notice - Full Year Results Conference Call
3,86 AU$+0,00%Trend Power :
Canadian Zinc(Ag-Au-Cu)CZN.TO
Reports Financial Results for Q2 and Provides Project Updates
0,12 CA$+4,55%Trend Power :
Stornoway Diamond(Gems-Au-Ur)SWY.TO
Second Quarter Results
0,02 CA$+100,00%Trend Power :
McEwen Mining(Cu-Le-Zn)MUX
TO ACQUIRE BLACK FOX FROM PRIMERO=C2=A0
11,26 US$-0,53%Trend Power :
Rentech(Coal-Ngas)RTK
Rentech Announces Results for Second Quarter 2017
0,20 US$-12,28%Trend Power :
KEFIKEFI.L
Reduced Funding Requirement
0,58 GBX-0,35%Trend Power :
Lupaka Gold Corp.LPK.V
Lupaka Gold Receives First Tranche Under Amended Invicta Financing Agreement
0,06 CA$+0,00%Trend Power :
Imperial(Ag-Au-Cu)III.TO
Closes Bridge Loan Financing
2,49 CA$-0,40%Trend Power :
Guyana Goldfields(Cu-Zn-Pa)GUY.TO
Reports Second Quarter 2017 Results and Maintains Production Guidance
1,84 CA$+0,00%Trend Power :
Lundin Mining(Ag-Au-Cu)LUN.TO
d Share Capital and Voting Rights for Lundin Mining
15,41 CA$-1,34%Trend Power :
Canarc Res.(Au)CCM.TO
Canarc Reports High Grade Gold in Surface Rock Samples at Fondaway Canyon, Nevada
0,24 CA$+0,00%Trend Power :
Havilah(Cu-Le-Zn)HAV.AX
Q A April 2017 Quarterly Report
0,20 AU$-2,38%Trend Power :
Uranium Res.(Ur)URRE
Commences Lithium Exploration Drilling at the Columbus Basin Project
6,80 US$-2,86%Trend Power :
Platinum Group Metals(Au-Cu-Gems)PTM.TO
Platinum Group Metals Ltd. Operational and Strategic Process ...
1,72 CA$-0,86%Trend Power :
Devon Energy(Ngas-Oil)DVN
Announces $340 Million of Non-Core Asset Sales
52,68 US$-1,39%Trend Power :
Precision Drilling(Oil)PD-UN.TO
Announces 2017Second Quarter Financial Results
8,66 CA$-0,35%Trend Power :
Terramin(Ag-Au-Cu)TZN.AX
2nd Quarter Report
0,03 AU$+3,03%Trend Power :